Active Building Code Administration Project Inspection Results

BCA Project #: 25-03700- Westcott -0001 Rooms 0313Q & 0315 Modifications
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/10/16 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | |
| 2026/09/25 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | ***Add Escutcheon plates for Final Fire Sprinkler |
| 2026/09/25 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | |
| 2026/09/25 | Mechanical | Final Mechanical | Passed | Paul Nitz | |
| 2026/09/25 | Electrical | Final Electrical | Passed | Paul Nitz | |
| 2026/03/24 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | This is a partial rough in for electrical in room 315 see wall rough |
| 2026/03/24 | Building/Structural | Framing | Failed | Rocky Wilde | This is a partial rough in for electrical in room 315 additional anchors required |
| 2026/03/24 | Electrical | Wall Rough-in | Conditional | Rocky Wilde | This is a partial rough in for electrical in room 315 juction box behind wall needs to be accessible, deleted boxes and conduit needs to be removed, open conduit needs to be capped, label juction boxes, |
| Mechanical | Duct Rough-in | Paul Nitz | |||
| Electrical | Ceiling Rough-in | Paul Nitz | |||
| Electrical | Wall Rough-in | Paul Nitz |

BCA Project #: 25-03695- Alumni Ctr Fac - 0465 Renovate RM 145
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/08/11 | Fire Safety | Final Fire Sprinkler | Conditional | Curtis Rogers | Good afternoon Can I set up a fire suppression final inspection for tomorrow morning as early as possible Thank you, David Zigler 850-354-1368 Project Superintendent Ram Construction and Development LLC |
| 2026/08/10 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | Can I setup 4 different inspections for tomorrow 1- fire suppression partial final 10am 2- overhead HVAC ductwork 10am 3- above ceiling fire suppression final 3 pm 4- above ceiling electrical 3pm Thank you, David Zigler 850-354-1368 Project Supe open boxes |
| 2026/08/07 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | Good afternoon Can I set up a fire alarm final and an above ceiling re inspection for Monday 8/10 at 11am Thank you, David Zigler 850-354-1368 Project Superintendent Ram Construction and Development LLC |
| 2026/08/07 | Fire Safety | Final Fire Sprinkler | Partial | Curtis Rogers | Can I setup 4 different inspections for tomorrow 1- fire suppression partial final 10am 2- overhead HVAC ductwork 10am 3- above ceiling fire suppression final 3 pm 4- above ceiling electrical 3pm Thank you, David Zigler 850-354-1368 Project Supe |
| 2026/08/07 | Mechanical | Above Ceiling | Passed | Rocky Wilde | overhead HVAC ductwork |
| 2026/08/07 | Fire Safety | Final Fire Sprinkler | Partial | Curtis Rogers | Can I setup 4 different inspections for tomorrow 1- fire suppression partial final 10am 2- overhead HVAC ductwork 10am 3- above ceiling fire suppression final 3 pm 4- above ceiling electrical 3pm Thank you, David Zigler 850-354-1368 Project Supe |
| 2026/08/07 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | Good afternoon Can I set up a fire alarm final and an above ceiling re inspection for Monday 8/10 at 11am Thank you, David Zigler 850-354-1368 Project Superintendent Ram Construction and Development LLC |
| 2026/07/22 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed drywall attachment to LG framing |
| 2026/07/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for new ceilings and one wall location |
| 2026/07/16 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed drywall attachment to LG ceiling/soffit framing |
| 2026/07/14 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for soffits located near doors and windows. |
| 2025/12/17 | Building/Structural | Final Building | Partial | Paul Nitz | TCO inspection for conclusion of Phase 1 |
| 2025/12/17 | Building/Structural | Final Building | Partial | Rocky Wilde | TCO inspection for conclusion of Phase 1 |
| 2025/12/17 | Building/Structural | Final Building | Partial | Rocky Wilde | TCO inspection for conclusion of Phase 1, closet areas are closed off unable to inspect the elctrical. |
| 2025/11/19 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | |
| 2025/10/30 | Building/Structural | Sheetrock | Conditional | Kody Boswell | Reviewed interior sheathing attachment to LG framing. Result is condtional pending receipt of photos from the Contractort showing screws were added in two areas that were missing at the time of inspection. |
| 2025/10/28 | Electrical | Wall Rough-in | Passed | Rocky Wilde | |
| 2025/10/28 | Building/Structural | Framing | Conditional | Paul Nitz | framing pics |

BCA Project #: 24-03684-D FSU Lacrosse Facility - Press Box/Concessions
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/08/19 | Electrical | Final Electrical | Passed | James Melvin | |
| 2026/08/19 | Electrical | Final Electrical | Passed | James Melvin | |
| 2026/08/18 | Fire Safety | Final Fire Alarm | Conditional | Curtis Rogers | |
| 2026/08/18 | Fire Safety | Final Egress/Emergency Lights | Passed | Curtis Rogers | |
| 2026/08/18 | Fire Safety | Final Fire Safety | Conditional | Curtis Rogers | |
| 2026/08/17 | Building/Structural | Final Building | Conditional | Kody Boswell | Final building inspection. Result is conditional approval pending the following being addressed/corrected: - Two entrance doors to the press area must be adjusted so door close time takes 5 seconds minimum. - Two exterior restrooms (men & women) must be adjusted so door close time takes 5 seconds minimum. FBC (Accessibility) Section 404.2.8.1 |
| 2026/08/11 | Mechanical | Final Mechanical | Passed | Paul Nitz | |
| 2026/08/11 | Plumbing | Final Plumbing | Passed | Paul Nitz | |
| 2026/08/08 | Plumbing | Final Plumbing | Conditional | Rocky Wilde | 1) Plumbing Final re-inspection (both buildings) 2) Mechanical Final re-inspection (both buildings) 3) Electrical Final inspection (Clubhouse only) – UE is requesting this be in the afternoon 4) Emergency Lighting Final Inspection (Clubhouse only) – UE is requesting this be in the afternoon. Please let us know when you will be able to come out. |
| 2026/08/07 | Mechanical | Final Mechanical | Conditional | Rocky Wilde | 1) Plumbing Final re-inspection (both buildings) 2) Mechanical Final re-inspection (both buildings) 3) Electrical Final inspection (Clubhouse only) – UE is requesting this be in the afternoon 4) Emergency Lighting Final Inspection (Clubhouse only) – UE is requesting this be in the afternoon. Please let us know when you will be able to come out. |
| 2026/07/30 | Fire Safety | Final Fire Alarm | Partial | Curtis Rogers | |
| 2026/07/17 | Fire Safety | Final Fire Safety | Cancelled | Curtis Rogers | NOT READY! |
| 2026/07/17 | Electrical | Final Electrical | NOT READY | Rocky Wilde | |
| 2026/07/17 | Mechanical | Equipment | NOT READY | Paul Nitz | |
| 2026/07/17 | Building/Structural | Final Building | NOT READY | Paul Nitz | |
| 2026/07/17 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | |
| 2026/07/17 | Mechanical | Re-Inspection | NOT READY | Paul Nitz | |
| 2026/07/15 | Plumbing | Final Plumbing | NOT READY | Paul Nitz | (please correct me if I’m wrong, but I feel like we did this already in order for the public to use the bathrooms during the season |
| 2026/07/15 | Mechanical | Final Mechanical | NOT READY | Paul Nitz | |
| 2026/07/08 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | missing two exit signs, exit sign in corridor needs to be relocated |
| 2026/07/07 | Fire Safety | Fire Alarm Rough-In | Partial | Curtis Rogers | clubhouse 2 exit signs missing, one in corridor needs to relocated |
| 2026/03/27 | Building/Structural | Re-Inspection | Passed | Kody Boswell | TCO for 3/29/26 game day. |
| 2026/03/13 | Building/Structural | Re-Inspection | Conditional | Rocky Wilde | TCO for Game Day bon 3/14/26 |
| 2026/02/23 | Building/Structural | Final Building | Passed | Rocky Wilde | Event TCO for Press Box |
| 2026/02/23 | Building/Structural | Re-Inspection | Passed | Rocky Wilde | Event TCO for Press Box |
| 2026/02/20 | Electrical | Re-Inspection | Passed | Rocky Wilde | re-inspection Bathroom E Rough at PM interior. |
| 2026/02/20 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | re-inspection Bathroom E Rough at PM interior. |
| 2026/02/19 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Hard lid E rough at bathroom of PB |
| 2026/02/16 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Above ceiling Mechanical only... |
| 2026/02/16 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | E rough for hard ceiling cover. 2- exterior soffits 2 interior soffits |
| 2026/02/12 | Building/Structural | Framing | Passed | Paul Nitz | Couple of walls in PB back side corridor |
| 2026/02/12 | Electrical | Final Electrical | Passed | Rocky Wilde | Temp Clubhouse Double wide. Power panel connect. |
| 2026/02/12 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection for sheetrock mud. Press Box |
| 2026/02/06 | Building/Structural | Final Building | Partial | Rocky Wilde | Temp TCO for Press Box. |
| 2026/02/03 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection second side. |
| 2026/02/02 | Electrical | Underground | Passed | Rocky Wilde | requested post cable pull inspection |
| 2026/01/30 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed LG framing for restrooms |
| 2026/01/30 | Building/Structural | Re-Inspection | Passed | Rocky Wilde | reinspection restrooms |
| 2026/01/30 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed LG framing for exterior soffits |
| 2026/01/30 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for restrooms |
| 2026/01/30 | Electrical | Wall Rough-in | Passed | Rocky Wilde | |
| 2026/01/30 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reinspect ADA balcony at stadium seating. 10 am concrete |
| 2026/01/30 | Building/Structural | Slab | Passed | Kody Boswell | Reinspect ADA balcony at stadium seating. 10 am concrete |
| 2026/01/30 | Electrical | Wall Rough-in | Passed | Rocky Wilde | |
| 2026/01/30 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed framing for exterior soffits |
| 2026/01/30 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | reinspection restrooms |
| 2026/01/30 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for interior wall framing for press box corridor and rooms. Result is conditional pending repairs in several areas. Repairs required include repair to wall bracing that was cut and several vertical studs that had been cut by other trades. |
| 2026/01/29 | Building/Structural | Slab | Failed | Paul Nitz | stadium seating at PB 1) This inspection was for the press box handy cap seating area, steps and right and left side of the handy cap area. The right and left side of the handy cap seating are as well as the steps passed inspection. An engineered letter will be required for the 3” non reinforced “cold joint” section in front of the handy cap area. |
| 2026/01/29 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Press Box 1) This was for a pressure test on the main trunk line. A rough mechanical will still be required for the system. |
| 2026/01/27 | Building/Structural | Framing | Failed | Paul Nitz | Frame for PB / Screw insection for restroom sheetrock 1) issues not addressed from the last inspection |
| 2026/01/26 | Plumbing | Rough-in | Passed | Paul Nitz | Interior bathroom at Press box |
| 2026/01/26 | Building/Structural | Slab | Passed | Paul Nitz | Press Box stadium seating for ramp landing support. 1) this was for the left and right side only, the landing was not formed up |
| 2026/01/26 | Building/Structural | Slab | Passed | Paul Nitz | Stadium Seating next to last pour |
| 2026/01/26 | Building/Structural | Framing | Passed | Paul Nitz | Restrooms / Server room 1) this was for the restrooms only, the server room was not compelte |
| 2026/01/23 | Building/Structural | Framing | Partial | Paul Nitz | Frame for restrooms / Frame for server room. At Press Box. 1) mens and women restroom back wall only |
| 2026/01/23 | Building/Structural | Framing | Partial | Paul Nitz | Interior metal stud restrooms only 1) mens and women restroom back wall only |
| 2026/01/23 | Electrical | Final Electrical | Passed | Rocky Wilde | Temp Trailer Clubhouse |
| 2026/01/23 | Building/Structural | Roofing | Passed | Rocky Wilde | Roof Roof |
| 2026/01/22 | Passed | Paul Nitz | MEP pipe insulation inspection for cover. Restrooms / Janitors closet / Grab and Go only PB Restroom only. 1) this was for the insulation, press box mens and womens bathroom in wall | ||
| 2026/01/22 | Building/Structural | Slab | Passed | Rocky Wilde | Another round of stadium seating concrete. |
| 2026/01/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the fourth row of spectator seating |
| 2026/01/21 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress roofing inspection for the flat roof area. Contractor was in the process of mechanically fastening coverboard over insulation, secured to the structural steel deck below. |
| 2026/01/20 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel roof deck attachment to steel structure for the flat roof area and two sloped roof areas. Sloped roof areas were covered with membrane so review was performed from the ground. |
| 2026/01/20 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the thrid row of seating |
| 2026/01/20 | Plumbing | Rough-in | NOT READY | Paul Nitz | Cover insp for PB restrooms |
| 2026/01/20 | Plumbing | Rough-in | NOT READY | Paul Nitz | Cover insp for PB restrooms |
| 2026/01/20 | Plumbing | Rough-in | Passed | Paul Nitz | Mens and PB restrooms. |
| 2026/01/16 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the second row of stadium seating |
| 2026/01/15 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | UG civil stormwater pipe. |
| 2026/01/15 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Civil DOM water pressure test |
| 2026/01/14 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the bottom row of stadium seating. There were a few areas with insufficient bottom cover of rebar to grade below. There were also 2 missing longitudinal bars located at the bottom of each side of the trench drain. Result is conditional pending the above items are corrected/installed. Contractor was in the process of installing missing rebar and correcting cover issues as FSU BCA left the site. |
| 2026/01/13 | Plumbing | Rough-in | Passed | Paul Nitz | Womens restroom at Press Box |
| 2026/01/12 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Stormwater pipe at back of Clubhouse |
| 2026/01/09 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the exterior SOG at the sout side plaza seating area |
| 2026/01/08 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for SOG located at the north exterior recreational seating area |
| 2026/01/07 | Plumbing | Underground | Passed | Paul Nitz | |
| 2026/01/07 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 4 ramps |
| 2026/01/06 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/30 | Fire Safety | Fire Water Underground | Passed | Rocky Wilde | Flush and Hydro of 8" underground Fire Main and 3 Fire Hydrants. |
| 2025/12/23 | Building/Structural | Masonry | Passed | Rocky Wilde | Masonry wall rebar 3 rd lift |
| 2025/12/22 | Building/Structural | Masonry | Passed | Rocky Wilde | |
| 2025/12/19 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/19 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/19 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/17 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/17 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 3rd lift for CMU walls above floor level. Result is conditional pending the following: 1) Sawcutting of bond beam after grout has cured for one interior wall. During inspection it was observed that bond beam reinforcing ran continuous over a vertical control joint, which is not in compliance with masonry typical details. 2) Missing vertical bars are installed. Only a few locations had missing reinforcing. This was discussed with the contractor prior to FSU BCA leaving the job site. Contractor was in the process of installing missing vertical reinforcing as FSU BCA left the site. |
| 2025/12/16 | Plumbing | Underground | Failed | Paul Nitz | 1) Slope not met for the storm drain |
| 2025/12/16 | Building/Structural | Re-Inspection | Passed | Paul Nitz | Reinspection |
| 2025/12/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the interior SOG for the clubhouse. |
| 2025/12/10 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 2nd lift for CMU walls above floor level. Result is conditional pending receipt of photos of showing additional vertical reinforcing has been added where lap splice lengths were too short. This was discussed with the Contractor while on site. Photos were received by the Contractor after FSU BCA left the site. |
| 2025/12/10 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | backside of Press Box stormwater pipe. |
| 2025/12/09 | Building/Structural | Masonry | NOT READY | Kody Boswell | CMU infill at LAX Press Box Cleanout holes in block containing vertical reinforcing were not cut (8 ft lift) and there were some walls with no access (scaffolding) to look down into reinforced cells |
| 2025/12/09 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | UG Civil UP stormwater at the Press box. |
| 2025/12/04 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/03 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/02 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/11/25 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 1st lift for CMU walls above floor level. Result is conditional pending recepit of video/photos of masonry sills at pressbox windows being cleaned out. There was excessive mortar in a few locations. Video and photos were received by the Contractor after FSU BCA left the site. |
| 2025/11/20 | Plumbing | Underground | NOT READY | Paul Nitz | more civil |
| 2025/11/19 | Plumbing | Underground | Passed | paul nitz | |
| 2025/11/18 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for portions of the slab on grade. Areas reviewed include the pressbox interior slab and exterior covered seating on both side of the building. |
| 2025/11/18 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/11/13 | Plumbing | Underground | Passed | Paul Nitz | Fire water |
| 2025/11/12 | Plumbing | Underground | Passed | Paul Nitz | Civil Storm water insp |
| 2025/11/12 | Plumbing | Underground | Passed | Paul Nitz | FOR THE CLUBHOUSE. |
| 2025/11/12 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/11/06 | Plumbing | Underground | Passed | Rocky Wilde | Stormwater continues |
| 2025/11/06 | Building/Structural | Masonry | Passed | Rocky Wilde | Stem wall insp at PB and Clubhouse. |
| 2025/11/04 | Building/Structural | Structural | Passed | Paul Nitz | Stormwater pipe and structure. LAX |
| 2025/11/04 | Plumbing | Underground | Passed | Paul Nitz | Stormwater pipe and structure. LAX |
| 2025/10/31 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for tie columns at the intersection of grids A-3 and A-6 |
| 2025/10/31 | Plumbing | Underground | Passed | Paul Nitz | Press Box UG plumbing for cover |
| 2025/10/31 | Plumbing | Underground | Passed | Paul Nitz | This request is taking the place of the 1 pm request. Thank you. Press Box UG plumbing for cover |
| 2025/10/30 | Plumbing | Underground | Passed | Paul Nitz | Thanks |
| 2025/10/30 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for 2 tie columns (TC-2) |
| 2025/10/29 | Plumbing | Specialty Piping | Passed | Paul Nitz | CIVIL Sanitation Pipe for cover. |
| 2025/10/29 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of CMU walls at the press box. 1st lift went from top of foundations to top of floor slab. All of the 1st lift is below grade and to be grouted soild. |
| 2025/10/28 | Building/Structural | Masonry | Failed | Paul Nitz | Stem walls LAX 1) Rocky and I visited the job site two times on 10/28 and both times they were not ready in addition to legible plans not being on site. |
| 2025/10/23 | Plumbing | Specialty Piping | Passed | Rocky Wilde | civil retaining wall ug drainage cover. |
| 2025/10/06 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | FSU BCA reviewed reinforcing steel for the field retaining wall on the Press Box side. Reinforcing steel was in substantial compliance with the contract documents. |
| 2025/10/06 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for some Pressbox foundations. As discussed on site, the Press Box foundations inspection has passed with the understanding the following conditions/items are addressed: - Finish installing vertical wall dowels for exterior walls at 2’ on center. This was almost completed before I left the job site. - Adjust footing step formwork at one WF3.0 location. This was a work in progress when I left the job site. - Maintain 3” bottom and side cover for reinforcing steel. There were a few locations that didn’t have required cover. This was a work in progress when I left the job site. |
| 2025/09/15 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the field wall foundation (WF3.5) on the pressbox side. Reinbforcing steel was in substantial compliance with the contract documents. |
| Building/Structural | Re-Inspection | Rocky Wilde | Temp TCO for Game day on 3/8/26 | ||
| Building/Structural | Masonry | Cancelled | Kody Boswell | ||
| Building/Structural | Structural | Cancelled | Kody Boswell | Contractor called to cancel inspection for concrete tie beams and tie columns prior to FSU BCA arriving on site | |
| Building/Structural | Slab | Postponed | Kody Boswell | stadium seating at PB Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date due to cold weather. | |
| Building/Structural | Re-Inspection | Rocky Wilde | Game Day TCO for Sunday game. | ||
| Plumbing | Specialty Piping | Paul Nitz | CIVIL Sanitation Pipe for cover. | ||
| Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection due to weather |

BCA Project #: 24-03684-C FSU Lacrosse - Clubhouse
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/08/18 | Fire Safety | Final Fire Safety | Conditional | Curtis Rogers | |
| 2026/08/18 | Fire Safety | Final Egress/Emergency Lights | Passed | Curtis Rogers | |
| 2026/08/18 | Fire Safety | Final Fire Alarm | Conditional | Curtis Rogers | |
| 2026/08/17 | Building/Structural | Final Building | Conditional | Kody Boswell | Final building inspection. Result is conditional approval pending the following being addressed/corrected: - Two corridor doors serving coachs' offices must be adjusted so door close time takes 5 seconds minimum. FBC (Accessibility) Section 404.2.8.1 The two corridor doors serving coachs' offices were adjusted to comply with FBC (Accessibility) Section 404.2.8.1. Verified on 8/20/2026. |
| 2026/08/11 | Mechanical | Final Mechanical | Passed | Paul Nitz | |
| 2026/08/11 | Plumbing | Final Plumbing | Passed | Paul Nitz | |
| 2026/08/07 | Mechanical | Final Mechanical | Conditional | Rocky Wilde | 1) Plumbing Final re-inspection (both buildings) 2) Mechanical Final re-inspection (both buildings) 3) Electrical Final inspection (Clubhouse only) – UE is requesting this be in the afternoon 4) Emergency Lighting Final Inspection (Clubhouse only) – UE is requesting this be in the afternoon. Please let us know when you will be able to come out. Thanks, Mark MARK WINGER | Senior Project Manager p. 850.519.1728 |
| 2026/08/07 | Electrical | Final Electrical | Conditional | Rocky Wilde | 1) Plumbing Final re-inspection (both buildings) 2) Mechanical Final re-inspection (both buildings) 3) Electrical Final inspection (Clubhouse only) – UE is requesting this be in the afternoon 4) Emergency Lighting Final Inspection (Clubhouse only) – UE is requesting this be in the afternoon. Please let us know when you will be able to come out. Thanks, Mark MARK WINGER | Senior Project Manager p. 850.519.1728 |
| 2026/08/07 | Plumbing | Final Plumbing | Conditional | Rocky Wilde | 1) Plumbing Final re-inspection (both buildings) 2) Mechanical Final re-inspection (both buildings) 3) Electrical Final inspection (Clubhouse only) – UE is requesting this be in the afternoon 4) Emergency Lighting Final Inspection (Clubhouse only) – UE is requesting this be in the afternoon. Please let us know when you will be able to come out. Thanks, Mark MARK WINGER | Senior Project Manager p. 850.519.1728 |
| 2026/08/07 | Fire Safety | Final Egress/Emergency Lights | NOT READY | Curtis Rogers | 1) Plumbing Final re-inspection (both buildings) 2) Mechanical Final re-inspection (both buildings) 3) Electrical Final inspection (Clubhouse only) – UE is requesting this be in the afternoon 4) Emergency Lighting Final Inspection (Clubhouse only) – UE is requesting this be in the afternoon. Please let us know when you will be able to come out. Thanks, Mark MARK WINGER | Senior Project Manager p. 850.519.1728 |
| 2026/07/30 | Fire Safety | Final Fire Alarm | Partial | Curtis Rogers | |
| 2026/07/30 | Fire Safety | Final Fire Alarm | Partial | Curtis Rogers | |
| 2026/07/28 | Building/Structural | Slab | Passed | Paul Nitz | this is for the north side under the canopy at the clubhouse |
| 2026/07/27 | Building/Structural | Footing | Passed | James Melvin | |
| 2026/07/27 | Building/Structural | Footing | Passed | James Melvin | Light Poles rebar footer inspection. |
| 2026/07/23 | Mechanical | Final Mechanical | NOT READY | Paul Nitz | |
| 2026/07/23 | Electrical | Final Electrical | NOT READY | Rocky Wilde | |
| 2026/07/22 | Fire Safety | Final Fire Safety | NOT READY | Curtis Rogers | |
| 2026/07/22 | Building/Structural | Final Building | NOT READY | Kody Boswell | |
| 2026/07/21 | Plumbing | Final Plumbing | Failed | Paul Nitz | 1) The lavatory in the accessible (ADA) restroom is installed too high. FBC A 606.3 Max height is 34” 2) Verify water the water hammer arrestor locations in the women’s restroom and ensure they are installed in accessible locations for maintenance. FBC P 604.9 3) Provide trap seals for all floor drains. FBC P1002.4.1 4) Provide Backflow test results FBC P 312.10.1 |
| 2026/06/22 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | |
| 2026/06/22 | Electrical | Ceiling Rough-in | Passed | James Melvin | |
| 2026/06/22 | Fire Safety | Fire Alarm Rough-In | Passed | James Melvin | |
| 2026/06/17 | Mechanical | Wall & Ceiling | Failed | Paul Nitz | 1) This is for above ceiling inspection 1) Mechanical strap needs to be replaced 2) Mechanical ducts need to be labeled |
| 2026/06/17 | Building/Structural | Wall/Ceiling | Conditional | Paul Nitz | 1) This is for above ceiling inspection 1) electrical was not ready |
| 2026/06/17 | Electrical | Ceiling Rough-in | Conditional | James Melvin | 1) This is for above ceiling inspection 1) electrical was not ready |
| 2026/06/17 | Plumbing | Rough-in | Passed | Paul Nitz | 1) This is for above ceiling inspection |
| 2026/05/28 | Mechanical | Duct Rough-in | Failed | Paul Nitz | 1)above ceiling inspection before the hard lid is installed and framing for sheetrock 1) supply, exhaust and return labeling is missing |
| 2026/05/28 | Electrical | Ceiling Rough-in | Passed | Paul Nitz | 1)above ceiling inspection before the hard lid is installed and framing for sheetrock |
| 2026/05/28 | Building/Structural | Framing | Passed | Paul Nitz | 1)above ceiling inspection before the hard lid is installed and framing for sheetrock |
| 2026/05/28 | Building/Structural | Framing | Paul Nitz | 1)above ceiling inspection before the hard lid is installed and framing for sheetrock | |
| 2026/05/28 | Plumbing | Rough-in | Failed | Paul Nitz | 1)above ceiling inspection before the hard lid is installed and framing for sheetrock 1) pipe labeling is missing 2) saddle supports are missing |
| 2026/05/27 | Electrical | Service Release | Passed | Rocky Wilde | |
| 2026/05/20 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Mech yard for HVAC Unit / Water heater re-work |
| 2026/05/20 | Plumbing | Re-Inspection | Passed | Paul Nitz | Mech yard for HVAC Unit / Water heater re-work |
| 2026/05/19 | Electrical | Ceiling Rough-in | Failed | Rocky Wilde | Bathroom / Locker room / soffits |
| 2026/05/14 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
| 2026/05/14 | Mechanical | Re-Inspection | Passed | Paul Nitz | |
| 2026/05/13 | Mechanical | Wall & Ceiling | Failed | Paul Nitz | Above ceiling Mechanical only including soffits. Not Ready 1) flex ducts are not connected 2) access openings are missing 3) soffit framing has not been inspected |
| 2026/04/24 | Electrical | Wall Rough-in | Passed | James Melvin | |
| 2026/04/22 | Electrical | Wall Rough-in | James Melvin | ||
| 2026/04/16 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw insp on sheetrock |
| 2026/04/13 | Electrical | Wall Rough-in | Passed | James Melvin | |
| 2026/04/09 | Other | Stormwater | Cancelled | Rocky Wilde | |
| 2026/04/06 | Building/Structural | Insulation | Passed | Paul Nitz | Partial insulation insp for top out board cover. |
| 2026/04/03 | Building/Structural | Roofing | Passed | Paul Nitz | in progress |
| 2026/04/02 | Building/Structural | Framing | Passed | Paul Nitz | Frame insp for top out board in rooms 114,118,116,115,111,117,113, |
| 2026/04/02 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | |
| 2026/04/02 | Plumbing | Rough-in | Passed | Paul Nitz | |
| 2026/04/02 | Plumbing | Water Piping & Test | Passed | Paul Nitz | |
| 2026/03/31 | Building/Structural | Insulation | Passed | Kody Boswell | Clubhouse Roof Insulation insp for Metal roof installs. |
| 2026/03/31 | Building/Structural | Roofing | Passed | Kody Boswell | Clubhouse Roof Insulation insp for Metal roof installs. |
| 2026/03/27 | Building/Structural | Framing | Passed | Kody Boswell | This is for high sheetrock installs only. |
| 2026/03/26 | Building/Structural | Masonry | NOT READY | Kody Boswell | Mech Yard CMU wall Contractor had finished 2 of the 3 walls |
| 2026/03/25 | Building/Structural | Masonry | NOT READY | Kody Boswell | Mech yard wall top out for grout. FSU BCA showed up on site and the mason was still laying block. |
| 2026/03/24 | Building/Structural | Sheetrock | Passed | Kody Boswell | Electrical room only screw inspection for tape and mud. |
| 2026/03/24 | Plumbing | Underground | Passed | Rocky Wilde | |
| 2026/03/19 | Building/Structural | Framing | Passed | Kody Boswell | Electrical room / Wall top out discussion / approval. |
| 2026/03/19 | Plumbing | Underground | Passed | Paul Nitz | Storm water UG at Clubhouse |
| 2026/03/18 | Mechanical | Re-Inspection | Passed | Paul Nitz | |
| 2026/03/18 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | |
| 2026/03/13 | Mechanical | Duct Pressure Test | Failed | Paul Nitz | Clubhouse / Thank you 1) pressure could not be maintained |
| 2026/03/13 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Clubhouse / Thank you 1) Straps missing in multiple locations |
| 2026/03/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the sidewalk between Clubhouse and Field. |
| 2026/03/06 | Building/Structural | Slab | Conditional | Paul Nitz | This is an exterior sidewalk between the Clubhouse and the field. 1) an engineered letter will be required for the expansion “diamond shaped” joints missing around the columns |
| 2026/02/20 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for 3 tie columns: 1) Along grid 6, near grid B 2) Along grid 2, between grids A-B 3) Along grid 2, at grid A The deficiencies noted on prior inspections were corrected. |
| 2026/02/20 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed reinforcing steel for 3 tie columns: 1) Along grid 6, near grid B 2) Along grid 2, between grids A-B 3) Along grid 2, at grid A The deficiencies noted on prior inspections were corrected. |
| 2026/02/18 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for 3 tie columns: 1) Along grid 6, near grid B 2) Along grid 2, between grids A-B 3) Along grid 2, at grid A The following deficiencies must be corrected: 1) The plate embed should be rotated 90° so that studs are oriented as shown in detail 6/S-601. 2) Bond beam reinforcing and horizontal CMU joint reinforcing should terminate inside of TC, as shown in detail 9/S-601. Masons were in the process of topping out bond beam at time of inspection. 3) The 4 additional ties as called out in detail 3/S-601 were not installed at the top of TC, they need to be added. |
| 2026/02/16 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for top out of several masonry walls. Result is condtional pending photos from Contractor showing horizontal reinforcing for top coarse of bond beams has been installed. |
| 2026/02/16 | Building/Structural | Structural | Failed | Kody Boswell | TC-2 vertical column rebar Reinforcing steel still needs correction as noted in inspection done on 2/13/2026 |
| 2026/02/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the mechanical pad located in the mechanical yard. Reinforcing steel was in substantial compliance with the contract drawings. |
| 2026/02/10 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for 3 tie columns: 1) Along grid 6, near grid B 2) Along grid 2, between grids A-B 3) Along grid 2, at grid A The following deficencies must be corrected: 1) Chairs should be installed to provide adequate cover during concrete placement. The plate embed should be rotated 90° so that studs are oriented as shown in detail 6/S-601. It was noted during TC inspection that the top of CMU wall doesn’t appear to match detail 6/S-601. Verify top of CMU wall condition with EOR. 2) Chairs should be installed to provide adequate cover during concrete placement. Bond beam reinforcing and horizontal CMU joint reinforcing should terminate inside of TC, as shown in detail 9/S-601. 3) Chairs should be installed to provide adequate cover during concrete placement. Bond beam reinforcing should either be continuous through or terminate inside TC with hooks. Verify with EOR. The 4 additional ties as shown in detail 3/S-601 were not installed at thje top of TC, they need to be added. |
| 2026/01/22 | Building/Structural | Re-Inspection | Passed | Paul Nitz | Re-Inspection for masonry |
| 2026/01/22 | Building/Structural | Masonry | Passed | Paul Nitz | Re-Inspection for masonry 1) This was for the back wall corrections that Kody had failed on 01/21/2026 only. |
| 2026/01/21 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for CMU walls. There are still missing reinforcing bars for 5 locations where roof rafters bear on CMU wall. This was discussed with the Contractor while on site. |
| 2026/01/16 | Building/Structural | Re-Inspection | NOT READY | Kody Boswell | Reinspection Clubhouse CMU for rebar. Mason was not on site and CMU was not able to be accessed for inspection |
| 2026/01/14 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the first lift of CMU walls (high lift). The back wall along grid A was missing reinforcing steel called out in details 3/S601 and 10/S601. Missing reinforcing is the "2 vertical bars at 8in. in solid grout". Contractor to contact EOR and verify if missing bars need to be drilled and epoxied into slab or not. Also, cleanouts have excessive debris that must be removed prior to close up and grouting. Contractor to request inspection after items above have been addressed. |
| 2026/01/14 | Building/Structural | Masonry | NOT READY | Kody Boswell | Masonry Rebar Masons were still laying block when FSU BCA arrived on site. Contractor requested FSU BCA to return to the site in the PM. |
| 2026/01/13 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | civil stormwater behind clubhouse |
| 2025/10/24 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several foundations |
| 2025/10/22 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for some LAX Clubhouse foundations |
| Building/Structural | Footing | Postponed | Kody Boswell | LAX Clubhouse foundations Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection | |
| Building/Structural | Re-Inspection | Passed | Rocky Wilde | ||
| Building/Structural | Masonry | Postponed | Kody Boswell | CMU rebar at Clubhouse Contractor postponed inspection to a later date in order to use high lift grouting over low lift grouting. | |
| Building/Structural | Structural | Postponed | Kody Boswell | Tie Columns at Clubhouse Inspection postponed | |
| Mechanical | Duct Rough-in | Paul Nitz | Clubhouse / Thank you | ||
| Mechanical | Duct Pressure Test | Paul Nitz | Clubhouse / Thank you |

BCA Project #: 24-03674- Strozier Sub-Basement Upgrades
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/04/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of exterior slab on grade |
| 2026/04/21 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for exterior stairs on west end of building |
| 2026/04/08 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for exterior CMU walls locateda th the NW stair |
| 2026/03/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 2 footings for new exterior CMU/brick walls and for new exterior stairs |
| 2026/03/19 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for exterior slab on grade |
| 2026/03/11 | Building/Structural | Erosion Control | Passed | Kody Boswell | Reviewed reinforcing steel for the north side curb along the exterior wall of the building |
| 2026/02/18 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for planter box at the north east corner of the building |
| 2026/02/13 | Building/Structural | Structural | Passed | Paul Nitz | This is a steel inspection for the new walkway and steps on the east side fire escape we intend to pour Monday morning |
| 2026/02/13 | Building/Structural | Slab | Passed | Paul Nitz | This is a steel inspection for the new walkway and steps on the east side fire escape we intend to pour Monday morning |
| 2026/02/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for trench infills in several areas |
| 2026/01/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for CMU walls for the new stair exterior of the NE corner of the building |
| 2026/01/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for CMU walls for the new stair exterior of the NE corner of the building |
| 2026/01/14 | Fire Safety | Final Egress/Emergency Lights | Conditional | Curtis Rogers | Requesting a fire egress inspection to close down the East side emergency stair of Strozier Library |
| 2026/01/14 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for footers for new walls at sidewalk near the NE corner of the building. Contractor was in the process of placing wall dowels when FSU BCA arrived on site. Result is conditional pending photo(s) from the Contractor showing wall dowels have been installed. |
| Building/Structural | Slab | Cancelled | Kody Boswell | This is for sidewalk aera on west end of building Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection | |
| Building/Structural | Structural | Cancelled | Kody Boswell | Rebar for pour on Tuesday morning Contractor cancelled inspection via email | |
| Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date. | |
| Building/Structural | Structural | Cancelled | Kody Boswell | Rebar for pour on Tuesday morning Contractor cancelled inspection via email |

BCA Project #: 24-03628-A Bio Unit 1 - Second Floor Remodling
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/11/02 | Mechanical | Final Mechanical | Passed | James Melvin | We have a few more inspections on the first floor of this permit. Please schedule a mechanical inspection for the afternoon of 11-2-2026. The rooms we will be inspecting will be 105-112. Thank you for your help, Larry Larry DuBose Project Superinte |
| 2026/08/17 | Building/Structural | Final Building | Conditional | Kody Boswell | Final building inspection. Result is conditional pending the following items being corrected/addressed: 1) Window barrier at the NE stair that was removed during construction must be reinstalled. 2) Two lights need to be installed in the SE stairwell. 3) The display case in the SE stairwell landing between floors 1 and 2 needs to be removed since it is impeding on egress width Items above were addressed via email with photos on 8/18/2026. |
| 2026/08/14 | Fire Safety | Final Egress/Emergency Lights | Passed | Curtis Rogers | We need the following inspections requested for tomorrow, 8-14 at 1 pm. -Fire Safety- Final Fire Safety -Fire Safety- Final Egress/ Emergency Lights Request date- 8-14-26 Request time- 1 pm Dean Poppell (850)445-9105 dpoppell@childers-construction. |
| 2026/08/14 | Fire Safety | Final Fire Safety | Passed | Curtis Rogers | We need the following inspections requested for tomorrow, 8-14 at 1 pm. -Fire Safety- Final Fire Safety -Fire Safety- Final Egress/ Emergency Lights Request date- 8-14-26 Request time- 1 pm Dean Poppell (850)445-9105 dpoppell@childers-construction. |
| 2026/08/13 | Fire Safety | Re-Inspection | Partial | Curtis Rogers | Laura, Please schedule the Final Fire Safety reinspection for tomorrow at 1:00. Curt Rogers is aware of the time for this inspection. Thank you, Larry |
| 2026/08/12 | Mechanical | Final Mechanical | Conditional | Paul Nitz | These comments apply to both mechanical rooms and 3rd floor duct closet. 1) Label all pipe, duct, and valves (Spec pg 23-0553 302) 2) Support missing on chill lines, duct, and glycol lines (Spec pg 23-0529 306) 3) Hydronic T&B need to be submitted (Spec pg 23-0594-a) 4) Tape and mastic all exposed insulation 5) Adjust the vibration springs on the booster fan All corrections have been reviewed with Larry, with Childers Construction as well as Junior, with Vause Mechanical |
| 2026/08/04 | Fire Safety | Final Fire Safety | Partial | Curtis Rogers | We need the following inspections requested for tomorrow, 8-4 at 1 pm. -Final Fire Alarm -Fire Egress/Emergency Lights -Final Fire safety Request date- 8-4-26 Request time- 1 pm Notes: Test flows and tampers during Dean Poppell (850)445-9105 dpoppel |
| 2026/08/04 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | We need the following inspections requested for tomorrow, 8-4 at 1 pm. -Final Fire Alarm -Fire Egress/Emergency Lights -Final Fire safety Request date- 8-4-26 Request time- 1 pm Notes: Test flows and tampers during Dean Poppell (850)445-9105 dpoppel |
| 2026/08/04 | Fire Safety | Final Egress/Emergency Lights | Partial | Curtis Rogers | We need the following inspections requested for tomorrow, 8-4 at 1 pm. -Final Fire Alarm -Fire Egress/Emergency Lights -Final Fire safety Request date- 8-4-26 Request time- 1 pm Notes: Test flows and tampers during Dean Poppell (850)445-9105 dpoppel |
| 2026/08/04 | Electrical | Final Electrical | Passed | James Melvin | We’d like the request a Final Electrical inspection for Monday, 8-3-2026, in the AM. We appreciate your help with these, Larry |
| 2026/07/30 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | I need to schedule a Fire Sprinkler final for Thursday, 7-30-2026 in the AM. Thank you for your help,Larry Larry DuBose Project Superintendent Childers Construction Company ldubose@childers-construction.com C. 850-879-2522 O. 850-222-2281 Notes: **Test Flows and Tampers for Sprinkler during Final Fire Alarm Inspection |
| 2026/07/20 | Electrical | Ceiling Rough-in | Passed | James Melvin | Electrical above ceiling (rooms 2002,2003,2005,2006,2027,2010 and remaining corridors |
| 2026/07/20 | Plumbing | Final Plumbing | Passed | Paul Nitz | Electrical above ceiling (rooms 2002,2003,2005,2006,2027,2010 and remaining corridors |
| 2026/06/08 | Building/Structural | Sheetrock | Passed | Kody Boswell | Drywall Screw Inspection |
| 2026/06/04 | Building/Structural | Framing | Passed | Rocky Wilde | New Wall at east main stairwell 2nd floor |
| 2026/06/04 | Electrical | Wall Rough-in | Passed | Rocky Wilde | New Wall at East Main Stairwell 2nd floor |
| 2026/05/29 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Room 0241 for AHU 2-1 |
| 2026/05/27 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Rooms 2001,2001A,2001B,2001C,2007,2208,2009,2011,2012, 2013, 2013A, 2014, 2015, 2015A, 2016, 2017, 2018, 2019, 2020, 2021, 2022, 2023, 2025, 2025A, 2028, 2028A, 2029, 2030, 2031. Above Ceiling Reviewed above ceiling plumbing on the 2nd floor |
| 2026/05/22 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | Curtis Rogers inspected this on 5/22/2026 also. |
| 2026/05/22 | Fire Safety | Fire Water Above Ground | Partial | Curtis Rogers | Curtis Rogers inspected this on 5/22/2026 also. |
| 2026/05/22 | Fire Safety | Fire Water Above Ground | Partial | Curtis Rogers | ***Acoustic Ceilings ***Above Ceiling |
| 2026/05/21 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Rooms that are ready; 2000, 2001, 2001A, 2001C, 2007, 2007A, 2008, 2009, 2011, 2012, 2013, 2013A, 2014, 2015, 2015A, 2016, 2017, 2022, 2023, 2025, 2028, 2029, 2030, and 2031 |
| 2026/05/21 | Mechanical | Wall & Ceiling | Failed | Paul Nitz | Rooms that are ready; 2000, 2001, 2001A, 2001C, 2007, 2007A, 2008, 2009, 2011, 2012, 2013, 2013A, 2014, 2015, 2015A, 2016, 2017, 2022, 2023, 2025, 2028, 2029, 2030, and 2031 1) Supply, return, and exhaust duct labeling missing 2) Saddles on plumbing missing 3) Insulation on grills missing 4) some ducting has not been installed 5) labeling missing on the plumbing lines 6) check access openings for the fire dampers 7) |
| 2026/05/18 | Building/Structural | Sheetrock | Passed | Paul Nitz | Partial wall in mechanical room 0241 |
| 2026/05/12 | Building/Structural | Sheetrock | Passed | Kody Boswell | Photos sent to Kody Boswell for inspection. Partial wall in 2015 lab screw inspection. |
| 2026/05/07 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Electrical wall rough in for mechanical divider wall in room 2015. |
| 2026/05/07 | Building/Structural | Framing | Passed | Kody Boswell | Mechanical divider wall framing in room 2015. |
| 2026/05/04 | Mechanical | Insulation | Passed | Paul Nitz | Partial insulation inspection for ductwork in mechanical room 0242. Paul Nitz looked at this on 4-27-26 |
| 2026/05/01 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | This is for CHW piping in mechanical rooms 0241 & 0242 to both AHU's. |
| 2026/04/14 | Electrical | Floor Rough-in | Passed | Rocky Wilde | Inspection will be in suite 119 on 1st floor for floor boxes in 2nd floor labs 2011 and 2012. |
| 2026/04/09 | Electrical | Floor Rough-in | Cancelled | Rocky Wilde | Inspection will be in 119 suite on 1st floor for floor boxes in 2nd floor labs 2011 and 2012. |
| 2026/03/27 | Building/Structural | Sheetrock | Passed | Rocky Wilde | Screw inspection for mechanical wall in prep room 2015A. Rocky Wilde passed inspection on 3-26-26. |
| 2026/03/26 | Electrical | Floor Rough-in | Passed | Rocky Wilde | This inspection will be in rooms 116 ,113, 104B, 104, 103, 101, and 101A. |
| 2026/03/19 | Electrical | Wall Rough-in | Passed | Rocky Wilde | The inspection will be in room 2015A. |
| 2026/03/19 | Building/Structural | Framing | Passed | Paul Nitz | The inspection will be in room 2015A. |
| 2026/03/16 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for 2 soffits |
| 2026/03/16 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing in several areas |
| 2026/03/10 | Electrical | Floor Rough-in | Passed | Rocky Wilde | This inspection will be rooms 116, 117, and 118. Thank you, Larry |
| 2026/03/09 | Building/Structural | Framing | Passed | Paul Nitz | Framing in the elevator lobby and plumbing at the emergency showers. |
| 2026/03/09 | Plumbing | Rough-in | Passed | Paul Nitz | Framing in the elevator lobby and plumbing at the emergency showers. |
| 2026/02/26 | Electrical | Floor Rough-in | Passed | Rocky Wilde | This inspection will be above the ceiling in room 100. Thank you, Larry |
| 2026/02/24 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Partial VAV connections. |
| 2026/02/17 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection for several areas |
| 2026/02/09 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Restroom wall auto operator electrical rough ins. |
| 2026/02/09 | Building/Structural | Insulation | Passed | Paul Nitz | HW piping inwall. |
| 2026/02/05 | Electrical | Wall Rough-in | Passed | Rocky Wilde | 2013 dividing wall at storage 2010. |
| 2026/02/05 | Building/Structural | Insulation | Passed | Paul Nitz | |
| 2026/02/05 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Rooms 2023, 2025, and 2028 |
| 2026/02/04 | Plumbing | Stack Piping & Test | Passed | Rocky Wilde | 2013, 2013A, 2015, and 2015A. |
| 2026/02/03 | Plumbing | Water Piping & Test | Passed | Paul Nitz | DCW and HW in rooms 2013, 2015, and 2015A. DI water in rooms 2014, 2015, 2015A, 2013A, 2025A, and 2028A. |
| 2026/01/30 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Rooms 2013, 2015, 2015A, 2025A, 2028 and 2031. |
| 2026/01/29 | Fire Safety | Hydro-Test | Passed | Curtis Rogers | |
| 2026/01/28 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
| 2026/01/27 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Rooms 2007, 2011, 2012, and 2014. |
| 2026/01/27 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | |
| 2026/01/27 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Partial DCW and HW return & supply. |
| 2026/01/27 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | |
| 2026/01/22 | Building/Structural | Sheetrock | Passed | Paul Nitz | Gang and HC baths |
| 2026/01/20 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Partial elevator wall. |
| 2026/01/15 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for several walls |
| 2026/01/13 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Inspections will be in the gang baths. |
| 2026/01/13 | Building/Structural | Framing | Passed | Paul Nitz | Inspections will be in the gang baths. |
| 2026/01/12 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | CHW piping to serve AHU 2.1 |
| 2026/01/12 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
| 2026/01/08 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing in several areas |
| 2026/01/07 | Mechanical | HW Piping & Test | Passed | Paul Nitz | |
| 2025/12/30 | Electrical | Wall Rough-in | Passed | Rocky Wilde | If you don't have card access to the building, the exterior door is unlocked on the north end of the building at the service road. Thanks, Larry |
| 2025/12/22 | Building/Structural | Sheetrock | Passed | Rocky Wilde | |
| 2025/12/22 | Mechanical | CHW Piping & Test | Passed | Rocky Wilde | This is hydro test/ inspection for Glycol piping. |
| 2025/12/22 | Plumbing | Water Piping & Test | Passed | Rocky Wilde | Inspection for water piping in restrooms on 2nd floor. |
| 2025/12/18 | Building/Structural | Framing | Passed | Paul Nitz | |
| 2025/12/18 | Building/Structural | Sheetrock | Passed | Paul Nitz | |
| 2025/12/18 | Building/Structural | Insulation | Passed | Paul Nitz | |
| 2025/12/15 | Mechanical | Duct Pressure Test | Failed | Paul Nitz | This inspection will be with Vause Mechanical. 1) Duct pressure test failed, ducts would not hold the minimum pressure specified on the plans |
| 2025/12/12 | Mechanical | Re-Inspection | Passed | Paul Nitz | CHW piping to serve AHU-4 |
| 2025/12/12 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | CHW piping to serve AHU-4 |
| 2025/12/10 | Mechanical | Duct Pressure Test | NOT READY | Paul Nitz | This inspection will be with Vause Mechanical. Larry |
| 2025/12/10 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Partial mechanical duct rough in. Paul looked at this on 12-10-25. |
| 2025/12/10 | Mechanical | CHW Piping & Test | Failed | Paul Nitz | Inspection for CHW piping to serve AHU 4. 1) air in the hydro test lines |
| 2025/12/09 | Electrical | Wall Rough-in | Passed | Rocky Wilde | These inspections will be in room 2001. |
| 2025/12/09 | Building/Structural | Sheetrock | Passed | Paul Nitz | These inspections will be in room 2001. 1) first layer on the fire wall |
| 2025/12/08 | Electrical | Wall Rough-in | Passed | Rocky Wilde | This inspection will be for the following rooms, 2001A, 2001B, 2001C, 2008, 2009, 2017, 2018, 2019, 2020, 2021 and 2022. Thank you, |
| 2025/12/05 | Plumbing | Rough-in | Passed | Paul Nitz | This inspection will be in the 1st and 2nd floor gang baths. Larry |
| 2025/12/05 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | This inspection will be in the 1st and 2nd floor gang baths. Larry |
| 2025/12/03 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | This inspection will be in the two gang bathrooms and the H/C bathroom. Larry |
| 2025/12/03 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | This inspection will be in the two gang bathrooms and the H/C bathroom. Larry |
| 2025/12/03 | Plumbing | Rough-in | NOT READY | Paul Nitz | This inspection will be in the two gang bathrooms and the H/C bathroom. Larry |
| 2025/12/03 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection in room 2007 |
| 2025/12/02 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 2 slab infills in lab areas |
| 2025/12/01 | Electrical | Wall Rough-in | Passed | Rocky Wilde | This will be a partial in room 2027. The framing inspection passed on 11-25-2025. We'd like to complete this room in order to relocate the fire alarm equipment. Larry |
| 2025/11/25 | Building/Structural | Framing | Passed | Kody Boswell | |
| 2025/11/25 | Building/Structural | Sheetrock | Passed | Kody Boswell | top out |
| 2025/11/20 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for CMU sill for new window in office 2019 |
| 2025/11/19 | Mechanical | Duct Rough-in | Partial | Paul Nitz | Please call when you get here and we'll get everyone gathered. Thanks, Larry |
| 2025/11/19 | Building/Structural | Sheetrock | Partial | Paul Nitz | Please call when you get here and we'll get everyone gathered. Thanks, Larry |
| 2025/11/19 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing in rooms 2016,2017,2018,2019,2020,2021, and 2022. |
| 2025/11/19 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for CMU jambs and header for new window in office 2019. |
| 2025/11/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for CMU jambs and header for new window in office 2019. |
| 2025/11/17 | Building/Structural | Sheetrock | Partial | Paul Nitz | This will be a screw inspection for some of the top out areas. Larry |
| 2025/11/17 | Building/Structural | Framing | Partial | Paul Nitz | This inspection was completed on 1-17-2025. Thank you, Larry |
| 2025/11/06 | Building/Structural | Framing | Conditional | Paul Nitz | Paul, We are asking for a courtesy inspection regarding the gyp board top out areas located in the open corridors. We'd like to hang the open corridor side of the wall, finish and paint the walls, the exposed structural steel and deck above. Larry |

BCA Project #: 24-03625- Sliger Data Center Chiller
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/07/02 | Mechanical | CHW Piping & Test | Passed | Paul Nitz |

BCA Project #: 24-03615-A Dittmer Building Reroof
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/11/19 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection of PVC capsheet installation |

BCA Project #: 24-03615- Dittmer Building Envelope Parapet
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/10/09 | Building/Structural | Roofing | Passed | Paul Nitz | In-Progress Inspection - LWIC/Weld Plates |
| 2025/09/10 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for new roof parapet. The items specified for prior framing inspection were addressed. |
| 2025/09/10 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed LG framing for new roof parapet. The items specified for prior framing inspection were addressed. |
| 2025/09/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing for the new roof parapet |
| 2025/09/08 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for the roof parapet. The following was observed: 1) There were a few LG connection screws and a few LG to structural steel connection PAFs. Fasteners were installed as BCA pointed them out. 2) There were a few vertical studs where the connection at the bottom track occurred at the prepunched location. Contractor was in the process of stiffening these locations when BCA left the site. Resolved with inspection on 9/10/2025 Inspection result is conditional pending item (2) above being completed. BCA will revisit the site this afternoon to confirm. |
| 2025/07/29 | Building/Structural | Roofing | Passed | Kody Boswell | Tear Off/Dry-In Inspection |
| Building/Structural | Structural | Postponed | Kody Boswell | Follow up from 9/8 inspection Contractor contacted FSU BCA prior to site arrival to postpone inspection | |
| Building/Structural | Framing | Postponed | Kody Boswell | Follow up from 9/8 inspection Contractor contacted FSU BCA prior to site arrival to postpone inspection |

BCA Project #: 23-03565- Dittmer Repair of Exterior Stair Towers
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/10/30 | Building/Structural | Final Building | Conditional | Kody Boswell | Final inspection for stair repairs. Inspection has passed, but waiting on reports from BNI and Pennono prior to permit closeout |

BCA Project #: 23-03539- NCF Pritzker Marine Building Exterior Improvements
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/09/22 | Electrical | Final Electrical | Passed | Rocky Wilde | |
| 2025/09/09 | Electrical | Final Electrical | Passed | Rocky Wilde | |
| 2025/06/27 | Roofing | In progress | Conditional | Hank Fulmer | dry in for the sloped sections of the roof were inspected. Installation of the peal and stick was installed per manufactures specifications. The original drip edge and flashing is remaining . This is a partial approval. |
| 2025/06/06 | Roofing | In progress | Conditional | Joan Lima | PARTIAL DRYIN IN PROGRESS SOUTH SIDE |
| 2025/04/22 | Plumbing | Final Plumbing | Passed | Hank Fulmer | |
| 2025/04/22 | Electrical | Final Electrical | Passed | Hank Fulmer | |
| 2024/11/18 | Electrical | Wall Rough-in | Passed | Hank Fulmer | |
| 2024/11/18 | Plumbing | Rough-in | Passed | Hank Fulmer | |
| 2024/11/18 | Electrical | Wall Rough-in | Conditional | Steve Bell | |
| 2024/11/18 | Plumbing | Rough-in | Conditional | Steve Bell | |
| 2024/11/05 | Building/Structural | Structural | Passed | Joseph Agriesti | |
| 2024/10/30 | Building/Structural | Slab | Passed | Steve Bell | |
| 2024/10/28 | Building/Structural | Slab | Failed | Steve Bell | FBC2023 SECTION 107 SUBMITTAL DOCUMENTS No construction documents on site. Please provide approved plans. 1 hr inspection time |
| 2024/10/25 | Electrical | Floor Rough-in | Passed | Nicholas Ninos | |
| 2024/10/25 | Electrical | Floor Rough-in | Failed | Steve Bell | |
| 2024/10/25 | Building/Structural | Slab | Failed | Steve Bell | |
| 2024/10/25 | Electrical | Wall Rough-in | Failed | Nicholas Ninos | PVC conduit was installed above dirt on plastic sheeting. Installation method is NEC compliant. No discrepancies noted. |
| 2024/10/25 | Building/Structural | Slab | Passed | Nicholas Ninos | |
| 2024/10/16 | Building/Structural | Structural | Passed | Hank Fulmer | Partial inspection passed. This is for te south wall, north stairs, and first two column walls. All steel was properly sized and palced. The depths and widths were correctly sized per plans. |
| 2024/09/20 | Building/Structural | Structural | Passed | Joseph Agriesti | |
| 2024/09/06 | Building/Structural | Footing | Passed | Joseph Agriesti | |
| 2024/08/29 | Building/Structural | Structural | Passed | Hank Fulmer | |
| 2024/08/21 | Plumbing | Gas Piping & Test | Passed | Joseph Agriesti | |
| 2024/08/21 | Building/Structural | Structural | Passed | Hank Fulmer | |
| 2024/08/19 | Plumbing | Gas Piping & Test | Passed | Joseph Agriesti | |
| 2024/08/09 | Building/Structural | Footing | Passed | Hank Fulmer |