Florida State University Search
Active Building Code Administration Project Inspection Results
BCA Project #: 23-03571- FSUS Gymnasium 8 Bleacher Replacement-Demolition
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Building/Structural | Slab | Kody Boswell | Forms and dowel pins |
BCA Project #: 23-03560- Cawthon Hall New Oil Cooler in Elevator
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/10 | Electrical | Final Electrical | Passed | Alex Masterton | No comments. |
BCA Project #: 23-03552- Mag Lab NHMFL Room 0269 Magnet Cooling Pump
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/15 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | rough inspectionn for the new pump, ok to insulate |
2024/07/15 | Electrical | Final Electrical | Passed | James Melvin |
BCA Project #: 23-03549- UCC Doak Campbell 8th & 9th Level Renovations
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the new floor slab in the middle room on the west side of the 9th floor. |
2024/07/11 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for concrete decking and stairs in suite 8014 and the new suites on the 9th floor. |
2024/06/27 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed interior sheathing attachment for levels 8 & 9 |
2024/06/25 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Both floors are ready for inspections. It is advisable to re-install the spray-applied fire insulation on the structural steel where it was removed during a previous project. Consult with the FSU project manager on this request. There is not a clear code mandate to do this, but it is in the interest of FSU to maintain fire safety. |
2024/06/25 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | |
2024/06/25 | Plumbing | Rough-in | Passed | Paul Nitz | Both floors are ready for inspection. |
BCA Project #: 23-03547- National Pan Hellenic Council Park Monuments & Landscaping
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/10 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed 7 out of 9 footers for the new monument signs. |
BCA Project #: 23-03538- UCC Rooms 2518 and 2526 Renovations
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/11 | Building/Structural | Sheetrock | Passed | Paul Nitz | |
2024/06/07 | Electrical | Wall Rough-in | Conditional | Sam Sevor | Wall rough in inspection passed. The shaft wall backing up to the stairs will need the 2 hour fire rated putty that is spec'd on Note 8 of the electrical power plan. Please ensure all penetrations in fire and smoke walls are repaired to match the rating of the wall. Will verify penetrations and box fire putty on the next inspection. |
2024/06/07 | Building/Structural | Framing | Passed | Paul Nitz |
BCA Project #: 23-03537- Bellamy Conference Room 0105B Renovation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/24 | Fire Safety | Final Fire Safety | Passed | Mary Creason | NOTE: Door and hardware are on back order - Builidng inspectors will handle the installation requirements. |
2024/06/06 | Fire Safety | Final Fire Safety | NOT READY | Mary Creason | spoke to Jason informed him that when everything is installed and ready to then call in a fire final. |
2024/06/06 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Sprinkler installed per plans |
BCA Project #: 23-03534- Law Research Center-Library AC Install
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/17 | Electrical | Appliance/Equipment | Passed | Dwayne Mahony | |
2024/05/17 | Mechanical | Equipment | Passed | Dwayne Mahony |
BCA Project #: 23-03528- Westcott Vending Machine
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Electrical | Final Electrical | Dwayne Mahony |
BCA Project #: 23-03526- DeGraff Building 1 East Side Roof Repair
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/27 | Building/Structural | Roofing | Passed | Kody Boswell | Final Roof Inspection |
2024/06/27 | Building/Structural | Final Building | Passed | Kody Boswell | Final Roof Inspection |
2024/06/04 | Building/Structural | Roofing | Passed | Kody Boswell | In progress inspection of the temporary torch down layer. Insulation and hardboard are installed under temporary. |
2024/05/29 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection of temporary torch down layer, prior to tapered insulation and Densdeck installation |
BCA Project #: 23-03509- State Storage Warehouse Metal Ring Roller
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/27 | Electrical | Final Electrical | Passed | Alex Masterton | No comments. |
BCA Project #: 23-03498- Bryan Hall Shower Renovations
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/12 | Electrical | Final Electrical | Passed | James Melvin | Electrical - Generator underground conduits - Level 3 Dorm Rooms Electrical Finals Plumbing - Level 3 Plumbing Final |
2024/07/12 | Plumbing | Final Plumbing | Passed | Paul Nitz | Electrical - Generator underground conduits - Level 3 Dorm Rooms Electrical Finals Plumbing - Level 3 Plumbing Final |
2024/07/12 | Electrical | Underground | Passed | James Melvin | Electrical - Generator underground conduits - Level 3 Dorm Rooms Electrical Finals Plumbing - Level 3 Plumbing Final |
2024/07/11 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Above ceiling conducted on all floors in the corridors. Approved AOR tentatively stated fire alarm is not in this scope of work. |
2024/07/10 | Fire Safety | Final Fire Safety | Failed | Mary Creason | 3rd Floor Life Safety - Fire alarm plans are currently stating a new system will be installed. However per Mike Bozone that was taken out of project. Until the AOR corrects this on the plans, a fire alarm system is required per approved plans. Also on the plans, there is work being done for HVAC in the corridors. However per Mike Bozone, there is no new work being done in the corridors except removal of Fire dampers which is not on the approved plans or in any Addendum or ASI. In addition, Mike Bozone indicated that he has addendum 2 and/or just 3 however, BCA does not have either of these addendums. Submit for our approval ASAP. A reinspection will be required once all the above is taken care of. |
2024/07/03 | Electrical | Ceiling Rough-in | Passed | James Melvin | -Level 3 Corridor Above ACT Ceiling Re-Inspection - Level 1 Above ACT Ceiling Inspection |
2024/07/03 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | -Level 3 Corridor Above ACT Ceiling Re-Inspection - Level 1 Above ACT Ceiling Inspection |
2024/07/03 | Plumbing | Rough-in | Passed | Paul Nitz | -Level 3 Corridor Above ACT Ceiling Re-Inspection - Level 1 Above ACT Ceiling Inspection |
2024/07/03 | Building/Structural | Re-Inspection | Passed | Paul Nitz | -Level 3 Corridor Above ACT Ceiling Re-Inspection - Level 1 Above ACT Ceiling Inspection |
2024/07/02 | Plumbing | Rough-in | NOT READY | Paul Nitz | 3rd Floor Corridor - Above ACT inspection |
2024/07/02 | Building/Structural | Wall/Ceiling | NOT READY | Paul Nitz | 3rd Floor Corridor - Above ACT inspection |
2024/07/02 | Building/Structural | Re-Inspection | NOT READY | Paul Nitz | 3rd Floor Corridor - Above ACT inspection |
2024/07/02 | Electrical | Ceiling Rough-in | NOT READY | James Melvin | 3rd Floor Corridor - Above ACT inspection |
2024/07/01 | Building/Structural | Wall/Ceiling | Failed | Paul Nitz | 3rd floor Corridor - Above ACT ceiling inspection 1) fireblocking requirements not met |
2024/07/01 | Electrical | Ceiling Rough-in | Failed | James Melvin | 3rd floor Corridor - Above ACT ceiling inspection 1) mc in contact with copper and ceilling grid |
2024/07/01 | Plumbing | Rough-in | Conditional | Paul Nitz | 3rd floor Corridor - Above ACT ceiling inspection 1) check to see if cold water needs to be insulated per specs |
2024/06/25 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | Level 3 Bathrooms Above ACT Ceiling Level 2 Bathrooms and Corridor Above ACT Ceiling All work including fire safety improvements has been done as per our (contractor/architect/dwayne) field discussion. |
2024/06/25 | Electrical | Ceiling Rough-in | Passed | Alex Masterton | Level 3 Bathrooms Above ACT Ceiling Level 2 Bathrooms and Corridor Above ACT Ceiling E-1 Support all junction boxes from structure. See multiple locations in corridors above ceiling tiles. NEC 314.23 E-2 Provide cover plates for all open junction boxes. NEC 314.41 E-3 Provide no more than 3 conductors within a single conduit without derating. NEC 310.15 (C)(1) E-4 Provide no more than 13 conductors in a single 4” square junction box. See above ceiling attend of corridor. NEC 314.16(B). E-5 Provide listed fire caulking for rated walls. See penetration at elevator shaft. FBC 714.4.1.2 |
2024/06/19 | Building/Structural | Sheetrock | Passed | Kody Boswell | 1st floor drywall screw |
2024/06/18 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | - installation of 3rd floor new construction style can lights in existing ceiling |
2024/06/17 | Plumbing | Fixtures | Passed | Paul Nitz | - 1st Floor shower Pan drains/ water test |
2024/06/14 | Building/Structural | Insulation | Passed | Paul Nitz | |
2024/06/14 | Building/Structural | Framing | Passed | Paul Nitz | - 1st flow shower pan underground - 1st floor framing repairs and shower soffits - 1st floor pipe and wall insulation - 1st floor plumbing wall rough |
2024/06/14 | Building/Structural | Insulation | NOT READY | Paul Nitz | - 1st flow shower pan underground - 1st floor framing repairs and shower soffits - 1st floor pipe and wall insulation - 1st floor plumbing wall rough |
2024/06/14 | Plumbing | Underground | Passed | Paul Nitz | - 1st flow shower pan underground - 1st floor framing repairs and shower soffits - 1st floor pipe and wall insulation - 1st floor plumbing wall rough |
2024/06/14 | Plumbing | Rough-in | Passed | Paul Nitz | - 1st flow shower pan underground - 1st floor framing repairs and shower soffits - 1st floor pipe and wall insulation - 1st floor plumbing wall rough |
2024/06/14 | Building/Structural | Insulation | Paul Nitz | ||
2024/06/11 | Building/Structural | Sheetrock | Passed | Paul Nitz | 2nd Floor Drywall Screw Inspection |
2024/06/10 | Building/Structural | Insulation | Passed | Paul Nitz | -2nd Floor Pipe and Wall Insulation -2nd Floor Shower Pans |
2024/06/10 | Plumbing | Fixtures | Passed | Paul Nitz | -2nd Floor Pipe and Wall Insulation -2nd Floor Shower Pans |
2024/06/06 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | 3rd floor shower pan water test; 3rd floor south corridor Sheetrock screw, 3rd floor hallway hard ceiling framing 2nd floor wall piping rough in |
2024/06/06 | Plumbing | Rough-in | Passed | Paul Nitz | 3rd floor shower pan water test; 3rd floor south corridor Sheetrock screw, 3rd floor hallway hard ceiling framing 2nd floor wall piping rough in |
2024/06/06 | Building/Structural | Sheetrock | Passed | Paul Nitz | 3rd floor shower pan water test; 3rd floor south corridor Sheetrock screw, 3rd floor hallway hard ceiling framing 2nd floor wall piping rough in |
2024/06/06 | Building/Structural | Sheetrock | Passed | Paul Nitz | -2nd floor wall framing repairs and shower soffits -3rd floor North corridor Sheetrock screw inspection |
2024/06/06 | Building/Structural | Framing | Passed | Paul Nitz | -2nd floor wall framing repairs and shower soffits -3rd floor North corridor Sheetrock screw inspection |
2024/06/06 | Plumbing | Fixtures | Passed | Paul Nitz | 3rd floor shower pan water test; 3rd floor south corridor Sheetrock screw, 3rd floor hallway hard ceiling framing 2nd floor wall piping rough in |
2024/06/05 | Building/Structural | Framing | Passed | Paul Nitz | -3rd floor bathroom and pipe insulation -3rd floor hallway hard ceiling framing - discuss drywall inspection, we plan on calling an “in progress” |
2024/06/05 | Building/Structural | Insulation | Passed | Paul Nitz | -3rd floor bathroom and pipe insulation -3rd floor hallway hard ceiling framing - discuss drywall inspection, we plan on calling an “in progress” |
2024/06/04 | Building/Structural | Insulation | NOT READY | Paul Nitz | 3rd floor |
2024/05/31 | Plumbing | Rough-in | Passed | Paul Nitz | |
2024/05/31 | Plumbing | Water Piping & Test | Passed | Paul Nitz | |
2024/05/31 | Building/Structural | Framing | Passed | Paul Nitz | 3rd Floor shower soffits, framing repairs, etc |
Mechanical | Duct Rough-in | Dwayne Mahony | Discuss dampers and fire ratings in corridors |
BCA Project #: 23-03496- Bellamy Building New Circuits for Room 042 Workstations
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/03/26 | Electrical | Final Electrical | Passed | Dwayne Mahony | |
Mechanical | Duct Rough-in | Paul Nitz |
BCA Project #: 23-03491- Wm. Johnston Textile Testing Lab Relocation to Suite 3005 & 3006
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/11 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Small area at eye wash station. |
2024/06/21 | Building/Structural | Insulation | Passed | Dwayne Mahony | |
2024/06/21 | Building/Structural | Framing | Passed | Kody Boswell | |
2024/06/14 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | |
2024/06/14 | Mechanical | Wall & Ceiling | Conditional | Paul Nitz | strap connections need to be masteced or sealed |
2024/06/14 | Plumbing | Water Piping & Test | Passed | Paul Nitz | |
2024/06/14 | Building/Structural | Framing | Conditional | Dwayne Mahony | Repair studs in some mannor where the webs were excessivly cut away for pipes or electrical conduit. Remove additional gypsum board back to studs for proper joint in fire-rated walls. Fire stop floor penetrations of pipes in walls. Re-inspection is required. |
2024/06/04 | Plumbing | Stack Piping & Test | Passed | Neely Lewis |
BCA Project #: 23-03488- College of Medicine Research Building Suite 2301 Modifications
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/13 | Fire Safety | Final Fire Sprinkler | Passed | Mary Creason | Sprinkler installed per NFPA13. Approved |
2024/05/13 | Building/Structural | Final Building | Passed | Dwayne Mahony | |
2024/05/09 | Mechanical | Final Mechanical | Passed | Neely Lewis | Need T&B if required by drawings |
2024/05/09 | Electrical | Final Electrical | Passed | Dwayne Mahony | |
2024/05/06 | Mechanical | Insulation | Passed | Neely Lewis | |
2024/05/02 | Mechanical | Duct Rough-in | Passed | Dwayne Mahony | Rough-in corrected to meet plan requirements. OK to insulate. Dwayne Mahony, cell 850 294 1581 |
2024/05/01 | Electrical | Wall Rough-in | Conditional | Dwayne Mahony | Assure that the electrical box plaster rings end up within 1/8" of the finished surface. |
2024/05/01 | Mechanical | Duct Rough-in | Failed | Dwayne Mahony | Work does not conform to the approved plans. Make corrections as disscussed and call for reinspection. |
BCA Project #: 23-03485- Parking Garage 5 Brick Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/31 | Building/Structural | Wall/Ceiling | Kody Boswell | No inspection performed. FSU BCA visited the site to assess condition of structure after brick façade was removed. |
BCA Project #: 23-03481- Facility For Arts Research Bldg. Art Gallery Remodel
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/02 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed attachment of fire retardant sheathing to the interior of the renovated space. This is a change from the 100% CDs, shown in ASI #2 and #3. |
2024/06/26 | Electrical | Ceiling Rough-in | Passed | Alex Masterton | No comments. |
2024/06/26 | Electrical | Panel/Feeder | Passed | Alex Masterton | No Comments. |
2024/06/13 | Building/Structural | Insulation | Passed | Paul Nitz | this was for the exterior wall only |
2024/06/12 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
2024/06/05 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed new header over door cut in existing masonry. |
2024/05/02 | Plumbing | Rough-in | Passed | Dwayne Mahony | Test pressure was 100 PSI |
2024/05/02 | Mechanical | Duct Rough-in | Conditional | Dwayne Mahony | All R.I. is approved. Conditional approval is for return duct size: Please have the mechanical engineer provide the required flex duct sizes for the return air from grill to main duct. Assure that the air velocity will not be excessive so that it will not cause excessive noise. With only two return grilles and ducts the volume at each of these will be nearly 1,000 CFM. |
2024/04/26 | Plumbing | Rough-in | Conditional | Neely Lewis | pressure test on water piping is too low. |
2024/04/24 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed attachment of exterior sheathing/insulation to exterior LG walls. |
2024/04/09 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed exterior LG framing for new walls. |
2024/04/05 | Plumbing | Rough-in | Passed | Neely Lewis |
BCA Project #: 23-03478- Psychology (4004), Office Remodeling A0207
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/31 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to new LG frame walls for new offices |
2024/05/31 | Building/Structural | Insulation | Passed | Kody Boswell | Contractor sent photos prior to sheathing attachment. See folder dated "2024-05-31 Insulation" |
2024/05/17 | Building/Structural | Framing | Passed | Dwayne Mahony | |
2024/05/17 | Electrical | Wall Rough-in | Passed | Dwayne Mahony |
BCA Project #: 23-03477- New College of Florida New Greenhouse & Shed
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/11 | Plumbing | Underground | Passed | Steve Bell | |
2024/06/11 | Building/Structural | Footing | Failed | Steve Bell | |
Steve Bell |
BCA Project #: 23-03473- Westcott - Partial Reroofing
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/10 | Building/Structural | Roofing | Passed | Kody Boswell | Reviewed pedestrain walkway tunnel for compliance with FBC. |
BCA Project #: 23-03471- UCD - Suite 4200 Office Improvements
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/21 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | |
2024/06/21 | Electrical | Final Electrical | Passed | Dwayne Mahony |
BCA Project #: 23-03467- Mendenhall Bldg. "A" - Replace AHU #10
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/11/14 | Mechanical | Final Mechanical | Passed | Dwayne Mahony |
BCA Project #: 23-03466- Wm. Johnston - Manikin Chamber Cool Air Upgrade
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/14 | Electrical | Final Electrical | NOT READY | Dwayne Mahony | No access to room. |
2024/05/14 | Mechanical | Final Mechanical | Failed | Neely Lewis | 1. Need locking caps on regfrigeration access ports FBC-M Sec 1101.10 2. Insulation is to be continuous on refrigeration suction line. FBC-C Section 403.2.10. ( exposed suction pipe will cause condensate to drip and discolor brick on historic building.) 3.Armaflex insulation is to be painted or covered to protect it for degrading from sunlight. FBC-C Sec C403.2.10.1. |
2024/02/06 | Building/Structural | Footing | Passed | Dwayne Mahony | Addition to mechanical slab is approved. |
2023/12/28 | Plumbing | Underground | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |
2023/12/28 | Building/Structural | Slab | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |
2023/12/28 | Building/Structural | Footing | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |
BCA Project #: 23-03465- Chemistry Science Lab - Rm. 4100 Autoclave Replacements
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/08 | Fire Safety | Final Fire Sprinkler | Passed | Mary Creason | Temperature bulbs changed to high temp. blue bulbs. Passed |
2024/07/08 | Fire Safety | Final Fire Alarm | Passed | Mary Creason | Tested fire alarm device - passed |
2024/07/08 | Fire Safety | Final Fire Safety | Passed | Mary Creason | |
2024/07/02 | Electrical | Final Electrical | Passed | Alex Masterton | Provide an accurate updated electrical panel schedule. |
2024/07/02 | Mechanical | Final Mechanical | Passed | Paul Nitz | |
2024/06/21 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | |
2024/06/13 | Plumbing | Specialty Piping | Passed | Paul Nitz | |
2024/06/13 | Plumbing | Rough-in | Passed | Paul Nitz | |
2024/05/15 | Plumbing | Rough-in | Passed | Dwayne Mahony | Approved floor drains. Third floor ceilings may be reinstalled. |
BCA Project #: 23-03464- Psychology - Lab Remodel C0366 & C0472
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/04/15 | Building/Structural | Final Building | Passed | Dwayne Mahony | Approved for C.C. |
2024/03/27 | Building/Structural | Above ceiling | Passed | Dwayne Mahony | |
2024/03/27 | Mechanical | Final Mechanical | Passed | Neely Lewis | Need T&B for CC. |
2024/03/27 | Electrical | Final Electrical | Passed | Dwayne Mahony | |
2024/03/22 | Mechanical | Duct Rough-in | Passed | Neely Lewis | Ready for insulation |
2024/03/06 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | |
2024/03/06 | Building/Structural | Framing | Passed | Dwayne Mahony |
BCA Project #: 23-03459- AME Bldg. - Wind Tunnel Compressed Air Tanks
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/02/09 | Building/Structural | Footing | Passed | Kody Boswell | Rebar inspection Reviewed reinforcing steel for concrete curbs and pedestals for new tank support and steel framing for access platform. (KB) |
2024/02/07 | Building/Structural | Foundation | Passed | Kody Boswell | This inspection is for rebar. Pre concrete inspection. Reviewed reinforcing steel for spread footings for tank supports and spread footings for steel platform. (KB) |
BCA Project #: 23-03458- Stone Building - Suites 1208 & 1211 Remodel
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/01/31 | Fire Safety | Final Fire Alarm | Passed | Mary Creason | 1. A visual/horn device was not installed per plans in new conference room. It shall be installed per plans or else the AOR/EOR will have to submit the changes to our office for approval. 2-2-2024 ASI # 3 was submitted to this office and F/A device was taken out in conference room. - Fire Final Approved |
2024/01/31 | Fire Safety | Final Fire Safety | Passed | Mary Creason | |
2024/01/25 | Plumbing | Final Plumbing | Conditional | Neely Lewis | Need instahot waterheater activated for completion |
2024/01/25 | Fire Safety | Final Fire Safety | Passed | Mary Creason | An Exit sign was not installed as per plans. Need to install and be witness that it works. 2/2/2024 - Exit sign was installed. Final Fire Safety approved ASI#3 was sent to our department and F/A device was taken out of scope of work. |
2024/01/25 | Fire Safety | Final Fire Alarm | Passed | Mary Creason | Fire alarm visual and horn were not installed as per approved plans. Informed Bryant Skipper that the EOR must submit an ASI to remove the device on plans. 2/2/2024 - ASI #3 was submitted to our department taking out the F/A device. Exit sign was also installed. Final Fire Alarm Approved |
2024/01/25 | Mechanical | Final Mechanical | Passed | Neely Lewis | Need T&B for CC. |
2024/01/10 | Mechanical | Wall & Ceiling | Passed | Dwayne Mahony | |
2024/01/10 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | All work to provide improved fire protection has been done, well. |
2024/01/10 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | This includes work to properly support many electrical boxes and conduits. |
2023/12/13 | Building/Structural | Sheetrock | Passed | Kody Boswell | Drywall Screw Inspection |
2023/12/08 | Building/Structural | Framing | Conditional | Dwayne Mahony | Either I or superintendent will meet you on site. Thank You Add one missing knee brace and add screws at box beam header as discussed. Ok to install wall board when you have done this, no additional inspection. |
2023/12/08 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Either I or superintendent will meet you on site. Thank You |
2023/12/08 | Plumbing | Rough-in | Passed | Neely Lewis | Either I or superintendent will meet you on site. Thank You |
Building/Structural | Final Building | Dwayne Mahony | |||
Electrical | Final Electrical | Dwayne Mahony |
BCA Project #: 23-03457- Rogers Hall - Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/02/20 | Building/Structural | Final Building | Conditional | Kody Boswell | Final inspection. Roofing is complete, lightning protection system was not yet fully reinstalled. Inspection is conditional pending the receipt of the lightning protection certification. Note: Siplast field rep completed their warranty inspection prior to this final inspection. (KB) |
2024/02/20 | Building/Structural | Roofing | Conditional | Kody Boswell | Final inspection. Roofing is complete, lightning protection system was not yet fully reinstalled. Siplast field rep did their warranty inspection prior to this final inspection. (KB) |
2023/12/12 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection request Reviewed cap sheet installation at low roof |
BCA Project #: 23-03455-A Doak Campbell - East Stands Improvements Phase II
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for elevated slabs on the upper concourse between grids 2N-9N |
2024/07/11 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S Missing reinforcing from 7/10/2024 inspection was installed and deck was cleaned off. |
2024/07/11 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S Missing reinforcing from 7/10/2024 inspection was installed and deck was cleaned off. |
2024/07/10 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S There was some reinforcing that was not installed per detail 7/S6.13 and there was excessive debris in some areas. Contractor to install reinforcing steel and clean off deck. |
2024/07/09 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU prior to arrival on site to cancel inspection and postpone to a later date. |
2024/06/27 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the elevated slab at the upper concourse level located in the area between grids F-G/7S-19S |
2024/06/26 | Building/Structural | ADA | Passed | Kody Boswell | Reviewed 1st floor ramps for compliance with FBC. Ramp slopes were within standards set by FBC. Connor Ross was present during the walk through. |
2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Gate K fire line underground = Hydro, visual and flush for west side HYDRO Start: 8am at 224psi Finish 10:20am at 225psi Visual DR18 Flush - passed |
2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Gate K, J, L and section 11: completed today - HYDRO, Visual and Flush Paperwork completed |
2024/06/26 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Gate K fire line underground = EAST SIDE: Hydro, visual and Flush HYDRO Start at 8:10am 225psi Finished 10:25am 226psi Visual DR18 pipe Flush - passed |
2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Section 11 fire line underground = new fire riser line : flush conducted |
2024/06/26 | Building/Structural | Slab | Postponed | Kody Boswell | 4th floor deck columns 7 south- 19s Contractor contacted FSU BCA prior to arriving on site to cancel and postpone inspection. Contractor will reschedule for another date. |
2024/06/21 | Plumbing | Rough-in | Passed | Dwayne Mahony | |
2024/06/17 | Plumbing | Rough-in | Passed | Paul Nitz | sections 14-13 and 16-15 only |
2024/06/12 | Plumbing | Rough-in | Failed | Paul Nitz | min slope not met on storm drain fbc p1106.2 |
2024/06/12 | Building/Structural | Slab | Passed | Paul Nitz | N side 4th floor elevated slab |
2024/06/10 | Plumbing | Rough-in | NOT READY | Paul Nitz | |
2024/06/05 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for new masonry walls located B-C/1E-2S |
2024/06/05 | Plumbing | Rough-in | Passed | Paul Nitz | |
2024/06/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the ramp and stair footer in the area between grids B-E/8S-9S |
2024/05/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade ramp located between grids A-C/5S-6S |
2024/05/29 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several ramps (slab on grade) |
2024/05/28 | Plumbing | Underground | Passed | Paul Nitz | Section 12/13 |
2024/05/24 | Building/Structural | Slab | Passed | Kody Boswell | Reinforcing steel for ramp slab on grade. Inspection deferred to threshold inspector. See correspondence folder for photos from Contractor. |
2024/05/23 | Plumbing | Rough-in | Passed | Neely Lewis | 1 floor inlet in lower level ramp |
2024/05/23 | Building/Structural | Slab | Passed | Kody Boswell | |
2024/05/22 | Plumbing | Rough-in | Passed | Paul Nitz | |
2024/05/22 | Building/Structural | Framing | Kody Boswell | Meeting held by the Contractor of procedures for weld inspections. FSU BCA met the Contractor, Testing Agency and Threshold Inspector in the field to discuss welding inspections. | |
2024/05/21 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following slab on grade ramps: 1) Between grids A-C/2N-3N 2) Between grids A-C/8N-9N 3) Between grids A-C/11N-12N |
2024/05/17 | Fire Safety | Hydro-Test | Passed | Mary Creason | test started at 7:45am at 215psi and stopped at 10:10am at 215psi. Passed test. |
2024/05/17 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Visual passed, hydro passed and flush passed |
2024/05/16 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel and steel deck attachment for a portion of the slab on deck located in the area between grids A-B/7S-16S. |
2024/05/15 | Plumbing | Rough-in | Passed | Paul Nitz | check slope on ramp 9/10 at next inspection |
2024/05/15 | Plumbing | Underground | Passed | Paul Nitz | check slope on ramp 9/10 at next inspection |
2024/05/13 | Plumbing | Underground | NOT READY | Neely Lewis | |
2024/05/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following slab on grade ramps: 1) In the area between grids A-C/5N-6N 2) In the area between grids A-C/8N-9N |
2024/05/13 | Plumbing | Rough-in | NOT READY | Neely Lewis | |
2024/05/09 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel and steel deck attachment for a portion of the slab on deck located in the area between grids A-B/7N-7S. |
2024/05/06 | Building/Structural | Slab | Passed | Dwayne Mahony | Excess foam plastic is to be removed, T.I. will verify. |
2024/05/03 | Plumbing | Rough-in | Passed | Dwayne Mahony | Approved south end of grandstand lowest level, 7 area drains, and two lower vomitory ramps. |
2024/05/01 | Plumbing | Rough-in | Passed | Neely Lewis | partial only. |
2024/04/30 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a stair footing located in the area between grids B-C/17S-18S |
2024/04/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 2 slab on grade areas that were removed to install underground pipe. Reinforcing consisted of steel doweled into existing concrete at 2'-0" spacing along with WWR. |
2024/04/25 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | |
2024/04/10 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a wall footing for the north wall at the visitor's locker room |
2024/04/02 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls located along grids 14S, 15S and 16S |
2024/03/28 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 10S, 11S, 12S and 13S. |
2024/03/26 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following: - Grade beam along grid 16N - Walls along grids 8S, 9S, 14N and 15N |
2024/03/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 2S, 3S, 4S, 5S, 6S and 7S |
2024/03/18 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 2N and 1E. |
2024/03/15 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following grade beams (GB) and walls: - GBs along grids 11S, 12S, 13S, 14S, 15S and 16S - Walls along grids 3N, 4N, 5N and 6N |
2024/03/13 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 2S thru 10S. |
2024/03/11 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/03/07 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to postpone the inspection to a later date. |
2024/03/06 | Building/Structural | Cast in Place Wall | Passed | Kody Boswell | Reviewed reinforcing steel for walls on top of grade beams located along grids 7N, 8N, 9N ,10N, 11N, 12N, 13N, 14N, 15N and the wall in the area between grids A-B/7N-16N. The deficiencies noted on 3/4/24 inspection were corrected. |
2024/03/05 | Building/Structural | Cast in Place Wall | Postponed | Kody Boswell | Contractor contacted FSU to postpone the inspection to a later date due to weather. |
2024/03/04 | Building/Structural | Cast in Place Wall | Failed | Kody Boswell | Reviewed reinforcing steel for walls on top of grade beams located along grids 7N, 8N, 9N ,10N, 11N, 12N, 13N, 14N, 15N and the wall in the area between grids A-B/7N-16N. There were several missing embeds at expansion joint locations and there was insufficient development length for #7 bars at multiple locations. Contractor to reschedule inspection after corrections are made. |
2024/03/01 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 1E, 2N, 3N, 4N, and 5N. The deficiencies noted on the 2/29/24 inspection were corrected. |
2024/02/29 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 2N, 3N, 4N, and 5N. Each of these grade beams were stepped and were supposed to be reinforced per detail 4/S5.01. Additional reinforcement called out in the detail going from top steel of top portion of grade beam to bottom steel of bottom portion of grade beam was not placed correctly. Also, the last stirrup located closest to the step did not encase the top steel of the bottom portion of grade beam. |
2024/02/27 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/02/27 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | |
2024/02/23 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/02/22 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for grade beams located along grids 6N, 7N, 8N, 9N and 10N. Reinforcing steel at the field side was not in place per detail 7/S5.01. This was discussed with the Contractor. Contractor to contact EOR for direction due to unforeseen conditions. An RFI will be generated. |
2024/02/15 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to postpone grade beam reinforcing steel inspection to a later date. (KB) |
2024/02/14 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for grade beams at the lower concourse located between gridlines 15N, 14N, 13N and 12N. Where new grade beams tied to existing concrete columns there was insufficient longitudinal steel length and spacing between existing concrete face and new reinforcing ties. Per the EOR the first new reinforcing tie should be 2" to 3" off of existing concrete. This was not the case for each side of the 4 grade beams reviewed. Contractor to fix reinforcing steel prior to concrete placement. BNI (threshold) to verify reinforcing is corrected prior to concrete placement. (KB) |
2024/02/09 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to cancel today's inspection and postpone to a later date. Inspection request was for grade beam reincorcing steel. (KB) |
2024/02/08 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to cancel today's inspection and postpone to a later date. Inspection request was for grade beam reincorcing steel. (KB) |
BCA Project #: 23-03455- Doak Campbell - East Stands Improvements Phase I
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/11 | Electrical | Ground | Passed | James Melvin | Ground rods for building steel 1) Al Smythe performed the inspection, it was from gate D to the first elevatoer shaft |
2024/04/29 | Fire Safety | System Flush | Passed | Mary Creason | UG near gate J - flushed - approved |
2024/04/29 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Hydro and visual of piping, tracer line, bulimous paint and restraints on line into sprinkler riser room. Hydro start 810am 220psi and finished at 1020am at 220psi. Passed |
2024/04/25 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Visual and hydro on UG piping at gate J. Hydro start at 8:10am at 205psi and end 10:10am at 2:05psi (See shop drawings for exact location) |
2024/04/25 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | |
2024/04/25 | Fire Safety | Hydro-Test | Passed | Mary Creason | Visual and hydro of pipe passed. Hydro start 8:10am and ended 10:10am 205 psi Pipe is located right next to J gate. (see shop drawings for exact location) |
2024/01/24 | Electrical | Ceiling Rough-in | Conditional | Dwayne Mahony | Panel 94 deadfront piece is missing. Replacement of this piece is mandatory since new load is being added to this panel, per Existing Building code section 808.2. |
2024/01/22 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | Inspected new lights and wiring on lower ramps. |
BCA Project #: 23-03453- Fine Arts Bldg. - Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspection |
2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspection |
2023/12/21 | Building/Structural | Roofing | Postponed | Tom Deckert | In-Progress Inspection - Cap Sheet |
2023/12/06 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection Reviewed installation of cap sheet on one low roof and the cleaning of existing material where cap sheet was to be installed (KB) |
BCA Project #: 23-03446- Housewright - Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/27 | Building/Structural | Roofing | Conditional | Kody Boswell | Final Roof Inspection Result is conditional pending drain installation at two locations on the highest roof level. Contractor to send photos after installation is complete. |
2024/06/27 | Building/Structural | Final Building | Conditional | Kody Boswell | Final Roof Inspection Result is conditional pending drain installation at two locations on the highest roof level. Contractor to send photos after installation is complete. |
2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspections |
2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspections |
2023/12/21 | Building/Structural | Roofing | Postponed | Tom Deckert | In-Progress Inspection - Cap Sheet |
2023/12/06 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection |
2023/11/09 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection |
BCA Project #: 23-03445- UCB - Room 2103 Renovation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/02 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Sorry for the short notice but I just found out that I have to schedule this inspection. Please call me. Visual conducted - approved |
2024/07/02 | Building/Structural | Sheetrock | Passed | Paul Nitz | |
2024/07/01 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
2024/07/01 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | WITH PICS |
2024/07/01 | Electrical | Ceiling Rough-in | Passed | James Melvin | |
2024/07/01 | Building/Structural | Framing | Passed | Paul Nitz | |
2024/06/18 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | This is for a welding inspection for above ceiling Approved welding of light support angles. |
2024/05/09 | Building/Structural | Framing | Passed | Dwayne Mahony | |
2024/05/09 | Electrical | Wall Rough-in | Passed | Dwayne Mahony |
BCA Project #: 23-03443- Maryland Bldg. - Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/14 | Building/Structural | Roofing | Passed | Kody Boswell | Final inspection of roof. Metal deck infill, PVC cap, coping metal and new primary roof drains are fully installed. Waiting on plumbers to cut out overflow scuppers, not in Harrell Roofing scope of work. Overflow scuppers have been installed and Harrell Roofing has completed their scope of work as of 6/14/2024 |
2024/03/06 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of flashing membrane of parapet walls. Contractor was working on the south and west parapets at time of inspection. |
BCA Project #: 23-03441- Rogers Bldg. - Basement Phase 2 Entry & Lab Remodel
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/12 | Building/Structural | Final Building | Failed | Paul Nitz | signage and lockable door requirements not met for the restrooms, fbc p2902.4 fbc p2902.3.6 fbc a703.2 |
2024/07/12 | Plumbing | Final Plumbing | Passed | Paul Nitz | |
2024/07/12 | Mechanical | Final Mechanical | Passed | Paul Nitz | |
2024/07/02 | Electrical | Final Electrical | Passed | James Melvin | |
2024/07/01 | Plumbing | Final Plumbing | Paul Nitz | ||
2024/07/01 | Electrical | Final Electrical | Paul Nitz | ||
2024/07/01 | Plumbing | Final Plumbing | Paul Nitz | ||
2024/07/01 | Mechanical | Final Mechanical | Paul Nitz | ||
2024/07/01 | Mechanical | Final Mechanical | Paul Nitz | ||
2024/07/01 | Electrical | Final Electrical | Paul Nitz | ||
2024/06/24 | Fire Safety | Re-Inspection | Passed | Mary Creason | Added 3 smoke detectors - Tested new smoke detectors with fire alarm company. Passed inspections. |
2024/06/20 | Building/Structural | Final Building | Conditional | Dwayne Mahony | Need to have plumbing and mechanical (smoke/fire dampers) final approval, not yet ready. Fire/smoke dampers must be tested after the wiring has been completed. |
2024/06/14 | Fire Safety | Final Fire Safety | Passed | Mary Creason | All emergency lights and occupancy sensor devices connected to the fire alarm were tested and passed. Sprinkler were installed and baffle ceiling does not effect the spray pattern. Fire extinguishers installed however need WORDING: on wall cabinets (will be corrected by building final) Fire Alarm devices tested and completed Lifesafety was in compliance |
2024/06/11 | Electrical | Final Electrical | Conditional | Dwayne Mahony | Ground transformer to the rod in that room. Relocate 3 pole circuit breaker for the surge protector to other side of panel to decrease conductor length. Provide updated schedule. |
2024/05/31 | Fire Safety | Final Fire Alarm | Conditional | Mary Creason | Fire Alarm Passed inspection - need to test Occupancy Sensors at Fire Final |
2024/05/31 | Fire Safety | Final Fire Sprinkler | Conditional | Mary Creason | Inspection passed per Approved plans however will need to see ceiling baffles installed for final |
2024/05/22 | Mechanical | Re-Inspection | Passed | Neely Lewis | A above ceiling re-inspection |
2024/05/22 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | This is for the above ceiling electrical inspection. This note is to acknowledge that the corridor ceiling is only 7'-2" AFF, while code minimum is 7'-6". Such height could not be achieved in this existing building condition. Dwayne. |
2024/05/22 | Plumbing | Rough-in | Conditional | Paul Nitz | 1) full open valve required on the discharge side of the check valve as per FBC p712.2 2) discharge pipe materials must match one of FBC p712.3.3.1 |
2024/05/22 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Above ceiling for sprinkler system Sprinkler installed per plans - approved. |
2024/05/06 | Mechanical | Wall & Ceiling | Conditional | Neely Lewis | Flex needs some hangers installed. Opne pipe neds isolation tape. |
2024/05/06 | Electrical | Ceiling Rough-in | Conditional | Dwayne Mahony | Many lights still need to be independently supported. Reinspection is required. |
2024/04/25 | Mechanical | Duct Rough-in | Passed | Neely Lewis | |
2024/04/17 | Plumbing | Rough-in | Passed | Neely Lewis | |
2024/04/17 | Plumbing | Underground | Passed | Neely Lewis | |
2024/04/16 | Plumbing | Rough-in | NOT READY | Neely Lewis | |
2024/04/15 | Mechanical | HW Piping & Test | Passed | Neely Lewis | |
2024/04/15 | Mechanical | Cond. Piping & Test | Passed | Neely Lewis | |
2024/04/01 | Mechanical | Duct Rough-in | Passed | Neely Lewis | Partial duct sealant in main basement entrance |
2024/03/27 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Ready for insulation |
2024/03/11 | Plumbing | Rough-in | Passed | Dwayne Mahony | |
2024/03/11 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | |
2024/03/06 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | This request is for an above ceiling inspection in the new bathroom area's. |
2024/03/04 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Cover up hard ceilings. 7 class rooms and 3 bathrooms were ok to cover up for hard ceilings. |
2024/03/01 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | |
2024/02/28 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Partial restrooms only |
2024/02/28 | Mechanical | Duct Rough-in | Conditional | Neely Lewis | missing mastic on some seams. Will revisit site when it is corrected |
2024/02/28 | Plumbing | Stack Piping & Test | Failed | Neely Lewis | Notes: All plumbing piping in walls is to be properly protected against physical damage per FBC-P Section 305.6. Any copper or PVC pipe within 1.25" of the nearest edge of the member is to be protected by steel shield plates. All PVC exposed to the plenum is to be properly separated from the plenum air with a wrap designed for use with PVC as the carrier pipe. Gang restroom waste piping is to be properly sloped per FBC-P Section 704. Two pipes are not properly sloped. Will reinspect when corrected. |
2024/02/28 | Plumbing | Water Piping & Test | Conditional | Neely Lewis | need insulation on hot water pipe prior to covering walls. Need nail guards installed where piping is under 1.25" from nearest edge of wall. |
2024/02/28 | Building/Structural | Framing | Conditional | Dwayne Mahony | Partial restrooms only Provide clips from studs to wall where the stust were cut for lavatory waste arms. |
2024/02/19 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | |
2024/02/19 | Building/Structural | Framing | Passed | Dwayne Mahony | |
2024/02/16 | Plumbing | Rough-in | Passed | Neely Lewis | Ready for HW insulation, Plenum wrap of PVC . Complete supports of copper before next inspection. |
2024/02/16 | Plumbing | Stack Piping & Test | Passed | Neely Lewis | |
2024/01/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of slab on grade that had been cut to install new underground piping. |
2024/01/26 | Plumbing | Underground | Passed | Neely Lewis | |
2024/01/26 | Plumbing | Rough-in | Passed | Neely Lewis | |
2024/01/11 | Building/Structural | Slab | Passed | Dwayne Mahony | Slab Repairs |
2024/01/10 | Plumbing | Rough-in | Passed | Dwayne Mahony | Just U/G and 5' stub-ups. |
2024/01/10 | Plumbing | Underground | Passed | Dwayne Mahony | pipe filled and tested. |
2023/11/06 | Building/Structural | Slab | Passed | Dwayne Mahony | |
2023/11/03 | Building/Structural | Slab | Passed | Dwayne Mahony | |
2023/11/01 | Building/Structural | Footing | Passed | Dwayne Mahony | |
Building/Structural | Slab | Cancelled | Dwayne Mahony | will not be ready |
BCA Project #: 23-03439- McIntosh Remodeling
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/12 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Generator final inspection. All electrical in the building has already been inspected and passed. Not on fire emergency life safety panel only for freezers. |
2024/07/12 | Electrical | Final Electrical | Passed | James Melvin | Generator final inspection. All electrical in the building has already been inspected and passed. |
2024/06/11 | Mechanical | Final Mechanical | Conditional | Paul Nitz | Remaining final inspections for all work except for the generator. 1) safety caps required on the king valve 2) pennatration going through the wall needs to be filled 3) T & B results need to be submitted |
2024/06/10 | Fire Safety | Final Egress/Emergency Lights | Passed | Mary Creason | Remaining final inspections for all work except for the generator. |
2024/06/10 | Building/Structural | Final Building | Conditional | Dwayne Mahony | Remaining final inspections for all work except for the generator. The new refrigerant lines to the new condensing unit are an obstruction to the working space in front of the electric meter, NEC 110.26. Construct a level platform over these lines. |
2024/06/10 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Remaining final inspections for all work except for the generator. |
2024/06/10 | Fire Safety | Final Fire Alarm | Passed | Mary Creason | Remaining final inspections for all work except for the generator. |
2024/05/17 | Building/Structural | Slab | Passed | Dwayne Mahony | Slab for generator pad. Final electrical inspection for all inside areas (does not include the generator) Final Plumbing inspection |
2024/05/17 | Electrical | Final Electrical | Conditional | Dwayne Mahony | Slab for generator pad. Final electrical inspection for all inside areas (does not include the generator) Final Plumbing inspection Partial approval, interior areas only. |
2024/05/17 | Plumbing | Final Plumbing | Conditional | Dwayne Mahony | Slab for generator pad. Final electrical inspection for all inside areas (does not include the generator) Final Plumbing inspection Provide access to floor drain. |
2024/05/07 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing for the new ramp to be built on the west side |
2024/05/01 | Mechanical | Insulation | Passed | Neely Lewis | Pressure test on the piping on the outside condenser. Insulation on the duct in the gym. |
2024/05/01 | Mechanical | Cond. Piping & Test | Passed | Neely Lewis | Pressure test on the piping on the outside condenser. Insulation on the duct in the gym. |
2024/04/09 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed fastening of store front to existing brick. During the previous inspection, Contractor was directed to use longer fasteners to penetrate through brick façade and penetrate into CMU walls |
2024/03/25 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Sheetrock and screws inspection for lab 139 only. Figured you could look at this Monday morning when you come for the storefront frame inspection at 9am. The system would not allow me to select Monday since it was the same day. Thank you |
2024/03/25 | Building/Structural | Wall/Ceiling | Conditional | Dwayne Mahony | Inspection for storefront door. Replace tapcons with longer ones that penetrate the brick veneer and go into the structural CMU. Re-inspection is required. |
2024/03/19 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | Remaining inspections so we can start hanging drywall. Time is flexible so please let me know if you need to do it earlier or later in the day. Thank you |
2024/03/19 | Mechanical | Duct Rough-in | Passed | Neely Lewis | Remaining inspections so we can start hanging drywall. Time is flexible so please let me know if you need to do it earlier or later in the day. Thank you Ready for ductwrap. |
2024/03/19 | Building/Structural | Framing | Passed | Dwayne Mahony | Remaining inspections so we can start hanging drywall. Time is flexible so please let me know if you need to do it earlier or later in the day. Thank you |
2024/03/01 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Electrical wall rough in inspection |
2024/02/08 | Plumbing | Rough-in | Passed | Neely Lewis | Reinspection of the elbows on the copper pipes in the gym. Thank you |
2024/02/08 | Plumbing | Re-Inspection | Passed | Neely Lewis | Reinspection of the elbows on the copper pipes in the gym. Thank you |
2024/02/02 | Plumbing | Rough-in | Failed | Neely Lewis | Hot and cold water line inspection before we insulate. Copper to steel connections on domestic water lines is not allowed. |
2023/12/28 | Plumbing | Underground | Passed | Neely Lewis | |
2023/12/26 | Plumbing | Underground | Postponed | Tom Deckert |
BCA Project #: 23-03433- Soccer Sideline Canopy Improvement
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/01/12 | Building/Structural | Roofing | Conditional | Kody Boswell | Reviewed new aluminum supports for new roof panel installation and reviewed new roof panel attachment. Aluminum supports were in substantial compliance with the contract documents. Screw attachment of panels to structure were in substantial compliance with the contract documents and FL Product Approval. Screw attachment at panel sidelaps had not been installed yet. FSU to verify installation during next inspection. (KB) |
BCA Project #: 23-03430- Parking Garages 1-6 CCTV Upgrade
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/12/05 | Electrical | Final Electrical | Conditional | Dwayne Mahony | Contact Todd Jones for specific site inspection time. 850-544-4424 Approved garage 5 final inspection in full. |
BCA Project #: 23-03427- Sandels Reroofing
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/02/20 | Building/Structural | Roofing | Conditional | Kody Boswell | Final inspection. Roofing is complete. Lightning protection system was not yet fully reinstalled. Drain bolts and baskets need to be replaced where deteriorated. Siplast field rep did their warranty inspection prior to this final inspection, Contractor was repairing areas marked by Siplast. (KB) |
2024/02/20 | Building/Structural | Final Building | Conditional | Kody Boswell | Final inspection. Roofing is complete. Lightning protection system was not yet fully reinstalled. Drain bolts and baskets need to be replaced where deteriorated. Inspection is conditional pending the receipt of the lightning protection certification and the new drain bolts and baskets being installed. Note: Siplast field rep did their warranty inspection prior to this final inspection, Contractor was repairing areas marked by Siplast during this inspection. (KB) |
2023/10/06 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection (10/5/2023) |
BCA Project #: 23-03425- Bio Unit 1 Fan Wall Retrofit
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/04/09 | Mechanical | Final Mechanical | Conditional | Neely Lewis | Deficiencies: • Install service door for AHU 4 - ordered from the manufacturer, ship date is 4/18 • Seal around door on AHU 2A • Install the two low temp detectors on AHU 1 and AHU 2 These should be arriving within the next few weeks they had an 8 month lead time. |
BCA Project #: 23-03418-B Doak Campbell - West Stands Renovation - (Pkg. 3 & 4)
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/15 | Plumbing | Underground | Passed | Paul Nitz | greese |
2024/07/15 | Plumbing | Underground | Passed | Paul Nitz | sanitary |
2024/07/12 | Building/Structural | Masonry | Cancelled | Kody Boswell | Contractor contacted FSU BCA prior to inspection to cancel. |
2024/07/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following masonry walls on level 3: 1) 2nd lift in the area between grids WD-WE/W10S-W11S 2) 2nd lift along grid M/W8S-W10S 3) 1st lift along grid M/W6S-W8S |
2024/07/11 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the level 3 elevated slab in the area between grids WD-M/W8N-W11N. There were several masonry dowels and curb dowels not yet installed. FSU BCA to verify with threshold inspetor that dowels are installed prior to concrete placement. |
2024/07/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of masonry walls along grid M/W8S-W9S |
2024/07/10 | Building/Structural | Masonry | Cancelled | Kody Boswell | Contractor and FSU discussed only goinng to the 2pm masonry inspection, as 2 masonry inspections in the same day was not needed. |
2024/07/10 | Plumbing | Underground | Passed | Paul Nitz | |
2024/07/10 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed precast welded connections for vomitory walls on level 3 between grids W2N-W3N, W2S-W3S and W4S-W5S. |
2024/07/10 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to arrival on site to cancel/postpone a level 3 elevated slab inspection to a later date. |
2024/07/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift for the following walls on level 3: 1) In the area between grids WD-WE/W10S-W11S 2) Along grid M between grids W8S-W10S |
2024/07/09 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the level 3 elevated slab in the area between grids WD-M/W4N-W7.9N. Several dowels for curbs supporting precast walls and dowels for load-bearing masonry walls were not in place. FSU BCA remained on site until enough work was complete to comfortably defer to the threshold inspector. Threshold inspector to verify remaining dowels in place prior to concrete placement. FSU BCA to follow up. |
2024/07/05 | Plumbing | Underground | Passed | James Melvin | I place of inspection on 7/5. |
2024/07/04 | Plumbing | Underground | Passed | Paul Nitz | Storm trunk line |
2024/07/04 | Plumbing | Underground | Passed | James Melvin | In place of inspection on 7/4. |
2024/07/03 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for curbs on level 3 in the area between grids WD-WE/W10S-W11S and between grids WF-M/W8S-W10S. Contractor was still installing formwork at time of inspection. FSU to defer to threshold inspector to verify formwork is in place prior to concrete placement. |
2024/07/03 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of 12" cmu walls in the area between grids WF-M/W2S-W3S. Main concourse level. |
2024/07/02 | Building/Structural | Structural | Cancelled | Kody Boswell | precast inspection Contractor contacted FSU BCA to cancel and postpone inspection prior to arrival on site |
2024/07/02 | Plumbing | Underground | Passed | Paul Nitz | Small section of grease replaced once storm piping was set below it. |
2024/07/02 | Plumbing | Underground | Passed | Paul Nitz | |
2024/07/02 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry inspection for the remaining block in area b. 1st lift of reinforcing steel was reviewed. |
2024/07/02 | Building/Structural | Slab | NOT READY | Kody Boswell | FSU arrived on site to review reinforcing steel for curbs on level 3 in the area between grids WD-WE/W10S-W11S. Contractor was not done tying reinforcing steel in place |
2024/06/28 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) 3rd level (Upper concourse) curbs for precast in the area between grids WD-WE/W6S-W7S and grids WD-WE/W4S-W5S 2) 2nd level (Founders level) elevated slab on deck in the area between grids WD-WF/ W3.9N-W3.9S |
2024/06/28 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of masonry located in the approximate area between grids WE-WF/3-4. |
2024/06/27 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of masonry located approximately in the area between grids WF-M/W3S-W4S. |
2024/06/27 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm and sanitary |
2024/06/26 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for bond beams below grade located at the intersection of gridines WE/W8S and WE/W9S |
2024/06/26 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/25 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/06/25 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/25 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/06/24 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/24 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of bathroom and concession stands masonry walls in area B. First lift goes from top of foundation elevation to top of slab elevation. There were two areas where bond beam reinforcing was not installed per RFI response. These locations are at the intersection of grids WE/W8S and WE/W9S. Other areas had reinforcing steel in substantial completion with the contract documents. |
2024/06/21 | Building/Structural | Masonry | Passed | Kody Boswell | Foundation block area b restrooms. |
2024/06/20 | Building/Structural | Slab | Passed | Kody Boswell | Rebar inspection for slab on metal deck at upper concourse sequence 2 |
2024/06/20 | Plumbing | Underground | Passed | Dwayne Mahony | |
2024/06/20 | Building/Structural | Masonry | Passed | Kody Boswell | Foundation block for area b restrooms. |
2024/06/19 | Building/Structural | Masonry | Passed | James Melvin | Foundation block inspection area b restroom. |
2024/06/18 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar before cell grout |
2024/06/07 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for the elevated slab on deck on level 3 in the area between girds M-WD/W8S-W11S. Contractor had not finished tying reinforcing in place. There were deck penetrations that need additional reinforcing and one curb did not have reinforcing tied in place. Contractor to reschedule once work is complete. |
2024/06/06 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to arriving on site to postpone the inspection for a later date. |
2024/06/04 | Plumbing | Underground | Failed | Paul Nitz | Inspecting storm line taps and sanitary leveling 1) sloope not met for waist drain fbc p704.1 |
2024/06/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the founders level elevated slab in the area between grids WD-M/W4S-W11S. |
2024/06/03 | Plumbing | Underground | NOT READY | Paul Nitz | this was for the storm drain connections, all were ok but the 16'' needs to be looked at |
2024/06/03 | Plumbing | Underground | Failed | Paul Nitz | slope not met for waist drain fbc p704.1 |
2024/05/31 | Plumbing | Underground | Failed | Paul Nitz | Sanitary and grease as per our conversation in regards to the drain line that was laid above grade the entire area will have to be reinspected after its corrected |
2024/05/31 | Building/Structural | Slab | NOT READY | Kody Boswell | Contractor was not ready for inspection and will reschedule for a later date. |
2024/05/28 | Building/Structural | Structural | Cancelled | Kody Boswell | Phase 1 structural steel inspection FSU communicated to Contractor that structural steel inspection to be done by threshold inspector. |
2024/05/28 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Inspected the megalug restraints. The open ditch had excessive water and I could not complete the inspection. I will return on 5/29 to reinspect remaining portion of the pipe, bolt coatings and thrust block installation. No leaks were present on the visible pipe section at the time of inspection. |
2024/05/21 | Plumbing | Underground | Passed | Neely Lewis | |
2024/05/21 | Building/Structural | Footing | Cancelled | Kody Boswell | This was a request for observation of grout placement under steel column baseplates. Threshold inspector was on site. |
2024/05/20 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following: 1) Pedestal at grids W11N/WF 2) Wall footing along grid M/W5S-W6S |
2024/05/20 | Plumbing | Underground | Failed | Paul Nitz | 5/21/2024:Slope was not accordig to FBC requirements. |
2024/05/17 | Plumbing | Underground | NOT READY | Paul Nitz | not ready for inspection |
2024/05/17 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Column footing at grids WC.1/W11N 2) Column footing at grids WC.1/W9N 3) Column footing at grids WE/W10N 4) Column footing at grids WF/W11N 5) Column footing at grids WF/W10N 6) Wall footing in the area between grids WA-WB/W10N-W11N |
2024/05/09 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid W9N/WA-WB 2) Along grid W10N/WA-WB 3) Along grid W11N/WA-WB 4) Along grid WA/W9N-W11N 5) At grids WE/W11N 6) In the area between grids WC-WD/W8N-W9N 7) In the area between grids WC-WD/W8S-W9S |
2024/05/09 | Plumbing | Underground | Passed | Neely Lewis | storm |
2024/05/08 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the following foundations: 1) Contractor to request re-inspection prior to concrete placement |
2024/05/07 | Plumbing | Underground | Failed | Paul Nitz | 1) slope not met on drain fbcp 704.1 2) cleanouts required min every 100' fbcp 708.1 |
2024/05/06 | Electrical | Ground | Passed | Dwayne Mahony | 4/0 Ufer ground |
2024/05/06 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Inspection on the UG fire line had passed earlier, but this inspection is to review the thrustblock installation. All previous items corrected and passed |
2024/05/02 | Plumbing | Underground | Passed | Dwayne Mahony | Approved 16" trunk line as marked on paper plans in trailer. |
2024/05/02 | Electrical | Ground | Postponed | Dwayne Mahony | |
2024/05/02 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Reinspection to insure coating on magalugs and full review of the bolts and tightening. Reinspection of mega lugs and corrosion coating passed. Note: 1) Will need to verify clearance of sanitary pipe once the sanitary lline has been installed over the fire line. 2) We will need to conduct a visual inspection of the thrust blocks once installed and conduct funtional hydro test via the fire pump. |
2024/05/01 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following wall footings: 1) Along grid M/W3S-W5S 2) Along grid M/W3N-W10N |
2024/05/01 | Fire Safety | Fire Water Underground | Failed | Sam Sevor | Inspection of UG 10" fire main pipe per RFI-0151 new pipe & valve (North section only). Inspection did not pass, the following items need correction: 1. Mega lugs not tightened. 2. Mega lugs not coated with anti-corrosion material. 3. Provide Contractors UG certification paperwork. 4. Ensure all bolts for mega lugs are visible for reinspection No leaks were identified at time of visual inspection. Fire water system has been re-pressurized under city pressure only. A follow-up inspection will be required for a hydro test at fire pump pressure (160PSI) after placement before work is covered up. Note: Contractor to provide mega lug manufacturers instruction sheet. |
2024/04/30 | Plumbing | Underground | Passed | Neely Lewis | |
2024/04/29 | Plumbing | Underground | Failed | Neely Lewis | 4/29: Slops of drains not per FBC-P Table 704.1. |
2024/04/29 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following wall footings: 1) In the area between grids WE-M/W8.5N-W9.5N 2) In the area between grids WF-M/W5.5S-W8.5S |
2024/04/26 | Building/Structural | Footing | Passed | Dwayne Mahony | approved elevator walls foundation to slab level. |
2024/04/25 | Plumbing | Underground | Passed | Neely Lewis | |
2024/04/25 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/04/24 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) Wall footing east of grid WA between grids 5N-7N 2) Column & wall footings along grid W5N/WA-WB 3) Column & wall footings along grid W4N/WA-WB 4) Elevator walls in the area between grids WD-WE/W7N-W8N 5) Column & wall footings along grid WF/W5S-W6S Items (1) thru (4) have a "passed" result. Item (5): Column footing at grids WF/W5S has a 1'-0" tall pedestal on top of it. Reinforcing is called out on elevation view 1 on sheet S4-4. It is unclear if the pedestal reinforcing needs to be hooked at the top or not. Also, anchor bolt embedment at this pedestal is 1'-0" which would be at the construction joint between top of footing and top of pedestal. These two items should be clarified with the EOR. Inspection result is conditional pending EOR response. |
2024/04/24 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the elvator mat foundation located in the area between grids WF-M/W5S-W6S. Top and bottom reinforcing layers do not have the proper out-to-out dimension. The foundation is 33" thick, so the out-to-out dimension should be 28". I measured between 25"-26" consistently in several areas of the foundation. This issue is to be corrected and called for a reinspection. |
2024/04/23 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) Elevator walls located between grids WD-WE/W7N-W8N 2) Elevator mat foundation located between grids WE-WF/W4N-W5N 3) Field wall footing located east of grid WA between grids W5N-W5S 4) Elevator walls located between grids W4S-W5S Item (1): Elevator walls were missing 2#5 continuous at the top and bottom of wall per detail 2/S5-5-1. Result is conditional until missing reinforcing is installed. |
2024/04/22 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Spread footings in the area between grids WB-WC/W2N-W3N 2) Spread footing and elevator pad located near grids WD-W8N 3) Elevator pad in the area between grids WE-WF/W4S-W5S |
2024/04/19 | Plumbing | Underground | Passed | Dwayne Mahony | Cleanouts added as required. |
2024/04/19 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids WC.1/W8N 2) At grids WC/W7N 3) At grids WC/W6N |
2024/04/18 | Plumbing | Underground | Failed | Neely Lewis | Grease waste line. Insufficient cleanouts. FBC708.1.1. |
2024/04/18 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid W10N/WA-WB 2) At grids WC/W5N 3) At grids WC/W4N 4) Along grid WD/W2N-W3N 5) In the area between grids WB-WC/Ww2N-W3N |
2024/04/17 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids WD/W11N 2) Along grid WF/W8N-W9N 3) Along grid WF/W5N-W6N 4) At grids WD/W5N 5) At grids WD/W4N 6) Along grid WE/W6S-W9S 7) In the area between grids WB-WC/W2S-W3S |
2024/04/16 | Building/Structural | Footing | Passed | Dwayne Mahony | Approved single column footing at column line WF @ W7, and column footings and CMU wall footings column line W5.5 to W3 on line WE. CMU wall footings do not have vertical dowels. An email has been sent requesting clarifiaction on use of epoxy dowels: During today’s inspection at the west stands project I questioned the lack of dowels for CMU walls on column line WE. A RFI was provided that allowed epoxy installed dowels at the field wall and at “thickened slabs”. These walls are on continuous grade beam foundations and will not be in the area of the temporary stands. I do not think (subjective opinion) that epoxy dowels are equivalent to dowels that are cast-in-place since to achieve the same structural value the dowel holes, preparation, cleaning, and epoxy mixing all must be near perfect, not likely. With this I am requesting greater clarity from the engineer of record, Dylan Richard, on the extent of epoxy dowels for CMU walls, and concurrence from the owner’s representative, Mike Materna, that 100% epoxy dowels for the CMU walls are acceptable to the owner if that is to be the case. |
2024/04/16 | Plumbing | Underground | Passed | Neely Lewis | GW, DW piping southwest side |
2024/04/15 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids WC.1/W10N 2) Along grid WD/W9N-W10N 3) In the area between grids WE-WF/W3N-W4N |
2024/04/12 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) Along grid W1/WB-WC 2) Along grid WD/W6N-W7N |
2024/04/11 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to cancel and postpone inspection due to overnight rain |
2024/04/10 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Several column footings and wall footings along grid WE/W6N-W9.5N 2) Several column footings and wall footings in the area between grids WB-WC/W2S-W3S |
2024/04/10 | Plumbing | Underground | Passed | Neely Lewis | sewer, and grease waste |
2024/04/10 | Plumbing | Underground | Passed | Neely Lewis | Sewer waste, grease waste |
2024/04/09 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid WD/W9S-W10S 2) In the area between grids WA-WB/W10S/W10.5S 3) At grids WE/W1 4) At grids WE/W2S 5) At grids WD/W1 6) Along grid WD/W2S-W3S 7) In the area between grids WE-WF/W3N-W6N |
2024/04/09 | Plumbing | Underground | Conditional | Neely Lewis | sewer waste inspection. Need to reslop;e about 20' of pipe. Slope is 0 deg. |
2024/04/08 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid WF/W3S-W4S 2) At grids WF/W1 3) At grids WF/W2S 4) At grids WF/W2N 5) At grids WE/W2N |
2024/04/05 | Plumbing | Underground | Passed | Neely Lewis | grease waste inspection |
2024/04/05 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) Along grid W11S/WA-WB 2) At grids W11S/WC.1 3) At grids W11S/WD 4) In the area between grids W10.5S-W11S/WE-M 5) In the area between grids W8S-W10S/WE-M 6) At grids W7S/WF |
2024/04/04 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) Along grid W11S/WA-WB 2) At grids W11S/WC.1 Locations 1 & 2 above were not per structural drawings and RFIs. Contractor to correct reinforcing to match structural drawings or contact EOR to verify field conditions are acceptable. |
2024/04/04 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) At grids W11S/WD 2) In the area between grids WA-WB/W8S-W9S |
2024/04/02 | Plumbing | Underground | Passed | Neely Lewis | sewer line on North elevation |
2024/04/02 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings for columns/walls: - Along grid W4S/WA-WB - Along grid W5S/WA-WB - Along grid WD/W6S-W7S - At grids W4S/WD - At grids W5S/WD - At grids W4S/WC - At grids W5S/WC - At grids W6S/WC - At grids W7S/WC - At grids W8S/WC.1 - At grids W9S/WC.1 - At grids W10S/WC.1 |
2024/04/01 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for spread footings for columns/walls along grids W7S/WA-WB, W8S/WA-WB and WA/W5S-W8S. |
2024/03/29 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several spread footings for walls/columns along grids W10S, W8S and between grids W5S-W8S. |
2024/03/27 | Plumbing | Underground | Conditional | Neely Lewis | underground grease piping 03/27/2024. Pressure test passed. Awaiting information on slope from EOR. |
2024/03/26 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several wall footings and column footings in the area between grids WA-WB/W8S-W9S. The field wall footing reinforcing (WF3) was reviewed approximately from grids W7S-W10S. |
2024/03/25 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | Inspected and approved new feeders for west stadium lights, from the ground level electrical room to the roof - junction at old Musco contactors. |
Plumbing | Underground | Neely Lewis | |||
Building/Structural | Masonry | Kody Boswell | Masonry rebar on upper concourse area b at restrooms and pantry. |
BCA Project #: 23-03418-A Doak Campbell - West Stands Renovation DEMOLITION
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/03/15 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | Construction Trailers Inspections 1. Electrical breaker missing on 1st offices panel. 2. Mechanical trailer - need 5LB ABC fire extinguisher. And not florida state approved sticker on trailer. |
BCA Project #: 23-03418- Doak Campbell - West Stands Enabling Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/01 | Plumbing | Underground | Failed | Paul Nitz | Storm pipe was not accessible |
2024/07/01 | Building/Structural | Masonry | Passed | Paul Nitz | Masonry inspection for cmu along WE line. |
2024/06/28 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/27 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm and sanitary |
2024/06/25 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/06/18 | Plumbing | Underground | Passed | Paul Nitz | 16'' storm section |
2024/06/13 | Plumbing | Underground | Passed | Paul Nitz | Grease |
2024/06/13 | Building/Structural | Slab | Passed | Alex Masterton | Slab on Metal Deck Sequence 1B |
2024/06/12 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/12 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/12 | Building/Structural | Slab | Passed | Alex Masterton | Slab on Metal Deck sequence 1c |
2024/06/11 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/11 | Building/Structural | Slab | Passed | Dwayne Mahony | Rebar inspection for slab on deck Sequence 1 area c. Approval is conditional to T.I. approval after curbs are completed. |
2024/05/24 | Plumbing | Underground | Passed | Dwayne Mahony | |
2024/04/04 | Building/Structural | Structural | Passed | Kody Boswell | Visually inspection of cementitious spray applied fireproffing to column stiffeners of UCC. Contractor to forward thickness and adhesion reports to FSU BCA. |
2024/02/27 | Building/Structural | Structural | Passed | Dwayne Mahony | last 4 stiffening steel columns 2 and 6 North and 2 5 South |
2024/02/20 | Mechanical | Insulation | Passed | Neely Lewis | insulation inspection on hw and cw piping |
2024/02/16 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed column stiffeners for UCC located at gridlines 6S and 8S. There was two locations on each stiffener that were partially missing a weld located at the existing column splice. Contractor to send photos after welds have been complete. Photos received 2/19/2024 . See Folder dated 2024-02-16 Inspection. (KB) |
2024/02/13 | Building/Structural | Structural | Passed | Kody Boswell | col,12 and 10 North stiffening steel Reviewed structural steel stiffening of columns located at gridlines 10N and 12N (KB) |
2024/02/12 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed 2nd layer of interior sheathing attachment in room 5301. Contractor emailed photos of 1st layer attachment and insulation installation. See folder "2024-02-12 C5301 screws" in "West Stands Demolition" --> "Contractor Photos" folder (KB) |
2024/02/08 | Electrical | Ground | Passed | Dwayne Mahony | 301 hendry service for new office trailer |
2024/02/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed column stiffeners for UCC located at gridlines 10S and 12S. (KB) |
2024/02/08 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing located where steel stiffening occurred at grids 2N and 2S. (KB) |
2024/02/02 | Building/Structural | Structural | Passed | Dwayne Mahony | inspecting steel column reinforcing, column line 16 and 14 North Reviewed column stiffeners for UCC on grids 14N & 16N with the threshold inspector. Inspection was initially failed by Kody Boswell so I returned in the afternoon after issues were corrected. Stiffener plate within stiffener columns were corrected per EOR direction. |
2024/02/02 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed column stiffeners for UCC on grids 14N & 16N with the threshold inspector. Stiffener plate within stiffener columns did not align with UCC floor slabs, as required by structural drawings. Threshold inspector contacted the EOR about the condition and EOR confirmed the stiffeneer plates were to align with UCC floor slabs. (KB) |
2024/01/30 | Building/Structural | Structural | Passed | Kody Boswell | Looking at stiffening steel connections, at column 16 and 14 South Reviewed stiffening connections as stated above. (KB) |
2024/01/25 | Building/Structural | Insulation | Passed | Kody Boswell | Looking at intumescent paint on columns in room 5301 before insulation and framing. |
2024/01/24 | Building/Structural | Structural | Conditional | Kody Boswell | structural steel inspection for enabling package 5th, and 6th floor Reviewed existing bracing strengthening for the 5th and 6th floor along grids 2N & 2S. Contractor was touching up a few small areas with additional welded plated. FSU deferring to BNI (threshold inspector) to verify the touch-ups were complete. |
2024/01/18 | Building/Structural | Slab | Passed | Kody Boswell | There was no detail on how to replace a portion of a slab on grade that had been chipped out for underground piping installation. Concrete area that was chipped out was approximately 2' wide by 25' long. Contractor doweled #5 bars at 24" OC into each side of existing slab and ran 1#5 continuous with the strip to be replaced. Reinforcing installed was more than what was in the existing slab. (KB) |
2024/01/18 | Mechanical | CHW Piping & Test | Conditional | Neely Lewis | inspect welds and insulation for chilled and hot water piping. 1. Add proper supports for vertical risers on piping per FBC requirements FBC-P Table 308.5. 2. Separate piping of dissimilar metals from ubolt hangers. |
2024/01/16 | Plumbing | Underground | Passed | Neely Lewis | All ok except for last 10' before turning up against the wall, which doesw not have the required slope. Site personnel promised to fix and provide pictures of pipe with required slope. Additionally, contractor is to provide pictures of grout around piping at manhole. 1/17/2024: Items listed above were resolved. Passed |
2024/01/10 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | was approved on previous inspection. |
2024/01/10 | Building/Structural | Sheetrock | Conditional | Kody Boswell | Reviewed drywall screws for new LG framing walls at grids 18N and 18S on 5th and 6th floors (4 locations). In 3 locations there were areas where screw spacing was excessive. This was discussed with the Contractor. Contractor to send photos after screw spacing is corrected. (KB) Photos from Contractor received. See Folder dated 2024-01-10 Inspection |
2024/01/09 | Building/Structural | Framing | Passed | Dwayne Mahony | |
2024/01/08 | Building/Structural | Framing | Conditional | Dwayne Mahony | Approval is conditional to providing a 2-hour rated fire stop at floor penetrations at the existing rainwater leaders. If the unrated penetration was existing it constitutes an existing condition code deficiency that must be remedied in all "work areas", per the Existing Building code, section EB 803.2.1. |
2024/01/08 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Contractor called and requested the original 2pm request to 8:30am (KB) |
2023/12/21 | Building/Structural | Structural | Passed | Kody Boswell | This will be for inspection of the stiffening steel on the north end of the 5th and 6th floors. BNI will be on site in conjunction as the third-party inspector for the project. Work completed appears to be in conformance with the EOR Construction documents Thold inspector on site and approved work |
2023/12/21 | Electrical | Ground | Passed | Dwayne Mahony | This inspection is for the temp power release for the Manhattan construction's job trailers. Approved, with the understanding that all feeder breakers are to be identified to which trailer unit, and backfed breakers in the trailers must have supplemental restraint. |
2023/12/12 | Building/Structural | Structural | Passed | Kody Boswell | Would like to request an inspection for the interior stiffening steel installation on the south side of the sixth floor to allow for demolition of stadia to be performed. New bracing reviewed at levels 5 & 6, along grid 18S/N-O (KB) |
2023/01/18 | Mechanical | HW Piping & Test | Conditional | Neely Lewis | inspect welds and insulation for chilled and hot water piping. 1. Add proper supports for vertical risers per FBC. FBC-P Table308.5. |
BCA Project #: 22-03403- Collins Bldg. - Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/03/21 | Building/Structural | Final Building | Passed | Kody Boswell | Final Inspection for reroof |
2023/10/31 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress inspection: Lower Roof area |
2023/10/25 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection |
2023/09/05 | Building/Structural | Roofing | Passed | Tom Deckert | in progress inspection, tear off dry in Reschedule from 9-1 Inspection of lower west roof recover- 60mil cap sheet installed drainfs and edge flashing in progress. Contractor awaiting taper layout for upper roofs. (temporary roof cover installed |
BCA Project #: 22-03400- New College of Florida College Hall Welcome Center Electrical Improvements
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/11/09 | Electrical | Wall Rough-in | Passed | Hank Fulmer | The electrical wall rough is approved. Wires were ran for 2 new floor outlets and several wall lights. The floor outlets were ran through the crawl space in the floor and are correctly protected and sized for the circuit. The wall lights also were ran to NEC code. |
BCA Project #: 22-03391- Housewright - Student Svcs. Office Remodel
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/09/18 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Fire alarm, sprinkler, em. Lights and life safety pass final. |
2023/09/18 | Building/Structural | Final Building | Conditional | Dwayne Mahony | Some work is on-going, so final not fully ready. The Dean's office is complete, and may be occupied. |
2023/09/18 | Electrical | Final Electrical | Conditional | Dwayne Mahony | Provide receptacle box extensions at cabinets in Dean's office. |
2023/09/18 | Plumbing | Final Plumbing | Passed | Dwayne Mahony | |
2023/09/18 | Mechanical | Final Mechanical | Conditional | Dwayne Mahony | Conditional to providing ventilation to the cabinet which will house the refrigerator. All refrigerators require ventilation. All electrical and mechanical equipment must be installed in compliance with the manufacturer's product instructions. Without ventilation this refrigerator will not last long, and could present a fire hazard. |
2023/09/07 | Mechanical | Wall & Ceiling | Passed | Neely Lewis | They need to finish some of the pipe insulation in the morning on mechanical. I can call Nealy if they wint be done by 10am to come later, but hopefully by 10am they will be done |
2023/09/07 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | They need to finish some of the pipe insulation in the morning on mechanical. I can call Nealy if they wint be done by 10am to come later, but hopefully by 10am they will be done |
2023/09/07 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | They need to finish some of the pipe insulation in the morning on mechanical. I can call Nealy if they wint be done by 10am to come later, but hopefully by 10am they will be done |
2023/09/07 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | They need to finish some of the pipe insulation in the morning on mechanical. I can call Nealy if they wint be done by 10am to come later, but hopefully by 10am they will be done |
2023/09/07 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | They need to finish some of the pipe insulation in the morning on mechanical. I can call Nealy if they wint be done by 10am to come later, but hopefully by 10am they will be done Note: sprinkler head missing in room 204A closet. Will check on final. |
2023/08/24 | Mechanical | HW Piping & Test | Passed | Neely Lewis | |
2023/08/02 | Building/Structural | Framing | Conditional | Dwayne Mahony | Door 203C-1 is scheduled to be 2'-8". This door (all egress doors) must be 3'-0" to provide the minimum 32" clear opening required by FBC 1010.1.1. Please consult with the architect and obtain direction for code compliance. |
2023/08/02 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Anytime! |
2023/08/02 | Mechanical | Duct Rough-in | Passed | Neely Lewis | Anytime! |
BCA Project #: 22-03387- Pepper Building - Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/09/12 | Building/Structural | Roofing | Passed | Dwayne Mahony | In progress inspection |
2023/08/01 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspection - Decking Main roof decking seems to be in sound condition. Membrane is fully adhered so the actual wood can not be seen. Looking from below the roof it appears that screw attachment is adequate, so inspection is passed. |
2023/07/27 | Building/Structural | Roofing | Conditional | Dwayne Mahony | In-Progress Inspection - DECKING In roofing areas where the plywood decking is decayed and the insulation is wet understandably this must all be replaced. When insulation is replaced it must be brought up to current code requirements, per Florida Energy Conservation code section R503.1.1. That code section requires replacement thermal envelope components to meet the requirements of commercial energy code section C402.1.3. This Table requires R-25 minimum insulation in this case (it varies based on specific construction type and location of thermal insulation). Please plan accordingly. This only applies where the insulation is removed and replaced. |
BCA Project #: 22-03382- Sandels - Restroom Renovations
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/02/26 | Electrical | Final Electrical | Conditional | Dwayne Mahony | Approval is for toiletrooms on 1st and 4th floors. |
2024/02/26 | Plumbing | Final Plumbing | Passed | Neely Lewis | Womens restroom 1st floor needs an extended height toilet seat in the accessible compartment, or the toilet needs to be raised to ADA standards. 3/21/2024: Reinspection of accessible restroom toilet height. Ppurchased an extedned seat. Passes with 17" AFF. |
2023/12/15 | Building/Structural | Final Building | Passed | Tom Deckert | ADA openers functioning properly. All other inspections completed and pasesed 4 restrooms floors 1& 2 approved for use. |
2023/12/15 | Plumbing | Final Plumbing | Passed | Neely Lewis | |
2023/12/15 | Electrical | Final Electrical | Passed | Tom Deckert | GFCI recepticles tested and functioning properly. Lighting Replacementn is to occur under Phase 2. |
2023/11/03 | Building/Structural | Final Building | Conditional | Dwayne Mahony | Substantial Completion - Basement Restroom Approved basement toilet room for occupancy. |
BCA Project #: 22-03376- Biology Unit One - BSIR 1st Floor Suite Remodel
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/11 | Building/Structural | Other | Passed | Dwayne Mahony | This inspection will be in room 119. Larry Just a brief pre-construction meeting. |
2024/04/04 | Mechanical | Insulation | Passed | Neely Lewis | The inspection is needed in rooms 102 and 103. Thank you, Larry |
2024/03/26 | Building/Structural | Wall/Ceiling | Conditional | Dwayne Mahony | This inspection will be in rooms 102, 102B and 103. Thank you, Larry |
2024/03/26 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | This inspection will be in rooms 102, 102B and 103. Thank you, Larry |
2024/03/25 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | This inspection will be in rooms 102 and 103. Thank you, Larry 3/25/2024:Ready to insulate. |
BCA Project #: 22-03364- President's House Camera Installation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/15 | Electrical | Final Electrical | Failed | Dwayne Mahony | Outdoor electrical receptacles shall be GFCI protected as required by NEC 210.8. |
BCA Project #: 22-03355- COM - HVAC Retrofit
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/04/09 | Mechanical | Final Mechanical | Conditional | Neely Lewis | Could not smoke the detectors. Will reinspect. Need some access doors installed on AHUs. Will reinspect. Electric OK. • Install access door on AHU 10 and thermometer • Install access door on AHU 9 • Install access door on AHU 11 and thermometer • Install access door on AHU 6 • Install access door on AHU 5 |
BCA Project #: 22-03342- Williams Building - Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/09/20 | Roofing | Final | Passed | Dwayne Mahony | Substantial completion inspecting for Building code. |
2023/05/23 | Building/Structural | Roofing | Passed | Dwayne Mahony | Inspection Request In-progress PVC Membrane Installation |
BCA Project #: 22-03329- Rovetta Buildng B - ReRoof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/06/26 | Building/Structural | Roofing | Conditional | Tom Deckert | Final Inspection Walk-thru- General observation SPM installation complete with minor corrections needed The following items were incomplete or present 1) Lightning protection not re-installed 2) 2 water blisters present on east side 3) Drain covers not attached- Clamping ring not installed 4) Cap metal at building Joints and parapetl not yet replaced (separate contract?) 5) Minor ponding present at several of the drains- Ponds still present after 48 hours |
2023/06/05 | Building/Structural | Roofing | Passed | Dwayne Mahony | Replacing Wet Insulation |
2023/05/30 | Building/Structural | Roofing | Passed | Dwayne Mahony | Installing Single Ply Membrane |
2023/05/26 | Building/Structural | Roofing | Passed | Dwayne Mahony | Tearing out wet insulation. |
2023/05/25 | Building/Structural | Roofing | Passed | Dwayne Mahony | Replacing more wet insulation. |
2023/05/19 | Building/Structural | Roofing | NOT READY | Dwayne Mahony | Replacing more wet insulation. No work lots of rain. |
2023/05/16 | Building/Structural | Roofing | Passed | Dwayne Mahony | Installing membrane over areas of wet insulation. (Not new single ply membrane) |
2023/05/16 | Building/Structural | Roofing | Passed | Dwayne Mahony | Tearing-out Wet Insulation |
2023/05/11 | Building/Structural | Roofing | Passed | Dwayne Mahony | We will be flashing walls and doing detail work. |
2023/05/10 | Building/Structural | Roofing | Passed | Dwayne Mahony | We will be installing single-ply field membrane. |
BCA Project #: 22-03328- Shaw Building - ReRoof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/05/10 | Building/Structural | Roofing | Conditional | Dwayne Mahony | Final Inspection Request Need to verify with Kent how utilities on wood blocks will be secured against wind load. |
2023/04/11 | Building/Structural | Roofing | NOT READY | Tom Deckert | Installing Single Ply No additional work performed to be inspected |
2023/04/10 | Building/Structural | Roofing | NOT READY | Tom Deckert | Installing Single Ply Membrane No additional work performed to be inspected |
2023/04/07 | Building/Structural | Roofing | NOT READY | Tom Deckert | Single Ply Installation. - In-progress - second section east flashing continuing Next inspection wll be on third section mod. Bit clean up and adhesive install for conver sheet. |
2023/04/06 | Building/Structural | Roofing | Passed | Tom Deckert | Installing single ply membrane In progress- second section east roof flashing in progress. Material adhesive per specs |
2023/04/05 | Building/Structural | Roofing | Passed | Tom Deckert | Installing Single Ply - in progress - section 2 of east roof existing surface cleaned and cap sheet fully adheared |
2023/04/04 | Building/Structural | Roofing | NOT READY | Tom Deckert | Installing Single Ply Membrane this work was postponed until tomorrow |
2023/04/03 | Building/Structural | Roofing | Passed | Tom Deckert | Installing more of the single ply membrane. |
2023/03/31 | Building/Structural | Roofing | Failed | Tom Deckert | We plan to install the field membrane over the existing modified roof system on 3/31. No insulation or coverboard is being installed. We plan to work 7:30 - 3:30ish. Our foreman, Eric Morris will be on-site with any questions/concerns. The following observations were made during this in progress inspection and need correction/resolution. 1) only east Ľ of building has membrane application in progress 2) existing roofing may require additional cleaning to remove loose granules before applying adhesive and cap sheet. 3) In several location cap sheet material is not bonding to existing membrane where adhesive is applied. Contractor to investigate cause 4) Several locations cap membrane is being applied with wrinkles resulting limited adhesion. 5) Detail flashing of curbs not complete and exposed to water infiltration |
2023/03/29 | Fire Safety | Opening Protections | Passed | Mary Creason | Required Building and Fire Site Safety Inspections Prior to Commencement. Make sure single back exit door is not blocked and an 36in area to the side walk is maintained for staff. |
2023/03/29 | Building/Structural | Roofing | Passed | Andy Howard | Required Building and Fire Site Safety Inspections Prior to Commencement. The roof surface preparation inspection was done and passed for the installation of the first membrane. Andy Howard and Mary Creason met with Tom McCaughey and Eric Morris from TWI. |
BCA Project #: 22-03326- Biomedical Research Facility - ReRoof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/06/29 | Building/Structural | Roofing | Passed | Dwayne Mahony | |
2023/05/03 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-progress inspection approved. |
2023/04/21 | Building/Structural | Roofing | Passed | Tom Deckert | TPA install on penthouse roof In progress- cap sheet application. Ribbon adhesive, roller application and sheet welds per manufactures instruction |
2023/04/12 | Building/Structural | Roofing | Passed | Tom Deckert | In progress - first section of North roof. Installed per manufacturers FPA details |
2023/04/04 | Building/Structural | Roofing | Passed | Tom Deckert | visit 1- Iso board being installed with fasteners pattern per manufactureres spec. Visit 2- deck board and Innerply being installed per specs |
2023/04/03 | Building/Structural | Roofing | Passed | Tom Deckert | In proress- removal of old roof membrane and insultaion in progress on east upper roof. Insulation and inner ply being installed per manufactureres spec |
2023/03/22 | Building/Structural | Roofing | Passed | Andy Howard | Andy Howard met with Tom McCaughey for this inspection. The base sheet torch down was being performed correctly. This in progress base sheet inspection passed. |
2023/03/21 | Building/Structural | Roofing | NOT READY | Andy Howard | ACM abatement, roof tear off and installation of Insulation board. Andy Howard, Kent Malik, with FSU, Oliver Volkmann, Ellis Brown with Perry Roofing, Tom McCaughey, Jeromy DeMuth with TWI, and James Hartman with Tremco met at the site to discuss the inspection process. No tear off had commenced at the time of this inspection, only the asbestos flashing was removed. Tom McCaughey will reschedule the inspection for installation tomorrow. |
2023/03/21 | Building/Structural | Roofing | NOT READY | Andy Howard | Andy Howard, Kent Malik, with FSU, Oliver Volkmann, Ellis Brown with Perry Roofing, Tom McCaughey, Jeromy DeMuth with TWI, and James Hartman with Tremco met at the site to discuss the inspection process. No tear off had commenced at the time of this inspection, only the asbestos flashing was removed. Tom McCaughey will reschedule the inspection for installation tomorrow. |
2023/03/17 | Building/Structural | Roofing | Passed | Andy Howard | Inspection for scaffolding improvements. The deficiencies noted on the previous inspection of March 10th, 2023 were corrected satisfactorily. |
2023/03/10 | Building/Structural | Roofing | NOT READY | Andy Howard | This inspection covers the building ground site pedestrian protection as required by 2020 FBC-Building and Accesibility Volumes. The following in place items require modifications: 1.) The building exit on the north side of the northeastern corner of the building overhead protection scaffolding is blocking the accessibility sidewalk route to the west and to the east. The sidewalk is required to be unobstructed to allow passage in the east and west directions on the existing accessible sidewalk. 2.) The overhead protection at the Northeast corner of the building where the roof trash shoot is located requires extended overhead protection and the addition of more protection screening than is currently placed. Multiple locations. 3.) On the southwest corner of the building where the exit of the building is located, more protective netting is required than is currently in place. 4.) On the southeast corner of the building at the loading dock the overhead protection at the southeastern most corner of the building can be either extended to provide complete overhead protection, or that route can be closed, rerouting the exiting path to the north side of the loading dock. Please notify Andy Howard (305-799-7095), FSU Deputy Building Official, for any questions regarding the required enhancements of the currently in place pedestrian protections. |
Building/Structural | Roofing | Conditional | Andy Howard | No result entry by Andy as of June 28, 2023. Dwayne | |
Building/Structural | Roofing | Conditional | Andy Howard | Insulation of new roof. Inspection date and time changed to 3/30/2023 at 2:00 P.M.. No result entry by Andy as of June 28, 2023. Dwayne | |
Building/Structural | Roofing | Conditional | Andy Howard | Base Sheet Dry-in. Inspection date changed to 3/30/2023. No result entry by Andy as of June 28, 2023. Dwayne |
BCA Project #: 22-03318- Bio Med Building Fire Alarm Upgrade
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/15 | Fire Safety | Final Fire Alarm | Conditional | Mary Creason | Alternate POC: Tom Pounds (904) 469-9521 The following items need to be completed: 1. Elevator recalls 2. HVAC duct detectors 3. a Couple of labels not on devices 4. A few devices addresses needed to be changed. 5. 100% test letter needed |
BCA Project #: 22-03302- COM Thrasher Building - Thrasher, Rotunda & Connector Bldg. Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/12 | Building/Structural | Roofing | Passed | Kody Boswell | In progress inspection of flat roof insulation installation. |
2024/05/10 | Building/Structural | Roofing | Postponed | Kody Boswell | In-progress inspection was cancelled and postponed due to severe weather |
2024/03/15 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed new roof hatch framing on the northern most gable roof, south side, for access to the flat roof. |
2024/03/07 | Building/Structural | Roofing | Passed | Kody Boswell | Contractor is to send photos showing roof panel clips attachment to the sloped roof receiving standing seam metal deck. Inspection result and date to be left blank until photos received. FSU requested photos on 3/11/24, awaiting Contractor response. Contractor provided a video received by FSU on 3/12/2024 showing panel clip spacing at roof valley. Clips are approximately 2'-0" OC. |
2024/02/20 | Building/Structural | Roofing | Passed | Kody Boswell | In progress review of tapered insulation layer for roof area TC (flat roof). Insulation is adhesively anchored using ribbon pattern. (KB) |
2023/12/21 | Building/Structural | Roofing | Passed | Tom Deckert | We will be ready earlier than 9am if y’all would like to come sooner tile tear off in progress. Contratcor to expose deck to verify fastener frequency |
2023/12/08 | Building/Structural | Roofing | Passed | Dwayne Mahony | brief review of roof over MRI entry. |
BCA Project #: 22-03298- C.A.P.S. High Bay Lab 2 - Solar PV System and Tie-in
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/02/01 | Electrical | Underground | Passed | Dwayne Mahony | I will be away from work on the 31st, Wallis Walker will be covering the job. Wallis can be reached at 850-933-2305. RT Electric the electrical contractor. Todd Jones is the supervisor. Todd can be reached at 850-544-4424. Thank you, Larry |
BCA Project #: 22-03294- Palm Court Communications Compound - Wireless Antenna Installations
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/27 | Building/Structural | Final Building | Passed | Kody Boswell |
BCA Project #: 22-03275- McCollum Hall - AT&T Cell Site Modifications
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/03/04 | Building/Structural | Final Building | Failed | Dwayne Mahony | Ms. Rodriguez, I was provided this letter of inspection today. I just visited the site for my own inspection. This installation is on a roof, so easily accessed. The only aspect of the installation I inspected was the ballast of the sleds that carry the antennas. The total ballast is significantly short of that called for on the submitted permit documents. These documents require (140) 8”x4”x16” solid concrete blocks at each mount. There are at most 120 blocks at each mount. Some of the blocks are 8”x8”x16” hollow CMU (taking up the space of 2 solid units, less weight). Accordingly, the final inspection is not approved. Re-inspection is required. FSU Building Department requires the contractor to request inspection on all permits we issue, including all cell equipment on our buildings. Please have additional ballast added to meet requirements of the construction documents, and then schedule an inspection with my office via our website, as directed in the cover letter provided with the permit issuance. Regards, Dwayne Mahony, FSU BCA inspector Cell 850 294 1581 |
BCA Project #: 21-03229-B COB, Legacy Hall - Buildout
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/15 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | 3rd floor chilled |
2024/07/15 | Mechanical | Re-Inspection | Passed | Paul Nitz | third floor seq 1&2 |
2024/07/10 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | Water piping and test 2nd Floor HW piping and test 3rd Floor CHW piping and test 3rd Floor Eddie with Millers-850-879-1036 |
2024/07/10 | Mechanical | CHW Piping & Test | NOT READY | Paul Nitz | Water piping and test 2nd Floor HW piping and test 3rd Floor CHW piping and test 3rd Floor Eddie with Millers-850-879-1036 |
2024/07/10 | Mechanical | HW Piping & Test | NOT READY | Paul Nitz | Water piping and test 2nd Floor HW piping and test 3rd Floor CHW piping and test 3rd Floor Eddie with Millers-850-879-1036 |
2024/07/08 | Plumbing | Storm Piping & Test | NOT READY | Paul Nitz | Contact is Eddie with Millers Plumbing Pent house- Storm Sanitary-Domestic-Seq1 Floor2 & Seq2 Floor 4 |
2024/07/08 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Contact is Eddie with Millers Plumbing Pent house- Storm Sanitary-Domestic-Seq1 Floor2 & Seq2 Floor 4 1) third floor waist only |
2024/07/03 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Chiller Pipe Pressure |
2024/07/01 | Building/Structural | Framing | Passed | James Melvin | Sequence 3 Floors 1,2,3 |
2024/07/01 | Building/Structural | Masonry | Passed | James Melvin | A masonry rebar inspection for the southeast corner of the third floor on the southwest building on Monday 7-1-24 @10am ,concrete pour is scheduled at 11am. |
2024/07/01 | Building/Structural | Slab | Passed | James Melvin | Chiller Pad inspection Monday 7-1-24 @2pm for pour on Tuesday 7-2-24 @1pm |
2024/06/26 | Fire Safety | Opening Protections | Passed | Mary Creason | We would like to request an inspection for FSU COB on Wednesday (06/26/2024)@1pm Sequence 1 Stair 5---Floors1 & 2. We would also like to request an inspection for FSU COB Sequence 1&2 Floors 3&4 for floor penetrations. 3rd party will send their results to me for this installation. |
2024/06/25 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | 3rd Floor Seq. 3 partial wall inspection |
2024/06/24 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | first and third floor duct pressure test that was approved per the commissoning report |
2024/06/21 | Mechanical | Duct Pressure Test | Passed | Dwayne Mahony | Supply Pressure Sequence 3 Floor 3 |
2024/06/20 | Building/Structural | Wall/Ceiling | Failed | Kody Boswell | Reviewed shafts for stairs 5 & 7 shafts. There are several penetrations that need to be fire caulked as well as drywall joints at corners need to be installed correctly. |
2024/06/20 | Building/Structural | Structural | Passed | Kody Boswell | Chiller pad wall rebar |
2024/06/05 | Mechanical | Duct Pressure Test | Conditional | Paul Nitz | Ground and First Floor see Tito (850-528-0997) for locations I need the commissioning report with results for the first and third floor |
2024/06/04 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG wall framing and soffit sheathing fastening for the commons area on levels 2 and 3. There were some missing fasteners for LG to LG connections and one verticla stud that was damaged nd needed to be replaced. |
2024/06/04 | Fire Safety | Opening Protections | Pass | Mary Creason | Through floor penetrations Sequence 1 & 2 floors 1 & 2 on Tuesday 6-4-24 @1pm NOTE: THIS WAS A MEETING TO GO OVER JOBS AND REQUIRER FOR THE FIRE PENETRATION INSPECTIONS. |
2024/06/04 | Mechanical | Insulation | Passed | Neely Lewis | Ground and First Floor see Tito (850-528-0997) for locations mastic inspection only. Not insulation. Ready to begin insulating ductwork. |
2024/05/29 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade on the ground floor in the approxximate areas between grids E-H/9-13 |
2024/05/28 | Mechanical | Cond. Piping & Test | NOT READY | Neely Lewis | Mechanical piping Ground floor ,Refrigerant piping Floors 1&2 Tuesday 5-28-24 @ 10 am. Refrigerant piiping test was not perfored proerly. |
2024/05/21 | Building/Structural | Framing | Conditional | Kody Boswell | Framing inspection for Seq1 &2 Floors 3&4 @1pm Only approved seq. 1 & 2 on floor 3, and did not include any walls with plumbing or floor pipe penetrations which still need fire stopping and inspection. |
2024/05/20 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Ground Floor Domestic Water ,Mechanical Water, Sanitary Monday @10:30 (Eddie) |
2024/05/02 | Building/Structural | Masonry | Passed | Dwayne Mahony | Rebar inspection for the north and west elevation of the auditorium 3rd lift,1pm Concrete is scheduled at 2pm |
2024/05/01 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | Storm Drain 2nd Floor Seq 1 San 3rd Floor Seq 2 Also, some wast piping 2.3 floor |
2024/04/30 | Building/Structural | Framing | Conditional | Dwayne Mahony | Sequence 1 and 2, Levels 1 and 2. Approved conditional to: Repair all damaged studs where marked during inspection. Repair fire spray insulation on columns and beams as noted, where damaged or material removed. Provide correct depth trim rings (double gypsum layers) for thermostats. Walls at floor penetrations for pipes are not approved for complete gypsum board installation. Leave open one side until you have fire stopping inspection approval. |
2024/04/30 | Fire Safety | Fire Alarm Rough-In | Passed | Dwayne Mahony | Wall rough in. All electrical rough-ins (including power, data, door and lighting controls, toilet flush valves, thermostats and fire alarms) have been inspected in all requested areas (partial inspections listed by floor numbers and sequence numbers) to date. All fire alarm inspections will continue to be done by the electrical inspector. |
2024/04/30 | Plumbing | Stack Piping & Test | Passed | Neely Lewis | Storm drains 3rd floor, Sequence 1, 2 & 3 And Sanitary Piping 2nd floor, Sequence 2 Inspected sttorm drains only. |
2024/04/24 | Building/Structural | Wall/Ceiling | Conditional | Dwayne Mahony | Window inspection Conditional to enginer of record providing verification that the components and cladding loads listed on sheet S0.02 are Vult, not Vasd. |
2024/04/24 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 3 Second floor Wall inspection. |
2024/04/05 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 1&2 Ground floor electrical rough in and added sequense 3, second floor. |
2024/04/03 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | Framing inspection for behind the elevator Seq1 & 2 |
2024/04/03 | Building/Structural | Structural | Passed | Dwayne Mahony | Framing inspection for behind the elevator Seq1 & 2 |
2024/04/02 | Mechanical | Duct Rough-in | Passed | Neely Lewis | an inspection on duct work any time – ready now. Seq. 1 & 2, Floors 1 & 2. Visual inspection on duct work. Low pressure & return. |
2024/03/22 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 1&2 fourth floor |
2024/03/19 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Sequence 1 First Floor Sanitary, Domestic and Mechanical. Need to add pipe guards at studs for plumbing lines |
2024/03/15 | Mechanical | HW Piping & Test | Passed | Neely Lewis | Need inspections please for 3/15/24, at 9:00 a.m. The request is for: Mechanical piping, Sequence 1 & 2, 1st & 2nd floors Domestic water, Sequence 1, 1st floor Storm piping, Sequence 1 & 2, 1st floor |
2024/03/15 | Plumbing | Stack Piping & Test | Passed | Neely Lewis | Need inspections please for 3/15/24, at 9:00 a.m. The request is for: Mechanical piping, Sequence 1 & 2, 1st & 2nd floors Domestic water, Sequence 1, 1st floor Storm piping, Sequence 1 & 2, 1st floor |
2024/03/15 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Need inspections please for 3/15/24, at 9:00 a.m. The request is for: Mechanical piping, Sequence 1 & 2, 1st & 2nd floors Domestic water, Sequence 1, 1st floor Storm piping, Sequence 1 & 2, 1st floor INSPECTED: includes extension of CHWS,CHWR at building edge from chillers NOT INSPECTED: Chilled water piping inside building. Domestic water inside building. |
Building/Structural | Roofing | Kody Boswell | Roof Observation |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade ramp ramp located on the ground floor in the area between grids E-F/4-7 |
2024/07/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the fourth floor southwest building, first lift |
2024/07/08 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of CMU walls on level 4, south elevation and west elevation. Masonry block was very wet at time of inspection so the Contractor was directed to hold off on grouting. |
2024/06/26 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 1st lift of the following walls on level 3: 1) Along grid K/2-3 2) Along grid 2/H-K Result is conditional until contractor rebuilds a window jamb where mortar joints broke. |
2024/06/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the south elevation wall on level 3. |
2024/06/20 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection for Thursday on the west elevation third floor, third lift. |
2024/06/18 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection for the southeast elevation on the second floor of the southwest building, third lift. And the second lift of the west elevation on the third floor. |
2024/06/07 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection for 6/7/24 on the second floor of the southwest building. |
2024/06/06 | Building/Structural | Structural | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to arriving on site to postpone the inspection for a later date. |
2024/06/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the fourth lift of the west elevation of the southwest building, 1st floor. And the 1st lift on the second floor of the southwest building. |
2024/05/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the retaining wall footer at the chiller yard |
2024/05/31 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection, 1st floor, southwest building, third lift on the west elevation and first lift on the second floor of the southwest building. |
2024/05/29 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the wall along grid 2/E.3-K |
2024/05/23 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the roof tie beam along grid 5/L-M |
2024/05/20 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following CMU walls: - 1st floor, 2nd lift along grid 2/B-D - 1st floor, 2nd lift along grid D/1-2 - 1st floor, 2nd lift along grid 1/D-E - 1st floor, 2nd lift along grid E/1-2 - 1st floor, 2nd lift along grid 2/E-H |
2024/05/15 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Ground floor, top out along grid A/3-7 - 1st floor, 1st course along grid A/3-7 - 1st floor, 1st course along grid 3/A-B - 1st floor, 1st course along grid B/2-3 - 1st floor, 1st course along grid 2/B-D - 1st floor, 1st course along grid 2/E.3-K |
2024/05/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the 5th floor slab on deck in the area between grids B-K/2-3 |
2024/05/07 | Building/Structural | Structural | NOT READY | Kody Boswell | FSU arrived on site for inspection of reinforcing steel for the 5th floor slab on deck in the area between grids B-K/2-3, but was informed by the Contractor that they were not ready for inspection |
2024/05/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following CMU walls: - Ground floor, 3rd lift along grid A/2-7 - Ground floor, 3rd lift along grid 7/A-D - Ground floor, 2nd lift in the area between grids E-F/1A-2 |
2024/05/03 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the east gable tie beam at the roof, located along grid N/14-17 |
2024/04/30 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Ground floor: 2nd lift along grid A/2-7 - Ground floor: 1st lift in the area between grids E-F/1-2 - Ground floor: 1st lift along grid 7/A-D |
2024/04/30 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the 4th level slab on deck in the area between grids B-K/1-3 |
2024/04/26 | Building/Structural | Masonry | Passed | Dwayne Mahony | Rebar inspection for the west elevation of the ground floor tomorrow 4-26-24 at 9am Pour to follow the inspection. |
2024/04/25 | Building/Structural | Slab | Passed | Dwayne Mahony | Sequence 4 deck 3 S1 East gable Tie beam for 4-25-2024 @2pm Thank you. |
2024/04/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Level 4, 3rd lift along grid 5/L-M - Penthouse, 4th lif of south gable wall along grid 5/L-M |
2024/04/22 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following CMU walls: - Ground level, 2nd lif in the area between grids M-P/12-14 - 4th level, 3rd lift along grid 5/L-M |
2024/04/22 | Building/Structural | Structural | NOT READY | Kody Boswell | FSU was requested to review reinforcing steel for the tie beam located along the east gable roof along grid N/14-17. Reinforcing steel was tied in place but no formwork was installed. Contractor to reschedule inspection. |
2024/04/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - level 4, 4th lift along grid 19/L-M - level 4, 3rd lift along grid 5/L-M |
2024/04/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following CMU walls: - Level 4, 3rd lift along grid 19/L-M - Level 4, 3rd lift along grid L/5-7 |
2024/04/18 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the slab on deck on level 1 in the area between grids B-K/1-3 |
2024/04/17 | Building/Structural | Masonry | Conditional | Kody Boswell | FSU BCA deferred CMU wall inspection to BNI (threshold) so result is conditional pending BNI's review. |
2024/04/16 | Building/Structural | Masonry | Passed | Dwayne Mahony | masonry rebar inspection for the fourth floor East gable and the fourth floor south elevation 1st lift for tomorrow 4-16-24 @8am with a planned pour at 9am Also inspected and approved 4th level exterior densglass board screws. |
2024/04/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following masonry walls: - Top out courses for levels 3 and 4 along grid 19/L-M - 2nd course on level 4 along grid L/17.5-19 |
2024/04/11 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for level 1 slab on deck in the approximate area between grids A-K/1A-3. |
2024/04/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior partition walls on the ground floor |
2024/04/09 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top out course of the east gable wall and north balcony wall. |
2024/04/08 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor informed FSU BCA they would like to postpone the slab on deck inspection to a later date. |
2024/04/05 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a a portion of a retaining wall footing for the chiller yard. |
2024/04/05 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several walls on the north, east and south building elevations. |
2024/04/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of the wall along grid 19/J-L |
2024/04/04 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the slab on grade in the approximate area between grids E.3-Y/4-9. There were missing #8 bars for a column strip running east-west near grids H/4.6. Threshold inspector (BNI) to verify bars are in place prior to concrete placement |
2024/04/02 | Building/Structural | Masonry | Passed | Kody Boswell | CMU rebar inspection for North elevation gable fourth lift. North elevation loading dock, third lift. East elevation gable second lift. |
2024/04/01 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on grade in the approximate area between grids E-H/3-9. |
2024/04/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Ground floor, 1st lift along grid 19/J-L - Ground floor, 2nd lift along grid 19/L-M |
2024/03/29 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Fourth floor: 1st lift along grid J/16.6-18 - Penthouse: 1st lift along grid N/14-17 |
2024/03/28 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Fourth floor: 3rd lift along grid M/17-19 - Fourth floor: 3rd lift along grid 17/M-N - Fourth floor: 3rd lift along grid N/14-17 - Fourth floor: 3rd lift along grid 14/M-N - Ground floor: 2nd lift along grid 17/L-M |
2024/03/25 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of several interior CMU walls in the approximate area bewteen grids L-N/12-19. |
2024/03/25 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the loading dock wall along grid 19/J-L. Dowels for the loading dock slab were not tied in place yet. Threshold inspector (BNI) to verify dowel installation prior to concrete placement. |
2024/03/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following CMU walls: - 3rd floor: 3rd lift along grid M/17-19 - 3rd floor: 3rd lift along grid 17/M-N - 3rd floor: 3rd lift along grid N/14-17 - 3rd floor: 3rd lift along grid 14/M-N - 3rd floor: 3rd lift along grid - 4th floor: 3rd lift along grid 14/M-N - 4th floor: 3rd lift along grid M/5-14 |
2024/03/20 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the 4th floor slab on deck in the approximate area between grids D-L/3-10. There was reinforcing steel surrounding the roof deck (between grids G.5-L/3-101) that was not the correct length per detail 7/S4.03. This was discussed with the Contractor. Threshold inspector to verify correct reinforcing steel is installed prior to concrete placement. |
2024/03/20 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Ground floor, 4th lift: Along grids M/17-19, 17/M-N and N/14-17 - 2nd floor, 3rd lift: Along grids M/17-19, 17/M-N and N/12-17 |
2024/03/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of the following masonry walls on the ground floor: - Along grid M/17-19 - Along grid 17/M-N |
2024/03/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for 2nd lift of masonry walls on the ground floor located along grid 19/J-L. |
2024/03/18 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed reinforcing steel for the concrete beam at the roof level along grid D.8/15-18. This was a re-inspection from a 3/15/24 inspection marked NOT READY. |
2024/03/18 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the concrete beam at the roof level along grid D.8/15-18. This was a re-inspection from a 3/15/24 inspection marked NOT READY. |
2024/03/15 | Building/Structural | Masonry | Passed | Dwayne Mahony | Reviewed reinforcing steel for the 2nd lift of masonry walls, ground floor, located: - Along grid 19/L-M - Along grid M/17-19 - Along grid 17/M-N - Along grid N/14-17 |
2024/03/14 | Building/Structural | Masonry | Passed | Dwayne Mahony | Masonry rebar inspection request for tomorrow morning, 3/14/24 at 9:00 a.m. of North elevation, ground floor |
2024/03/13 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top out lift of the masonry wall along grid N/14-17 on level 2. |
2024/03/13 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for slab on deck on level 3 in the approximate area between grids B-G/3-13. |
2024/03/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lif of the masonry wall located along grid 18/D.8-J on level 3. |
2024/03/11 | Building/Structural | Structural | Passed | Kody Boswell | Rebar inspection for sequence 3 deck 3 as well as the Deans Terrace on Monday (03-11-24) @2pm Reviewed reinforcing steel for level 3 slab on deck in the approximate area between grids G-J.7/3-13 and grids M-P/6-14. Some clean up of the steel deck needed to be done. BNI (threshold) to verify deck is cleaned prior to concrete placement. |
2024/03/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry wall located at the 4th level, 4th lift located along gridline D.8/15/18. |
2024/03/08 | Building/Structural | Masonry | Conditional | Dwayne Mahony | Masonry needs a rebar inspection tomorrow morning, Friday, March 8, 2024 on the north elevation first and second floor. Pour observation will follow at 9:00 AM Masonry approved. Another issue found: The big sag in the floor deck we saw today was due to not following detail 8 on S0.07 which states the decking at the proposed opening is not to be cut out until after casting the floor concrete (box out opening). The condition we saw today may not be an issue structurally since it happened while the concrete was plastic, still being placed, and the additional reinforcing is now functional. If the engineer of record desires load testing for additional deflection can be done, at the contractor’s expense. The structural engineer of record must review this condition, with the Threshold Inspector in consultation. Cutting these floor openings prior to concrete placement has happened several times, all such shall be reviewed and acknowledged. This is another non-conforming structural condition which should be on the T.I. record until resolved. |
2024/03/07 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for the Dean's Terrace located approximately in the area between grids M-P/6-14. Contractor was performing clean up of deck and had not finished placing reinforcing. |
2024/03/07 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - 4th level: 3rd lift located along gridline D.8/15/18. - 2nd level: top our course for the walls along grids P/6-12, 6/M-P and M/5-6 |
2024/03/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel of the 2nd lift of the masonry wall on the 4th level located along gridline D.8/15/18. |
2024/03/05 | Building/Structural | Masonry | Postponed | Kody Boswell | Inspection was postponed to 3/6/24 due to weather |
2024/03/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed top out course for the following walls on 1st floor: - Along grid 18/G-H - Along grid P/6-12 - Along grid 6/M-P - Along grid M/5-6 - Along grid 5/L-M |
2024/03/01 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the slab on deck for the 2nd floor in the approximate areas between grids D-J/3-13. During review there was concern about the metal deck span directly west from the opening in the area between grids E.3-F/3-5. Deck span length for a single span condition per manufacturer's load tables appears to have been exceeded. EOR to be notified of this condition. This was discussed with the Contractor who is to contact EOR. EOR provided direction that a steel beam be added to support the steel deck in the area noted above. Beam to be added at levels 2-4. Level 2 concrete has not been placed yet whereas levels 3 and 4 have concrete placed. (noted on 3/7/2024) |
2024/03/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of wall along grid D.8/15-18 on 4th floor. |
2024/03/01 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade for the ground floor in the approximate area between grids J.7-P/12-19. |
2024/03/01 | Electrical | Wall Rough-in | Conditional | Dwayne Mahony | Partial electrical wall inspection Sequence 1&2 third floor. |
2024/02/28 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for elevated slab on deck on 2nd floor in the approximate area between grids F-K/3-13. There were a few deck penetrations where reinforcing steel was not installed per structural drawings. These areas were corrected prior to FSU leaving the job site. |
2024/02/28 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 4th lift of the masonry wall on the 3rd floor located along grid D.8/15-18. |
2024/02/27 | Building/Structural | Masonry | Passed | Dwayne Mahony | Masonry rebar inspection for tomorrow Tuesday 2-27-24 @10am (no pour time given yet) The remaining portion of Seq2 slab on grade rebar is ready for inspection as well |
2024/02/23 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Masonry rebar inspection for tomorrow morning 02-23-24, 1st floor, 4th lift on the west elevation. Pouring cell fill at 9am Electrical wall inspection Seq 1 & Seq 2 second floor |
2024/02/22 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the wall located along grid D.8/15-18. (KB) |
2024/02/22 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade in the approximate area between grids J.7-P/5-12. (KB) |
2024/02/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of masonry walls on the 4th level at the following locations: - Along grid L/17.5-19 - Along grid 19/L-M - Along grid M/17.5-19 - Along grid 17/M-N - Along grid N/14-17 - Along grid 14/M-N - Along grid M/5-14 - Along grid 5/L-M |
2024/02/20 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on deck for level 1 approximately in the area between grids 3-13/A-E.3. There was one deck penetration where reinforcing steel was not placed correctly. This issue was resolved while FSU was on site. |
2024/02/19 | Building/Structural | Slab | NOT READY | Kody Boswell | Reviewed reinforcing steel for slab on deck for level 1 approximately in the area between grids 3-9/A-E.3. Contractor was still installing reinforcing and was not ready for inspection. Contractor to reschedule inspection for a later date. |
2024/02/16 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 5th lift of masonry walls on the ground level located: - Along grid D.8/15-19 - Along grid 18/D.8-J |
2024/02/15 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of masonry walls on the 4th level at the following locations: - Along grid L/17.5-19 - Along grid 19/L-M - Along grid M/17.5-19 - Along grid 17/M-N - Along grid N/14-17 - Along grid 14/M-N - Along grid M/5-14 - Along grid 5/L-M |
2024/02/15 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for 1st level slab on deck in the approximate areas between gridlines D.9-J.7/3-9. There was a condition around the slab perimeter on the north side that needed to be corrected prior to concrete placement. BNI (threshold) to verify condition is corrected. |
2024/02/14 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 4th lift of the following masonry walls on the ground floor: - Along grid 15/D.8-E - Along grid D.8/15-18 - Along grid 18/D.8-J |
2024/02/09 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of masonry walls on ground floor located: - Along gridline 15/D.8-E - Along gridline D8./15-18 - Along gridline 18/D.8-J |
2024/02/09 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 1 & 2 Floor 1 |
2024/02/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade in the approximate area between gridlines A-E/3-7. |
2024/02/07 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed the reinforcing steel for the following CMU walls on the ground floor: - 2nd lift of wall along grid 15/D.8-E - 2nd lift of wall along grid D.8/15-18 - 2nd lift of wall along grid 18/G-J |
2024/02/07 | Building/Structural | Framing | Passed | Dwayne Mahony | Top out for duct penetrations. |
2024/02/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls on the ground floor: - 1st lift of the wall along grids D.8/15-18 and 15/D.8-D.9 - 2nd lift of the wall along grid 18/D.8-G |
2024/02/05 | Building/Structural | Structural | Passed | Dwayne Mahony | We would like to request a rebar inspection for S colonnade wall and seq2 slab on grade hole inspection @11am Monday (2-5-24). |
2024/02/05 | Building/Structural | Slab | Passed | Dwayne Mahony | We would like to request a rebar inspection for S colonnade wall and seq2 slab on grade hole inspection @11am Monday (2-5-24). |
2024/02/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of masonry walls on level 3 located along gridlines L/17-19, 19/L-M, M/17-19 and N/14-17. (KB) |
2024/02/01 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Riser |
2024/01/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade located in the area between gridlines A-E.3/1A-3. |
2024/01/30 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of CMU walls on level 3 along grids: - 19/L-M - M/17-19 - 17/M-N - N/12-17 - P/6-12 - 6/M-P - M/5-6 |
2024/01/29 | Building/Structural | Structural | NOT READY | Kody Boswell | Reviewed reinforcing steel for wall and pilasters along grid 1A/E.3-H.6 between ground floor and level 1. Work was still in-progress. FSU informed Contractor to reschedule once work was complete. |
2024/01/26 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of masonry walls on level 3 located along grids: - 18/D.8-J - 17.5/J-L - L/17.5-19 |
2024/01/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed the 3rd lift of masonry walls on level 2 along grids: - 19/L-M - M/17-19 - 17/M-P - N/12-17 - P/6-12 - 6/M-P - M/5-6 |
2024/01/23 | Building/Structural | Roofing | Passed | Kody Boswell | Roofing In-progress review of the insulation layer of the north gable roof |
2024/01/23 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed grade beam and pilasters along grid 1A/E.3-H.6 (South). Grade beam and pilasters along grids 3/K-L and L/3-5 (East) were not ready for inspection. East grade beam and pilasters to be rereviewed at a later date. South grade beam and pilasters had minor issues to be corrected. (KB) |
2024/01/22 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed the 2nd lift of masonry walls on the 2nd level located along grids 6/M-P, M/5-6, 5/L-M and D.8/15-18 |
2024/01/22 | Building/Structural | Slab | Passed | Kody Boswell | Rebar inspection for Monday (1-22-24) 1PM Slab on Grade Seq1 to pour 3am Tuesday1-23-24 Reviewed reinforcing for slab on grade in the approximate area between grids D.8-L/13-18. |
2024/01/22 | Building/Structural | CIP Beam | NOT READY | Kody Boswell | While on the job site, the concrete subcontractor informed me they were not ready for inspection of grade beams/pilasters. Inspection to be rescheduled. (KB) |
2024/01/19 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar East 2nd floor 2nd lift Reviewed reinforcing for the 2nd lift of the masonry wall on the 2nd level along grids 19/L-M, M/17-19, 17/M-N, N/14-17 and P/6-16 (exterior walls on the east side) |
2024/01/18 | Building/Structural | Structural | Postponed | Kody Boswell | Rebar Grade Beam south porch and east porch Contractor called and informed FSU they were not ready for inspection. (KB) |
2024/01/17 | Building/Structural | Structural | Passed | Kody Boswell | Masonry rebar 2nd floor North Wall Reviewed reinforcing steel for the 3rd lift of the masonry wall between grids 18/D.8-L. |
2024/01/16 | Building/Structural | Masonry | Postponed | Kody Boswell | 2nd Floor North Masonry Rebar Postponed due to weather. Contractor is resubmitting request for 1/17/2024. (KB) |
2024/01/12 | Building/Structural | Structural | Conditional | Kody Boswell | Rebar Seq2 Penthouse Deck Reviewed elevated slab reinforcing in the area between grids J-N/5-19. Reinforcing was in substantial compliance with the contract documents with exception to the area between grids J-J.7/ 16.3-16.7. This area is marked as a roof in architectural drawings. Contractor to verify the area is supposed to receive roof deck as opposed to composite deck with concrete. Contractor verified the area noted above is to be composite deck with concrete. (noted 3/7/2024) |
2024/01/12 | Building/Structural | Structural | Passed | Kody Boswell | Masonry rebar east 2nd floor planned pour is 11am Reviewed the 1st lift of the east exterior wall on the 2nd level |
2024/01/12 | Plumbing | Underground | Passed | Dwayne Mahony | Underground Sanitary NE Seq2 section C. |
2024/01/10 | Building/Structural | Structural | Passed | Kody Boswell | Rebar Due to FSU closure (severe weather), inspections for masonry reinforcing and retaining wall reinforcing were deferred to the threshold inspector, BNI. (KB) |
2024/01/08 | Building/Structural | Structural | Passed | Kody Boswell | Rebar inspection in foundation wall Reviewed reinforcing around doorway near the SW corner of retaining wall. Reinforcing reviewed per direction in RFI #287. |
2024/01/05 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry reinforcing inspection level 1 Reviewed reinforcing for the 1st lift of the wall along grid 18/D.8-J on level 2. (KB) |
2024/01/04 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry reinforcing level 1 Reviewed reinforcing for the following walls: - 3rd lift of the west wall on level 1 (along grid D.8/15-18) |
2024/01/04 | Plumbing | Underground | Passed | Neely Lewis | Storm Water on NE quadrant. Underground slab |
2024/01/03 | Building/Structural | Structural | Passed | Kody Boswell | Re-inspection of the concrete foundation wall rebar 1.5 in cover was achieved (KB) |
2024/01/02 | Building/Structural | Structural | Failed | Tom Deckert | ****************This inspection is for Tuesday 1-2-24 **********The system will not let anything schedule for 2024 masonry inspection and wall/pilast RI steel cover for west wall interior face does not meet minimum 1.5 inches. Contract to adjust an recall inspection |
2024/01/02 | Building/Structural | Masonry | Passed | Tom Deckert | ****************This inspection is for Tuesday 1-2-24 **********The system will not let anything schedule for 2024 masonry inspection and wall/pilaster inspection level 2 3rd lift north and 2nd life east- Masonry reinforcing (dowells and tie beam) in place per cd's |
2023/12/28 | Plumbing | Underground | Passed | Neely Lewis | Seq 1 storm line 8" running North & South with 6" branch line running East |
2023/12/28 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | Seq 1 storm line 8" running North & South with 6" branch line running East |
2023/12/21 | Building/Structural | Structural | Postponed | Kody Boswell | Pilaster Rebar East and South Contractor requested to postpone pilaster inspection once FSU arrived on site for other inspections (KB) |
2023/12/21 | Building/Structural | Structural | Conditional | Kody Boswell | Rebar Slab on Deck 4th level slab reinforcing reviewed in the area between grids J.7-N/5-19 Contractor was still tying vertical masonry dowels and slab reinforcing bars and had not installed the construction joint. BNI to verify completion of reinforcing placement and construction joint installation prior to concrete placement. (KB) |
2023/12/21 | Building/Structural | Structural | Conditional | Kody Boswell | Block mason rebar.---------- Also entering a 12 pm rebar Slab on Deck Reviewed the following: -1st lift of CMU along grids M, N & P between grids 5-19 -2nd lift of CMU along grids 18 & 19 between grids D.8-N A few individual CMU blocks broke loose from wall assembly at window jambs. BNI to verify block is re-laid with fresh mortar. |
2023/12/15 | Plumbing | Underground | Passed | Neely Lewis | waste piping north 6" line |
2023/12/13 | Building/Structural | Structural | Conditional | Kody Boswell | Sequence4 Slab on Grade Reviewed SOG reinforcing at the SW corner of the building between grids (E-L/2-3). Several minor corrections to be made: 1. Fix top cover issue for #8 column strip bars 2. Rotate hooks where the slab edge meets the retaining wall so sufficient cover is met. 3. Bend slab dowels protruding from pile caps and grade beams so that they are in the slab. 4. Install #8 column strip reinforcing running N-S between grids 2 & 3. FSU BCA to verify with BNI (threshold) above mentioned corrections are completed prior to concrete placement. (KB) |
2023/12/11 | Building/Structural | Structural | Passed | Kody Boswell | Slab on deck inspection (for Tuesday 3am pour) |
2023/12/07 | Building/Structural | Structural | Passed | Kody Boswell | Retaining Wall 21-03229-A |
2023/12/04 | Building/Structural | Structural | Passed | Kody Boswell | **************** This inspection is for 12-4-23 @2pm (today) and has been coordinated over the phone. Due to Building Code Inspection System limitations not allowing same day appt this is for record. Seq2-Level2-Slab On Deck 21-03229-A ********** FSU BCA: Request sent after 7:30am on 12/4/2023, accomodation was made. |
2023/11/29 | Building/Structural | Structural | Passed | Kody Boswell | Slab on Deck Rebar/Wire 1st level. Sequence 2 reviewed |
2023/11/28 | Building/Structural | Structural | Passed | Kody Boswell | Retaining Wall 21-03229-A Retaining wall rebar at the south wall of the southwest portion of the building. Brick ledge rebar per EOR direction was installed during inspection. |
2023/11/27 | Building/Structural | Structural | Conditional | Kody Boswell | Wall Rebar 21-03229-A Retaining wall rebar at the south wall of the southwest portion of the building. Brick ledge rebar per EOR direction not fully installed during inspection. FSU to review brick ledge after installation. |
2023/11/16 | Building/Structural | Slab | Passed | Kody Boswell | Slab inspection Seq1Level4 21-03229-A |
2023/11/14 | Building/Structural | Slab | NOT READY | Kody Boswell | Slab Inspection 21-03229-A 4th level, Sequence 1 Contractor was still placing slab reinforcing upon site arrival |
2023/11/14 | Plumbing | Storm Piping & Test | Passed | Dwayne Mahony | Partial storm inspection for cover up. 21 03229-A |
2023/11/13 | Building/Structural | Structural | Conditional | Kody Boswell | Retaining wall rebar (south) and concrete pilasters/columns at the exterior of the retaining wall (south and east) Some cover issues, but rebar is in substantial compliance. Threshold inspector to verify cover issues remedied prior to concrete placement. |
2023/11/09 | Plumbing | Underground | Passed | Dwayne Mahony | Underground Plumbing |
2023/11/09 | Building/Structural | Structural | Passed | Kody Boswell | South Wall 21-03229-A |
2023/11/08 | Building/Structural | Structural | Passed | Kody Boswell | Sequence 1 level 3 deck slab 21-03229-A |
2023/11/06 | Building/Structural | Structural | Failed | Dwayne Mahony | Pilaster rebar 21-03229-A Work is not in accordance with the plans: all ties shall have 135 degree hooks where required by ACI 318. Consult with engineers and provide alternate direction if necessary. One P5 column #8 bars have too short of laps to dowels. Other columns rebar dowel placement was inaccurate: dowel bars will not have required 2" clear cover. Increase coverage by increasing column size as needed. |
2023/11/02 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | Sanitary and storm in seq 4 slab on grade for partial cover up. |
2023/11/02 | Building/Structural | Structural | Conditional | Kody Boswell | Retaining Wall 21-03229-A Concrete pilasters missing cross ties. BNI to verify ties installed prior to concrete placement |
2023/11/02 | Building/Structural | Slab | Passed | Kody Boswell | Slab inspection 2nd floor. 21-03229-A |
2023/10/30 | Building/Structural | Slab | Passed | Kody Boswell | 1st elevated deck |
2023/10/26 | Building/Structural | Structural | Conditional | Kody Boswell | Foundation Wall inspection Corner bars for outside face of horizontal wall reinf was not installed BNI to verify installation of bars prior to concrete placement |
2023/10/24 | Building/Structural | Structural | NOT READY | Dwayne Mahony | Foundation/Wall inspection 21-03229-A |
2023/10/13 | Building/Structural | Structural | Passed | Kody Boswell | Retaining Wall Rebar 21-03229-A |
2023/10/13 | Building/Structural | Structural | Passed | Kody Boswell | Elevator Shaft 21-03229-A west wall was formed up upon arrival. BNI was contacted to verify reinforcing was in compliance. N, S and E walls were reviewed |
2023/10/04 | Plumbing | Underground | Passed | Neely Lewis | Chiller piping prior to covering. 21-03229-A |
2023/10/04 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Chiller piping prior to covering. 21-03229-A |
2023/10/03 | Building/Structural | Structural | Passed | Dwayne Mahony | Elevator Rebar 21-03229-A Link Beam tie spacing was wrong at time of my inspection (@12") corrected to 10" while I waited. |
2023/09/22 | Building/Structural | Structural | Passed | Kody Boswell | Elevator shaft rebar, Retaining wall rebar 21-03229-A |
2023/09/13 | Building/Structural | Structural | Passed | Kody Boswell | Elevator Shaft Rebar Vertical permit 21-03229-A |
2023/09/12 | Building/Structural | Structural | Postponed | Kody Boswell | Elevator Shaft Rebar Vertical permit 21-03229-A Inspection postponed to 9/13/23 due to incoming weather |
2023/08/10 | Building/Structural | Structural | Passed | Dwayne Mahony | Rebar inspection for elevator shaft. First lift approved, corrections completed. |
2023/08/09 | Building/Structural | Structural | Failed | Dwayne Mahony | North , South, and West elevator shaft rebar. Reinforcing not in compliance with the approved construction documents: Horizontal bars not corrected to outside of verticle bars. U-bars #3, but #4 are required. |
2023/08/08 | Building/Structural | Structural | Failed | Dwayne Mahony | Rebar on the East side of the elevator shaft. Reinforcing not in compliance with the approved construction documents: Horizontal bars not outside of verticle bars. U-bars at wall opening are missing. Rebar couplers not tightened. |
2023/01/24 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed grade beam and pilasters along grid 1A/E.3-H.6 (South) and along grids 3/K-L and L/3-5 (East). |
Building/Structural | Masonry | Kody Boswell | masonry rebar inspection for Ground floor 12" CMU on the SW building for Monday 7-15-24 @ 9am pour scheduled for 10am. | ||
Building/Structural | Structural | NOT READY | Kody Boswell | Contractor requested inspection of reinforcing steel for the concrete beam at the roof level along grid D.8/15-18. Reinforcing steel was not in place and not ready for inspection. |
BCA Project #: 21-03229- New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/15 | Plumbing | Rough-in | Passed | Paul Nitz | 2nd floor bathroom |
2024/06/28 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Sequence 3 floor1 Pressure and Return Sequence 1 floor 4 Return low pressure 1) 1st floor |
2024/06/28 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Sequence 3 floor1 Pressure and Return Sequence 1 floor 4 Return low pressure 1) 4th floor |
2024/06/14 | Building/Structural | Masonry | Passed | Dwayne Mahony | masonry rebar inspection for the east elevation of the second floor of the southwest building, second lift. Tomorrow 6-14-24 @1pm -Concrete is scheduled at 1:30. |
2024/06/13 | Building/Structural | Masonry | Passed | Dwayne Mahony | masonry rebar inspection for tomorrow (6-13-24) @9:30 for the third and fourth lift on the second floor, southwest building. Pour scheduled for 10am. |
2024/06/13 | Mechanical | Duct Pressure Test | NOT READY | Paul Nitz | Low Pressure and Return Sequence 1,2&3 Floor 3 |
2024/06/12 | Plumbing | Water Piping & Test | Passed | Paul Nitz | SOG 112’ rebar inspection for tomorrow (Wednesday 6-12-24) @ 1pm with a scheduled pour for Thursday morning @3am. Domestic water Sequence 1&2 Floors2&3 1) third floor seq 1&2 only |
2024/06/12 | Building/Structural | Slab | Passed | Dwayne Mahony | SOG 112’ rebar inspection for tomorrow (Wednesday 6-12-24) @ 1pm with a scheduled pour for Thursday morning @3am. |
2024/06/11 | Building/Structural | Masonry | Passed | Dwayne Mahony | Masonry rebar inspection @9am on 6-11-24 for the first lift of the third floor on the west elevation of the southwest building. Concrete is scheduled at 10am |
2024/06/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the tie beam at the north gable wall |
2024/05/24 | Building/Structural | Masonry | Passed | Dwayne Mahony | Masonry rebar inspection for tomorrow morning. 1st floor, south west building second and third lift. Concrete is scheduled at 10:30 |
2023/12/15 | Building/Structural | Structural | Passed | Kody Boswell | Sequence 1 First floor rebar on block Reinforcing for 1st lift of CMU along grid 18/D.8-N on first floor reviewed |
2023/11/21 | Building/Structural | Structural | Passed | Kody Boswell | Foundation Inspection 21-03229- |
2023/10/25 | Building/Structural | Structural | Passed | Kody Boswell | 40' Foundation Wall and Concrete Pedestals X2 21-03229-A |
2023/10/10 | Building/Structural | Structural | Conditional | Kody Boswell | Retaining wall and foundation rebar. 21-03229- Contractor to finish providing clearance around reinforcing steel around earth-formed components. BNI threshold to verify work complete prior to concrete palcement. (KB) |
2023/09/28 | Building/Structural | Structural | Passed | Kody Boswell | Retaining wall rebar. |
2023/09/19 | Building/Structural | Footing | Conditional | Kody Boswell | Wall footings, piles caps, grade beams KB: Contractor to verify reinf around pipe penetration along south wall footing. BNI threshold will also verify. |
2023/09/11 | Electrical | Ground | Passed | Dwayne Mahony | This inspection is for 9/8/23 am for grounding and re-inspect on gridlines 15-18. |
2023/09/08 | Building/Structural | Structural | Passed | Kody Boswell | This inspection is for 9/8/23 am for grounding and re-inspect on gridlines 15-18. |
2023/09/07 | Building/Structural | Footing | Conditional | Dwayne Mahony | Foundations/Foundation Walls 21-03229 Foundation Permit |
2023/08/25 | Building/Structural | Structural | Passed | Dwayne Mahony | For rebar Gridline 3 to 1A to Gridline F 11am pour |
2023/08/14 | Building/Structural | Footing | Passed | Dwayne Mahony | Rebar inspection - piles caps and grade beams - sequence #3 |
2023/07/28 | Building/Structural | Footing | Passed | Dwayne Mahony | Pile cap and grade beams - remainder of sequence 2. 11:00 concrete pour. |
2023/07/19 | Electrical | Service Release | Passed | Dwayne Mahony | Temp service (#3) for the building as well as Crane #2. South East corner of the site. Service approved. Approval sticker placed on CT cabinet. |
2023/07/12 | Electrical | Lightning Protection | Passed | Dwayne Mahony | Scheduled to pour 5am Thursday Just one column downleader inspected. |
2023/07/12 | Building/Structural | Structural | Passed | Dwayne Mahony | Scheduled to pour 5am Thursday |
2023/07/12 | Building/Structural | Foundation | Passed | Dwayne Mahony | Scheduled to pour 5am Thursday |
2023/06/30 | Building/Structural | Footing | Passed | Dwayne Mahony | 11:30 Concrete for gridlines 18-16. |
2023/06/30 | Electrical | Ground | Passed | Dwayne Mahony | Bonding ground to column inspection. Approved Ufer ground in grade beam. |
2023/06/27 | Building/Structural | Footing | Passed | Andy Howard | Continuation of grid line 18. Andy Howard met with Todd Nedley, Kenny Heierman, and Robbie Tucker at the north east corner of the building site. This inspection was a preliminary inspection requiring another BCA structural inspection prior to placing the concrete. The area of the inspection covered gridlines J throughP from west to east and gridline 16 through 19 from south to north. The items inspected are pile caps and beams supported by piles. |
2023/06/16 | Building/Structural | Footing | Passed | Dwayne Mahony | Pile cap and grade beam rebar inspections gridline 18,15 and 13. We are pouring concrete at 11am on this date. This has to be a morning inspection. |
2023/06/13 | Electrical | Ground | Passed | Dwayne Mahony | Service inspection for meter release at the jobsite trailer. 2 services approved, one per trailer. |
2023/06/06 | Building/Structural | Footing | Passed | Dwayne Mahony | Modular buildings earth anchors/setup approved. |
Electrical | Ground | NOT READY | Dwayne Mahony | rain delay | |
Building/Structural | Footing | NOT READY | Dwayne Mahony | Foundation Rain delay | |
Electrical | Lightning Protection | NOT READY | Dwayne Mahony | rain delay | |
Building/Structural | Structural | NOT READY | Dwayne Mahony | Foundation Rain delay |
BCA Project #: 21-03227- Football Operations Facility
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/12 | Plumbing | Underground | Passed | Paul Nitz | *7/11/2024 Inspection* Area B (Hydro Pit Area) - U/G Pool Plumbing - (2) Recirculation Lines (6") & (2) Suction lines (4") - Column Line's 9.5 to 12 & D to D.5 |
2024/07/12 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) SF4.0 at grids R/22.7 2) SF4.0 at grids S/22.7 3) SF4.0 at grids R/25 4) SF4.0 at grids S/25 5) Building retaining wall along grid A/6.1-12 |
2024/07/11 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | In-progress review of reinforcing steel for the building retaining wall located along grid A/6.1-12.5 prior to formwork being fully installed. There will be another inspection once formwork is up, prior to concrete placement. |
2024/07/11 | Plumbing | Underground | Passed | Paul Nitz | Area B (Hydro Pit Area) - U/G Pool Plumbing - Resistance Pool Main Drain Lines (8" & 10") - Column Line's 9.5 to 12 & D to D.5 |
2024/07/10 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for site walls and stari walls in the area between grids A-C/0-1 |
2024/07/10 | Plumbing | Underground | Passed | Paul Nitz | Area C - U/G Storm Main Line (12" & 15") - Column Line's G.4 to F.7 & 25 to 27.5 |
2024/07/08 | Building/Structural | Wall/Ceiling | Postponed | Kody Boswell | Contractor contacted FSU prior to arrival on site to postpone inspection to a later date. |
2024/07/03 | Plumbing | Underground | Passed | Paul Nitz | U/G Rough-In - Resistance Pool Piping (6") - Wall Inlet & Skimmer feeds - Column Line's 9 to 12 (along West hydro pit wall) |
2024/07/03 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator walls in the area between grids K-H/24-25 from top of foundation to 2nd level. Reinforcing steel was in substantial compliance with the contract documents. Contractor to call in another inspection after forms and steel embeds have been set. |
2024/07/02 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the footer CF12.0 along grid F/14-15. |
2024/07/01 | Building/Structural | Structural | Passed | James Melvin | A-line wall in Area-B. |
2024/07/01 | Building/Structural | Footing | Passed | Paul Nitz | this inspection passed on Friday 6-28-24 |
2024/07/01 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | this inspection passed on Friday 6-28-24 |
2024/06/28 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the following foundations: 1) Wall footer CF9.0A along grid A/6.5-12.5 2) Wall footer CF12.0 along grid 7/A-D.5 Result is conditional pending installation of stirrups per detail 13/S6-1-2 at grids D/7. Threshold inspector to verify prior to concrete placement. |
2024/06/28 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for stair walls located NW of grids B/1 |
2024/06/28 | Plumbing | Underground | Passed | Paul Nitz | Area C - U/G Storm Main Line (10" & 12") - Column Line's G.4 to F.7 & 20 to 25 |
2024/06/25 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/12.5-15.5. Result is conditional pending minor corrections to reinforcing, anchor bolt installation and form installation. |
2024/06/21 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/3-6 |
2024/06/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/3-6 |
2024/06/20 | Plumbing | Underground | Passed | Dwayne Mahony | Area D - UG Storm Mains (two lines total - 8", 10", & 12") - Column Line's 25 to 29:P to S) |
2024/06/18 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Area A - Retaining Wall - Wall Rough-in (receptacles, fire alarm, etc.) - Column line's A:4 to 6 |
2024/06/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the footer CF12 along grid 13/D-F. |
2024/06/14 | Plumbing | Underground | Passed | Paul Nitz | Area C - UG Storm Main (16") - last 20' of storm line (future tie in to exterior storm system at CL 21) |
2024/06/12 | Plumbing | Underground | Passed | Paul Nitz | *FOR RECORD* Area B/C - UG Storm Main (16") - Column line's C-D:16-20 *Inspected on Tuesday, June 11th by FSU* |
2024/06/12 | Building/Structural | Structural | Passed | Paul Nitz | Hydrotherapy pit. |
2024/06/10 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/10 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | FTgs on line A, between 12 and 18. Interior wall at hydro pit. |
2024/06/10 | Plumbing | Underground | Passed | Paul Nitz | Area D - UG Sanitary Main (6") - Column Line's 23-23.7:K-S |
2024/06/10 | Building/Structural | Footing | Passed | Dwayne Mahony | FTgs on line A, between 12 and 18. Interior wall at hydro pit. |
2024/06/07 | Building/Structural | Structural | Passed | Kody Boswell | Hydrotherapy pit walls (South,East,North). Footers CL D6, F7,F8. Reviewed reinforcing steel for the following: 1) For north, south and east hydrotherapy walls 2) Footer at grids D/6 3) Footer at grids F/8 |
2024/06/06 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the west hydrotherapy pit wall along grid B/8-12. Result is conditional upon installation of waterstop, chamfer installation on forms at vertical control joints and clarification of blockouts for beams bearing on wall. |
2024/06/06 | Plumbing | Underground | Passed | Paul Nitz | Area B - UG Storm Main (16") - Column Line's 16-17: G-D Area D - UG Sanitary Main (6") - Column Line's 23-23.7:K-S 1) this was for the the storm drain only |
2024/06/05 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. |
2024/06/04 | Electrical | Wall Rough-in | Passed | Tom Deckert | Electrical Wall R/I - Hydrotherapy Pit Cast-In-Place Walls - All required wall R/I (receptacles, fire alarm, telecom, etc.) 3 boxes installed per code |
2024/06/03 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. Hairpins around anchor bolts were not installed and several horizontal bars were not cut at vertical control joints. |
2024/06/03 | Plumbing | Underground | Passed | Paul Nitz | UG Storm Main (16") - Area B - Column Line's 13.5 to 16.5: F.7 to G.4 UG Sanitary Main (6") - Area C/D - Column Line's 23 to 24: F.7 to K |
2024/05/31 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the footer loacted at grids F/12 |
2024/05/30 | Plumbing | Underground | Passed | Neely Lewis | 16" UG Storm - Area B - Column Line's 12.8 to 13.5 - Per conversation in the field on 5/29, WT to call FSU as soon as the pipe is ready to be inspected (due to logistical constraints). Inspection may differ from 1 PM, pending completion. |
2024/05/30 | Building/Structural | Structural | NOT READY | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. Contractor was still installing rebar towards the top of the wall where the anchor bolts were. Contractor to reschedule after work is complete. |
2024/05/29 | Plumbing | Underground | Passed | Paul Nitz | UG Storm main - Area B |
2024/05/29 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following foundations: - At grids K/11.3 - At grids K/12 - At grids K/13 - At grids K/14 - At grids K/15 - At grids K/16 - At grids K/17 |
2024/05/28 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator mat foundation located between grids H-K/24-25 |
2024/05/28 | Plumbing | Underground | Passed | Neely Lewis | 40 ft of sanitary line. |
2024/05/28 | Electrical | Underground | Passed | Tom Deckert | Rought in underground south of IPF. Conduit installed at 36" deep with marking tape 12 inched above. |
2024/05/22 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. |
2024/05/22 | Plumbing | Underground | Passed | Paul Nitz | 1) UG Storm Main - Area A/B - Column line's 9 to 10.5 - 12" & 16" Piping 2) UG Sanitary Main - Area B/C - Column line's 16 to 20.9 - 6" Piping |
2024/05/22 | Plumbing | Underground | Passed | Paul Nitz | Hydrotherapy Pit plumbing UG - final sign-off prior to pit slab pour |
2024/05/22 | Electrical | Ground | Passed | Dwayne Mahony | Grounding for the hydrotherapy pit (prior to hydrotherapy pit slab pour) |
2024/05/22 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/4-6. Wall dowels were corrected as required from inspection on 5/21/2024 |
2024/05/21 | Electrical | Ground | Conditional | Dwayne Mahony | Grounding for the hydrotherapy pit (prior to hydrotherapy pit slab pour) Partial. Work is not complete. |
2024/05/21 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/4-6. Wall dowels were not centered on the footing, as required per plan note 9. |
2024/05/21 | Building/Structural | Slab | Failed | Kody Boswell | FSU arrived on site to review reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. Contractor had to rip out an area of reinforcing and waterproofing due to weekend storm erosion into the formwork so the area was not ready for review. |
2024/05/21 | Plumbing | Underground | Failed | Neely Lewis | 1) UG Sanitary piping (6") - Area C - Column Line's 16-19:F-G 2) Hydrotherapy Pit UG - final sign-off prior to pit slab pour 5/21/2024: slope was not per FBC requirements |
2024/05/20 | Plumbing | Underground | Postponed | Paul Nitz | Electrical: Hydrotherapy Pit Grounding Plumbing: Hydrotherapy Pit UG - final sign-off prior to pit slab pour |
2024/05/20 | Building/Structural | Footing | Failed | Kody Boswell | FSU arrived on site to review reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. Contractor had to rip out an area of reinforcing and waterproofing due to weekend storm erosion into the formwork so the area was not ready for review. |
2024/05/20 | Building/Structural | Slab | Failed | Kody Boswell | FSU arrived on site to review reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. Contractor had to rip out an area of reinforcing and waterproofing due to weekend storm erosion into the formwork so the area was not ready for review. |
2024/05/17 | Plumbing | Underground | Passed | Paul Nitz | 1) Underground Storm Main (12") - Area A - Column line's 6.5-9.5:G-J 2) Underground Sanitary Drain (2") - Hydrotherapy Pit - Column line's 11-12:C-D - Remaining portion of piping within concrete pit slab |
2024/05/17 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids G.2/1 2) At grids J/1 3) At grids J/2 4) At grids J/4 5) At grids J/5 6) At grids J/6 7) At grids J/7 |
2024/05/16 | Plumbing | Underground | Passed | Paul Nitz | UG Sanitary piping (6" and 8") - Area B - Column Line's 12-16:F-G |
2024/05/16 | Building/Structural | Structural | NOT READY | Kody Boswell | FSU BCA arrived on site and was told by the Contractor they were not ready for inspection |
2024/05/15 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. Reinforcing was not fully installed and tied in place. The following deficiencies are as follows: 1) #4 hairpins around anchor bolts (detail 14/S6-1-2) 2) Anchor bolts were not installed at plinths 3) Vertical control joint reinforcing was not installed (detail 8/S5-1-3) |
2024/05/13 | Plumbing | Underground | Passed | Neely Lewis | UG Sanitary Piping - Area B - Column Lines 9.5-12:F-G UG 2" drain line - Hydrotherapy Pit - Column Lines 9-12:B-D - Re-Inspection UG 8" Sanitary Line, SSMH-5, & Conflict Box - Tie-In to Building Sanitary Stub Out - Sheet C6-0-N Section X-X |
2024/05/09 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids J/8 2) At grids J/9 |
2024/05/08 | Plumbing | Underground | Conditional | Paul Nitz | Re-inspection of the two 2" sanitary drain lines for the two hydroworx pools underneath the hydrotherapy pit slab. WT has email confirmation from Aquatics engineer stating these two lines can be ran flat (no slope). 1) provide positive slope, reinspection required after rebar is placed |
2024/05/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At the intersection of grids D.9/1 2) At the intersection of grids D/2 3) At the intersection of grids D/3 4) At the intersection of grids D/4 5) At the intersection of grids D/5 6) Along grid 1/A-D.5 7) Along grid A/0.5-4 8) Stair footer located north of grid 0.7 |
2024/05/07 | Plumbing | Underground | Failed | Paul Nitz | Underground Sanitary Piping - Area A - Column Lines 8-9.5:F-G Remaining Underground Sanitary & Pool Piping - Hydrotherapy Pit - Column Lines 9-12:B-D 1) Slope not met for 2" pipe fbcp 704 2) rock support for 2" pipe is not approved |
2024/04/30 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor informed FSU they were not ready for inspection prior to FSU arriving on site. |
2024/04/30 | Plumbing | Underground | Passed | Neely Lewis | Hydrotherapy Pit U/G piping - Hydroworx and Resistance Pool U/G - column line's 9-12:B-E - (2) 6" suction lines, (4) 4" suction lines Area A Deep sanitary U/G piping - column line's 3-8:F-G |
2024/04/29 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU while FSU was on site to postpone the inspection of building foundations to a later date. |
2024/04/29 | Plumbing | Underground | Passed | Neely Lewis | Hydrotherapy Pit - Underground sanitary piping - Column line's 10-12:B-D |
2024/04/26 | Plumbing | Underground | Conditional | Neely Lewis | Area A underground sanitary main (column line's J-F.7:1-3) 4/26: Slope was too steep. They will reslope for 1/8". |
2024/04/26 | Building/Structural | Structural | NOT READY | Dwayne Mahony | Rebar Inspection For CF7&CF9 Footer |
2024/04/25 | Building/Structural | Structural | Passed | Dwayne Mahony | Inspection for CF9&CF7 footer at North stair. |
2024/04/25 | Plumbing | Underground | Passed | Neely Lewis | Underground sanitary piping underneath hydrotherapy pit slab (column line's 8-9:C-D) |
2024/04/25 | Building/Structural | Slab | Passed | Dwayne Mahony | slab at hydrotherapy pit for sump pump and ejector pit |
2024/04/25 | Building/Structural | Structural | Passed | Dwayne Mahony | Hydrotherapy sewage ejector and sump pit slabs (2 total) reinforcement on 4/24/2024 |
2024/04/23 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the site retaining wall at the north side of the project site. |
2024/04/19 | Plumbing | Underground | Passed | Dwayne Mahony | Underground 8" sanitary sewer inspection prior to backfill. First 20' stick of pipe at CL's J:1.5 (NW corner of IPF building). Approved, filled with 10' of head pressure test for this pipe section and the two clean-outs. |
2024/04/19 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for more of the retaining wall spread footing located at the NW corner of the site (sheet S2-1-A). There was a conflict with the shotcrete wall piers and retaining wall footing. RFI 20.2 addresses this concern. Reinforcing steel was corrected and in substantial compliance with the contract documents. |
2024/04/18 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for more of the retaining wall spread footing located at the NW corner of the site (sheet S2-1-A). There was a conflict with the shotcrete wall piers and retaining wall footing. RFI 20.2 addresses this concern. Reinforcing steel was not placed per typical site retaining wall detail near the conflict with the shotcrete wall. Contractor to correct reinforcing and schedule re-inspection. |
2024/04/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the site retaining wall at the north side of the project site. Contractor added a control joint near the corner of the wall per last inspection on 4/12/2024. |
2024/04/15 | Plumbing | Underground | Passed | Neely Lewis | Courtesy inspection - new plumbing contractor on-site (Comfort Systems) - want to go over underground plumbing inspection expectations |
2024/04/12 | Building/Structural | Wall/Ceiling | Conditional | Kody Boswell | Reviewed reinforcing steel for a portion of the site retaining wall at the north side of the project site. Result is conditional due to vertical control joint location at the corner of the wall where it turns south. Contractor to either add a control joint at the correct spacing or move existing control joint to the correct location. |
2024/04/08 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for more of the retaining wall spread footing located at the NW corner of the site (sheet S2-1-A) |
2024/04/05 | Electrical | Underground | Passed | Dwayne Mahony | This inspection is for the first layer of conduits for our U/G duct bank coming from the East Annex building. Would like this inspection first thing in the morning, if possible. Thank you. |
2024/04/02 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for retaining wall spread footing located at the NW corner of the site (sheet S2-1-A) |
2024/03/11 | Electrical | Service Release | Passed | Dwayne Mahony | Inspection for release of temporary power for job-site trailer offices, specifically the drop poles. Approved all four 200-amp services for utility connection. Dwayne Mahony, Electrical Inspector, cell 850 294 1581 |
2024/03/06 | Building/Structural | Framing | Passed | Dwayne Mahony | Inspecting annex building sofit |
2024/03/06 | Fire Safety | Final Egress/Emergency Lights | Passed | Mary Creason | We need an inspection on our temporary offices. (Trailers) Inspecting annex building sofit The planning trailer has no violations: Passed The following items need to be corrected forTrailer that is not in operation as of yet. 1. Fire extinguisher required in large trailer for meeting room/staff offices 2. Exit signs need to be in working order when trailer is in operation. 3. Electrical panel in first office has a breaker missing.(Gap in panel observed) 4. Two hand rails required on stairs from exits out of buildings. 5. Occupancy load sign needed for trailer that will have over 50 people. |
2024/03/06 | Building/Structural | Final Building | NOT READY | Dwayne Mahony | We need an inspection on our temporary offices. (Trailers) Inspecting annex building sofit Electrical work is incomplete. |
2024/02/27 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | framing at end wall where section of building will be demolished. |
2023/11/08 | Plumbing | Specialty Piping | Passed | Dwayne Mahony | Inspection on new back flow and water meter |
2023/11/08 | Plumbing | Underground | Passed | Dwayne Mahony | Inspection on new back flow and water meter |
2023/10/25 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Screw inspection on ceiling bathrooms |
2023/09/22 | Plumbing | Rough-in | Failed | Dwayne Mahony | Inspection on water fountains Early am inspection not approved, piping not under test. Late am inspection not approved, only potable water piping under test, need to test DWV too. What we have here is a failure to communicate. |
2023/07/11 | Building/Structural | Footing | Passed | Dwayne Mahony | Inspection on Retaining Wall rebar in footer Wall on baseball side approved. A wee different from the plan, which dimensions / drafting did not agree. |
2023/06/06 | Building/Structural | Masonry | Conditional | Dwayne Mahony | Inspection on CMU re-bar |
2023/05/18 | Building/Structural | Slab | Passed | Dwayne Mahony | Inspection on slab and footing re-bar |
2023/05/18 | Building/Structural | Footing | Passed | Dwayne Mahony | Inspection on slab and footing re-bar |
2023/05/12 | Plumbing | Underground | Passed | Dwayne Mahony | Inspection on remainder of underground Storm and sanitary piping |
2023/04/10 | Plumbing | Underground | Passed | Neely Lewis | Partial inspection on underground main. Main line ok. No branches inspected. |
Building/Structural | Slab | NOT READY | Dwayne Mahony | elevator pit and FTGs | |
Building/Structural | Footing | NOT READY | Dwayne Mahony | rain delay | |
Building/Structural | Footing | NOT READY | Dwayne Mahony | elevator pit and FTGs | |
Electrical | Ground | Postponed | Dwayne Mahony | Electrical: Hydrotherapy Pit Grounding Plumbing: Hydrotherapy Pit UG - final sign-off prior to pit slab pour |
BCA Project #: 21-03215- FSU- IRCB - Construction of New Research Building
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/15 | Building/Structural | Sheetrock | Passed | Paul Nitz | L2 Shaft 5 furred wall framing Partial drywall inspection for walls from levels 1 to 3 in stairs 2 Drywall inspection for ceilings in RM 1030,1000,1000B,1000C |
2024/07/15 | Electrical | Wall Rough-in | Passed | James Melvin | All in-wall MEP systems for Furred walls in shafts 1-8 |
2024/07/15 | Plumbing | Rough-in | Passed | Paul Nitz | All in-wall MEP systems for Furred walls in shafts 1-8 |
2024/07/15 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | All in-wall MEP systems for Furred walls in shafts 1-8 |
2024/07/15 | Building/Structural | Framing | Passed | Paul Nitz | L2 Shaft 5 furred wall framing Partial drywall inspection for walls from levels 1 to 3 in stairs 2 Drywall inspection for ceilings in RM 1030,1000,1000B,1000C |
2024/07/11 | Plumbing | Specialty Piping | Passed | Paul Nitz | Requesting inwall inspections: 1. Plumbing - Furred walls in L2 Shaft 1, 2, 3, 4, 6, and 7 for HPW,LA, N2, LV/LW, and Hot/Cold Water 2. Mechanical - Furred Walls in L2 Shaft 1-2 for Chilled beam, Tstats 3. Electrical - Furred Walls in L2 shaft 1-4 |
2024/07/11 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Requesting inwall inspections: 1. Plumbing - Furred walls in L2 Shaft 1, 2, 3, 4, 6, and 7 for HPW,LA, N2, LV/LW, and Hot/Cold Water 2. Mechanical - Furred Walls in L2 Shaft 1-2 for Chilled beam, Tstats 3. Electrical - Furred Walls in L2 shaft 1-4 |
2024/07/11 | Electrical | Wall Rough-in | NOT READY | James Melvin | Requesting inwall inspections: 1. Plumbing - Furred walls in L2 Shaft 1, 2, 3, 4, 6, and 7 for HPW,LA, N2, LV/LW, and Hot/Cold Water 2. Mechanical - Furred Walls in L2 Shaft 1-2 for Chilled beam, Tstats 3. Electrical - Furred Walls in L2 shaft 1-4 |
2024/07/11 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting inwall inspections: 1. Plumbing - Furred walls in L2 Shaft 1, 2, 3, 4, 6, and 7 for HPW,LA, N2, LV/LW, and Hot/Cold Water 2. Mechanical - Furred Walls in L2 Shaft 1-2 for Chilled beam, Tstats 3. Electrical - Furred Walls in L2 shaft 1-4 |
2024/07/11 | Building/Structural | Framing | Passed | Kody Boswell | inspection of the furred wall framing for shafts 1-8 on level 2 |
2024/07/11 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Requesting inwall inspections: 1. Plumbing - Furred walls in L2 Shaft 1, 2, 3, 4, 6, and 7 for HPW,LA, N2, LV/LW, and Hot/Cold Water 2. Mechanical - Furred Walls in L2 Shaft 1-2 for Chilled beam, Tstats 3. Electrical - Furred Walls in L2 shaft 1-4 |
2024/07/10 | Electrical | Ceiling Rough-in | Passed | Alex Masterton | Requesting MEP above ceiling inspection for hard ceilings only on Level 1 Lobby RM 1000. |
2024/07/10 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting MEP above ceiling inspection for hard ceilings only on Level 1 Lobby RM 1000. |
2024/07/10 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Requesting MEP above ceiling inspection for hard ceilings only on Level 1 Lobby RM 1000. |
2024/07/10 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed LG ceiling framing for lobby 1000 and down to room 1060 |
2024/07/09 | Electrical | Panel/Feeder | Passed | James Melvin | Requesting Electrical Panel inspection: - 1) DS1GH1 panel for elevators.... 2) ATS 3 This is located in Emergency RM 1014 |
2024/07/02 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Requesting Duct Testing for: - Penthouse AHU 5 SA - Penthouse GE 22x22 to EF 3&4 |
2024/07/02 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Requesting Duct Testing for: - Penthouse AHU 5 SA - Penthouse GE 22x22 to EF 3&4 |
2024/07/02 | Building/Structural | Framing | Passed | Paul Nitz | L2 and L3 South Exterior Framing between CL F.1 and G Re-inspection for L3 mechanical shafts |
2024/07/02 | Building/Structural | Re-Inspection | Passed | Paul Nitz | L2 and L3 South Exterior Framing between CL F.1 and G Re-inspection for L3 mechanical shafts |
2024/06/27 | Electrical | Panel/Feeder | Passed | Alex Masterton | Requesting inspection for electrical panel feeder and panel inspection for: - DS1MH1 located in Emergency Room |
2024/06/26 | Plumbing | Specialty Piping | Passed | Paul Nitz | Requesting a test/inspection for Level 3 north casework: - HPW piping - Special gas piping - Nitrogen and compressed air piping - Lab waste and lab vent - Domestic hot and cold water piping |
2024/06/26 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Requesting a test/inspection for Level 3 north casework: - HPW piping - Special gas piping - Nitrogen and compressed air piping - Lab waste and lab vent - Domestic hot and cold water piping |
2024/06/26 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Requesting a test/inspection for Level 3 north casework: - HPW piping - Special gas piping - Nitrogen and compressed air piping - Lab waste and lab vent - Domestic hot and cold water piping |
2024/06/26 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Requesting a test/inspection for Level 3 north casework: - HPW piping - Special gas piping - Nitrogen and compressed air piping - Lab waste and lab vent - Domestic hot and cold water piping |
2024/06/26 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting a test/inspection for Level 3 north casework: - HPW piping - Special gas piping - Nitrogen and compressed air piping - Lab waste and lab vent - Domestic hot and cold water piping |
2024/06/26 | Mechanical | CHW Piping & Test | Conditional | Paul Nitz | Require test/inspection for Level 3 remaining (including casework and coils): Chilled beam, reheat, and chilled water piping. Note - Mains have been tested in north and south. 1) saddles missing, hangers missing |
2024/06/26 | Mechanical | HW Piping & Test | Conditional | Paul Nitz | Require test/inspection for Level 3 remaining (including casework and coils): Chilled beam, reheat, and chilled water piping. Note - Mains have been tested in north and south. 1) saddles missing and hangers missing |
2024/06/25 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting above ceiling close in for Level 1 North hard ceilings: Conference RM 1030 Flexible RM 1030 Work RM 1032 Corridor 1000D Elevator Lobby 1000B Corridor 1000C |
2024/06/25 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Visual on Floor 1 hard ceilings and a couple of soft ceilings: Still need sprinkler in partition pocket near kitchen. All other areas will be inspected next time. (See marked plans in Austin's office) |
2024/06/25 | Fire Safety | Hydro-Test | Passed | Mary Creason | This is a pressure test for level 1 Start of test - 9:36am at 214psi end of test 11:45am at 214psi No leak observed - test held for 2 hours - Passed |
2024/06/24 | Building/Structural | Framing | Conditional | Kody Boswell | Several shafts were reviewed on level 3. Most shafts were in substantial compliance with contract documents with the exception of shaft 1 and shaft 5. These shafts had several penetrations that need to be fireblocked. |
2024/06/24 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Requesting above ceiling close in for Level 1 North hard ceilings: Conference RM 1030 Flexible RM 1030 Work RM 1032 Corridor 1000D Elevator Lobby 1000B Corridor 1000C |
2024/06/24 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | Requesting above ceiling close in for Level 1 North hard ceilings: Conference RM 1030 Flexible RM 1030 Work RM 1032 Corridor 1000D Elevator Lobby 1000B Corridor 1000C |
2024/06/20 | Building/Structural | Framing | Passed | Kody Boswell | L1- Grand Stair, Elevator Lobby, Conference Room ceilings L2- Grand Stair Ceiling L3- Screw Inspection- 3080,3081,3055A-C,3050B-F,3052,3054, Corr 3000B,3010,3011 L3- Shafts 1 and look at shaft 5 Penthouse: Parapet wall framing |
2024/06/20 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | L1- Grand Stair, Elevator Lobby, Conference Room ceilings L2- Grand Stair Ceiling L3- Screw Inspection- 3080,3081,3055A-C,3050B-F,3052,3054, Corr 3000B,3010,3011 L3- Shafts 1 and look at shaft 5 Penthouse: Parapet wall framing |
2024/06/20 | Mechanical | Duct Pressure Test | Passed | Dwayne Mahony | Duct Testing for the following systems: 1. AHU 1 RA duct and SA duct 2. AHU 5 SA duct 3. 22x22 GE from shaft 6 to EF 3/Plenum |
2024/06/20 | Mechanical | Duct Rough-in | Passed | Dwayne Mahony | Duct Testing for the following systems: 1. AHU 1 RA duct and SA duct 2. AHU 5 SA duct 3. 22x22 GE from shaft 6 to EF 3/Plenum |
2024/06/20 | Building/Structural | Sheetrock | Passed | Kody Boswell | L1- Grand Stair, Elevator Lobby, Conference Room ceilings L2- Grand Stair Ceiling L3- Screw Inspection- 3080,3081,3055A-C,3050B-F,3052,3054, Corr 3000B,3010,3011 L3- Shafts 1 and look at shaft 5 Penthouse: Parapet wall framing |
2024/06/12 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | Need electrical inspection for temporary electrical panels serving temporary AC. TP7 and TP8 from TP1. |
2024/06/11 | Fire Safety | Fire Water Underground | Passed | Mary Creason | This inspection is to confirm pressure test to the underground fire water pipe and connection. Phoenix Fire will send Mary a picture in the morning of the gauge holding pressure. I f9am works for Mary that would be great. Partial underground inspection still need to do a visual, hydro and visual of FDC line. 1. The underground line to backflow was tested today. A. Hydrostatic test was start at 7:20am 225psi and end at 9:30am at 225PSI. Passed B. Visual inspection completed. DR18 pipe and megalug. Passed C. Flush conducted. Passed |
2024/06/10 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Screw inspection for sheet rock on shaft 6 level 2, LVL 3 offices 3040 A-J, 3071-3076 |
2024/06/10 | Electrical | Panel/Feeder | Conditional | Dwayne Mahony | Electrical panelboards inspections for downstream panels of main switchgear: 1. MSB 1200A breaker a. Penthouse D4MH1 2. MSB 600A breaker; Level 1 D1MH1, 4MH1, T-4ML1, 4ML1 3. MSB 1200A breaker; ATS-2, DS1MH1, T-S1ML1, S1ML1, DS4MH1, T-S4ML1, S4ML1 Conditional to inspection required at panel D4MH1 after installation of the C.T.s and the surge suppressor. |
2024/06/06 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Ductwork Leakage Testing at Penthouse: 1. AHU 2 Supply and Return 2. AHU 6 Supply and Return |
2024/06/06 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Ductwork Leakage Testing at Penthouse: 1. AHU 2 Supply and Return 2. AHU 6 Supply and Return |
2024/06/05 | Electrical | Wall Rough-in | Passed | Tom Deckert | Level 3 In-wall electrical: Open labs north and south, RMs 3061-3066,3010-3011,3022-3026 All power boxes indicated on approved plans in place and installed per code. |
2024/06/05 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Inwall Level 3 north Chilled Beam Piping Test 6/5/24: Ready for insulation. |
2024/06/04 | Building/Structural | Framing | Conditional | Paul Nitz | Level 3 IN-wall and framing inspection: Open labs north and south, RMs 3061-3066,3010-3011,3022-3026 1) 6'' walls or engineered repair detail |
2024/06/04 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Level 3 IN-wall and framing inspection: Open labs north and south, RMs 3061-3066,3010-3011,3022-3026 |
2024/06/04 | Plumbing | Re-Inspection | Conditional | Paul Nitz | Re-inspection of the failed level 3 in-wall plumbing pipes 1) 6'' wall or engineered repair detail |
2024/06/03 | Plumbing | Rough-in | Failed | Paul Nitz | Level 3 IN-wall and framing inspection: Open labs north and south, RMs 3061-3066,3010-3011,3022-3026 1) slope not net for twaist drains fbc p704.1 |
2024/05/29 | Plumbing | Stack Piping & Test | Conditional | Neely Lewis | Inspection to test the following OH systems in Level 3 North and NE inwall: 1. Lab gas, nitrogen, and special gas piping 2. Domestic water piping 3. High purity piping 4. Lab waste and vent piping 5/29/24: larger than 60% cutout in one stud wall |
2024/05/29 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Inspection to test the following OH systems in Level 3 North and NE inwall: 1. Lab gas, nitrogen, and special gas piping 2. Domestic water piping 3. High purity piping 4. Lab waste and vent piping |
2024/05/29 | Mechanical | Duct Rough-in | Passed | Neely Lewis | Testing the following: 1. Penthouse AHU 3 West 2. Shaft 4 EA |
2024/05/29 | Building/Structural | Sheetrock | Passed | Tom Deckert | Screw inspection for south stairs level 1-4, LVL 2 shaft walls 2nd layer all drywall secured per MI |
2024/05/29 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Inspection to test the following OH systems in Level 3 North and NE inwall: 1. Lab gas, nitrogen, and special gas piping 2. Domestic water piping 3. High purity piping 4. Lab waste and vent piping |
2024/05/29 | Plumbing | Specialty Piping | Passed | Neely Lewis | Inspection to test the following OH systems in Level 3 North and NE inwall: 1. Lab gas, nitrogen, and special gas piping 2. Domestic water piping 3. High purity piping 4. Lab waste and vent piping |
2024/05/29 | Plumbing | Rough-in | Passed | Neely Lewis | Inspection to test the following OH systems in Level 3 North and NE inwall: 1. Lab gas, nitrogen, and special gas piping 2. Domestic water piping 3. High purity piping 4. Lab waste and vent piping |
2024/05/29 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Testing the following: 1. Penthouse AHU 3 West 2. Shaft 4 EA |
2024/05/22 | Mechanical | HW Piping & Test | Passed | Neely Lewis | Testing the following Systems from shaft to AHU/equipment isolation valves: 1. Penthouse Chilled Beam OH piping 2. Penthouse Chilled Water OH piping 3. Penthouse reheat OH piping |
2024/05/22 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Testing the following Systems from shaft to AHU/equipment isolation valves: 1. Penthouse Chilled Beam OH piping 2. Penthouse Chilled Water OH piping 3. Penthouse reheat OH piping |
2024/05/20 | Plumbing | Rough-in | Passed | Neely Lewis | Level 3 restrooms in-wall plumbing inspection All passed except drain branch line at north end. Wall needs to be fixerd. |
2024/05/17 | Plumbing | Rough-in | Failed | Paul Nitz | Requesting Inspection for: 1. Level 3 Women 3001 and Men 3002: Domestic water pressure test and sanitary/vent head test 2. Level 3 South column line 5 thru 10 rooms: Lab waste/Vent, Domestic Water system, High Purity Water, and LA&N2 pressure test 1) slope not met per fbc p704.1 |
2024/05/17 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Requesting Inspection for: 1. Level 3 Women 3001 and Men 3002: Domestic water pressure test and sanitary/vent head test 2. Level 3 South column line 5 thru 10 rooms: Lab waste/Vent, Domestic Water system, High Purity Water, and LA&N2 pressure test |
2024/05/17 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Requesting Inspection for: 1. Level 3 Women 3001 and Men 3002: Domestic water pressure test and sanitary/vent head test 2. Level 3 South column line 5 thru 10 rooms: Lab waste/Vent, Domestic Water system, High Purity Water, and LA&N2 pressure test 1) slope and support not met fbc p704.1 p305.4 |
2024/05/17 | Plumbing | Specialty Piping | Passed | Paul Nitz | Requesting Inspection for: 1. Level 3 Women 3001 and Men 3002: Domestic water pressure test and sanitary/vent head test 2. Level 3 South column line 5 thru 10 rooms: Lab waste/Vent, Domestic Water system, High Purity Water, and LA&N2 pressure test |
2024/05/17 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Requesting Inspection for: 1. Level 3 Women 3001 and Men 3002: Domestic water pressure test and sanitary/vent head test 2. Level 3 South column line 5 thru 10 rooms: Lab waste/Vent, Domestic Water system, High Purity Water, and LA&N2 pressure test |
2024/05/15 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Level 3 Office Spaces: Framing and in-wall electrical inpsection Level 2 Shafts 2nd layer drywall screw inspection Level 2 drywall screw inspection |
2024/05/15 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Level 3 Office Spaces: Framing and in-wall electrical inpsection Level 2 Shafts 2nd layer drywall screw inspection Level 2 drywall screw inspection |
2024/05/15 | Building/Structural | Framing | Passed | Dwayne Mahony | Level 3 Office Spaces: Framing and in-wall electrical inpsection Level 2 Shafts 2nd layer drywall screw inspection Level 2 drywall screw inspection |
2024/05/14 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Hydro Test for Level 3 South HHW and Chilled Beam Piping 1) supports missing in multiple locations, will check at insulation |
2024/05/14 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Hydro Test for Level 3 South HHW and Chilled Beam Piping 1) supports missing in multiple locations, will check at insulation |
2024/05/13 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Level 2 North Casework Roughin Inspection 1. Waste Chem drain head test 2. Hight Purity Piping test 3. Domestic/Hot water piping test 4. Lab gases (Air, N2, special gases) |
2024/05/13 | Mechanical | Duct Rough-in | Passed | Neely Lewis | Follow Up inspection for Level 2 Shaft Fire Dampers |
2024/05/13 | Plumbing | Rough-in | Passed | Neely Lewis | Level 2 North Casework Roughin Inspection 1. Waste Chem drain head test 2. Hight Purity Piping test 3. Domestic/Hot water piping test 4. Lab gases (Air, N2, special gases) |
2024/05/13 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Level 2 North Casework Roughin Inspection 1. Waste Chem drain head test 2. Hight Purity Piping test 3. Domestic/Hot water piping test 4. Lab gases (Air, N2, special gases) |
2024/05/13 | Plumbing | Stack Piping & Test | Passed | Neely Lewis | Level 2 North Casework Roughin Inspection 1. Waste Chem drain head test 2. Hight Purity Piping test 3. Domestic/Hot water piping test 4. Lab gases (Air, N2, special gases) |
2024/05/09 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Duct Testing 1. Level 3 North AHU 1 SA 2. Level 3 South AHU 4 SA 3. Level 3 South EA check taps and straps at next inspection |
2024/05/08 | Building/Structural | Foundation | Passed | Paul Nitz | Pipe pedistole at the chiller yard. Nonstructural rebar inspection needed. |
2024/05/07 | Mechanical | Duct Rough-in | Neely Lewis | Fire damper testing #1 2 hours | |
2024/05/07 | Building/Structural | Framing | Passed | Kody Boswell | Wall panels at elevator at the penthouse (Kody) |
2024/05/07 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Fire damper testing lot #1 1. Add some screws to sleeve/angle installation. 2.Relocate 2 doors. 3. Check reset on FD#11. |
2024/05/07 | Building/Structural | Sheetrock | Passed | Kody Boswell | All shafts 1-8 partial screw inspection. (Kody) |
2024/05/02 | Mechanical | Re-Inspection | Passed | Dwayne Mahony | 1. 3rd floor shaft 5 26 round EA 2. 3rd floor RA north for AHU 1 3. 3rd floor EA southwest to Shaft 5 |
2024/05/02 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | 2nd floor drywall screw inspection |
2024/05/02 | Building/Structural | Re-Inspection | Passed | Dwayne Mahony | Rebar for walls at the chiller yard |
2024/05/02 | Building/Structural | Structural | Passed | Dwayne Mahony | Rebar for walls at the chiller yard |
2024/05/02 | Building/Structural | Framing | Conditional | Dwayne Mahony | The horizontal mullions have had the web of the C shaped sections cut away significantly at the F clips. This creates a structural deficiency at the connections to the shear block/F clip. Engineering review of this condition is required. |
2024/05/02 | Mechanical | Duct Pressure Test | Passed | Dwayne Mahony | 1. 3rd floor shaft 5 26 round EA 2. 3rd floor RA north for AHU 1 3. 3rd floor EA southwest to Shaft 5 |
2024/05/01 | Building/Structural | Roofing | Passed | Kody Boswell | In progress inspection of bermuda roof panels installation. Clips were installed per Florida Product Approval. |
2024/05/01 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Heating hot water mains, Chilled Beam mains 3rd floor North |
2024/05/01 | Mechanical | HW Piping & Test | Passed | Neely Lewis | Heating hot water mains, Chilled Beam mains 3rd floor North |
2024/05/01 | Mechanical | Duct Insulation | NOT READY | Neely Lewis | Level 2 North Testing Fire Dampers per specifications 23 33 14.3.4.B Postponed until 5/7. Noeed installation instructions at inspection |
2024/05/01 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | This inspection is to walk and look at above ceiling sprinkler pipe rough in level 1. Austin Marks will be happy to walk with you. Visual inspection on 1st floor hard ceilings and fire main line. Passed visual - see approved shop drawings on site |
2024/04/30 | Fire Safety | Opening Protections | Passed | Mary Creason | This inspection is to look at the fire stopping on level 1 north. And 1 pipe penetration on level 2 north. Nova Company inspected several areas on 1st floor for the fire assemblies of joints and conducted 2 deconstruction inspections. Need to have a life safety plan showing correct wall ratings for inspections. |
2024/04/30 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the chiller yard foundation wall east of grid J between grids 4-6 |
2024/04/25 | Building/Structural | Re-Inspection | Passed | Dwayne Mahony | Footer rebar inspection at the chiller yard Strapping inspection for all exterior framing |
2024/04/25 | Building/Structural | Framing | Passed | Dwayne Mahony | Footer rebar inspection at the chiller yard Strapping inspection for all exterior framing |
2024/04/25 | Building/Structural | Structural | Passed | Dwayne Mahony | Footer rebar inspection at the chiller yard Strapping inspection for all exterior framing |
2024/04/24 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | L2 Chilled Beam piping to include the casework skeletons. |
2024/04/23 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to several interior LG partition walls, including shaft walls on levels 1, 2 and penthouse. |
2024/04/23 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several equipment pads at the chiller yard. |
2024/04/23 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | a. L3 RA AHU 4 b. L3 GE to shaft 6 c. L2-L4 SA in Shaft 4 d. PH 34x44 FE in shaft 2 4/23: Add a few straps for hanging duct. Ok . |
2024/04/19 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for an equipment pad at the chiller yard. |
2024/04/18 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Remainder of Level 2 interior framing and in-wall |
2024/04/18 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Level 2 In-wall inspection for mechanical and plumbing piping Level 1 Chilled Beam piping for pump rooms |
2024/04/18 | Mechanical | Wall & Ceiling | Passed | Neely Lewis | Level 2 In-wall inspection for mechanical and plumbing piping Level 1 Chilled Beam piping for pump rooms |
2024/04/18 | Plumbing | Rough-in | Failed | Neely Lewis | Level 2 In-wall inspection for mechanical and plumbing piping Level 1 Chilled Beam piping for pump rooms Reasons for failure: 1. Steel shield plates are to be installed in areas where water piping is closer than 1.25" to the edge member. Shield plates also need to be installed in locations where cabinet backing is installed. FBC-P Sec 305.6. It is recommended that Whiting Turner verify the screws used to hang cabinetry to the wall not be longer than required to support the cabinetry. 2. Cutting of holes for water and drain lines are exceeding the maximum rewuirements set forth in FBC-M Section 302.5.3. Studs must be somehow reinforced per manufacturer's or UL requirements where the maximum is exceeded. Contact the building inspectior for further information. |
2024/04/18 | Building/Structural | Framing | Conditional | Dwayne Mahony | Remainder of Level 2 interior framing and in-wall Corrections required at 4" studs where a 2" horiziontal pipe passes through many studs that have holes punched in the webs in great excess of that allowed by code. Additionally add nail guaards where plumbing pipes are within 1 1/4" of the face of studs or backing wood. Reinspection of these items is required. May start gypsum board elsewhere. |
2024/04/18 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | This inspection is looking at the fire alarm in walls. NO issued found with fire alarm locations or wiring. Well done. 1. Please take note of Standppipe/Riser in stairwell for clearance to equipment so that it maybe maintained. 2. Please take note to valve in wall that does not have proper clearance away from framing. |
2024/04/17 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a wall footing at the chiller yard in the area between grids 7-8 and equipment pad in the area between grids 6-7 |
2024/04/17 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed several interior walls where sheathing was attached to LG framing, level 1 and penthouse. |
2024/04/15 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG bracing for exterior walls on levels 1-3. There are several areas on levels 2 and 3 where bracing was not installed. Contractor informed FSU they would like to reschedule at a later date. FSU did not review the ground floor. |
2024/04/12 | Building/Structural | Framing | Passed | Dwayne Mahony | Electrical In-Wall and framing inspection for 2070,2071,2072,2080,2081,2010,2011,2054,2052,2003,2021,2051, Corridor 2060 Bulkhead framing all of level 2 |
2024/04/12 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Electrical In-Wall and framing inspection for 2070,2071,2072,2080,2081,2010,2011,2054,2052,2003,2021,2051, Corridor 2060 Bulkhead framing all of level 2 |
2024/04/11 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Framing inspection in PH south Tighten up 3 straps on duct. Pressure ok. |
2024/04/11 | Building/Structural | Framing | Passed | Tom Deckert | Framing inspection in PH south framing installed per manufacturers instructions for a "composite" wall. |
2024/04/10 | Plumbing | Underground | Conditional | Neely Lewis | This inspection is to look at the main water connection to the building from the street. The back water preventer is not connected. The hole is currently open and ready for inspection. 4/10: connections passed. NO pressure test performed. Need pressure test for pipe in ditch next to building for passage. |
2024/04/09 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Framing and in-wall MEP inspection for office spaces 2040A-K, 2031-2033,2041,2042 |
2024/04/09 | Building/Structural | Framing | Conditional | Dwayne Mahony | Framing and in-wall MEP inspection for office spaces 2040A-K, 2031-2033,2041,2042 Approval is conditional to inspection and approval of pipe penetrations for fire stopping through the floor. Do not install gypsum board at plumbing pipes until this fire stopping inspection is approved. |
2024/04/05 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed attachment of interior sheathing for the sloped penthouse roofs |
2024/04/04 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | 3rd Floor AHU 3 North Supply 3rd Floor AHU 3 South Supply 3rd Floor Exhaust Shaft 2 3rd Floor exhaust Shaft 4 2nd Floor AHU 2 Supply |
2024/04/03 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Drywall inspection on the first floor Rebar inspection for added curb/wall at the penthouse |
2024/04/03 | Building/Structural | Structural | Passed | Dwayne Mahony | Drywall inspection on the first floor Rebar inspection for added curb/wall at the penthouse |
2024/04/02 | Electrical | Service Release | Passed | Dwayne Mahony | This inspection is to confirm the electrical gear on level 1. MSB Gear is terminated and ready to be released for COT. I inspected and approved main switchgear of MSB 1 (4000 amp main building service) and MSB 2 (2000 amps for chillers). All conforms to plan requirements and is approved for connection to City of Tallahassee utilitiy. The arc energy reduction switches are to be "on" as long as possible / final electrical inspection. All adjustable circuit breakers are to be set as directed by the engineer, based on the arc fault study, by the time of final electrical inspection. There shall be signage posted at each service denoting Service 1 of 2 and Service 2 of 2, with each sign indicating where the other service is located, as required by NEC 230.2(E). Coordinate these signs with signage required by NEC 700.7, signage at service entrance informing type and location of on-site generator. All doors to large equipment rooms shall have panic bar hardware. The contractor shall maintain a lock-out/tag-out safety program. Dwayne Mahony, FSU Electrical Inspector |
2024/03/27 | Building/Structural | Sheetrock | Passed | Kody Boswell | This inspection is to look at the screw pattern for some soffitts on level 1 north and some columns at the Penthouse. |
2024/03/21 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | duct pressure test in shaft 7 and 8 All but one passed. Will retest Tuesday. |
2024/03/20 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed the sheathing attachment to LG framing for the following walls/elements: - 1st floor: north and west stair shaft walls at the SE stair. - 1st floor: rooms 1029 and 1028 - 2nd floor: west stair shaft wall at the SE stair - 3rd floor: west stair shaft wall at the SE stair |
2024/03/20 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed the LG framing for the following walls/elements: - 1st floor: north and west stair shaft walls at the SE stair. - 2nd floor: west stair shaft wall at the SE stair - 3rd floor: west stair shaft wall at the SE stair - Penthouse: several column surrounds located in the penthouse |
2024/03/19 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed curtain wall frame attachment on levels 1 & 2 along grid J (east side). Contractor to email photos showing T-clip fastening for large windows on level 1. Inspection result is conditional until photos are received. |
2024/03/19 | Plumbing | Specialty Piping | Passed | Neely Lewis | L2 south LG/HPW/DWS/LW&LV |
2024/03/19 | Plumbing | Water Piping & Test | Passed | Neely Lewis | L2 south LG/HPW/DWS/LW&LV |
2024/03/19 | Mechanical | HW Piping & Test | Passed | Neely Lewis | All L2 reheat to terminal boxes with 90 psi at the terminal boxes All L2 chilled beam for L2... North tested but doing south side |
2024/03/19 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | L2 south LG/HPW/DWS/LW&LV |
2024/03/19 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | All L2 reheat to terminal boxes with 90 psi at the terminal boxes All L2 chilled beam for L2... North tested but doing south side |
2024/03/14 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Level 2 Low pressure - Level 2 SAT 3.5 (Office grad RM 2021) - Level 2 SAT 1.7 (Lobby/Corridor RM 2000) - Level 2 SAT 4.10 (Lab Entry RM 2050) Shaft 2 Supply AHU 3 2nd floor SA south AHU 1 – North of Shaft 5 2nd floor RA AHU 1 North – North of Shaft |
2024/03/13 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for conference room 1030 soffits. |
2024/03/13 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed second layer sheathing attachment to several interior LG walls located on level 1, north of grand stair. |
2024/03/11 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to several interior LG walls located on level 1, north of grand stair. These walls get two layers of sheathing. One layer is currently in place. |
2024/03/07 | Mechanical | HW Piping & Test | Passed | Neely Lewis | reheat and chilled beam riser from L1 to PH |
2024/03/07 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | reheat and chilled beam riser from L1 to PH |
2024/03/05 | Mechanical | HW Piping & Test | Passed | Neely Lewis | L1 to penthouse: chilled water riser, L2 chilled water piping,L1 chilled water piping L1 North and south heating and chilled beam piping CHW and HHW risers are to be supported at 15'Max vertical. FBC-P Table 308.5. Will reinspect risers at a later date. |
2024/03/05 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | L1 to penthouse: chilled water riser, L2 chilled water piping,L1 chilled water piping L1 North and south heating and chilled beam piping CHW and HHW risers are to be supported at 15'Max vertical. FBC-P Table 308.5. Will reinspect risers at a later date. |
2024/03/04 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed curtain wall attachment to structure located on 3rd floor along the east side of the building (grid J) |
2024/02/29 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | 1.2nd floor supply South AHU 4 2. 2nd Floor supply South AHU 5 3. Exhaust shaft 6 4. Supply Shaft 2 AHU 3 5. Exhaust 2nd floor Column line H |
2024/02/27 | Building/Structural | Structural | Passed | Dwayne Mahony | Rebar inspection for grand stairs going from level 1 to 2 |
2024/02/23 | Mechanical | Duct Rough-in | Passed | Neely Lewis | This inspection is for Shaft 5 Return and supply duct riser. 1st floor through Penthouse. |
2024/02/23 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Stair 2 south wall only. 1st layer. |
2024/02/22 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Shaft 6: L1/L2 to PH 16x16 GE Shaft 5 - L1/L2 to PH 16x12 RA 24x20 SA 12in FE 18in FE Shaft 1 – L1 to PH 24 FE 2 passed, 2 did not. Will repeat soon. |
2024/02/21 | Mechanical | Wall & Ceiling | Passed | Neely Lewis | In-wall inspection for level 1 North CL 5 to 1 |
2024/02/21 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | In-wall inspection for level 1 North CL 5 to 1 |
2024/02/21 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | In-wall inspection for level 1 North CL 5 to 1 The stair wall framing is 16’ -2” high. In two sources I found limits of 16’-5” and 16’-8”, so the framing construction is approved. The shower water piping is correct*, based on these showers being roll-in, with fold-down seats, as shown on plans. *Drew to verify that the hot water piping is roughed-in on the left, per code, not on the right as shown on sheet P5.01. |
2024/02/21 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Level 2 Areas B, C, and F Inspecting in-wall / overhead DWV, LWV, LG, and HPW |
2024/02/21 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Level 2 Areas B, C, and F Inspecting in-wall / overhead DWV, LWV, LG, and HPW |
2024/02/20 | Building/Structural | Framing | Postponed | Kody Boswell | Contractor called to postpone the inspection because the work was not complete. (KB) |
2024/02/15 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | In-wall inspection for 1014 and 1015 Normal and emergency electrical rooms exterior walls are approved for interior gypsum board installation. |
2024/02/14 | Building/Structural | Roofing | Conditional | Kody Boswell | First work inspection to see the underlayers of the bermuda roofing be installed on the sloped roof. Will need a harness to see everything. Reviewed insulation and coverboard layer for sloped roofs receiving Bermuda panels. Fastening of these layers did not agree with shop drawings. The Contractor stated the detail for roofing attachment changed from attachment directly to LG framing to attachment to plywood securely fastened to LG framing below. Conditional approval granted that FSU receives an updated detail showing what is being done in the field. (KB) |
2024/02/13 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Shaft 1&2 Duct Risers and L3 SS Oval Testing 2/13: all passed, including 1 fume exhaust. |
2024/02/09 | Building/Structural | Structural | Passed | Kody Boswell | Nano wall steel on the first floor for room 1030 Reviewed structural steel for room 1030. Steel framing attached to the underside of level 2 concrete slab. (KB) |
2024/02/08 | Building/Structural | Roofing | Passed | Kody Boswell | First work inspection of fan wells roofing In-progress inspection of densdeck roofing over insulation for the penthouse flat roof located at the fan well. (KB) |
2024/02/08 | Plumbing | Underground | Passed | Neely Lewis | Underground sewer connection in the North Underground storm connetion on the West |
2024/02/07 | Plumbing | Underground | Passed | Neely Lewis | Sewer line connection inspection on the North side of the building Storm line is not connected to the building storm line. 2/8:Storm line now has a fernwall coupling installed. Good to go. |
2024/02/06 | Plumbing | Underground | Passed | Neely Lewis | This inspection is to look at the underground at the north of the building for our storm drain. |
2024/02/05 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | Re-inspection of ceiling drop framing of the overhand on the West Inspection of overhead penthouse framing where it was left open for units, will potentially need a harness for the inspection |
2024/02/05 | Building/Structural | Framing | Passed | Dwayne Mahony | Re-inspection of ceiling drop framing of the overhand on the West Inspection of overhead penthouse framing where it was left open for units, will potentially need a harness for the inspection |
2024/02/01 | Plumbing | Re-Inspection | Passed | Neely Lewis | Level 2 Sanitary and Domestic water for restrooms Level 2 North High purity water, Lab Gas, San, DW |
2024/02/01 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Level 2 Sanitary and Domestic water for restrooms Level 2 North High purity water, Lab Gas, San, DW |
2024/02/01 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Level 2 Sanitary and Domestic water for restrooms Level 2 North High purity water, Lab Gas, San, DW |
2024/02/01 | Building/Structural | Framing | Failed | Kody Boswell | Exterior ceilings drop along the westside overhang of the building Reviewed LG framing for drop down ceiling located along the west exterior portions of the building at level 2. Ceiling framing does not comply with details in the LG shop drawings. This was discussed with the Contractor. Contractor to contact delegated engineer to either verify field conditions are acceptable or produce a new detail to alter current field conditions. (KB) |
2024/01/31 | Plumbing | Water Piping & Test | Failed | Neely Lewis | Level 2 Sanitary and Domestic water for restrooms Level 2 North High purity water,Lab Gas, San, DW Sanitary needs More supporting. |
2024/01/31 | Plumbing | Gas Piping & Test | NOT READY | Neely Lewis | Level 2 Sanitary and Domestic water for restrooms Level 2 North High purity water,Lab Gas, San, DW 1/31: No lb gas, HP water inspections |
2024/01/31 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | 2nd floor chiled beams |
2024/01/31 | Mechanical | HW Piping & Test | Passed | Neely Lewis | 2nd floor HW coils, south side |
2024/01/30 | Building/Structural | Roofing | Passed | Kody Boswell | Watch the installation of foam roofing on the penthouse Observed in-progress install of tapered insulation board and coverboard for the modified bit flat roof |
2024/01/30 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | 1. Exhaust Riser (GE) in Shaft 6 56x30 (including 22x22 risers) and the 16x16 GE M4.41 for reference a. Part of LEF 5-6 b. Test at 6”WG 2. 2nd Floor AHU #3 North (20x18) and South Supply air (20x20) a. Test at 6”WG |
2024/01/25 | Building/Structural | Framing | Passed | Kody Boswell | Finish sheeting inspection all levels south Look at framing and sheeting on the north around the transport platform all levels Reviewed LG framing and sheathing attachment at levels 1-3 at the NW corner and the S face of the building. |
2024/01/23 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | 1st floor AHU 6 Northwest Low -Pressure 2nd Floor (Northwest) Return Column A.6 Section A and C.... AHU 2 2nd Floor (South) Exhaust East Column J..... LEF 5-6 . 5% leakage at 4"SP. Ok. |
2024/01/23 | Building/Structural | Framing | Passed | Kody Boswell | inspection to look at the remaining of parapet wall on the penthouse Reviewed LG parapet framing on the penthouse at the NW corner and a portion of the south near the temporary stair is located. (KB) |
2024/01/22 | Building/Structural | Framing | Postponed | Kody Boswell | parapet wall on penthouse Contractor contacted me via text message to cancel the inspection. Inspection to be rescheduled. (KB) |
2024/01/19 | Building/Structural | Roofing | Passed | Kody Boswell | Screw inspection for dens glass on west side of building and look at roofing being placed on the flat part of the roof Reviewed in progress procedure of torch down vapor barrier for the modified bit flat roof. Contractor was not actively installing vapor barrier while FSU was on site because the site received rain overnight. (KB) |
2024/01/19 | Building/Structural | Framing | Passed | Kody Boswell | Screw inspection for dens glass on west side of building and look at roofing being placed on the flat part of the roof Reviewed sheathing attachment to exterior LG walls along the south and west side of the building on levels 1-3. (KB) |
2024/01/16 | Building/Structural | Structural | Passed | Kody Boswell | Rebar inspection for grand stairs level 1 to 2, in-fill framing at penthouse and continue exterior framing inspection Reviewed grand stair reinforcing steel from level 1 to 2 |
2024/01/16 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Overhead DWV and High purity Level 1 |
2024/01/16 | Building/Structural | Framing | Passed | Kody Boswell | Rebar inspection for grand stairs level 1 to 2, in-fill framing at penthouse and continue exterior framing inspection Reviewed LG framing at the penthouse roof (north) and south walls near the SE stair on levels 1-3 (KB) |
2024/01/05 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Overhead DWS,LG,HER,HPW on level 1 south |
2024/01/05 | Building/Structural | Framing | Passed | Kody Boswell | Framing for the valley at the penthouse Framing for valley beam differed slightly from the detail on ship drawings. Chris Childers with BNI contacted the LG engineer, Carson Hicks, about the variations and Carson confirmed the condition wwas ok. |
2024/01/05 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Overhead DWS,LG,HER,HPW on level 1 south |
2024/01/03 | Building/Structural | Framing | Conditional | Kody Boswell | framing inspection at the penthouse Framing inspection for the following exterior walls: - west gable knee wall at penthouse - west wall at levels 2 and 3 - south wall at levels 2 and 3 There is a condition at the west wall where bottom track is not supported and has a cantilever condition. WT to contact EOR for direction. (KB) |
2023/12/28 | Building/Structural | Structural | Passed | Dwayne Mahony | rebar inspection for the remainder of the ramp at the mechanical yard |
2023/12/22 | Plumbing | Specialty Piping | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/22 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/22 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/22 | Mechanical | Cond. Piping & Test | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/22 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/22 | Mechanical | HW Piping & Test | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/19 | Plumbing | Specialty Piping | Passed | Neely Lewis | Level 1 Northwest Overhead DWS and LG |
2023/12/19 | Plumbing | Rough-in | Passed | Neely Lewis | Level 1 Northwest Overhead DWS and LG |
2023/12/19 | Building/Structural | Framing | Passed | Kody Boswell | LG parapet wall framing inspection on the penthouse (north & west parapet walls) LG framing - gable end roof sections (east and west) |
2023/12/19 | Building/Structural | Slab | Passed | Kody Boswell | *Inspection requested by Drew Honnert once FSU was on site* Reviewed reinforcing for stair and ramp at the loading dock (KB) |
2023/12/19 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | *Inspection requested once FSU was on site* Reviewed reinforcing for portion of loading dock north wall (KB) |
2023/12/14 | Building/Structural | Framing | Passed | Kody Boswell | framing on penthouse and knee wall. South gable roof LG framing and parapet wall along the north and west sides of the building reviewed (KB) |
2023/12/14 | Building/Structural | Roofing | Passed | Kody Boswell | screw inspection for fire rated plywood on penthouse Fire rated plywood fastening to structure reviewed for the sloped penthouse roofs (KB) |
2023/12/14 | Plumbing | Rough-in | Passed | Neely Lewis | Level 1 Men and Women's restrooms in-wall and overhead DWS and DWV |
2023/12/14 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Level 1 Men and Women's restrooms in-wall and overhead DWS and DWV |
2023/12/13 | Building/Structural | Framing | Passed | Kody Boswell | Sheathing attachment to exterior LG walls along north wall of building, levels 2 & 3 (KB) |
2023/12/12 | Mechanical | Duct Rough-in | Passed | Neely Lewis | - Level 2 north SA - Level 2 north EA Oval - Level 2 south SA - Level 2 south EA |
2023/12/12 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | - Level 2 north SA - Level 2 north EA Oval - Level 2 south SA - Level 2 south EA 3 systems passed. 2 failed, retest on Thursday |
2023/12/12 | Fire Safety | Opening Protections | Passed | Tom Deckert | Exterior wall EJ installation reviewed Point was stressed the EJ is applied as a floor to floor seperation and not exterior wall fire rating. System should be installed as presented. |
2023/12/08 | Building/Structural | Framing | Conditional | Kody Boswell | penthouse exterior framing LG penthouse framing and parapet walls reviewed. Parapet wall corner at grids J/4.7 was missing some concrete fasteners and one clip angle connecting concrete slab to vertical parapet LG stud (KB) |
2023/12/05 | Building/Structural | Roofing | Passed | Kody Boswell | galvanized painting of puddle welds on decking at the penthouse Sloped penthouse roof deck puddle welds were painted. Flat roof sections were not done. (KB) |
2023/12/05 | Mechanical | HW Piping & Test | Passed | Neely Lewis | re-inspection for heating hot water for VAVs in Level 1 North Chilled water piping for FCUs in level 1 north 110psi 15 min passed |
2023/12/05 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | re-inspection for heating hot water for VAVs in Level 1 North Chilled water piping for FCUs in level 1 north 110psi 15 min |
2023/12/04 | Mechanical | CHW Piping & Test | Failed | Neely Lewis | heating hot water for VAV's in level 1 North and chilled water piping for FCU's level 1 north Wrong pressure gauges used. |
2023/12/04 | Mechanical | HW Piping & Test | Failed | Neely Lewis | heating hot water for VAV's in level 1 North and chilled water piping for FCU's level 1 north Wrong pressure gauges used. |
2023/12/04 | Building/Structural | Sheetrock | NOT READY | Kody Boswell | We need Rebar inspection at mechanical yard wall and ext. slab at FSU-IRCB on 12-4-23 at 11:00am. We also need a framing inspection on the north side all levels. and Ext. sheeting all levels. Contractor did not request sheathing inspection while FSU was on site. |
2023/12/04 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | We need Rebar inspection at mechanical yard wall and ext. slab at FSU-IRCB on 12-4-23 at 11:00am. We also need a framing inspection on the north side all levels. and Ext. sheeting all levels. Rebar for slab and mech yard wall was tied and place and in substantiall compliance. |
2023/12/04 | Building/Structural | Framing | Passed | Kody Boswell | We need Rebar inspection at mechanical yard wall and ext. slab at FSU-IRCB on 12-4-23 at 11:00am. We also need a framing inspection on the north side all levels. and Ext. sheeting all levels. Exterior LG walls reviewed on levels 1-3, North side of building (except area where buck hoist is located). Interior walls reviewed on level 3. |
2023/11/27 | Building/Structural | Framing | Passed | Kody Boswell | Exterior framing on the 2nd and 3rd floor on the NE corner |
2023/11/27 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | Storm system from CL 4 to 3. Still waiting on sway brackets for storm water. |
2023/11/20 | Building/Structural | Framing | Passed | Kody Boswell | Will need to look at rebar for the loading dock slab, and also exterior framing on the North LG framing for portion of east roof members, towards the SE corner of the building. LG framing for several interior partition walls on the 3rd floor (KB) |
2023/11/20 | Building/Structural | Structural | Passed | Kody Boswell | Will need to look at rebar for the loading dock slab, and also exterior framing on the North Rebar for loading dock slab (KB) |
2023/11/16 | Building/Structural | Framing | Passed | Kody Boswell | Exterior framing inspection on the 3rd floor Exterior sheathing on west and south sides of building have already been reviewed on levels 1 & 2. |
2023/11/14 | Plumbing | Storm Piping & Test | Passed | Dwayne Mahony | Testing storm from levels 2 and 3 in the south |
2023/11/13 | Building/Structural | Sheetrock | Passed | Kody Boswell | Sills 3rd floor , headers parapet wall, sheathing for levels 1 and 2 |
2023/11/13 | Building/Structural | Framing | Conditional | Kody Boswell | Sills and headers on 3rd floor (north side), parapet wall at penthouse (east side) Parapet wall is missing fasteners towards the north end. Contractor is aware and will finish fastener installation as they turn the corner of the building. The area needing fasteners is currently outside of the safety guard. |
2023/11/09 | Building/Structural | Framing | Passed | Kody Boswell | Rebar inspection at the mechanical yard. Header inspection on levels 2 and 3 on the southwest corner |
2023/11/09 | Building/Structural | Framing | Passed | Kody Boswell | Exterior sheathing inspection on the west side of the building, levels 2 and 3 (KB) |
2023/11/09 | Building/Structural | Structural | Passed | Kody Boswell | Rebar inspection at the mechanical yard. Header inspection on levels 2 and 3 on the southwest corner |
2023/11/08 | Building/Structural | Structural | Passed | Kody Boswell | re-inspection of the parapet wall on the penthouse, and inspection of the elevator cap on the penthouse elevator cap reinforcing was in substantial compliance |
2023/11/08 | Building/Structural | Framing | Failed | Kody Boswell | re-inspection of the parapet wall on the penthouse, and inspection of the elevator cap on the penthouse parapet wall is still missing fasteners |
2023/11/07 | Building/Structural | Framing | Failed | Kody Boswell | Framing inspection on the penthouse Reviewed east parapet wall on south portion of building. Each stud was missing one fastener attaching the stud to the floor track. (KB) |
2023/11/02 | Building/Structural | Structural | NOT READY | Kody Boswell | Inspection of elevator cap lid. Please bring a harness we will provide a scissor lift for the inspection. Inspection of any exterior and interior framing that is available. Elevator cap lid was not accessible to review (KB) |
2023/11/02 | Building/Structural | Framing | Conditional | Kody Boswell | Inspection of elevator cap lid. Please bring a harness we will provide a scissor lift for the inspection. Inspection of any exterior and interior framing that is available. West exterior LG wall reviewed on levels 2 and 3. one stud needs to be replaced on level 3. Misc. interior LG walls and drywall top out reviewed on level 2. Two pieces of drywall to be replaced. (KB) |
2023/11/01 | Building/Structural | Framing | Passed | Kody Boswell | Inspection of all bottom track along the south and west side of the building |
2023/10/31 | Building/Structural | Framing | Conditional | Dwayne Mahony | exterior framing inspection along the east side Gap at top of wall/floor in two areas must obtain 2-hour fire rating. Provide national laboratory listed details for all conditions where the concrete floor slab does not completely meet and seal to the exterior framing. 2-hour rating is required for horizontal (floor) separation between stories, per FBC for construction type IB (this building). |
2023/10/27 | Building/Structural | Framing | Conditional | Kody Boswell | Inspection of exterior framing along the east side of the building Damaged studs need to be replaced TI to verify |
2023/10/26 | Building/Structural | Framing | Conditional | Kody Boswell | inspection of the exterior framing along the east side of the building Some locations had missing screws One location with damaged stud Screws to be installed and damaged stud to be replaced |
2023/10/25 | Building/Structural | Structural | Passed | Kody Boswell | inspection of the grand stairs from level 2 to 3 |
2023/10/24 | Building/Structural | Masonry | Passed | Dwayne Mahony | Rebar inspection for the final lift of CMU at the elevator shaft on the penthouse Screw inspection for Level 1 soffit east side, drywall top out on level 2 |
2023/10/24 | Building/Structural | Structural | Passed | Dwayne Mahony | Rebar inspection for the final lift of CMU at the elevator shaft on the penthouse Screw inspection for Level 1 soffit east side, drywall top out on level 2 |
2023/10/24 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | storm drain and overflows level 2 and 3 |
2023/10/20 | Building/Structural | Framing | Passed | Kody Boswell | Framing inspection for level 1 and 2 interior walls Bulkhead on lvl 2 has some studs that were cut thru punch at top track. One wall stud damaged on lvl 1. All studs with deficencies listed above to be replaced. |
2023/10/20 | Building/Structural | Masonry | Passed | Kody Boswell | Elevator shaft 3rd floor |
2023/10/19 | Building/Structural | Masonry | Passed | Kody Boswell | rebar inspection for the second lift of the elevator shaft on the 3rd floor |
2023/10/18 | Building/Structural | Masonry | Passed | Dwayne Mahony | masonry rebar inspection for elevator shaft Final lift on second floor approved for grout. |
2023/10/17 | Building/Structural | Masonry | Passed | Kody Boswell | rebar inspection for the first lift of masonry on the 3rd floor |
2023/10/16 | Building/Structural | Masonry | Passed | Kody Boswell | rebar inspection for 2nd lift on elevator shaft on level 2 |
2023/10/13 | Building/Structural | Masonry | Passed | Kody Boswell | 1st lift of 2nd floor elevator shaft (KB) |
2023/10/13 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | Level 1 Storm: Areas A, H and all verticals on the East wall exteriors |
2023/10/12 | Building/Structural | Framing | Passed | Kody Boswell | |
2023/10/12 | Building/Structural | Masonry | Passed | Kody Boswell | bond beam inspection pump rooms ok (KB) |
2023/10/11 | Building/Structural | Masonry | Passed | Kody Boswell | rebar inspection at pump room 1051 and 1052 |
2023/10/10 | Building/Structural | Masonry | Passed | Kody Boswell | |
2023/10/09 | Building/Structural | Masonry | Passed | Kody Boswell | 2nd lift of masonry walls for pump room (KB) |
2023/10/06 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | This inspection is for a partial second layer screw inspection North side level 1 top out only. We need to confirm on this inspection how BCA and WT is going to track completed inspections. I will address on your visit. Thanks. |
2023/10/06 | Building/Structural | Other | NOT READY | Kody Boswell | grand stairs rebar grandstair rebar was postponed due to stair formwork needing to be lowered (KB) |
2023/10/06 | Building/Structural | Masonry | Passed | Kody Boswell | masonry walls masonry walls passed (KB) |
2023/10/05 | Building/Structural | Masonry | Passed | Dwayne Mahony | Bond beam inspection at pump room 1053 and vertical rebar inspection for second lift of 1056 |
2023/10/04 | Building/Structural | Masonry | Passed | Tom Deckert | Rebar inspection for 2nd lift of elevator shaft RI steel in place Cells clean OK to grout. TI rep on site |
2023/10/03 | Plumbing | Water Piping & Test | Passed | Neely Lewis | |
2023/10/03 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | |
2023/10/03 | Plumbing | Storm Piping & Test | NOT READY | Neely Lewis | |
2023/10/03 | Building/Structural | Masonry | Passed | Tom Deckert | vertical rebar at pump room 1056 and 1053 RI steel in place per CD's cells cleaned TI rep. on site |
2023/10/02 | Building/Structural | Masonry | Passed | Kody Boswell | rebar inspection for second lift on the machine room and elevator shaft on the penthouse |
2023/10/02 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | partial wall rough-in on the 2nd floor |
2023/09/29 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Portions of the waste and acid drains on 1st floor. |
2023/09/29 | Building/Structural | Framing | Passed | Dwayne Mahony | screw inspection on 1st layer |
2023/09/28 | Building/Structural | Masonry | Passed | Kody Boswell | 1st lift of masonry for pump room 1051 (KB) |
2023/09/27 | Building/Structural | Masonry | Passed | Tom Deckert | Masonry walls s pump room lift 2- vertical dowells & lintel steel in place per cd's |
2023/09/26 | Building/Structural | Masonry | Postponed | Kody Boswell | 2nd lift Inspection rescheduled for 9/27/23 due to weather |
2023/09/25 | Building/Structural | Masonry | Passed | Dwayne Mahony | Masonry wall. Elevator shaft, first lift. |
2023/09/22 | Building/Structural | Masonry | Passed | Kody Boswell | knee walls at penthouse and masonry walls. CMU walls for elevator at penthouse level, 1st lift (KB) |
2023/09/22 | Building/Structural | Framing | Passed | Dwayne Mahony | This inspection is to inspect framing on level 1 so we can top out drywall and start MEP. |
2023/09/21 | Building/Structural | Wall/Ceiling | NOT READY | Kody Boswell | Masonry walls and knee walls on penthouse. Knee walls not ready on penthouse (KB) |
2023/09/21 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry walls and knee walls on penthouse. Masonry walls for south pump room on level 1, 1st lift (KB) |
2023/09/20 | Plumbing | Rough-in | Passed | Dwayne Mahony | we have Masonry walls level 1 and knee walls at the penthouse. rough in level 1. R.I. of 2 acid waste drains and one sanitary vent in CMU approved. |
2023/09/20 | Building/Structural | Masonry | Passed | Kody Boswell | we have Masonry walls level 1 and knee walls at the penthouse. rough in level 1. |
2023/09/20 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | we have Masonry walls level 1 and knee walls at the penthouse. rough in level 1. |
2023/09/18 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | knee walls |
2023/09/18 | Electrical | Panel/Feeder | Conditional | Dwayne Mahony | This inspection is to have BCA look at the temp electric service inside our building. Approval is conditional to providing the secondary side of the transformer with a properly sized ground conductor, as discussed. Plan provided is in violation of NEC for ground conductor size, #2 minimum, not #4. |
2023/09/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | knee wall. |
2023/09/12 | Building/Structural | Cast in Place Wall | Passed | Kody Boswell | knee walls |
2023/09/08 | Building/Structural | Structural | Passed | Kody Boswell | Final inspection pour #3 penthouse |
2023/08/28 | Building/Structural | Footing | NOT READY | Kody Boswell | cancelled due to hurricane prep |
2023/08/22 | Building/Structural | Slab | Passed | Dwayne Mahony | Knee wall on Penthouse - Next segment. |
2023/08/21 | Building/Structural | Cast in Place Wall | Conditional | Dwayne Mahony | knee walls and curbs at roof Approved partial segment. |
2023/08/16 | Building/Structural | Slab | Passed | Dwayne Mahony | Final Inspection on Penthouse slab Pour# 1. |
2023/08/15 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 3x columns |
2023/08/14 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | Columns |
2023/08/11 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour 1 Penthouse. |
2023/08/10 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 columns |
2023/08/10 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | This inspection was performed in February 2023. We feel that the temp electric panels TP1, TP2, TP3, have been sitting for 6 months and feel the best practice is to have them reinspected. |
2023/08/09 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 columns |
2023/08/07 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 4 columns at penthouse |
2023/08/03 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 1 column |
2023/08/02 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | Columns vans final on pour3 level 3 Approved final 5 round columns. |
2023/08/02 | Building/Structural | Slab | Passed | Dwayne Mahony | Columns vans final on pour3 level 3 |
2023/08/01 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour#3 level 3 |
2023/08/01 | Building/Structural | Slab | Conditional | Dwayne Mahony | 5 columns and ongoing rebar pour#3 level 3 Slab on-going work, no issues. |
2023/07/31 | Building/Structural | Cast in Place Column | Passed | Tom Deckert | 5 columns on going rebar pour #3 level 3 I/4.7, J/4.7 F/3.9, G/3.9, I/3.9 RI steel in palce per CD's TI rep on site |
2023/07/31 | Building/Structural | Slab | Conditional | Tom Deckert | In progress- level 3 beam steel in progress of install inspection condition until final deck inspection is compleed TI rep on site |
2023/07/28 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 6 columns on going rebar pour #3 level 3. |
2023/07/28 | Building/Structural | Slab | NOT READY | Dwayne Mahony | 6 columns on going rebar pour #3 level 3. No inspection done for on-going work for next slab section |
2023/07/27 | Building/Structural | Footing | NOT READY | Dwayne Mahony | 3x columns Duplicate request so this is N/A. |
2023/07/27 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 3x columns |
2023/07/26 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 colujmns and final for slab on deck pour #2 levl 3 |
2023/07/26 | Building/Structural | Slab | Passed | Dwayne Mahony | 5 colujmns and final for slab on deck pour #2 levl 3 |
2023/07/25 | Building/Structural | Slab | Passed | Dwayne Mahony | 5 columns on going rebar pour 2 level 3 |
2023/07/25 | Building/Structural | Footing | Passed | Dwayne Mahony | 5 columns on going rebar pour 2 level 3 |
2023/07/24 | Building/Structural | Slab | Conditional | Dwayne Mahony | 5 columns and ongoing rebar pour 2 level 3. Work on-going, a couple of minor concerns pointed out to contractor. |
2023/07/24 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour 2 level 3. |
2023/07/21 | Building/Structural | Slab | Conditional | Dwayne Mahony | Columns and ongoing rebar pour#2 level 3 Slab on-going, doing well. |
2023/07/21 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | Columns and ongoing rebar pour#2 level 3 |
2023/07/20 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5X columns |
2023/07/19 | Building/Structural | Footing | Passed | Dwayne Mahony | 2 columns |
2023/07/19 | Building/Structural | Slab | Passed | Dwayne Mahony | 2 columns |
2023/07/18 | Building/Structural | Column | Passed | Dwayne Mahony | columns and final on slab on deck |
2023/07/18 | Building/Structural | Slab | Passed | Dwayne Mahony | columns and final on slab on deck |
2023/07/17 | Building/Structural | Structural | Passed | Dwayne Mahony | LEVEL 3 POUR 1 FINAL AND 5X COLUMNS |
2023/07/13 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 Columns and ongoing deck pour 1 level 3. |
2023/07/12 | Building/Structural | Footing | Passed | Dwayne Mahony | Columns and ongoing rebar for pour 1 level 1 |
2023/07/10 | Building/Structural | Footing | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour 1 level 3. 5 colums only, no deck inspection due to weather. |
2023/07/07 | Building/Structural | Slab | Passed | Dwayne Mahony | Looking at 5 Columns. please call me with any questions. |
2023/07/05 | Building/Structural | Structural | Passed | Dwayne Mahony | Final Inspection Pour#3 level 2 |
2023/06/30 | Building/Structural | Slab | Passed | Dwayne Mahony | Looking at columns and ongoing slab. |
2023/06/29 | Building/Structural | Structural | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour#3 level 2. |
2023/06/29 | Building/Structural | Footing | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour#3 level 2. |
2023/06/26 | Building/Structural | Slab | Passed | Dwayne Mahony | Final for slab on deck level 2 pour 2. 4 columns. |
2023/06/23 | Building/Structural | Footing | Conditional | Dwayne Mahony | Ongoing rebar pour 2 and columns Approval is contingent on approval from T.I representative. |
2023/06/22 | Building/Structural | Slab | NOT READY | Dwayne Mahony | Ongoing slab pour #2 level 2. More delays due to seemingly endless lightning storms. |
2023/06/21 | Building/Structural | Slab | NOT READY | Tom Deckert | 5 columns and ongoing rebar pour#2 elevated slab Elevated slab steel in progress- Not ready for final inspection |
2023/06/16 | Building/Structural | Footing | Passed | Dwayne Mahony | Looking at 6 columns. 5 approved. |
2023/06/14 | Building/Structural | Slab | Passed | Dwayne Mahony | ongoing elevated slab on pour 1 level 2. Final inspection. Approved with the understanding that the T.I. will verify cut top steel (for recessed door opener) at column is reworked in accordance with a detail to be provided from the SEOR. |
2023/06/13 | Building/Structural | Slab | Conditional | Dwayne Mahony | ongoing elevated deck slab pour 1 On-going work. Contractor reminded that the shoring must be inspected by a P.E., and approval verified by T.I. |
2023/06/12 | Building/Structural | Slab | Passed | Dwayne Mahony | Stem walls on North, 1 column and ongoing rebar level 2 pour #1 2nd level deck, pour 1, on-going work reviewed, no concerns. |
2023/06/12 | Building/Structural | Cast in Place Column | Conditional | Dwayne Mahony | Stem walls on North, 1 column and ongoing rebar level 2 pour #1 One round column being prepared, but has clearance issues. All rebar is correct. T.I. will verify clearance requirements so BCA lists as passed. |
2023/06/09 | Building/Structural | Slab | Passed | Dwayne Mahony | curbs and ongoing beams level 2 |
2023/06/09 | Building/Structural | Footing | Conditional | Dwayne Mahony | curbs and ongoing beams level 2 Level 2 in-progress. No concerns. Conditional is just because it is not yet complete. |
2023/06/08 | Building/Structural | Cast in Place Column | NOT READY | Dwayne Mahony | column and reinspection on grade beam at Mechanical yard |
2023/06/08 | Building/Structural | Slab | Conditional | Dwayne Mahony | column and reinspection on grade beam at Mechanical yard Remaining mechanical yard grade beams approved conditional to finishing the tie installation which will be re-inspected by BNI T.I. representative. No additional columns ready today. |
2023/06/07 | Building/Structural | Footing | Failed | Dwayne Mahony | 3 columns and grade beams at mechanical yard Grade beams fail inspection due to a lack of required ties at the beam intersections. |
2023/06/07 | Building/Structural | Slab | Passed | Dwayne Mahony | 3 columns and grade beams at mechanical yard. 3 columns approved. Grade beams not approved due to lack of required ties at beam intersections. |
2023/06/06 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | columns on line 2 and 1 |
2023/06/05 | Building/Structural | Footing | Passed | Dwayne Mahony | Columns on line 1 and ongoing rebar level 2 deck Columns D E F -2 approved. No inspection on deck 2, work on hold pending rebar conflict issue resolution, new ties to be fabricated.. |
2023/06/02 | Building/Structural | Structural | Passed | Dwayne Mahony | Looking at columns. |
2023/06/01 | Building/Structural | Footing | Passed | Dwayne Mahony | columns and ongoing rebar for level 2 beams. |
2023/05/31 | Building/Structural | Footing | Passed | Dwayne Mahony | Columns and grade beams |
2023/05/30 | Building/Structural | Footing | Conditional | Dwayne Mahony | Columns and ongoing slab Conditional is actually one passed and one failed. Columns approved after minor adjustments. Grade beam at mechanical yard failed. Work is not per approved constucuction documents: 1. Cold joint bulkheads must be at the 1/3 span point of beams, not at end of beam/intersection of primary beam. 2. Beam ties for primary beam must be continuous through the beam, not stopped at pilings (3 foot gap in ties). This is the point of maximum shear, at the piling. 3. Clearance issues and debris to be removed. |
2023/05/26 | Building/Structural | Cast in Place Column | Passed | Tom Deckert | Columns RI steel in place per CDs T-hold rep on site and approved |
2023/05/25 | Building/Structural | Structural | Passed | Tom Deckert | Inspecting 5 columns. Please call me with any questions. Conumn RI steel in place per cd's TI representative on site |
2023/05/24 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | Looking at 5 round columns. |
2023/05/23 | Building/Structural | Slab | Passed | Dwayne Mahony | S.O.G final inspection. |
2023/05/23 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | looking at 2 columns |
2023/05/22 | Building/Structural | Slab | Passed | Dwayne Mahony | We are looking at columns and S.O.G for pour 3. Please call me with any questions. Approved columns at J 4.7, I 4.7, I 3.9 and F 4.8 Slab on grade in progress, no concerns except that any electrical bonding connections between lightning conductors and rebar are to be reinstalled if removed by rebar guys (two such locations observed). |
2023/05/19 | Building/Structural | Slab | Passed | Dwayne Mahony | Looking at 3 columns. S.O.G ongoing. please call me with any questions, Approved columns at G 5, 6 & I 5. Reviewed work in progress for final slab section, no concerns. |
2023/05/18 | Building/Structural | Slab | Passed | Dwayne Mahony | We are looking at columns. Approved columns 7, 8, 9 on line G. This included electrical PVC in the columns. |
2023/05/17 | Building/Structural | Slab | NOT READY | Dwayne Mahony | We will look at columns and stem walls. Tony called and canceled at 9 :30 am, rain delay. |
2023/05/16 | Building/Structural | Slab | Passed | Dwayne Mahony | columns line I, 6, 7, 8. |
2023/05/15 | Building/Structural | Slab | Passed | Tom Deckert | Final Inspection for slab on grade. Minor corrections for concrete cover were in progress. TI rep. will verify prior to pour |
2023/05/11 | Plumbing | Underground | Conditional | Dwayne Mahony | This inspection is for the 4" water main the north Column line I.6 and J Starting at column line 1. This line is under pressure for testing. |
2023/05/11 | Building/Structural | Slab | Passed | Dwayne Mahony | we are inspecting columns on J-line and ongoing for slab-on grade. Please call me with any questions. |
2023/05/10 | Building/Structural | Structural | Passed | Tom Deckert | We will look at columns and S.O.G for pour 2. ongoing. please call me with any questions, RI steel in place Contractor added Chairs to ensure cover while on site. OK to close form and place concrete TI rep. on site |
2023/05/08 | Building/Structural | Slab | Passed | Dwayne Mahony | 3 columns on grid line 11 approved. Pre inspection Pour 2, in progress inspection, conditional approval, bottom bars without contact lap need to be considered for required lap length. |
2023/05/05 | Plumbing | Underground | Conditional | Neely Lewis | under ground S.O.G complete. with head test. 5/5/23: All ok for covering. 10' pressure test on waste and acid waste. Cleanouts required for acid waste and waste lines as they exit the bullding, within 10' of the buiiding edge. FBC2020-P Section 708.1.3. |
2023/05/04 | Building/Structural | Slab | Passed | Dwayne Mahony | Final inspection for S.O.G pour 1. |
2023/05/03 | Plumbing | Underground | Passed | Neely Lewis | Inspection to include a head test Head test . 5/3/2023: Will check on outside building for cleanouts on both PCVC and CPVC lines, and acid resistant Fernwall coupling. |
2023/05/03 | Building/Structural | Slab | Passed | Dwayne Mahony | Pre inspection slab on grade |
2023/05/01 | Building/Structural | Slab | Conditional | Dwayne Mahony | Slab on grade from 11 to 6 In-progress inspection approved conditional to the engineer of record reviewing the slab edge condition at the doorway, and providing either approval or direction for reinforcing bars. |
2023/04/26 | Plumbing | Underground | Passed | Dwayne Mahony | Continuing the underground at column line 4.7.and J line. |
2023/04/26 | Electrical | Underground | Passed | Dwayne Mahony | This inspection is to capture the floor boxes at column line X.1 - 15. |
2023/04/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Fire stand pipe at north east of Building at line 1 and I.6 4/26/2023 4inch and 6inch standpipe stub in inspected. Passed |
2023/04/21 | Plumbing | Underground | Passed | Neely Lewis | Millers will be performing the head test for the underground plumbing from Column line 11 towards column line 6. |
2023/04/20 | Building/Structural | Footing | Passed | Tom Deckert | Grade beam complete on I.6 and stem wall. RI steel in place per CD's TI Rep on site |
2023/04/19 | Building/Structural | Footing | NOT READY | Tom Deckert | stem wall on line 1. Inspection rescheduled for 4-20-23 |
2023/04/17 | Building/Structural | Footing | Passed | Tom Deckert | Inspection for grade beam and caps on grid line I.6 from GL 1 to 4.7. with caps on I.6,1 / I.6, 2 RI steel in place per CDs. TI Rep on site |
2023/04/12 | Building/Structural | Footing | Passed | Tom Deckert | Stem wall on line 1 Wall RI steel installed per approved documents |
2023/04/11 | Building/Structural | Footing | Passed | Tom Deckert | Light poles at south parking lot 3 light pole based with electric RI- RI steel per documents |
2023/04/06 | Building/Structural | Footing | Passed | Tom Deckert | Stem wall online 1 from C to E.75. stem wall RI steel in place- sleeve detail being reviewed by SEOR TI rep on site |
2023/04/05 | Building/Structural | Footing | Passed | Mary Jo Spector | columns at elevator pit. RI steel in palce per CD's TI rep on site and passed inspection |
2023/04/04 | Building/Structural | Footing | Passed | Tom Deckert | We will look at grade beams and elevator wall complete Deficienceies in elevator wall and grade beam resolved Contractor awaiting dowell |
2023/04/04 | Electrical | Underground | Passed | Tom Deckert | Looking for an underground primary conduits at the Utility Yard. Conbduti material and depth verified, install was accepted by COT |
2023/04/03 | Building/Structural | Footing | Conditional | Tom Deckert | We will look at grade beam on line 1 from E.5 to I.6 and grade beam on I.6 from 1 to 1.75. Walls on elevator complete and columns on elevator slab. Please call me with any questions. Design steel in place per CD's contractor waiting on EOR to provide detail fro Bulkhead steel on Grade beam |
2023/04/03 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | We will be testing the underground chilled water pipes. 4/3: Pressure tested at 150 PSI. Held for 20 minutes. Ready for insulation to be completed. |
2023/03/31 | Building/Structural | Footing | Passed | Tom Deckert | looking at stem wall on grid line J from 8.5 to 10. Grade beam on line 1 and caps. RI steel in place per CD's TI rep on site and approved installation |
2023/03/31 | Electrical | Underground | Passed | Tom Deckert | We are requesting an underground inspection for the secondary transformer conduits in the utility yard. Conduits material and placement per design spec. Contractor advised additional inspection of conduits under structural slabs will be conducted by inspector on random basis when on site. |
2023/03/30 | Building/Structural | Footing | Passed | Tom Deckert | We need an inspection at FSU-IRCB on 3-30-23 at 11:00am. We will be looking at grade beam on A.6 , 1 from 4 to 1.3 and from A.6 to C on 1.3. And grade beam from 1 to from C to D.5. Possible wall section on J. All RI steel in place per CD;s TI on site and passed inspection |
2023/03/29 | Building/Structural | Footing | Passed | Tom Deckert | Looking at caps on I,4.7 /A.6 1/ Grade beams on A.6 ,Stem wall on J All RI steel in palce per CD's TI authorized Rep on site and passed inspection |
2023/03/28 | Building/Structural | Footing | Passed | Tom Deckert | We will look at the elevator slab with Caps. we will also look at Caps RI steel in place per CD's TI rep on site and passed inspection |
2023/03/24 | Building/Structural | Footing | Passed | Mary Jo Spector | we will look at caps on line 2 and 3. Please call me with questions. Thank you. Neely, Reinforcing steel at column caps H.1, I.2, and F.4 was inspected and approved. It was installed per the construction drawings. Contractor to remove debris at bottom prior to pouring concrete. Threshold inspector was onsite and approved the three column caps. Best, Mary Jo |
2023/03/23 | Building/Structural | Footing | Passed | Mary Jo Spector | Caps on line 2,3 and 4.7 including dilution pit walls. with possible 2 or 3 more caps at different location Neely, Reinforcing steel for pile caps at I.5 and F.2 was inspected. It was installed per the construction drawings. There was a bottom clearance (3” min.) issue noted at F.2. This was brought to the attention of the threshold inspector (Kody Boswell) and Tony Flores. Kody to verify that this is corrected prior to the concrete pour. Otherwise, the steel was approved. Debris at the bottom was noted and to be removed prior to the pour. The fiberglass rebar for the walls of the dilution pit was inspected and it was installed per the construction drawings. It was approved. The grade beam at column line J was reinspected. The corrective work noted by the threshold inspector on the previous day was done. This was approved. Threshold inspector (Kody Boswell) was present at the site. Best, Mary Jo |
2023/03/22 | Building/Structural | Footing | Passed | Mary Jo Spector | Inspection will be on J line grade beam and caps from 9.5 to 4.8. Caps on line 2 and 3. Reinforcing steel for pile caps A.2, E.2, and E.3 was inspected and approved. Concrete is not being poured until Thursday. Grade beam reinforcing steel along Column Line J was inspected and is conditionally approved. I will return Thursday to reinspect. Concrete will not be poured until Thursday. Reinforcing steel was installed per the construction documents. Threshold inspector (Kody Boswell) was onsite. |
2023/03/21 | Building/Structural | Footing | Passed | Mary Jo Spector | Caps on C,3 / D,3/C.5,2 /D,2 /D,4/E,5 Possible grade beam on J and caps. I inspected the reinforcing steel at Column caps B.3, C.3, C.5.2, D.2, D.3, D.4 and F.3. It was installed per the AE documents and all seven locations were approved. The threshold inspector (Kody Boswell) was present, and he approved the same 7 locations as well. Best, Mary Jo |
2023/03/20 | Building/Structural | Footing | Passed | Mary Jo Spector | We will look at grade beams and caps on Line J up to grid line 5. Also, 3 caps on 3. Neely, Inspection passed. Reinforcing steel inspected at pile caps C4 and B2 was per construction documents. Threshold inspector (Kody Boswell) was onsite for the inspection. Mary Jo |
2023/03/17 | Building/Structural | Footing | Passed | Tom Deckert | WE need an inspection on 3-17-23 at 11:00am for caps on gridlines I,7 / I,5 G,5 . Grade beam on Line J from 9.5 to 7.5 with caps on J,9 and J,8 RI steel in place per CD's TI representative on site |
2023/03/16 | Building/Structural | Footing | Passed | Tom Deckert | Looking at grade beam and pile caps on line A.6, Cap on b.4 all RI steel in place per Construction documents TI rep on site and confirmed results |
2023/03/15 | Building/Structural | Footing | Passed | Tom Deckert | We are inspecting the dilution Pit. With caps on G line and I line and grade beam following the pour 7 stop on X.1 Dilution pit - all reinforing material (fiberglass) in place per construction documents. waterproofing liner inspected by thirdparty prior to placement. Caps and Beams- RI steel in place per CD's. TI rep on site and confirmed conditions |
2023/03/14 | Building/Structural | Footing | Passed | Tom Deckert | Inspection will be on grade beam in grids line J and 11 , cap J,11 and grade beam on 15. We will be inspecting Grade beams on grid Line 11 and J. Cap on J,11/ Grade beam on GL 15.75 from X.5 to X.2 to 15.5. Caps on X,1 / X,2 X,3 /X,5 **ALSO, THE SITE IS PRETTY MUCKY SO BRING RUBEER BOOTS JUST INCASE** Inspected above work- All steel in palce per CD's TI rep on site conducting inspection |
2023/03/10 | Building/Structural | Footing | Passed | Tom Deckert | Inspection on Line J grade beam from Gridline 10 to 9.5 and Caps on J,10 / J,9. All steel in place per construction documents. TI inspection completed and confirmed |
2023/03/09 | Building/Structural | Footing | Passed | Tom Deckert | We need inspection on 3-9-23 at 11:00am for Grade beams on line F.4 from 9.5 to 16. And grade beam on 16 from F to D.5. Including caps on line F.4 ,9,8,7,6 and on line E,16. Steel in palce per CD's TI on site and completed his inspection |
2023/03/08 | Building/Structural | Footing | Passed | Tom Deckert | Inspection will be on caps I 6&7 steel in palce per cds. Bar size, quantity and placement verified |
2023/03/07 | Building/Structural | Footing | Passed | Tom Deckert | we are inspecting 3 caps on Gride line on I,7 / G,7 and picking up the grade beam on line F.4 to line 6.4 all steel in place per CD's |
2023/03/06 | Building/Structural | Footing | NOT READY | Tom Deckert | Grade Beam F.4 from 9.5 to 8.5 , Caps on Gridline F.4, 9 / G,9 Grade beam / pile caps steel install not completed |
2023/03/03 | Building/Structural | Footing | Passed | Tom Deckert | Caps on Gridline I, 10 / Gride line G,10 and Gridline F.1 ,10. Please call me with any questions. 5 Pile caps as indicated above Cap steel and column steel in place per cd's - TI rep on site and verified install |
2023/03/02 | Building/Structural | Footing | Passed | Tom Deckert | Inspection on rebar our first pour Visual inspection conducted steel in place per CD's TI on site for inspection |
2023/02/17 | Electrical | Ground | Passed | Andy Howard | This an inspection for the temp electric service on our project. Andy Howard met with Adam Dodson and Casey Dodson for the temporary job site electric service equipment installation. The equipment installed matches the CDs prepared by Toby Smith dated February 9th, 2023 Sheet TCE-1 Revision 2 with the following exception: as to be expected, not all the circuits are connected in panels TP1, TP2, and TP3. The equipment was checked for compliance with 2017 NEC service equipment requirements and labeled with FSU BCA's green sticker therby allowing the equipment to be energized by the servicing utility provider. |
2023/02/10 | Building/Structural | Final Building | Passed | Andy Howard | This will be the final for the construction trailer. The trailer tiedowns were installed according to the submitted documents. The ADA ramp meets code requirements. This completes the required inspections for the GC's construction trailers. Andy Howard met with Joshua Rodriguez of Whiting-Turner at the site. |
2023/02/10 | Electrical | Service Release | NOT READY | Andy Howard | This inspection is for the Temp job site service. Lewis & Thompson will be on site. This inspection is pending FSU BCA reviewed and approved engineered electrical drawings. Andy Howard spoke with Adam Dodson by telephone - this inspection is listed as not ready. When the CDs for this work are completed, Lewis & Thompson/Whting-Turner will reschedule the final electrical inpection with FSU BCA. |
2023/02/09 | Fire Safety | Final Fire Safety | Passed | Mary Creason | This is for the construction trailer... |
2023/01/09 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | This is the fire final for our construction trailers on the project site. One fire extinguisher not state certified in main building at exit door. Fire extinguisher needs to be hung in storage trailer. Emergency light required in break area if occupancy over 50 people. (Considered Assembly occupancy) |
2023/01/09 | Building/Structural | Final Building | Conditional | Andy Howard | This is the final for our job site trailers on the project site. Andy Howard and Mary Creason both fropm FSU BCA, Scott Melber, Drew Honnert, and Tony Flores were present when this inspection was conducted. The accessible ramp is not yet installed and the final fire safety inspection is not yet passed. When these two items are completed, the final building inspection can be passed. Please schedule a follow up final building inspection when the previous two items are completed. |
2022/11/14 | Electrical | Panel/Feeder | Passed | Andy Howard | This inspection is for our temp electric to our construction trailers. They sit across the street and in front of the Engineering School on Engineer way. ndy Howard/FSU BCA, Tom Deckert/FSU BCA, Trevor Kraeutler/ W-T, Drew Honnertr/W-T, Adam and Casey Dodson/ L&T Electric, et.al. were present for this inspection. The underground secondary feeders from the utility company transformer to the two temporary 400 amp service meter sockets and breaker panel combination were inspected for this project The services consist of two separate 400 amp meter socket panels numbered 2001-1 and 2001-2, and two 400 amp capacity circuit breaker panels. This portion of the work is the under ground service entrance conductors feeding the meter socket service equipment. One of the two 400 amp service panels feeds one manufactured building, and the other 400 amp panel feeds a complex of four connected together manufactured buildings. This portion of the work was installed and meets the requirements of the 2017 National Electrical Code Article 230 for Service Requirements and Article 250 for Grounding and Bonding Requirements. An FSU BCA sticker was attached to the each of the two meter socket panels 2001-1 and 2001-2 indicating the the panels are released by FSU BCA to be energized by the utility company. The two 400 amp service circuit breaker panels were inspected under a separate service panel to five separate structure subpanels. See Electric - Panel/Feeder inspection performed the same day. The service panels as well as the structure subpanels passed inspection as well. |
2022/11/14 | Electrical | Underground | Passed | Andy Howard | This inspection is for temporary electric to the site construction trailers. The trailers sit across the street and in front of the Engineering School on Engineer Way. Andy Howard/FSU BCA, Tom Deckert/FSU BCA, Trevor Kraeutler/ W-T, Drew Honnert/W-T, Adam and Casey Dodson/ L&T Electric, et.al. were present for this inspection. The underground secondary feeders from the utility company transformer to the two temporary 400 amp service meter sockets and breaker panel combination were inspected for this project The services consist of two separate 400 amp meter socket panels numbered 2001-1 and 2001-2, and two 400 amp capacity circuit breaker panels. This portion of the work is the under ground service entrance conductors feeding the meter socket service equipment. One of the two 400 amp service panels feeds one manufactured building, and the other 400 amp panel feeds a complex of four connected together manufactured buildings. This portion of the work was installed and meets the requirements of the 2017 National Electrical Code Article 230 for Service Requirements and Article 250 for Grounding and Bonding Requirements. An FSU BCA sticker was attached to the each of the two meter socket panels 2001-1 and 2001-2 indicating the the panels are released by FSU BCA to be energized by the utility company. The two 400 amp service circuit breaker panels were inspected under a separate service panel to five separate structure subpanels. See Electric - Panel/Feeder inspection performed the same day. The service panels as well as the structure subpanels passed inspection as well. |
2022/06/21 | Building/Structural | Footing | Passed | Tom Deckert | 7- level 2 columns inspected- RI steel in place per cd's TI representative on site |
2019/07/20 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5X columns |
Building/Structural | Roofing | Postponed | Dwayne Mahony | Llyod roofing and Whiting-Turner would like to have the roofing slab inspected for primer and Vapor barrier. Postponed to go over roofing submittals with WT | |
Fire Safety | Opening Protections | Mary Creason | Overhead sprinkler piping / fire inspection south side of building and open office 1060 | ||
Building/Structural | Footing | NOT READY | Dwayne Mahony | Ongoing Rebar Pour 1 level 3. please call me with any questions. Rain delay. | |
Plumbing | Underground | Dwayne Mahony | |||
Building/Structural | Slab | Dwayne Mahony | |||
Building/Structural | Footing | Tom Deckert | Stem wall complete on line I.6 from 2.25 to 4.7 | ||
Building/Structural | Footing | NOT READY | Dwayne Mahony | columns and final pour 1 levl 3 Canceled due to heavy rain | |
Building/Structural | Sheetrock | Cancelled | Dwayne Mahony | Framing and sheeting for the parapet wall that was left out for the transport platform on the penthouse | |
Building/Structural | Footing | NOT READY | Dwayne Mahony | ||
Plumbing | Rough-in | NOT READY | Neely Lewis | in wall rough in. | |
Building/Structural | Slab | NOT READY | Dwayne Mahony | Columns on level 3 Canceled, not ready. | |
Building/Structural | Slab | NOT READY | Dwayne Mahony | knee wall at penthouse | |
Building/Structural | Framing | Cancelled | Dwayne Mahony | Framing and sheeting for the parapet wall that was left out for the transport platform on the penthouse |
BCA Project #: 21-03205- Critchfield Hall - Classroom Improvements
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/12/08 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | Final The following items are still outstanding: 1. Need Fire alarm and sprinkler final paperwork 2. Em. Light not working near water fountain/kitchen 3. EXIT sign over the front entrance door not working 4. Em. Light over main door discharge did not work when tested. NEW item : need address on building and Sign stating where sprinkler risers located on outside door to riser room. |
2023/12/08 | Building/Structural | Final Building | Failed | Dwayne Mahony | Grab bar in one of the accessible toilet rooms is missing. |
2023/12/08 | Electrical | Final Electrical | Failed | Dwayne Mahony | Items from previous inspection have not been corrected. New breaker for feeder to new panel H1A is not a new breaker, rather a used old breaker that the AIC rating is inadequate for the panel has been installed. Install adjustable trip breaker as per plans. |
2023/11/15 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | 1. Need final paperwork from Fire alarm and sprinkler contractors 2. Emergency light did not work near kitchen area. 3. Exterior em. Light at front exit door was not installed as required on plans. |
2023/11/15 | Fire Safety | Final Fire Sprinkler | Conditional | Mary Creason | Need to provide the Contractor’s Material and Test certificate for Aboveground piping. NFPA 13: 25.1(3) edition 2016 |
2023/11/15 | Fire Safety | Final Fire Alarm | Conditional | Mary Creason | Fire Alarm final paperwork is required. Devices worked when tested |
2023/11/07 | Mechanical | Final Mechanical | Conditional | Dwayne Mahony | Provide test and balance report. Of specific interest will be control and operation of the toilet room (s) exhaust fan. This fan was not running at time of inspection. The plans call for toilet room doors to have 1 1/2" undercut, for "return air", which may have been intended to be for exhaust make-up air. The doors have some undercut; the architect is to determine if this is satisfactory. |
2023/11/07 | Electrical | Final Electrical | Conditional | Dwayne Mahony | This building has two separate electrical services. These have long ago been installed in violation of basic NEC requirements, and must be corrected: 1. The 200 amp service is not grounded. This is a fundamental life safety hazard, and must be corrected by installing a lug in the fuse box, and running a #4 minimum conductor the grounding electrode (water pipe) at panel MDP. 2. NEC 230.2(E) requires each service to be identified (in this case Service 1 of 2, Service 2 of 2, with system voltages listed (in this case service 1 is 120/208 volts, three phase, and service two is 120/240 volts, single phase). Identifying multiple services is important for emergency personnel trying to de-energize a building. Identifying voltages and phases is important to electrical service technicians. 3. Identify where the circuit breaker is that feeds new panel H1A. No 200 amp breaker located. |
2023/11/07 | Building/Structural | Final Building | Conditional | Dwayne Mahony | Install the accessible parking sign as noted on the plans. Install signage for the toilet rooms. |
2023/09/28 | Fire Safety | Final Fire Safety | NOT READY | Mary Creason | Need to call in sprinkler and fire alarm finals Also trade finals. |
2023/06/15 | Building/Structural | Framing | Passed | Dwayne Mahony | Approved the soffit framing over the main entry bar/counter. |
2023/02/23 | Building/Structural | Masonry | Passed | Tom Deckert | Rebar for 8' bond beam- RI steel in place per CD's. All cells clean for grout placement. |
2023/02/08 | Building/Structural | Masonry | Passed | Andy Howard | Andy Howard met with Travis Sullivan for this inspection. The first lift of vertical masonry passed inspection. |
2023/02/06 | Building/Structural | Slab | Passed | Andy Howard | FaceTime call with Andy. This inspection was performed using video telephone between Andy Howard and Travis Sullivan on 02/06/2023. |
2023/01/20 | Building/Structural | Footing | Passed | Andy Howard | Andy Howard met with Travis Sullivan and Mike Walker/Gulf Coast Masonry for this inspection. Footer width, depth, and steel sizes and placement were as per plans. Inspection passed. |
2023/01/11 | Electrical | Ceiling Rough-in | Passed | Andy Howard | Andy Howard/FSU BCA, Travis Sullivan/Southern, and Shannon Stephens/L&L Electric met for this inspection. The second floor junction boxes and conduits were inspected for above ceiling installation. This inspection was done at 11:15 A.M. est. |
2022/11/21 | Building/Structural | Sheetrock | Passed | Tom Deckert | Wall Patches secured OK to finish |
2022/11/15 | Electrical | Wall Rough-in | Passed | Andy Howard | Andy Hoard, Neely Lewis, Travis Sullivan, and Shannon Stephens were present for the stud wall framing and electrical wall rough inspections. Both inspections passed. |
2022/11/15 | Building/Structural | Framing | Passed | Andy Howard | Andy Hoard, Neely Lewis, Travis Sullivan, and Shannon Stephens were present for the stud wall framing and electrical wall rough inspections. Both inspections passed. |
Mechanical | Final Mechanical | Neely Lewis | Final |
BCA Project #: 20-03138- Keen Building Re-Roofing
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/02/07 | Electrical | Final Electrical | Conditional | Andy Howard | Final Electrical: Andy Howard, Neely Lewis, Sean Mitchell, Travis Marchant, Kent Malik, Matt Ganskop, Mark Poindexter, and Kurt Koetz were present for this joint inspection. The panel on the roof requires a permanent placard identifying the panel, the feed from panel, and the circuit breaker associated with the new exhaust fan. 2017 NEC 408.4 field identification of new equipment. |
2023/02/07 | Mechanical | Final Mechanical | Failed | Neely Lewis | 1. Roof drains appear to not be installed according to manufacturers instructions, including the interfacing of the roof membrane with the roof drain. The hole cut into the membrane is smaller than the bowl below it. See Zurn product literature rd-cvr-21. 2. Condensate lines from the package a/c units need to be secured to the roof. FBC2020-M Section 301.15. |
2023/02/07 | Building/Structural | Roof Final | Conditional | Andy Howard | Roof Final Building Inspection: Andy Howard, Neely Lewis, Sean Mitchell, Travis Marchant, Kent Malik, Matt Ganskop, Mark Poindexter, and Kurt Koetz were present for this joint inspection. The final building inspection is dependent on the final mechanical deficiencies and the final electrical deficiencies to be corrected. Once Final Mechanical and Final Electrical pass, the Final Building can be passed. See the final mechanical and final electrical results for dificiencies. |
2023/01/10 | Building/Structural | Roofing | Passed | Andy Howard | Andy Howard/FSU BCA met with Matt Ganskop and Nick Polovich of OWC at the walk way concrete roof covering the sidewalk between Keen and Collins. This inspection was for the MDC Product Approved Siplast Liquid Applied Roof Coating. This stage of the work included approximately 70% of the roof area with the first stage of the installation which includes a coating directly on the existing coating, a textile membrane, and a coating on top of the membrane. This is stage one of a multilayer installation - see the MDCPA for the exact steps. This is an inprogress inspection. A final inspection is required. |
2022/09/06 | Building/Structural | Roofing | Passed | Andy Howard | Andy Howard, Sean Mitchell, Kent Malik, and John Travis Marchant of FSU and Jacob Winters of OWC met for a cap sheet inprogress inspection. The cap inprogress passed, however, the FSU Design team and Project Manager discussed multiple quality control tems to be reworked. John Travis Marchant will be producing a report on the items that were discussed. |
2022/08/18 | Building/Structural | Roofing | Conditional | Tom Deckert | This work was concealed without BCA inspection. AOR and Manufacturers inspections will be reviewed for records and acceptance. Contractor needs to verify roof drains / capacities and wall flashing detail. Note- Contractor ceased torching activities until 2 charged extinguishers were on site. |
BCA Project #: 17-02732- Mission Road Main House - New Open Pole Barn
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2018/04/24 | Fire Safety | Final Fire Safety | Passed | Gail Ivey | Fire Extinguisher is mounted correctly |
2018/04/20 | Building/Structural | Final Building | Failed | Dwayne Mahony | Dwayne Thanks for going to the inspection this afternoon. I will stop by Monday morning to discuss with you and Tom. Have a nice weekend. Brian Cannady FSU Design and Construction |
2018/04/06 | Building/Structural | Footing | Passed | Dwayne Mahony | Approved for concrete placement into foundation holes at posts. |