Active Building Code Administration Project Inspection Results
BCA Project #: 24-03648- David Middleton Golf Center Chiller Replacement
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/03/13 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | On site POC is Josh Kirkman 904-318-5004 Projects foreman. 1) this was for the pipe welds only |
BCA Project #: 24-03647- Nursery-Grounds Greenhouse Electric Pole
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/02/21 | Electrical | Final Electrical | Passed | Al Smythe | Service pole inspection |
2025/02/21 | Electrical | Service Release | Passed | Al Smythe | Service pole inspection |
BCA Project #: 24-03643- New Student Union Letters
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/02/18 | Building/Structural | Footing | Passed | Kody Boswell | FSU BCA deferred footing inspection to Pennoni. Inspection is passed with the understanding that comments in report "Site Visit #02", dated 2/17/2025, are addressed prior to concrete placement. |
2025/02/14 | Building/Structural | Footing | Failed | Kody Boswell | Inspections prior to concrete placement Saturday 02/15/25 FSU BCA showed up for inspection but no one was on site and the access gate was padlocked. After review of Pennoni's Observation Report #1 and discussion with Scott it was determined that another inspection is required prior to concrete placement. There are several items that need to be addressed and items were not yet addressed at the time of inspection. |
2025/02/14 | Building/Structural | Slab | Failed | Kody Boswell | Inspections prior to concrete placement Saturday 02/15/25 FSU BCA showed up for inspection but no one was on site and the access gate was padlocked. After review of Pennoni's Observation Report #1 and discussion with Scott it was determined that another inspection is required prior to concrete placement. There are several items that need to be addressed and items were not yet addressed at the time of inspection. |
Electrical | Floor Rough-in | Rocky Wilde | Inspections prior to concrete placement Saturday 02/15/25 | ||
Building/Structural | Final Building | Kody Boswell | Please call Scot Fisher to meet onsite for final inspection (850)509-0247 | ||
Electrical | Underground | Rocky Wilde | Inspections prior to concrete placement Saturday 02/15/25 | ||
Electrical | Final Electrical | Cancelled | Rocky Wilde |
BCA Project #: 24-03642- Women's Softball Scoreboard Audio System
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/15 | Electrical | Final Electrical | Failed | James Melvin | they havent even started |
2025/04/15 | Building/Structural | Final Building | Failed | James Melvin | the welders were still working |
Building/Structural | Structural | Kody Boswell |
BCA Project #: 24-03630- UCA North Wing Roof Repair
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/03/18 | Building/Structural | Final Building | Failed | Kody Boswell | Final Building/Roofing Inspection for Tile Repairs. Work is not complete for this project. The following items need to be addressed/corrected: 1) There was one section of roof on the north side where no work was done, but is in the project scope. Contractor is to complete work for the one section that was missed. 2) There were several areas along top ridge and hip ridges where the caulking/sealing was not completed. Contractor to complete caulking/sealing. 3) There were several air terminals for the lightning protection system that were removed in order to complete roof work and not replaced. Air terminals must be replaced. 4) General cleanup. There was excessive debris left over from work being done. |
2025/03/18 | Building/Structural | Roofing | Failed | Kody Boswell | Final Building/Roofing Inspection for Tile Repairs. Work is not complete for this project. The following items need to be addressed/corrected: 1) There was one section of roof on the north side where no work was done, but is in the project scope. Contractor is to complete work for the one section that was missed. 2) There were several areas along top ridge and hip ridges where the caulking/sealing was not completed. Contractor to complete caulking/sealing. 3) There were several air terminals for the lightning protection system that were removed in order to complete roof work and not replaced. Air terminals must be replaced. 4) General cleanup. There was excessive debris left over from work being done. |
2025/01/29 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection for underlayment installation amd tile reinstallation. |
2025/01/16 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection for Plywood/Fastener. Note: Kody conducted this inspection on 01/16/2025 @ 10:30 am. Due to the nature of the phase being inspected, it had to be done on this date and then "scheduled" for the day after. Portal restrictions |
2025/01/08 | Building/Structural | Roofing | Conditional | Kody Boswell | Mobilization/Life Safety Inspection Result is conditional pending walkway tunnel installtion completion |
BCA Project #: 24-03624-B IM Fields Softball Control Storm Damage Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/10 | Building/Structural | Roofing | Passed | Paul Nitz | Final Inspection |
2025/02/13 | Building/Structural | Roofing | Passed | Kody Boswell | Underlayment and nailing for small building. Contractor submitted photos for inspection, requested by FSU BCA, received on 2/13/2025 via email from Colbert Hamilton. Photos filed in "Photos" folder |
BCA Project #: 24-03624-A IM Fields Control Building Storm Damage Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/10 | Building/Structural | Roofing | Passed | Paul Nitz |
BCA Project #: 24-03624- IM Fields Rec Sportsplex Facilities Storm Damage Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/10 | Building/Structural | Roofing | Passed | Paul Nitz | Final Inspection |
2025/02/07 | Building/Structural | Roofing | Passed | Paul Nitz | Big Building shingle nailing inspect |
2025/02/05 | Building/Structural | Roofing | Passed | Paul Nitz |
BCA Project #: 24-03622- Carraway Wet Lab Remodeling Suite 0312
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/02/20 | Plumbing | Rough-in | Passed | Paul Nitz | |
2025/02/20 | Plumbing | Final Plumbing | Passed | Paul Nitz |
BCA Project #: 24-03613- Panama City Tech Bldg ECAP Electrical Circuit
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Electrical | Wall Rough-in | Passed | James Melvin | ||
Electrical | Ceiling Rough-in | Passed | James Melvin |
BCA Project #: 24-03612-B Haskins Circus Complex Electrical
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Electrical | Ground | James Melvin |
BCA Project #: 24-03612- Haskins Circus Tent Concrete
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/03/19 | Building/Structural | Slab | Passed | Paul Nitz | |
2025/02/17 | Building/Structural | Footing | Passed | Paul Nitz | |
2025/02/13 | Plumbing | Underground | Passed | Paul Nitz | I talked to Travis, he said this was for an underground plumbing inspection done yesterday -Kody |
2025/01/29 | Building/Structural | Slab | Passed | Kody Boswell | Preliminary rebar inspection for the new slab for the new circus tent. Contractor to schedule another inspection prior to concrete placement to verify embed installation and expansion material where new concrete meets old concrete. |
BCA Project #: 24-03607- UCB 4th and 5th Floor Modifications
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/14 | Fire Safety | Final Fire Safety | Passed | Mary Creason | |
2025/04/14 | Mechanical | Final Mechanical | Conditional | Paul Nitz | 1) Test And Balance report required |
2025/04/14 | Electrical | Final Electrical | Failed | Paul Nitz | 1) outlet covers are still missing, this is the third failure for final electrical for this project |
2025/03/28 | Mechanical | Final Mechanical | Conditional | Paul Nitz | TAB required |
2025/03/28 | Fire Safety | Final Fire Sprinkler | Passed | Mary Creason | |
2025/03/28 | Fire Safety | Final Fire Safety | NOT READY | Mary Creason | Contractor not ready for a final - no door hardware, no glass panels on doors to hallways, electrical sockets not covered, tape on fire alarm devices due to painting, etc. |
2025/03/26 | Building/Structural | Final Building | Failed | Paul Nitz | This inspection is for the fourth floor only. Please call 850.252.7910 20-30 minutes before you 1) missing final mechanical, electrical 2) missing windows, carpet, door handles, outlet covers |
2025/03/25 | Building/Structural | Final Building | Failed | Paul Nitz | This inspection is for the fourth floor only. Please call 850.252.7910 20-30 minutes before you 1) glass for offices are missing 2) door knobs are missing 3) carpet is missing 4) outlet covers are missing I called the contractor but have not received a call back |
2025/02/11 | Fire Safety | Final Fire Sprinkler | Passed | Sam Sevor | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
2025/02/10 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
2025/02/10 | Electrical | Wall Rough-in | Passed | James Melvin | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
2025/02/10 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. 1) ducts need to be sealed |
2025/02/10 | Electrical | Ceiling Rough-in | Passed | James Melvin | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
2025/02/10 | Building/Structural | Sheetrock | Passed | Paul Nitz | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
2025/01/13 | Electrical | Final Electrical | Passed | James Melvin | This inspection is for the 5th floor kitchen area. Super onsite is Charles Burges, his number is 8506934872. |
2025/01/13 | Fire Safety | Final Fire Safety | Passed | Sam Sevor | This inspection is for the 5th floor kitchen area. Super onsite is Charles Burges, his number is 8506934872. |
2025/01/13 | Building/Structural | Final Building | Conditional | Paul Nitz | This inspection is for the 5th floor kitchen area. Super onsite is Charles Burges, his number is 8506934872. 1) 5th floor is ok for CC, the fourth floor was not ready |
2025/01/06 | Electrical | Ceiling Rough-in | Passed | James Melvin | Call me 30 minutes in advance please. |
2025/01/03 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Call me 30 minutes in advance please. |
2025/01/03 | Mechanical | Insulation | Passed | Paul Nitz | Call me 30 minutes in advance please. |
2025/01/03 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Moved three heads. Pre Inspected by Kurt on 1/3/2025 and passed. |
2025/01/03 | Mechanical | Final Mechanical | Passed | Paul Nitz | Call me 30 minutes in advance please. |
Electrical | Final Electrical | James Melvin | Call me 30 minutes in advance please. | ||
Electrical | Final Electrical | Failed | Rocky Wilde |
BCA Project #: 24-03606- Chemical Science Laboratories Building Chemistry New Equipment Power
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/10/02 | Electrical | Final Electrical | Passed | James Melvin | Greg 813-853-2249 |
BCA Project #: 24-03605- Rovetta Building A Roof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/08 | Building/Structural | Roofing | Cancelled | Kody Boswell | In-Progress Inspection - Metal Wall Panels Drawings were revised and not yet submitted to FSU BCA so a formal inspection was not executed. Contractor to submit FSU BCA drawings for review. FSU BCA was on site when this discovery was made. |
2025/02/11 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection - Mobilization Stage 2 Safety Inspection |
2025/01/14 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection. Contractor was installing coping cap plate on parapets |
2025/01/13 | Building/Structural | Roofing | Cancelled | Paul Nitz | In-Progress Inspection |
BCA Project #: 24-03603- Askew Life Center Room 101 E-Sports Gaming Modifications
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/11/25 | Building/Structural | Final Building | Passed | Rocky Wilde | During the electrical final on 11/22/2024. Rock Wilde also looked over everything for the building final. |
2024/11/22 | Electrical | Final Electrical | Passed | Rocky Wilde | |
2024/11/12 | Electrical | Ceiling Rough-in | Passed | Alex Masterton | Requesting an above ceiling rough in inspection. If at all possible being there at 8am would be greatly appreciated since flooring is starting tomorrow. |
2024/10/29 | Building/Structural | Sheetrock | Passed | Paul Nitz | sheetrock screw pattern inspection. |
2024/10/23 | Electrical | Wall Rough-in | Passed | James Melvin | Electrical in wall inspection for Rooms 101A, B, C, and D. Please note, above ceiling will be requested at another day/time. |
BCA Project #: 24-03602- Doak Storm Damage Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/01/17 | Electrical | Final Electrical | Passed | Alex Masterton | Onsite contact is Todd Jones 850-544-4424 |
Building/Structural | Final Building | Cancelled | Paul Nitz | Rob Thompson with RT Electric contacted FSU BCA via email to cancel this inspection due to roof work not being completed. | |
Electrical | Final Electrical | Cancelled | Al Smythe | Rob Thompson with RT Electric contacted FSU BCA via email to cancel this inspection due to roof work not being completed. |
BCA Project #: 24-03592- Mag Lab NHMFL Storm Damage
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/01/30 | Building/Structural | Wall/Ceiling | Failed | Kody Boswell | Framing inspection for soffit. Vertical LG framing was missing screws all along the interior side of the soffit. Contractor to schedule reinspection |
Electrical | Ceiling Rough-in | Passed | Al Smythe | ||
Building/Structural | Framing | Passed | Al Smythe | ||
Electrical | Final Electrical | James Melvin | |||
Building/Structural | Final Building | Al Smythe | |||
Building/Structural | Wall/Ceiling | Conditional | Al Smythe | ||
Electrical | Ceiling Rough-in | Passed | Al Smythe | ||
Building/Structural | Wall/Ceiling | Conditional | Al Smythe |
BCA Project #: 24-03587- Student Services Building The DEN Sign
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/02/24 | Building/Structural | Final Building | Passed | Kody Boswell | Final building inspection. The sign is installed and appears to agree with the permitted documents. The sign attachment to the structure was not able to be verified, but the sign appears to be secured in place. |
BCA Project #: 24-03584- NCF Hamilton Center Retail Food Services Area Renovation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/10/07 | Plumbing | Final Plumbing | Passed | Hank Fulmer | |
2024/10/07 | Electrical | Final Electrical | Passed | Hank Fulmer | |
2024/10/07 | Electrical | Final Electrical | Passed | Joseph Agriesti | |
2024/10/07 | Plumbing | Final Plumbing | Passed | Joseph Agriesti | |
2024/10/07 | Building/Structural | Final Building | Passed | Hank Fulmer | |
2024/10/07 | Building/Structural | Final Building | Passed | Joseph Agriesti | |
2024/09/11 | Building/Structural | Framing | Passed | Steve Bell | |
2024/09/11 | Plumbing | Rough-in | Passed | Steve Bell | |
2024/09/11 | Electrical | Panel/Feeder | Passed | Steve Bell | |
2024/09/11 | Electrical | Wall Rough-in | Passed | Steve Bell |
BCA Project #: 24-03582- Research Foundation Building A Neuromodulation Lab
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Electrical | Final Electrical | James Melvin |
BCA Project #: 24-03581- Williams Building Roof Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/03/25 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection - Clay Tile Install |
2025/03/17 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection - Tile Tear Off/Dry-In Inspection done virtually via photos provided by th Contractor. Filed in in "Inspections" folder in job file. |
BCA Project #: 24-03580- Osceola Duplex-Seminole Barber Shop Roof Replacment
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/08/26 | Building/Structural | Roofing | Passed | Paul Nitz | Final Inspection - Shingles Roof |
2024/08/23 | Building/Structural | Roofing | Passed | Paul Nitz | In-Progress Inspection |
BCA Project #: 24-03579- Maryland Circle Interior Renovation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/08 | Building/Structural | Framing | Passed | Paul Nitz | |
2025/04/07 | Building/Structural | Insulation | Passed | Paul Nitz | Partial ( ceilings) |
2025/04/03 | Mechanical | Insulation | Passed | Paul Nitz | 2139 Maryland circle |
2025/04/01 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Remaining underground checked 3/28 |
2025/03/21 | Plumbing | Water Piping & Test | Passed | Al Smythe | Ale Smythe check missing plumbing items 3/19/25 |
2025/03/20 | Building/Structural | Wall/Ceiling | Passed | Al Smythe | 2139 Maryland circle |
2025/03/20 | Electrical | Wall Rough-in | Passed | Al Smythe | 2139 Maryland circle |
2025/03/19 | Plumbing | Water Piping & Test | partial approval | Paul Nitz | 2139 Maryland circle 1) supply clamps were missing and isolation tape will be required in multiple locations, OK to insulate the pipes in the walls only |
2025/03/19 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 2139 Maryland circle |
2025/03/14 | Building/Structural | Wall/Ceiling | NOT READY | Paul Nitz | 2139 Maryland circ |
2025/03/10 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for ceiling framing for peer rooms, observation rooms, and therapy rooms. Result is conditional pending installation of longer screws for top track connection. |
2025/03/07 | Building/Structural | Framing | NOT READY | Paul Nitz | 2139 Maryland circle |
2025/02/19 | Building/Structural | Slab | Passed | Paul Nitz | Maryland circle 2139 |
2025/02/11 | Plumbing | Underground | Passed | Paul Nitz | |
Building/Structural | Insulation | Kody Boswell | |||
Building/Structural | Insulation | Kody Boswell | 2139 Maryland circle, Meet Rick Williams in charge | ||
Electrical | Underground | Passed | James Melvin | ||
Building/Structural | Sheetrock | Kody Boswell |
BCA Project #: 23-03574- Recycling Center Exterior Stair & Envelope Repair
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/03/18 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for stair footings and stair landing. Contractor was not finished installing bollards yet and reinforcing around the stair landing pad was not in place. Result is conditional pending receipt of photos from the contractor shwoing installtion of the items mentioned above. Photos received from Justin Owens on 3/20/25. Filed in job folder under "Inspections". |
2025/03/18 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for stair footings and stair landing. Contractor was not finished installing bollards yet and reinforcing around the stair landing pad was not in place. Result is conditional pending receipt of photos from the contractor shwoing installtion of the items mentioned above. Photos received from Justin Owens on 3/20/25. Filed in job folder under "Inspections". |
2025/03/11 | Building/Structural | Framing | Passed | Kody Boswell | Inspection for Window Framing, Door Framing, Sheathing, Vapor Barrier, Siding. Inspection was done virtual via photos. Filed in job folder. |
Building/Structural | Footing | Postponed | Kody Boswell | Inspection for reinforcing steel for footers for new stair. Contractor cancelled/postponed inspection to a later date, prior to FSU BCA arriving on site. |
BCA Project #: 23-03572- Jim Moran Neon Sign
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/10/24 | Electrical | Final Electrical | Passed | Alex Masterton |
BCA Project #: 23-03568- Mag Lab General Science Replace Generator
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/03/25 | Fire Safety | Final Egress/Emergency Lights | Passed | Mary Creason | Generator test = Alex Masterton BCA fire inspector/electrical inspector on 12/20/2024 inspected the Annunciator panel on generator, tested emergency power for lighting on generator - all passed Today I tested transfer switch for less than 10 seconds to come on and also cool down time. I tested fire alarm connection to FSU PD dispatch - passed I tested transfer from city power to generator. Passed Emergency lights in generator was lit. passed ONLY item still needed is the commissioning report and 100% load bank test. _ 3/28/2025 Received commissioning report and 100% load test. - passed |
2025/03/24 | Fire Safety | Final Egress/Emergency Lights | NOT READY | Mary Creason | Waited for almost 2 hours and they still was not ready for the inspection. They will call it in again for tommorrow |
2025/03/24 | Electrical | Final Electrical | Passed | James Melvin | |
2025/03/21 | Electrical | Final Electrical | NOT READY | Al Smythe | |
2025/03/21 | Fire Safety | Final Egress/Emergency Lights | NOT READY | Mary Creason | Paul Hughes called and cancelled inspection - Not ready |
2025/03/20 | Fire Safety | Final Egress/Emergency Lights | NOT READY | Mary Creason | Paul called to cancel. We call back in for final |
2025/03/20 | Electrical | Final Electrical | Cancelled | Al Smythe | |
2025/03/20 | Electrical | Panel/Feeder | Cancelled | Al Smythe | |
2024/11/22 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Pressure test on 2” gas line for new generator install |
BCA Project #: 23-03562- NCF Car Museum Demolition
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/10/18 | Plumbing | Final Plumbing | Passed | Joseph Agriesti | Approved today, plumbing cap off of water and sewer, also electric service conductors coming from transformers to meter cans. Transformers will remain in place to be used again if necessary. Buildings will be removed, and replaced with a new ball field. All means of disconnections of plumbing, water and eleectrical have been completed in accordance with current codes. Currently building still stands and will be pushed over soon, final approved will be achieved when structure is removed. |
2024/10/18 | Electrical | Final Electrical | Passed | Joseph Agriesti | Approved today, plumbing cap off of water and sewer, also electric service conductors coming from transformers to meter cans. Transformers will remain in place to be used again if necessary. Buildings will be removed, and replaced with a new ball field. All means of disconnections of plumbing, water and eleectrical have been completed in accordance with current codes. Currently building still stands and will be pushed over soon, final approved will be achieved when structure is removed. |
2024/10/18 | Building/Structural | Final Building | Passed | Joseph Agriesti | Approved today, plumbing cap off of water and sewer, also electric service conductors coming from transformers to meter cans. Transformers will remain in place to be used again if necessary. Buildings will be removed, and replaced with a new ball field. All means of disconnections of plumbing, water and eleectrical have been completed in accordance with current codes. Currently building still stands and will be pushed over soon, final approved will be achieved when structure is removed. |
2024/09/18 | Electrical | Final Electrical | Passed | Nicholas Ninos | |
2024/09/18 | Plumbing | Final Plumbing | Passed | Nicholas Ninos | |
2024/09/18 | Building/Structural | Final Building | Passed | Joseph Agriesti | |
2024/09/18 | Electrical | Final Electrical | Passed | Joseph Agriesti | |
2024/09/18 | Plumbing | Final Plumbing | Passed | Joseph Agriesti | |
2024/09/18 | Building/Structural | Final Building | Passed | Nicholas Ninos |
BCA Project #: 23-03560- Cawthon Hall New Oil Cooler in Elevator
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/10 | Electrical | Final Electrical | Passed | Alex Masterton | No comments. |
BCA Project #: 23-03556- Claude Pepper Building Envelope Restoration
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/03/28 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2025/03/27 | Plumbing | Rough-in | Passed | Paul Nitz | |
2025/02/17 | Plumbing | Underground | Passed | Paul Nitz | Downspout/storm water tie in number 5. |
2025/02/17 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Downspout/storm water tie in number 5. |
2025/02/06 | Building/Structural | Slab | Conditional | Kody Boswell | Sidewalk reinforcement for downspouts 1, 2, 3, 4, 14, 15, and 16. Result is conditional pending receipt of photos showing that WWR mesh is chaired up off of grade and expansion material is installed where required. This was discussed with the Contractor on site. |
2025/01/29 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Downspout/storm water tie-ins 3, 4, 14, 15, and 16. |
2025/01/29 | Plumbing | Underground | Passed | Paul Nitz | Downspout/storm water tie-ins 3, 4, 14, 15, and 16. |
2025/01/17 | Plumbing | Underground | Conditional | Paul Nitz | 1) this was for drains 1,2,&6 out of 16 |
2025/01/17 | Plumbing | Storm Piping & Test | Conditional | Paul Nitz | 1) this was for drains 1,2,&6 out of 16 |
2025/01/14 | Plumbing | Underground | Failed | Paul Nitz | This is to reschedule the inspection I requested for today. 1) plans call for min schedule 40 |
2025/01/14 | Plumbing | Storm Piping & Test | Failed | Paul Nitz | This is to reschedule the inspection I requested for today. 1) plans call for min schedule 40 |
2025/01/13 | Plumbing | Storm Piping & Test | Cancelled | Paul Nitz |
BCA Project #: 23-03554- FSURF Entrepreneurial Bldg. Commonwealth Building Roof Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/03/31 | Building/Structural | Roofing | Passed | Paul Nitz | Paul made a second trip to the site on 3/28/25 to inspect roof decking. |
2025/03/31 | Building/Structural | Re-Inspection | Passed | Paul Nitz | Paul made a second trip to the site on 3/28/25 to inspect roof decking. |
2025/03/28 | Building/Structural | Roofing | Failed | Paul Nitz | Decking along parapet wall 1)PLANS NOT ON SITE |
2025/03/27 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed welding of new steel framing along the south side of the building. This is a re-inspection of steel framing reviewed on 3/13/25 and 3/19/25, specifically framing located at the center entry bumpout framing. Steel framing at center entry bumpout was installed in substantial compliance with the contract drawings (detail B/S-2.1). |
2025/03/27 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed welding of new steel framing along the south side of the building. This is a re-inspection of steel framing reviewed on 3/13/25 and 3/19/25, specifically framing located at the center entry bumpout framing. Steel framing at center entry bumpout was installed in substantial compliance with the contract drawings (detail B/S-2.1). |
2025/03/27 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing along the south side of the building from the SW corner to the center entry bumpout. LG framing in place did not match structural drawings (dated 12/3/2024) provided to FSU BCA. The following items/issues need to be addressed: 1) Per Light Gauge Steel Framing note 3 on sheet S-0.1, "SUBMIT COMPLETE SHOP DRAWINGS AND CALCULATIONS SHOWING METHOD OF FABRICATION, ERECTION PROCEDURES, ATTACHMENT OF THE SYSTEM TO THE BUILDING, JOINTS, CONNECTIONS AND FRAMING." Shop drawings must be reviewed and approved by the EOR and a copy of approved shop drawings are to be provided to FSU BCA. Upon receipt of approved shop drawings, Contractor may schedule a re-inspection of LG framing. 2) Detail A/S-2.1: There are missing fasteners for the sloped roof joist at each end. Detail calls for 6 fasteners, only 4 were installed. 3) Detail A/S-2.1: Verify with EOR that screws are allowed for use into new HSS framing in lieu of PAFs for the Simpson FCB45.5 clips. |
2025/03/19 | Building/Structural | Re-Inspection | Failed | Kody Boswell | Reviewed welding of new steel framing along the south side of the building. This is a re-inspection of steel framing reviewed on 3/13/25, specifically framing located at the center entry bumpout framing. Steel framing at center entry bumpout was not installed per the contract drawings (detail B/S-2.1). Contractor to schedule reinspection after framing is installed per the contract documents. |
2025/03/13 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed welding of new steel framing to existing steel framing along the south side of the building. FSU BCA reviewed areas affected by structural drawing revisions (not reviewed on 3/5/25). Framing at the center entry bumpout was not installed (detail B/S-2.1). Contractor to schedule a reinspection after new steel framing is installed. |
2025/03/06 | Building/Structural | Roofing | Passed | Kody Boswell | Virtual in-progress roofing inspection. Contractor provided photos of roofing prgress at each stage of construction. Stages of construction include existing roof tear off, installation of new stryrofoam infill of existing metal deck flutes, instllation of new insulation, installation of new coverboard, and installation of cap sheet. Photos filed in "Inspections" folder dated 3/6/2025. |
2025/03/05 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed welding of new steel framing to existing steel framing along the south side of the building. FSU BCA arrived on site and discovered there was a revision to structural drawings that affected the scheduled inspection. The revised drawings, dated 12/4/2024, had not been submitted to FSU BCA so a full inspection was not performed. FSU BCA only reviewed areas that were not affected by the structural revisions. These areas appeared to be in compliance with the drawings. Result is conditional pending FSU BCA review of revised structural drawings. Once revised drawings have been reviewed, the Contractor may schedule an inspection for areas affected by the revised drawings. |
BCA Project #: 23-03546- Postal Services Building Madison Street Printer Circuits
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/07/18 | Electrical | Final Electrical | Passed | Alex Masterton | E1- Provide typed panel schedules for final survey. |
BCA Project #: 23-03541- Diffenbaugh Steep Slope Roof Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/04 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of waterproofing underlayment on steep slope roof areas |
BCA Project #: 23-03540- Howser Baseball Dugout Frame & Door
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Building/Structural | Framing | Kody Boswell |
BCA Project #: 23-03539- NCF Pritzker Marine Building Exterior Improvements
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/11/18 | Plumbing | Rough-in | Conditional | Steve Bell | |
2024/11/18 | Electrical | Wall Rough-in | Conditional | Steve Bell | |
2024/11/18 | Electrical | Wall Rough-in | Passed | Hank Fulmer | |
2024/11/18 | Plumbing | Rough-in | Passed | Hank Fulmer | |
2024/11/05 | Building/Structural | Structural | Passed | Joseph Agriesti | |
2024/10/30 | Building/Structural | Slab | Passed | Steve Bell | |
2024/10/28 | Building/Structural | Slab | Failed | Steve Bell | FBC2023 SECTION 107 SUBMITTAL DOCUMENTS No construction documents on site. Please provide approved plans. 1 hr inspection time |
2024/10/25 | Electrical | Floor Rough-in | Failed | Steve Bell | |
2024/10/25 | Building/Structural | Slab | Passed | Nicholas Ninos | |
2024/10/25 | Electrical | Floor Rough-in | Passed | Nicholas Ninos | |
2024/10/25 | Building/Structural | Slab | Failed | Steve Bell | |
2024/10/25 | Electrical | Wall Rough-in | Failed | Nicholas Ninos | PVC conduit was installed above dirt on plastic sheeting. Installation method is NEC compliant. No discrepancies noted. |
2024/10/16 | Building/Structural | Structural | Passed | Hank Fulmer | Partial inspection passed. This is for te south wall, north stairs, and first two column walls. All steel was properly sized and palced. The depths and widths were correctly sized per plans. |
2024/09/20 | Building/Structural | Structural | Passed | Joseph Agriesti | |
2024/09/06 | Building/Structural | Footing | Passed | Joseph Agriesti | |
2024/08/29 | Building/Structural | Structural | Passed | Hank Fulmer | |
2024/08/21 | Plumbing | Gas Piping & Test | Passed | Joseph Agriesti | |
2024/08/21 | Building/Structural | Structural | Passed | Hank Fulmer | |
2024/08/19 | Plumbing | Gas Piping & Test | Passed | Joseph Agriesti | |
2024/08/09 | Building/Structural | Footing | Passed | Hank Fulmer |
BCA Project #: 23-03534- Law Research Center-Library AC Install
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/17 | Mechanical | Equipment | Passed | Dwayne Mahony | |
2024/05/17 | Electrical | Appliance/Equipment | Passed | Dwayne Mahony |
BCA Project #: 23-03528- Westcott Vending Machine
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/10/24 | Electrical | Final Electrical | Passed | Alex Masterton | |
Electrical | Final Electrical | Dwayne Mahony |
BCA Project #: 23-03524- Mag Lab Kitchen Micro Mart
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/08/08 | Electrical | Final Electrical | Passed | Alex Masterton | No comments. |
BCA Project #: 23-03519- New College of Florida Reichert House Building Demo
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/08/19 | Building/Structural | Final Building | Passed | Hank Fulmer | |
2024/08/15 | Electrical | Final Electrical | Passed | Hank Fulmer | |
2024/08/15 | Plumbing | Final Plumbing | Passed | Steve Bell |
BCA Project #: 23-03518- New College of Florida Knight Residence Building Demo
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/08/19 | Building/Structural | Final Building | Passed | Hank Fulmer | |
2024/08/15 | Plumbing | Final Plumbing | Passed | Steve Bell | |
2024/08/15 | Electrical | Final Electrical | Passed | Hank Fulmer |
BCA Project #: 23-03517- New College of Florida Palmer E Building Demo
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/08/19 | Building/Structural | Final Building | Passed | Hank Fulmer | |
2024/08/15 | Plumbing | Final Plumbing | Passed | Steve Bell | |
2024/08/15 | Electrical | Final Electrical | Passed | Hank Fulmer |
BCA Project #: 23-03515- New College of Florida Palmer C Building Demo
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Electrical | Final Electrical | Hank Fulmer | If he is not available please call Justin Sam 734-680-4860 | ||
Plumbing | Final Plumbing | Hank Fulmer | If he is not available please call Justin Sam 734-680-4860 |
BCA Project #: 23-03510- Rogers Exterior Envelope Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/01/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed window attachment to structure for windows in the stairwells |
2025/01/09 | Building/Structural | Masonry | Passed | Kody Boswell | |
2024/12/23 | Building/Structural | Masonry | Passed | Al Smythe | |
2024/11/13 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed LG framing for the bracing of the existing exterior CMU walls. Deficencies noted on 11/8/24 framing inspection were corrected. FSU BCA met the threshold inspector on site. During inspection, the threshold inspector noted that window attachment differed from the contract docs. |
2024/11/13 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the bracing of the existing exterior CMU walls. Deficencies noted on 11/8/24 framing inspection were corrected. FSU BCA met the threshold inspector on site. During inspection, the threshold inspector noted that window attachment differed from the contract docs. |
2024/11/08 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing for exterior wall strengthening. There were several areas where top and bottom track fastener attachment spacing exceeed what was specified in the structural drawings. Also, clips attaching LG studs to existing CMU wall exceeded spacing on structural drawings. It was also discussed with the Contractor that a threshold inspector must also inspect any load bearing elements being repaired/modified. |
Building/Structural | Masonry | Cancelled | Rocky Wilde | Rebar Install stairwell CMU |
BCA Project #: 23-03509- State Storage Warehouse Metal Ring Roller
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/27 | Electrical | Final Electrical | Passed | Alex Masterton | No comments. |
BCA Project #: 23-03508-A Tucker Center Chiller Replacement
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/01/31 | Electrical | Appliance/Equipment | Passed | Rocky Wilde | No visit required. This was already looked at by Rocky Wilde this morning at 10am |
2025/01/31 | Electrical | Panel/Feeder | Passed | Rocky Wilde | No visit required. This was already looked at by Rocky Wilde this morning at 10am |
2025/01/30 | Mechanical | Cond. Piping & Test | Passed | Paul Nitz | Please call me when on the way |
2025/01/30 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Please call me when on the way |
BCA Project #: 23-03503- Rogers Building 5th Remodeling
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/09 | Mechanical | Final Mechanical | Passed | Paul Nitz | We will need a Test and Balance. Final pending T and B. |
2025/04/04 | Electrical | Ceiling Rough-in | Passed | Al Smythe | |
2025/03/18 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Grid cieling |
2025/02/25 | Fire Safety | Hydro-Test | Passed | Curtis Rogers | Side note: Above Hard Ceiling looks Good |
2025/02/05 | Plumbing | Re-Inspection | Passed | Paul Nitz | Above cieling pipe insulation inspection |
2025/02/05 | Mechanical | Insulation | Passed | Paul Nitz | |
2025/01/28 | Building/Structural | Sheetrock | Passed | Kody Boswell | |
2025/01/28 | Building/Structural | Insulation | Passed | Kody Boswell | |
2025/01/14 | Mechanical | Duct Rough-in | Passed | Paul Nitz | : this was for the penthouse duct |
2025/01/13 | Mechanical | HW Piping & Test | Passed | Paul Nitz | |
2025/01/13 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
2025/01/13 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | |
2024/12/11 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | |
2024/12/04 | Mechanical | HW Piping & Test | Passed | Paul Nitz | |
2024/11/26 | Mechanical | Insulation | NOT READY | Rocky Wilde | |
2024/11/26 | Building/Structural | Framing | Passed | Rocky Wilde | |
2024/11/19 | Plumbing | Water Piping & Test | Passed | Paul Nitz | |
2024/11/19 | Plumbing | Rough-in | Passed | Paul Nitz | |
2024/11/12 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | 1) waiting for pics of minor corrections |
Building/Structural | Re-Inspection | Postponed | Kody Boswell | FSU BCA arrived on site and was informed by the Contractor the inspection was postponed to a later date | |
Building/Structural | Framing | Postponed | Kody Boswell | FSU BCA arrived on site and was informed by the Contractor the inspection was postponed to a later date | |
Electrical | Ceiling Rough-in | NOT READY | Rocky Wilde | ||
Electrical | Wall Rough-in | Passed | Rocky Wilde |
BCA Project #: 23-03500- Criminology & Justice Envelope
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/02 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | In-progress inspection of PVC cap sheet install for flat roof area |
2025/03/31 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | In-progress inspection of wall panels being installed. |
2025/03/28 | Building/Structural | Structural | NOT READY | Paul Nitz | 1) materials did not come in |
2025/03/13 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of roof tile installation and wall panel installation at dormers. Virtual inspection done via photos provided by Nick Lee. Filed in job folder. |
2025/03/05 | Building/Structural | Roofing | NOT READY | Kody Boswell | In progress wall panel installation. FSU BCA arrived on site and there was no work to be inspected. Wall panels were alread installed. |
2025/01/15 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of sloped tile roof areas, peel and stick underlayment, 1st layer. Contractor already installed cover board and PVC membrane on dormer flat roofs and will submit photos for documentation. |
Building/Structural | Slab | Kody Boswell |
BCA Project #: 23-03496- Bellamy Building New Circuits for Room 042 Workstations
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/03/26 | Electrical | Final Electrical | Passed | Dwayne Mahony | |
Mechanical | Duct Rough-in | Paul Nitz |
BCA Project #: 23-03489- UCB 1st Floor Restrooms Renovation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/08 | Plumbing | Final Plumbing | Failed | Paul Nitz | 1) plans call for copper supply lines and they installed flex 2) Plans call for 2" sanitary waist drains, 3) Plans call for a trap primer in the drains all drains and supply lines must be insulate,covered with approved product or both |
2025/04/08 | Electrical | Final Electrical | Passed | Rocky Wilde | |
2025/03/11 | Mechanical | Final Mechanical | Conditional | Paul Nitz | Final Test and balance report is required |
2025/03/10 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Above ground visual fire sprinklers |
2025/02/25 | Electrical | Ceiling Rough-in | Passed | James Melvin | Was inspected on 2/24/2025 |
2025/02/24 | Building/Structural | Framing | Passed | Paul Nitz | Was inspected on 2/24/2025 |
2024/12/06 | Building/Structural | Framing | Passed | Paul Nitz | |
2024/12/05 | Building/Structural | Sheetrock | Conditional | Paul Nitz | 1) engineered letter/ manufacture installation instructions for attachment of 1/2" sheet rock directly to cmu block |
2024/11/27 | Electrical | Wall Rough-in | Passed | Rocky Wilde | |
2024/11/27 | Plumbing | Rough-in | Passed | Rocky Wilde | |
2024/11/08 | Plumbing | Rough-in | Passed | Paul Nitz | Partial rough in inspection for the drain line for the water cooler. |
2024/11/07 | Plumbing | Rough-in | Failed | Paul Nitz | Partial rough in inspection for the drain line for the water cooler 1) this inspection was done on 11/7/24 2) vapor barrer required before concrete is poured and slope needs to be verified on drain line |
2024/10/31 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Reinspection for hangers for the duct in the back hallway by the loading dock. |
2024/10/29 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Duct inspection in the back hallway and restrooms by the loading dock. This inspection was done on 10-29-2024 1) new ducts must be secured by the structure, not the existing ducts |
Plumbing | Final Plumbing | Paul Nitz | If possible, please give me a 30 minute notice before arriving for inspection. |
BCA Project #: 23-03488- College of Medicine Research Building Suite 2301 Modifications
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/13 | Building/Structural | Final Building | Passed | Dwayne Mahony | |
2024/05/13 | Fire Safety | Final Fire Sprinkler | Passed | Mary Creason | Sprinkler installed per NFPA13. Approved |
2024/05/09 | Electrical | Final Electrical | Passed | Dwayne Mahony | |
2024/05/09 | Mechanical | Final Mechanical | Passed | Neely Lewis | Need T&B if required by drawings |
2024/05/06 | Mechanical | Insulation | Passed | Neely Lewis | |
2024/05/02 | Mechanical | Duct Rough-in | Passed | Dwayne Mahony | Rough-in corrected to meet plan requirements. OK to insulate. Dwayne Mahony, cell 850 294 1581 |
2024/05/01 | Electrical | Wall Rough-in | Conditional | Dwayne Mahony | Assure that the electrical box plaster rings end up within 1/8" of the finished surface. |
2024/05/01 | Mechanical | Duct Rough-in | Failed | Dwayne Mahony | Work does not conform to the approved plans. Make corrections as disscussed and call for reinspection. |
BCA Project #: 23-03483- New College Robertson Hall Roof Replacement
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/08/23 | Roofing | Final | Passed | Hank Fulmer | |
2024/07/30 | Building/Structural | Roofing | Passed | Hank Fulmer | Per Hank's Inspection Report: Approved is an in-progress inspection. The roof was in different stages and they were all being installed correctly. Ok to proceed and finish the roof. |
Building/Structural | Roofing | Paul Nitz | Final Roofing Inspection |
BCA Project #: 23-03477- New College of Florida New Greenhouse & Shed
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/10/01 | Electrical | Wall Rough-in | Passed | Hank Fulmer | The underground conduit was checked and found to be at the correct depth. Also the panel is installed per code and the correct wire size was used for the 100A main disconnect. I am approving the electrical underground, pnael/feeder, and service release. |
2024/10/01 | Electrical | Panel/Feeder | Passed | Hank Fulmer | The underground conduit was checked and found to be at the correct depth. Also the panel is installed per code and the correct wire size was used for the 100A main disconnect. I am approving the electrical underground, pnael/feeder, and service release. |
2024/10/01 | Electrical | Underground | Passed | Hank Fulmer | The underground conduit was checked and found to be at the correct depth. Also the panel is installed per code and the correct wire size was used for the 100A main disconnect. I am approving the electrical underground, pnael/feeder, and service release. |
2024/10/01 | Electrical | Ground | Passed | Hank Fulmer | The underground conduit was checked and found to be at the correct depth. Also the panel is installed per code and the correct wire size was used for the 100A main disconnect. I am approving the electrical underground, pnael/feeder, and service release. |
2024/06/11 | Plumbing | Underground | Passed | Steve Bell | |
2024/06/11 | Building/Structural | Footing | Failed | Steve Bell | |
Steve Bell |
BCA Project #: 23-03474- Turnbull Conference Center Renovations
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/14 | Building/Structural | Slab | Passed | Kody Boswell | hole prep for slab infill at plumbing trenches in slab. |
2025/04/09 | Building/Structural | Structural | Passed | Paul Nitz | Need Housekeeping pad rebar, Steel-I Beams and C-Channel in basement inspected. |
2025/04/09 | Building/Structural | Slab | Passed | Paul Nitz | Need Housekeeping pad rebar, Steel-I Beams and C-Channel in basement inspected. |
2025/03/07 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for vending area walls and ceiling framing in the auditorium (north side) located on level 1. Result is conditional pending additional fasteners added to top track connection for vending area walls and installing missing vertical support stud for ceiling framing. |
2025/03/05 | Building/Structural | Structural | Passed | Paul Nitz | |
2025/03/05 | Building/Structural | Masonry | Passed | Paul Nitz | |
2025/02/25 | Plumbing | Rough-in | Passed | Paul Nitz | |
2025/02/06 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Drywall inspection for the third phase of the fire ceiling. |
2025/02/04 | Building/Structural | Structural | Passed | Kody Boswell | Structural Inspection on the Lower Level for temporary opening in masonry wall located along grid A/11-12. The Contractor, FSU BCA, and Threshold inspector (Penonni) were on site. |
2025/02/03 | Building/Structural | Structural | Passed | Kody Boswell | Structural Inspection on the Lower Level for temporary opening in masonry wall located along grid A/11-12. The Contractor, FSU BCA, and Threshold inspector (Penonni) were on site. The reinforcing steel was not yet tied in place. Only dowel holes for new reinforcing were drilled. Penonni checked dowel hole depth and cleanliness. Holes were the corret depth and clean. Contractor to schedule FSU BCA for inspection once reinforcing steel is tied in place, prior to reinforcing being covered up with formwork. |
2025/01/30 | Building/Structural | Structural | Postponed | Kody Boswell | Contractor contacted FSU BCA to inspect masonry reinforcing for a temporary opening in the basement. Upon site arrival it was discovered that the structural drawings were modified for the area requested for inspection. FSU BCA and the Thresold Inspector came to the conclusion that the area could not be inspected prior to the modified structural documents being submitted for review and included in the permit documents. Inspection is postponed until modified structural drawings are submitted for BCA review. |
2025/01/28 | Building/Structural | Framing | Passed | Paul Nitz | Paul, FSU BCA Inspector, will return today at 1:30 pm to inspect. |
2025/01/28 | Building/Structural | Framing | NOT READY | Paul Nitz | Need framing inspection to hang some drywall. 1) plans not on site |
2025/01/15 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for fire-rated encasement of a structural steel beam |
BCA Project #: 23-03466- Wm. Johnston - Manikin Chamber Cool Air Upgrade
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/14 | Electrical | Final Electrical | NOT READY | Dwayne Mahony | No access to room. |
2024/05/14 | Mechanical | Final Mechanical | Failed | Neely Lewis | 1. Need locking caps on regfrigeration access ports FBC-M Sec 1101.10 2. Insulation is to be continuous on refrigeration suction line. FBC-C Section 403.2.10. ( exposed suction pipe will cause condensate to drip and discolor brick on historic building.) 3.Armaflex insulation is to be painted or covered to protect it for degrading from sunlight. FBC-C Sec C403.2.10.1. |
2024/02/06 | Building/Structural | Footing | Passed | Dwayne Mahony | Addition to mechanical slab is approved. |
2023/12/28 | Plumbing | Underground | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |
2023/12/28 | Building/Structural | Slab | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |
2023/12/28 | Building/Structural | Footing | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |
BCA Project #: 23-03455-A Doak Campbell - East Stands Improvements Phase II
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/10 | Building/Structural | Framing | Passed | Paul Nitz | Screw down inspection for decking bathroom section 7 on the 4th floor |
2025/04/03 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Re Inspection new bathroom north side 4 th floor section 7 |
2025/04/03 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed roof framing for the new north bathroom, section 7, upper concourse. Items noted in failed inspection on 4/1/2025 have been corrected and/or addressed. |
2025/04/03 | Plumbing | Rough-in | Passed | Paul Nitz | Re Inspection new bathroom north side 4 th floor section 7 |
2025/04/03 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Re Inspection new bathroom north side 4 th floor section 7 |
2025/04/02 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | North new bathroom 4th floor section 7 1) not holding water and vent not supported |
2025/04/02 | Plumbing | Rough-in | Failed | Paul Nitz | North new bathroom 4th floor section 7 1) not holding water |
2025/04/02 | Plumbing | Water Piping & Test | Failed | Paul Nitz | North new bathroom 4th floor section 7 1) Vent not supported |
2025/04/01 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed framing new north bathroom 4th floor section 7. The following items need to be addressed/corrected: 1) Simpson clips were not used as shown in detail 5/S7.01. Contractor to verify steel angles area acceptable connections in lieu of Simpson clips with EOR or install Simpson clips. 2) Holes in angle connections along the front wall (detail 6/S7.01) and back wall appeared oversized for the screws being used for connection of angle to LG roof joists. Washers must be installed. 3) Blocking between the end joists and exterior CMU walls was not installed. Blocking must be installed. Items above were discussed with the Contractor prior to FSU BCA leaving the site. Once items are addressed, a re-inspection may be scheduled. Item 1 was addressed by the EOR with acceptance via email. Email filed in Transmittals-correspondence folder. Items 2 and 3 were resolved via re-inspection on 4/2/2025 |
2025/03/27 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls for ne bathroom 4th floor section 13, final lift |
2025/03/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinnforcing steel for 4th floor section 13 new bathroom rebar prior to grout installation, 2nd lift |
2025/03/17 | Building/Structural | Masonry | Conditional | Kody Boswell | New bathroom section 13 on 4th floor 1st lift grout rebar. FSU BCA arrived on site and the Subcontractor had grouted most of the walls, so FSU BCA was not able to review. Contractor stated the Threshold Inspector (TI) had reviewed and passed the reinforcing. Result is conditional pending verification of the TI's approval. FSU BCA contacted TI via email and is awaiting a response. |
2025/03/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the elevated slab infill on 4th level, section 13 |
2025/03/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top put lift of new bathroom 4th floor section 7 |
2025/02/27 | Building/Structural | Masonry | Passed | Kody Boswell | Re inspection for header rebar for new bathroom section 7 |
2025/02/26 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the new bathroom walls, 4th floor, section 7. Reinforcing steel was in compliance with the structural drawings except for the east wall. The horizontal reinforcing header for the door opening on the east wall did not have proper bearing over jamb reinforcing. This was discussed with the contractor while on site and must be corrected and called in for re-inspection. Contractor may proceed with grouting the north, south, and west walls. |
2025/01/29 | Plumbing | Final Plumbing | Passed | Paul Nitz | |
2025/01/16 | Plumbing | Storm Piping & Test | Failed | Paul Nitz | Smoke test 1) smoke test was good, missing multiple horizontal and vertical hangers |
2024/11/19 | Plumbing | Storm Piping & Test | Conditional | Paul Nitz | Discuss testing options 1) smoke detection will be allowed for the storm drain only |
2024/11/13 | Plumbing | Underground | Conditional | Paul Nitz | Storm line tie in by gate L 1st floor 1) Pressure test required before final inspection |
2024/11/13 | Plumbing | Storm Piping & Test | Conditional | Paul Nitz | Storm line tie in by gate L 1st floor 1) pressure test required before final inspection |
2024/10/17 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel and steel decking for 2 concrete repair areas noted on sheet S2.03B (ASI-09): (1) Between grids K-L/2N-3N (2) Between grids K-L/2S-3S Result is conditional pending the WWR mesh is tied down to epoxied bars prior to concrete placement. Threshold inspector to verify. |
2024/08/30 | Fire Safety | Final Egress/Emergency Lights | Passed | Mary Creason | Conditional certification of occupancy for the 2024 football season - Fire extinguishers to be provided by FSU, and mounts provided by MCJV to be placed in back of house areas adjacent to the temp concession stands. - Temporary illuminated Exit Signs to be placed in locations per the design documents. 12 AFF. To be installed today and tomorrow. - Egress Lighting Completion - We observed the battery-power operation of the high-bay fixtures in the event of a power outage. No issues were observed. A temporary CCO is approved by Fire for the 2024 season Per Sam Sever and Jason Greisel TFD and Todd Pierce State Fire Marshal office |
2024/08/30 | Building/Structural | Final Building | Conditional | Kody Boswell | FSU BCA walked the site to review compliance with the contract documents in order to issue a Conditional Certificate of Occupancy for the upcoming football season. The following need to be addressed prior to the issuance of the Conditional Certificate of Occupancy: 1) Steps at 7 lower vomitories need yellow paint stripes to indicate a change in height. 2) Stair stringer connection to header channel for stairs between grids 11S-12S needs to be corrected. 3) Change in elevation exceeding 1/2" where new field slab and existing field slab at grids A/16S needs to be addressed. Contractor to install flat plate to remedy trip hazard. Per conversation with the Contractor, David Zigler, items stated above would be complete over the weekend prior to the first football game on Monday (9/2/2024) and would provide photos to FSU BCA FSU BCA received pictures addressing the items above on Saturday (8/31) |
2024/08/29 | Fire Safety | Final Egress/Emergency Lights | Passed | Sam Sevor | Generator transfer switch was tested and Emergency lights with State Fire Marshal, Todd --- Test Passed |
2024/08/19 | Electrical | Ceiling Rough-in | Passed | James Melvin | 1st floor commissary building section 9 |
2024/08/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the bosster storage walls. Reviewed reinforcing steel for the 2nd lift of masonry walls for the booster storage room in the area between grids C-E/3N-5N. Reinforcing over door openings was corrected from prior failed inspection. |
2024/08/15 | Electrical | Ceiling Rough-in | Passed | James Melvin | Commissary building 1st floor section 10 |
2024/08/15 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of masonry walls for the booster storage room in the area between grids C-E/3N-5N. Reinforcing over door openings was not installed per detail 14 on sheet S5.21. This was discussed with the Contractor and threshold inspector. Re-inspection required after reinforcing is installed. |
2024/08/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of masonry walls for the booster storage room in the area between grids C-E/3N-5N. |
2024/08/08 | Fire Safety | Hydro-Test | Passed | Mary Creason | hydro test for 2 hours Start 9:01am at 222psi and End at 11:21am 224psi Passed Visual on pipe/heads inside vistors locker room/maintenance shop/equipment shop/breakroom |
2024/08/08 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | hydro test for 2 hours Start 9:01am at 222psi and End at 11:21am 224psi Passed Visual on pipe/heads inside vistors locker room/maintenance shop/equipment shop/breakroom |
2024/07/25 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed structural steel framing for new stairs and reinforcing steel for new landings between column line 8s-18s |
2024/07/24 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Section 4 floor drains x 4 |
2024/07/24 | Building/Structural | Framing | Postponed | Kody Boswell | Stairs in section 16-12. Contractor contacted FSU prior to arrival on site to postpone the inspection to a later date. |
2024/07/24 | Building/Structural | Slab | Postponed | Kody Boswell | Stairs and landings section 12-16. Contractor contacted FSU prior to arrival on site to postpone the inspection to a later date. |
2024/07/19 | Electrical | Ground | Passed | James Melvin | notes*Building ground inspection by Gate C . Gate D was inspected a week ago *notes* |
2024/07/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for elevated slabs on the upper concourse between grids 2N-9N |
2024/07/11 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S Missing reinforcing from 7/10/2024 inspection was installed and deck was cleaned off. |
2024/07/11 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S Missing reinforcing from 7/10/2024 inspection was installed and deck was cleaned off. |
2024/07/10 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S There was some reinforcing that was not installed per detail 7/S6.13 and there was excessive debris in some areas. Contractor to install reinforcing steel and clean off deck. |
2024/07/09 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU prior to arrival on site to cancel inspection and postpone to a later date. |
2024/06/27 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the elevated slab at the upper concourse level located in the area between grids F-G/7S-19S |
2024/06/26 | Building/Structural | Slab | Postponed | Kody Boswell | 4th floor deck columns 7 south- 19s Contractor contacted FSU BCA prior to arriving on site to cancel and postpone inspection. Contractor will reschedule for another date. |
2024/06/26 | Building/Structural | ADA | Passed | Kody Boswell | Reviewed 1st floor ramps for compliance with FBC. Ramp slopes were within standards set by FBC. Connor Ross was present during the walk through. |
2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Gate K fire line underground = Hydro, visual and flush for west side HYDRO Start: 8am at 224psi Finish 10:20am at 225psi Visual DR18 Flush - passed |
2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Gate K, J, L and section 11: completed today - HYDRO, Visual and Flush Paperwork completed |
2024/06/26 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Gate K fire line underground = EAST SIDE: Hydro, visual and Flush HYDRO Start at 8:10am 225psi Finished 10:25am 226psi Visual DR18 pipe Flush - passed |
2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Section 11 fire line underground = new fire riser line : flush conducted |
2024/06/21 | Plumbing | Rough-in | Passed | Dwayne Mahony | |
2024/06/17 | Plumbing | Rough-in | Passed | Paul Nitz | sections 14-13 and 16-15 only |
2024/06/12 | Building/Structural | Slab | Passed | Paul Nitz | N side 4th floor elevated slab |
2024/06/12 | Plumbing | Rough-in | Failed | Paul Nitz | min slope not met on storm drain fbc p1106.2 |
2024/06/10 | Plumbing | Rough-in | NOT READY | Paul Nitz | |
2024/06/05 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for new masonry walls located B-C/1E-2S |
2024/06/05 | Plumbing | Rough-in | Passed | Paul Nitz | |
2024/06/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the ramp and stair footer in the area between grids B-E/8S-9S |
2024/05/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade ramp located between grids A-C/5S-6S |
2024/05/29 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several ramps (slab on grade) |
2024/05/28 | Plumbing | Underground | Passed | Paul Nitz | Section 12/13 |
2024/05/24 | Building/Structural | Slab | Passed | Kody Boswell | Reinforcing steel for ramp slab on grade. Inspection deferred to threshold inspector. See correspondence folder for photos from Contractor. |
2024/05/23 | Plumbing | Rough-in | Passed | Neely Lewis | 1 floor inlet in lower level ramp |
2024/05/23 | Building/Structural | Slab | Passed | Kody Boswell | |
2024/05/22 | Plumbing | Rough-in | Passed | Paul Nitz | |
2024/05/22 | Building/Structural | Framing | Kody Boswell | Meeting held by the Contractor of procedures for weld inspections. FSU BCA met the Contractor, Testing Agency and Threshold Inspector in the field to discuss welding inspections. | |
2024/05/21 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following slab on grade ramps: 1) Between grids A-C/2N-3N 2) Between grids A-C/8N-9N 3) Between grids A-C/11N-12N |
2024/05/17 | Fire Safety | Hydro-Test | Passed | Mary Creason | test started at 7:45am at 215psi and stopped at 10:10am at 215psi. Passed test. |
2024/05/17 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Visual passed, hydro passed and flush passed |
2024/05/16 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel and steel deck attachment for a portion of the slab on deck located in the area between grids A-B/7S-16S. |
2024/05/15 | Plumbing | Underground | Passed | Paul Nitz | check slope on ramp 9/10 at next inspection |
2024/05/15 | Plumbing | Rough-in | Passed | Paul Nitz | check slope on ramp 9/10 at next inspection |
2024/05/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following slab on grade ramps: 1) In the area between grids A-C/5N-6N 2) In the area between grids A-C/8N-9N |
2024/05/13 | Plumbing | Underground | NOT READY | Neely Lewis | |
2024/05/13 | Plumbing | Rough-in | NOT READY | Neely Lewis | |
2024/05/09 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel and steel deck attachment for a portion of the slab on deck located in the area between grids A-B/7N-7S. |
2024/05/06 | Building/Structural | Slab | Passed | Dwayne Mahony | Excess foam plastic is to be removed, T.I. will verify. |
2024/05/03 | Plumbing | Rough-in | Passed | Dwayne Mahony | Approved south end of grandstand lowest level, 7 area drains, and two lower vomitory ramps. |
2024/05/01 | Plumbing | Rough-in | Passed | Neely Lewis | partial only. |
2024/04/30 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a stair footing located in the area between grids B-C/17S-18S |
2024/04/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 2 slab on grade areas that were removed to install underground pipe. Reinforcing consisted of steel doweled into existing concrete at 2'-0" spacing along with WWR. |
2024/04/25 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | |
2024/04/10 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a wall footing for the north wall at the visitor's locker room |
2024/04/02 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls located along grids 14S, 15S and 16S |
2024/03/28 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 10S, 11S, 12S and 13S. |
2024/03/26 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following: - Grade beam along grid 16N - Walls along grids 8S, 9S, 14N and 15N |
2024/03/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 2S, 3S, 4S, 5S, 6S and 7S |
2024/03/18 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 2N and 1E. |
2024/03/15 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following grade beams (GB) and walls: - GBs along grids 11S, 12S, 13S, 14S, 15S and 16S - Walls along grids 3N, 4N, 5N and 6N |
2024/03/13 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 2S thru 10S. |
2024/03/11 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/03/07 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to postpone the inspection to a later date. |
2024/03/06 | Building/Structural | Cast in Place Wall | Passed | Kody Boswell | Reviewed reinforcing steel for walls on top of grade beams located along grids 7N, 8N, 9N ,10N, 11N, 12N, 13N, 14N, 15N and the wall in the area between grids A-B/7N-16N. The deficiencies noted on 3/4/24 inspection were corrected. |
2024/03/05 | Building/Structural | Cast in Place Wall | Postponed | Kody Boswell | Contractor contacted FSU to postpone the inspection to a later date due to weather. |
2024/03/04 | Building/Structural | Cast in Place Wall | Failed | Kody Boswell | Reviewed reinforcing steel for walls on top of grade beams located along grids 7N, 8N, 9N ,10N, 11N, 12N, 13N, 14N, 15N and the wall in the area between grids A-B/7N-16N. There were several missing embeds at expansion joint locations and there was insufficient development length for #7 bars at multiple locations. Contractor to reschedule inspection after corrections are made. |
2024/03/01 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 1E, 2N, 3N, 4N, and 5N. The deficiencies noted on the 2/29/24 inspection were corrected. |
2024/02/29 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 2N, 3N, 4N, and 5N. Each of these grade beams were stepped and were supposed to be reinforced per detail 4/S5.01. Additional reinforcement called out in the detail going from top steel of top portion of grade beam to bottom steel of bottom portion of grade beam was not placed correctly. Also, the last stirrup located closest to the step did not encase the top steel of the bottom portion of grade beam. |
2024/02/27 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | |
2024/02/27 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/02/23 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/02/22 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for grade beams located along grids 6N, 7N, 8N, 9N and 10N. Reinforcing steel at the field side was not in place per detail 7/S5.01. This was discussed with the Contractor. Contractor to contact EOR for direction due to unforeseen conditions. An RFI will be generated. |
2024/02/15 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to postpone grade beam reinforcing steel inspection to a later date. (KB) |
2024/02/14 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for grade beams at the lower concourse located between gridlines 15N, 14N, 13N and 12N. Where new grade beams tied to existing concrete columns there was insufficient longitudinal steel length and spacing between existing concrete face and new reinforcing ties. Per the EOR the first new reinforcing tie should be 2" to 3" off of existing concrete. This was not the case for each side of the 4 grade beams reviewed. Contractor to fix reinforcing steel prior to concrete placement. BNI (threshold) to verify reinforcing is corrected prior to concrete placement. (KB) |
2024/02/09 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to cancel today's inspection and postpone to a later date. Inspection request was for grade beam reincorcing steel. (KB) |
2024/02/08 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to cancel today's inspection and postpone to a later date. Inspection request was for grade beam reincorcing steel. (KB) |
Building/Structural | Slab | Cancelled | Kody Boswell | Structual slab 4th section 13 column 10s line k. Contactor contacted FSU BCA on 3/7/25 to cancel inspection. | |
Electrical | Wall Rough-in | Passed | Rocky Wilde | New north bathroom 4th floor 1st lift of grout 4 in wall boxes | |
Building/Structural | Masonry | Passed | Rocky Wilde | New north bathroom 4th floor 1st lift of grout |
BCA Project #: 23-03455- Doak Campbell - East Stands Improvements Phase I
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/03/27 | Building/Structural | Masonry | NOT READY | Paul Nitz | Final lift new s bathroom 4th floor section 13 |
2025/03/11 | Building/Structural | Slab | NOT READY | Kody Boswell | FSU BCA arrived on site and was informed by the Subcontractor that the elevated slab reinforcing steel was not ready for inspection. FSU BCA then left the site. |
2025/01/15 | Plumbing | Storm Piping & Test | Failed | Paul Nitz | Smoke test |
2025/01/07 | Plumbing | Storm Piping & Test | NOT READY | Paul Nitz | Smoke test |
2024/12/16 | Building/Structural | Slab | Passed | Kody Boswell | New Plumbing drains section 5 on the 4th floor rebar |
2024/08/30 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Temporary CCO is approved for the 2024 season by Fire. Sam Sever, Fire Manaager FSU, Jason Griisel TFD, and Todd Perce, State Fire Marshal office conducted a walk thru on 8/27/2024 and conditions were good. |
2024/08/27 | Building/Structural | Other | Conditional | Paul Nitz | Compliance for football game 1) edge protection required on ramps fbc a405.9 2) protruding objects need to be protected fbc a307.0 |
2024/08/27 | Electrical | Ceiling Rough-in | Passed | James Melvin | Visitors locker room |
2024/08/23 | Building/Structural | ADA | Failed | Paul Nitz | Preliminary inspection for compliance in preparation for football game 1) ADA 303.2 vertical change on third floor 2)deburring hand rails 2) ADA 405.9 Edge protection on ground leve |
2024/08/23 | Failed | Paul Nitz | Preliminary inspection for compliance in preparation for football game 1) ADA 303.2 vertical change on third floor 2)deburring hand rails 2) ADA 405.9 Edge protection on ground level | ||
2024/08/22 | Electrical | Ceiling Rough-in | Passed | James Melvin | Commissary building 1st floor section 9 |
2024/08/21 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection visitors locker room |
2024/08/21 | Building/Structural | Insulation | Passed | Paul Nitz | Commisary building 1st floor section 9 |
2024/08/21 | Building/Structural | Roofing | Passed | Paul Nitz | Commisary building 1st floor section 9 |
2024/08/20 | Plumbing | Underground | Passed | Paul Nitz | Storm line tie in by gate J |
2024/08/20 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Locker room bulkhead framing |
2024/08/02 | Building/Structural | Framing | Passed | Paul Nitz | Drywall framing in visitors locker room section 13/14 |
2024/08/02 | Building/Structural | Slab | Passed | Paul Nitz | Plumbing repair at existing ramp at section 4 (column 19n- 16n) 1st floor |
2024/08/02 | Plumbing | Rough-in | Passed | Paul Nitz | Plumbing repair at existing ramp at section 4 (column 19n- 16n) 1st floor |
2024/07/11 | Electrical | Ground | Passed | James Melvin | Ground rods for building steel 1) Al Smythe performed the inspection, it was from gate D to the first elevatoer shaft |
2024/04/29 | Fire Safety | System Flush | Passed | Mary Creason | UG near gate J - flushed - approved |
2024/04/29 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Hydro and visual of piping, tracer line, bulimous paint and restraints on line into sprinkler riser room. Hydro start 810am 220psi and finished at 1020am at 220psi. Passed |
2024/04/25 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Visual and hydro on UG piping at gate J. Hydro start at 8:10am at 205psi and end 10:10am at 2:05psi (See shop drawings for exact location) |
2024/04/25 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | |
2024/04/25 | Fire Safety | Hydro-Test | Passed | Mary Creason | Visual and hydro of pipe passed. Hydro start 8:10am and ended 10:10am 205 psi Pipe is located right next to J gate. (see shop drawings for exact location) |
2024/01/24 | Electrical | Ceiling Rough-in | Conditional | Dwayne Mahony | Panel 94 deadfront piece is missing. Replacement of this piece is mandatory since new load is being added to this panel, per Existing Building code section 808.2. |
2024/01/22 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | Inspected new lights and wiring on lower ramps. |
Electrical | Underground | Alex Masterton | Gate D , Small section of 15kva duct bank encasement Revise project to West Stands |
BCA Project #: 23-03453- Fine Arts Bldg. - Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspection |
2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspection |
2023/12/21 | Building/Structural | Roofing | Postponed | Tom Deckert | In-Progress Inspection - Cap Sheet |
2023/12/06 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection Reviewed installation of cap sheet on one low roof and the cleaning of existing material where cap sheet was to be installed (KB) |
Building/Structural | Roofing | Postponed | Kody Boswell | Final Roofing/Building Inspection - Had to Reschedule due to weather Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
Building/Structural | Final Building | Postponed | Kody Boswell | Final Roofing/Building Inspection - Had to Reschedule due to weather Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
Building/Structural | Final Building | Postponed | Kody Boswell | Final Roofing/Building Inspection Inspection has been postponed to a later date due to incoming weather | |
Building/Structural | Roofing | Postponed | Kody Boswell | Final Roofing/Building Inspection Inspection has been postponed to a later date due to incoming weather |
BCA Project #: 23-03446- Housewright - Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/27 | Building/Structural | Roofing | Conditional | Kody Boswell | Final Roof Inspection Result is conditional pending drain installation at two locations on the highest roof level. Contractor to send photos after installation is complete. |
2024/06/27 | Building/Structural | Final Building | Conditional | Kody Boswell | Final Roof Inspection Result is conditional pending drain installation at two locations on the highest roof level. Contractor to send photos after installation is complete. |
2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspections |
2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspections |
2023/12/21 | Building/Structural | Roofing | Postponed | Tom Deckert | In-Progress Inspection - Cap Sheet |
2023/12/06 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection |
2023/11/09 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection |
BCA Project #: 23-03433- Soccer Sideline Canopy Improvement
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/01/12 | Building/Structural | Roofing | Conditional | Kody Boswell | Reviewed new aluminum supports for new roof panel installation and reviewed new roof panel attachment. Aluminum supports were in substantial compliance with the contract documents. Screw attachment of panels to structure were in substantial compliance with the contract documents and FL Product Approval. Screw attachment at panel sidelaps had not been installed yet. FSU to verify installation during next inspection. (KB) |
BCA Project #: 23-03430- Parking Garages 1-6 CCTV Upgrade
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/12/05 | Electrical | Final Electrical | Conditional | Dwayne Mahony | Contact Todd Jones for specific site inspection time. 850-544-4424 Approved garage 5 final inspection in full. |
BCA Project #: 23-03418-B Doak Campbell - West Stands Renovation - (Pkg. 3 & 4)
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/15 | Plumbing | Water Piping & Test | Passed | Paul Nitz | North women's room 3rd floor overhead 1) additional supports and insulation needs to be added at insulation inspection |
2025/04/15 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | North women's room 3rd floor overhead |
2025/04/15 | Electrical | Wall Rough-in | Passed | Rocky Wilde | In-wall rough inspection on 3rd floor for the south grab and go and the speed of concessions area. |
2025/04/14 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed sub roof framing for field club area B, between grids WA-WC/W4S-W11S, specifically the 2 areas noted in the 8am inspection. |
2025/04/14 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | north women's restroom, north men's room, and speed of concession on 3rd floor upper concourse. |
2025/04/14 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | north women's restroom, north men's room, and speed of concession on 3rd floor upper concourse. |
2025/04/14 | Electrical | Wall Rough-in | NOT READY | James Melvin | south grab and go and speed of concession 3rd floor, upper concourse. |
2025/04/14 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed sub roof framing for field club area B, between grids WA-WC/W4S-W11S There were 2 areas where framing was not installed per approved shop drawings. This was discussed with the Contractor on site. |
2025/04/11 | Building/Structural | Framing | Passed | Paul Nitz | Exterior framing on founders area B. |
2025/04/11 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | 3rd floor bathroom, north women's restroom. pressure drain and waist overhead, and domestic water test inspection. |
2025/04/11 | Building/Structural | Framing | Passed | Paul Nitz | Sub roof framing on founders for suites. |
2025/04/11 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | MCJV is requesting a reinforcement inspection for remainder of south wall on precast and big overpour on lower bowl of founders precast, we would also like to request an inspection for 6th floor loge boxes before cover-up. thanks |
2025/04/11 | Building/Structural | Structural | Passed | Paul Nitz | Steel inspection for the north bar on main concourse. |
2025/04/11 | Building/Structural | Framing | Passed | Paul Nitz | Field club exterior framing area A and framing around north stairs. |
2025/04/11 | Building/Structural | Slab | Passed | Paul Nitz | MCJV is requesting a reinforcement inspection for remainder of south wall on precast and big overpour on lower bowl of founders precast, we would also like to request an inspection for 6th floor loge boxes before cover-up. thanks |
2025/04/10 | Building/Structural | Framing | Passed | Paul Nitz | Field club exterior framing on areas A and B. Re-inspection from Friday with engineers' detail. |
2025/04/10 | Plumbing | Water Piping & Test | Cancelled | Paul Nitz | Testing overhead on Area A upper concourse. |
2025/04/10 | Plumbing | Stack Piping & Test | Cancelled | Paul Nitz | Testing overhead on Area A upper concourse. |
2025/04/09 | Plumbing | Water Piping & Test | Passed | Paul Nitz | men's room 01.05.01 and women's room 01.04.01 |
2025/04/09 | Building/Structural | Framing | partial | Paul Nitz | Framing inspection on upper concourse area B for speed of service concession and concession prep. 1) Front and back wall are not complete |
2025/04/09 | Plumbing | Rough-in | Passed | Paul Nitz | men's room 01.05.01 and women's room 01.04.01 |
2025/04/09 | Building/Structural | Slab | Passed | Paul Nitz | MCJV is requesting a reinforcement inspection for north founders overpour and south wall on existing structure. thanks |
2025/04/08 | Building/Structural | Wall/Ceiling | Conditional | Kody Boswell | Reviewed reinforcing steel for south wall curb on precast, booster pump pad on south side main concourse. Contractor was finishing installing reinforcing steel at time of inspection. Result is condtional pending receipt of photos from Contractor verifying remaining reinforcing steel is installed. Photos received on 4/9/2025. Filed in job folder. |
2025/04/08 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for south wall curb on precast, booster pump pad on south side main concourse. Contractor was finishing installing reinforcing steel at time of inspection. Result is condtional pending receipt of photos from Contractor verifying remaining reinforcing steel is installed. Photos received on 4/9/2025. Filed in job folder. |
2025/04/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for founders lvl, area A private dining, kitchen prep, and storage area |
2025/04/07 | Electrical | Wall Rough-in | Passed | James Melvin | Partial in-wall rough-in speed of concession on 4th floor and north Founders area. |
2025/04/07 | Electrical | Wall Rough-in | Passed | James Melvin | Partial in-wall rough inspection in the north founders and the south speed of concession area. |
2025/04/04 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for topping slabs on founders level, area B |
2025/04/04 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing for south endzone, levels 4 and 6, areas C and D |
2025/04/04 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for interior walls for the womens restroom, upper concourse, spltting areas A and B. Result is conditional pending installation of 1 vertical stud, located along the east wall near the south entrance. |
2025/04/03 | Electrical | Wall Rough-in | Failed | James Melvin | Partial in-wall rough on Founders area-A. 1) support requirements not met for electrical equipment |
2025/04/02 | Building/Structural | Structural | Postponed | Kody Boswell | South endzone Party decks. FSU BCA was on site for another inspection. During this time the Contractor contacted FSU BCA to cancel/postpone inspection to a later date. |
2025/04/02 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for Exterior soffit for main concourse area A north Field Club wall. |
2025/04/02 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for north and south founders level overpour and part of the south wall on precast located at the expansion joint between new and existing construction. Contractor was not finished installing formwork on north founders overpour so clear cover between reinforcing steel and face of concrete was not verified. After discussion with Contractor it is acceptable to FSU BCA for photos to be provided verifying clear cover is per contract documents. Result is condtional pending receipt of photos. |
2025/04/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for Upper Concourse area B restroom/mechanical room on existing slab. Walls are topped out. |
2025/04/01 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing screw inspection for store front framing, area B |
2025/04/01 | Building/Structural | Wall/Ceiling | Postponed | Kody Boswell | MCJV is requesting a reinforcement inspection for south wall on precast. Inspection was postponed to a later date |
2025/04/01 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for Upper Concourse area B men's bathroom. |
2025/03/31 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing copper supply and pvc drain/vent on upper concourse. Center women’s restroom and southern grab-n-go |
2025/03/31 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing copper supply and pvc drain/vent on upper concourse. Center women’s restroom and southern grab-n-go |
2025/03/28 | Building/Structural | Slab | Passed | Paul Nitz | MCJV is requesting a reinforcement inspection for north founders upper level slab. Concrete is set for 8. thanks |
2025/03/28 | Building/Structural | Framing | Passed | Paul Nitz | Framing on main concourse area B store front framing. |
2025/03/28 | Building/Structural | Framing | NOT READY | Paul Nitz | Upper concourse both side grab and go concession framing. Planning on doing founders level first and then go to the upper concourse. |
2025/03/28 | Electrical | Wall Rough-in | Passed | Rocky Wilde | founders level area-A partial inwall rough |
2025/03/28 | Plumbing | Specialty Piping | Passed | Paul Nitz | Checking overhead plumbing insulation on Upper Concourse Area B |
2025/03/27 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for south side founders level slab |
2025/03/27 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw Inspection for main concourse area B south wall |
2025/03/27 | Building/Structural | Roofing | Passed | Kody Boswell | Upper concourse area A roofing progress inspection. Insulation, cover board, and cap sheet |
2025/03/26 | Building/Structural | Structural | Passed | Kody Boswell | South endzone level 4 and level 6 party decks. |
2025/03/26 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the north party porch on founders level. |
2025/03/26 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for upper concourse area B south restroom and mechanical room, 1st lift |
2025/03/26 | Building/Structural | Masonry | Passed | Kody Boswell | Inspection for elevator 5, top out lift |
2025/03/25 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a curb on founders level, area A |
2025/03/25 | Building/Structural | Framing | Passed | Kody Boswell | In wall blocking founders level, area A |
2025/03/25 | Building/Structural | Framing | Passed | Kody Boswell | Exterior framing in area a. Soffit framing also. |
2025/03/25 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for elevator 5, 7th lift, area B |
2025/03/24 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection for sheathing on main concourse field club wall, area B |
2025/03/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel roof decking at south electrical room on main concourse, area A |
2025/03/21 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for elevated slab on deck on founders level, area A and area B |
2025/03/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG exterior framing on founders level area a. |
2025/03/20 | Plumbing | Specialty Piping | Passed | Paul Nitz | Inspecting copper insulation for in-wall close up |
2025/03/20 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel joist and bridging for the south electrical room, main concourse, area B |
2025/03/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of field club walls on main concourse, area B, along grid WB/W6S-W8S |
2025/03/19 | Building/Structural | Structural | Passed | Kody Boswell | Inspecting party porches at south endzone. Reviewed structural steel framing for several areas in the south endzone where stadia is being modified, 4th and 6th levels, areas C and D |
2025/03/19 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed exterior LG framing for kitchen area in area B, main concourse, between grids W5S-W8S. Result is conditional pending clarification on 2 framed louver openings (4' and 6' openings). With exception to louver openings, LG wall framing appeared to be in substantial compliance with the contract documents. |
2025/03/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for elevator 5, 6th lift, area B |
2025/03/18 | Building/Structural | Roofing | Passed | Kody Boswell | Detailing around penetrations in progress inspection for main concourse. This was an in-progress inspection of roofing installation around roof penetrations. |
2025/03/18 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for SOG for area A, sequence 3. Result is conditional pending the following items being addressed and verified by the Threshold Inspector prior to concrete placement: 1) Smooth dowel installation along previously placed concrete and along preceast elements. 2) At thickened slab edges in various locations, there are several bottom cover issues. 3) Diamond slip dowel installation along construction joint at the north end. FSU BCA got a verbal approval from the Threshold Inspector that the items above were addressed prior to concrete placement. |
2025/03/17 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 5th lift of elevator 5 masonry walls, area B |
2025/03/14 | Building/Structural | Structural | Passed | Paul Nitz | Party porch decking on level 4. |
2025/03/14 | Building/Structural | Masonry | NOT READY | Paul Nitz | Interior cmu inspection for area a upper concourse. |
2025/03/14 | Building/Structural | Masonry | NOT READY | Paul Nitz | Elevator 5 cmu inspection. |
2025/03/14 | Fire Safety | Opening Protections | Passed | Mary Creason | Looking at fire wall labeling for cover up in area a main concourse. |
2025/03/14 | Electrical | Ground | Passed | Rocky Wilde | 15kv switch grounding at Gate D |
2025/03/14 | Building/Structural | Framing | Passed | Paul Nitz | Subroof framing on founders level. |
2025/03/14 | Building/Structural | Structural | Passed | Paul Nitz | Stair 1 inspection. |
2025/03/13 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of several interior cmu walls on upper concourse, area a. |
2025/03/13 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed reinforcing steel for portions of the elevated slab on deck and topping slab over foam for the founders level party porch, area B. Corrections were made to address comments on failed slab inspection earlier today. Contractor installed the correct size rebar for the topping slab over foam and corrected the spacing for the Z-bars for the composite slab. |
2025/03/13 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for portions of the elevated slab on deck and topping slab over foam for the founders level party porch, area B. Reinforcing steel for topping slab over foam was not the correct size rebar. Contract drawings show #5@8in OC, contractor had #4@8in OC tied in place. Reinforcing steel (Z-bars) for elevated slab on deck was the incorrect spacing. Contract drawings show #5@6in OC, contractor had #5@12in OC. Contractor to correct incorrectly sized and incorrectly spaced reinforcing |
2025/03/12 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for curbs for south restroom on existing elevated slab on upper concourse, area B. Result is conditional pending side cover for reinforcing being addressed. |
2025/03/12 | Building/Structural | Slab | NOT READY | Kody Boswell | FSU BCA arrived on siteto review reinforcing steel for party porch at founders level, area B. Contractor was not ready for inspection. |
2025/03/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for elevator 5 in area B, 3rd lift |
2025/03/11 | Plumbing | Underground | Passed | Paul Nitz | Testing underground sanitary line at Gate B. |
2025/03/11 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Rough in duct work branches on main concourse corridor |
2025/03/11 | Building/Structural | Footing | Failed | Paul Nitz | Last section of conduit in the Duct bank at Gate D behind bus stop by sidewalk . 1) red die not installed per plans nor installation instructions, contractor is going to ask the electrical engineer if they will allow a alternative method in leu of the red die. Contractor is ok to cover the trench so that other trades can continue their work but is aware that he may have to uncover to address not following the plans. |
2025/03/07 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for SOG reinforcement for north bathroom, area A. |
2025/03/07 | Fire Safety | Opening Protections | Passed | Mary Creason | Nova will be onsite through out the day for fire stopping on founders level. Shannon Burgess from NOVA was on site to do inspections. |
2025/03/07 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior cmu walls, area a, upper concourse, 2nd lift |
2025/03/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed joist framing, bridging, and RTU frame at north custodial room on upper concourse. |
2025/03/07 | Building/Structural | Footing | Failed | Paul Nitz | Concrete inspection for the duct bank at Gate D by the ramp . This is for the electrical duct bank for west stands 1) minimum coverage not met as per plans, 3 min and they have less than an 1 inch in many locations. 2) red concrete die was not installed per manufacture installation instructions. Contractor said that he had 10 cans of die and my calculations said it would require around 41 of the cans that they were using |
2025/03/07 | Plumbing | Specialty Piping | Failed | Paul Nitz | Copper insulation inspection of upper con women’s bathroom Area A 1) insulation and clamps are missing |
2025/03/07 | Plumbing | Underground | Passed | Paul Nitz | Inspecting the remaining grease and sanitary lines underground at L4 |
2025/03/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for elevator 1 in area A, 6th lift. |
2025/03/06 | Plumbing | Specialty Piping | Failed | Paul Nitz | Checking copper insulation on founders level in prep for drywall. 1) water arresters are missing |
2025/03/06 | Electrical | Underground | Failed | James Melvin | 40' of duct bank at Gate D . Exiting building by ramp . 1) red die not installed per plans nor installation instructions, contractor is going to ask the electrical engineer if they will allow a alternative method in leu of the red die. Contractor is ok to cover the trench so that other trades can continue their work but is aware that he may have to uncover to address not following the plans. |
2025/03/06 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed decking at the south bar roof, area B. Fasteners were not at the correct spacing at deck side laps (12" OC per structural drawings). This was discussed with the contractor prior to FSU BCA leaving the site. |
2025/03/06 | Building/Structural | Slab | NOT READY | Kody Boswell | Reviewed reinforcing steel for SOG for north bathroom, area A. Contractor was not finished installed reinforcing. |
2025/03/06 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed steel framing for level 4 party deck, area D, 2 east most bays. Result is conditional pending engineer approval for cantilever condition for horizontal framing occuring at existing steel columns. 3 locations. This condition occurs in each bay. |
2025/03/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for elevator 5, area A, 1st lift |
2025/03/05 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Visual inspection for rough in at entry portal soffit gate c area. *Dry Concealed Pendants (Sprinkler) |
2025/03/05 | Fire Safety | Opening Protections | Passed | Sam Sevor | Nova will be onsite through out the day doing in progress inspections for fire stopping on founders level. *Observed Concealed dry pendants in Soffit area |
2025/03/05 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior masonry walls on upper concourse, area A, 2nd lift |
2025/03/05 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG interior framing on founders level, areas A and B. Framing locations reviewed can be seen on "LG Framing Markups", filed in Inspections folder. Green highlighted walls on markup sheets have a passing result. |
2025/03/04 | Plumbing | Underground | Passed | Paul Nitz | -Testing Main Con L4 underground storm. -Pressure testing Upper Con women’s restroom copper and drain/vent |
2025/03/04 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing on level 2 (Founders lvl) for the exterior corridor wall, between grids W1-W8S (area B) |
2025/03/04 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | -Testing Main Con L4 underground storm. -Pressure testing Upper Con women’s restroom copper and drain/vent 1)missing clamps 2) missing water hammer 3) add support |
2025/03/04 | Plumbing | Water Piping & Test | Passed | Paul Nitz | -Testing Main Con L4 underground storm. -Pressure testing Upper Con women’s restroom copper and drain/vent |
2025/03/04 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed roof decking on the upper concourse seq 2 |
2025/03/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of several interior walls on upper concourse, area a. |
2025/03/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 5th lift of elevator 1 masonry walls |
2025/03/03 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for a portion of the main concourse slab on grade, located in the approximate area between grids WB-WD/W4N-W8S. There were several issues, see below: - Reinforcing for isolation pads between grids W6S-W8S was not installed. Contractor was still installing vapor barrier on grade at time of inspection. - Reinforcing for slab turndown and curbs between grids W4N-W2N and W2S-W5S was not installed. Contractor had not excavated slab turndown. Vapor barrier and WWR was in place. Vapor barrier and WWR must be removed and reinstalled after slab turndown is excavated. - Construction joints were not installed along grid WB/W4N-W4S and along grid W4N/WB-WD. Contractor was not actively working on installing formwork at time of inspection. After discussion with the Bo Anthony and Kaleb Phillips, FSU BCA agreed to grant a conditonal passing result for this inspection with the understanding that the items stated above would be corrected/addressed prior to concrete placement in those areas specified. FSU BCA to rereview areas affected by above comments. Contractor is not to place concrete in those areas until FSU BCA approval. FSU BCA confirmed items above were addressed prior to concrete placement. |
2025/03/03 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing on level 2 (Founders lvl) for the exterior corridor wall, between grids W1-W8S (area B) |
2025/03/03 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 4th lift of masonry walls for elevator 1, area A |
2025/02/28 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift for elevator 1, area A |
2025/02/28 | Fire Safety | Fire Wall | Passed | Mary Creason | Fire wall in a chase main concourse area b restroom. Stencils placement on a 2hr fire wall. |
2025/02/28 | Electrical | Wall Rough-in | Passed | James Melvin | in-wall rough inspection on founders' level 2. |
2025/02/28 | Building/Structural | Structural | Passed | Kody Boswell | Seq 2 upper concourse joist, bridging, and frame inspection. |
2025/02/27 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Testing overhead exhaust ductwork on main concourse near Gate C |
2025/02/27 | Plumbing | Underground | Passed | Paul Nitz | Testing small underground sections of continued storm and remaining section of sanitary on Main Concourse Phase 2 L4. Testing copper water lines as one unit before sleeving and setting underground. Looked at on 2/27 and passed. |
2025/02/27 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | Testing underground grease lines in L4 of phase 2 |
2025/02/27 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Inspecting small section of RA ductwork on Founders level. Also high overhead ductwork at Gate B. Looked at and passed on 2/24. Calling in for record. |
2025/02/27 | Electrical | Wall Rough-in | Passed | Al Smythe | inwall inspection for north market concessions |
2025/02/27 | Building/Structural | Footing | Failed | Paul Nitz | Duct Bank - manhole to sidewalk by Gate D behind bus stop . 1) failure to use approved materials for concrete die. 2) (IRWIN STRAIGHT-LINE) was used as a concrete die |
2025/02/27 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for level 2 elevated slab located in the area between grids WC.1-WD/W4N-W4S |
2025/02/27 | Plumbing | Specialty Piping | Passed | Paul Nitz | Inspecting copper insulation in Upper Concourse Area A men’s restroom. |
2025/02/27 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing small underground sections of continued storm and remaining section of sanitary on Main Concourse Phase 2 L4. Testing copper water lines as one unit before sleeving and setting underground. Looked at on 2/27 and passed. |
2025/02/26 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of masonry walls for elevator 1, area A. Structural drawings call for fully grouted walls. Cells not containing vertical reinforcing appeared to be filled with mortar 4 courses down from the top of the 2nd lift, obstructing view down to the top of the 1st lift (previously grouted). Due to obstructed view, FSU BCA was not able to verify that grout would be able to fill all voids in masonry. |
2025/02/26 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for stair walls at field club, area A. |
2025/02/26 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a pour strip at founders level along grid WC.1/W5N-W5S |
2025/02/26 | Mechanical | Duct Pressure Test | NOT READY | Paul Nitz | Testing exhaust ductwork on main concourse. |
2025/02/26 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Re-test of storm piping with minimum 5’ head pressure at highest point. |
2025/02/25 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Upper con Area A Men’s restroom. Copper and drain/vents |
2025/02/25 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Upper con Area A Men’s restroom. Copper and drain/vents |
2025/02/25 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed south endzone steel tube framing for curtainwall. |
2025/02/25 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for south field club stair walls |
2025/02/25 | Plumbing | Underground | Failed | Paul Nitz | Testing underground storm in phase 2 north (L4) 1) min head pressure not met |
2025/02/24 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Inspecting rough in for soffits in area a main concourse. |
2025/02/24 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 1st lift of elevator 6 masonry walls. Result is conditional pending photos of missing reinforcing being installed. |
2025/02/24 | Electrical | Wall Rough-in | Passed | James Melvin | inwall inspection for the first-floor area-a |
2025/02/23 | Building/Structural | Footing | Passed | Paul Nitz | Unable to schedule weekend inspections. Correct date and time of inspection is Sunday the 23rd at 2:00am. Inspection is of conduits exiting manhole by Gate D at bus stop . 1) electrical bank for Doak West Stand |
2025/02/21 | Building/Structural | Framing | Conditional | Kody Boswell | Interior framing for area a main concourse restrooms and concessions. The result is conditional pending a passed electrical in-wall inspection |
2025/02/21 | Plumbing | Specialty Piping | Passed | Paul Nitz | Main con Area A overhead copper insulation. |
2025/02/21 | Building/Structural | Structural | Passed | Kody Boswell | Inspecting rtu frames, joist, and bridging in seq 1 (partial) upper concourse. |
2025/02/21 | Fire Safety | Opening Protections | Cancelled | Sam Sevor | Inspecting chase wall and fire wall labeling. Area b main concourse. |
2025/02/21 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for slab on grade in the area between grids WA-WD/W8S-W11S. Result is conditional pending minor coerrections to be made, including cover issues, missing reinforcing, missing dowels tying new to existing concrete. |
2025/02/19 | Building/Structural | Structural | Conditional | Kody Boswell | Inspecting decking in seq 2 on upper concourse. There was one area missing a weld at the continuous steel edge angle. This was discussed with the contractor prior to FSU BCA leaving the site. Result is conditional pending weld. |
2025/02/18 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | Checking SA/RA (market concession) and exhaust duct (bathrooms) in Area A. Looked at on 2/18/25, passed. Called in for record on 2/19/25. |
2025/02/18 | Building/Structural | Roofing | Conditional | Kody Boswell | In progress roof inspection for area a main concourse. There is one RTU that requires a cricket installed due to the width of RTU. This was discussed with the Contractor while on site. Result is conditional pending cricket installation. |
2025/02/17 | Plumbing | Underground | Failed | Paul Nitz | Testing underground of newly added in south bar area. 1) need approved plans |
2025/02/17 | Building/Structural | Re-Inspection | Passed | Paul Nitz | Reinspection for field walls. Already reinfected the reinforcement on 2/17 |
2025/02/17 | Building/Structural | Wall/Ceiling | Failed | Paul Nitz | MCJV is requesting a reinforcement inspection for field wall on north side. Thanks Not ready |
2025/02/14 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | reinforcement inspection for field wall on north side |
2025/02/14 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing copper supply and PVC drain/vent lines on Upper Con Area A women’s restroom 03.11.01 |
2025/02/14 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing copper supply and PVC drain/vent lines on Upper Con Area A women’s restroom 03.11.01 |
2025/02/13 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing DW/CW/HW and drain/vent pipes on Main Con Area A building. |
2025/02/13 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing DW/CW/HW and drain/vent pipes on Main Con Area A building. |
2025/02/13 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing DW/CW/HW and drain/vent pipes on Main Con Area A building. |
2025/02/13 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing DW/CW/HW and drain/vent pipes on Main Con Area A building. |
2025/02/12 | Building/Structural | Wall/Ceiling | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone field wall reinforcing inspection to a later date. |
2025/02/12 | Building/Structural | Masonry | Passed | Kody Boswell | Interior cmu walls on upper concourse area b. Note: FSU BCA initially failed the inspection due to lack of clean outs for high lift grouting. In order to keep work going, FSU BCA returned to the site in the late afternoon after clean outs were cut in. |
2025/02/12 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection for fire rated wall in chase on main concourse. Electrical room 01.04.07 |
2025/02/11 | Building/Structural | Roofing | Passed | Kody Boswell | PVC roofing in progress inspection for area b main concourse. |
2025/02/11 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone masonry inspection to a later date |
2025/02/11 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection for main concourse concession stand and restrooms |
2025/02/11 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Checking main con overhead ductwork in concession areas Area A |
2025/02/11 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed steel framing connections for new HSS beams welded to existing steel columns. Result is conditional pending EOR approval of connection. |
2025/02/11 | Electrical | Underground | Passed | James Melvin | Reinspection of duct bank under sidewalk at Gate D to manhole |
2025/02/11 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for secondary field wall, area A |
2025/02/10 | Building/Structural | Wall/Ceiling | NOT READY | Paul Nitz | MCJV is requesting an inspection for secondary field wall reinforcement. thanks |
2025/02/07 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | MCJV is requesting a reinforcement inspection for primary field wall for 12. thanks |
2025/02/07 | Mechanical | Insulation | Passed | Paul Nitz | Checking insulation on main con area B concession areas |
2025/02/07 | Building/Structural | Structural | Passed | Rocky Wilde | Joist, bridging, and RTU framing on upper concourse area a. |
2025/02/07 | Building/Structural | Roofing | Passed | Rocky Wilde | Cover board inspection on area a main concourse roof. |
2025/02/07 | Building/Structural | Framing | Passed | Paul Nitz | Framing inspection for soffits on main concourse area b soffits in the concession stands. |
2025/02/07 | Fire Safety | Fire Water Above Ground | Passed | Sam Sevor | Visual fire sprinkler rough in for soffits at main concourse area b concession stands. |
2025/02/07 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Soffit electrical rough in at concession stands in area b. |
2025/02/06 | Building/Structural | Structural | Passed | Kody Boswell | Precast weld inspection lower bowl Deferred to BNI (threshold inspector) and NOVA (3rd party testing agency) |
2025/02/06 | Building/Structural | Structural | Passed | Kody Boswell | 6th floor sez box framing inspection. |
2025/02/06 | Building/Structural | Framing | Passed | Kody Boswell | 6th floor sez box framing inspection. |
2025/02/05 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Ductwork rough in Area B northern grab-n-go. |
2025/02/05 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Inspected on 2/4/25. Checking DW/CW/HW and PVC drain/vent lines on upper con Concession Prep 03.06.01 & 03.06.02. Passed with condition regarding water fountain copper supply and PVC drain line protection when coming through block wall. |
2025/02/05 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | MCJV is requesting an inspection for field wall reinforcement. thanks |
2025/02/05 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Inspected on 2/4/25. Checking DW/CW/HW and PVC drain/vent lines on upper con Concession Prep 03.06.01 & 03.06.02. Passed with condition regarding water fountain copper supply and PVC drain line protection when coming through block wall. |
2025/02/04 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Ductwork inspection main con Market Concession. In-wall/overhead before close up. |
2025/02/04 | Mechanical | Insulation | Passed | Paul Nitz | Inspections copper insulation on upper con men’s restroom |
2025/02/04 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed joist framing on the upper concourse, sequence 1. Joist framing appeared to be in substantial compliance with the contract documents with the exception of a few joists located at enabling steel locations. Result is conditional pending installation of remaining joists. Note: There are some wide flange steel beams that are still a work in progress. Contractor submitted an RFI for an alternate connection due to bolted connections not fitting correctly. This will require a separate inspection. |
2025/02/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for some interior masonry walls on upper concourse area b. |
2025/02/04 | Building/Structural | Wall/Ceiling | NOT READY | Kody Boswell | MCJV is requesting an inspection for field wall reinforcement for 12. FSU BCA arrived on site and there was no reinforcing ready to be reviewed. |
2025/02/03 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | MCJV is putting in a request for field wall reinforcement inspection that is being looked at on 2/3 |
2025/02/03 | Building/Structural | Structural | Postponed | Kody Boswell | Joist inspection for upper concourse. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. |
2025/02/03 | Building/Structural | Roofing | Passed | Kody Boswell | In progress inspection of the north bathroom/concession group on the main concourse. Contractor was in the process of laying down insulation board and fastneing coverboard to the steel roof deck. |
2025/01/31 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for the south restroom group and concessions. All rooms were reviewed with excpetion to the "Mother's" room. There were a few screws missing in some vertical members. Contrctor to verify these screws get installed. |
2025/01/31 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing remaining DW/HW/CW in upper con men’s restroom. Along with scattered copper and drain/vents in same area. Side note: visual inspection of copper insulation in previously tested/passed. |
2025/01/31 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing remaining DW/HW/CW in upper con men’s restroom. Along with scattered copper and drain/vents in same area. Side note: visual inspection of copper insulation in previously tested/passed. |
2025/01/31 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the field wall in area A |
2025/01/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the subroof for the south grab-n-go concession and the south pantry. |
2025/01/30 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | concrete wall rebar inspection. |
2025/01/30 | Building/Structural | Structural | Passed | Kody Boswell | Precast weld inspection. FSU BCA has deferred precast weld inspections to BNI (Threshold inspector) and NOVA (3rd party testing agency) |
2025/01/30 | Building/Structural | Masonry | Passed | Kody Boswell | Interior CMU on upper concourse in area b. |
2025/01/29 | Building/Structural | Masonry | Passed | Kody Boswell | Top section of walls at electrical rooms in upper concourse. |
2025/01/29 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing upper con partial men’s south restroom and sink wall in women’s. DW/HW/CW and drains. |
2025/01/29 | Building/Structural | Roofing | Passed | Kody Boswell | North grab and go sub roof framing at upper concourse. |
2025/01/29 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing upper con partial men’s south restroom and sink wall in women’s. DW/HW/CW and drains. |
2025/01/28 | Building/Structural | Framing | NOT READY | Paul Nitz | Framing inspection for area b main concourse. |
2025/01/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel angle installation for new seating in the SE endzone, located section 327, level 6. Only a few top rows were complete. At some of the vertical support angles, there was only about 4-5" of weld when structural drawings call for 6" (detail 10/S5-6-3). This was discussed with the Contractor prior to FSU BCA leaving the site. |
2025/01/17 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Continuation of copper inspection from 1/16 Upper con |
2025/01/17 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Continuation of inspection on 1/16 Upper con restroom drains. |
2025/01/16 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | Testing drain/vent lines on Upper Con Area B Women’s restroom. 1)drain was not full and supply was not ready |
2025/01/16 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | MCJV is requesting an inspection for wall reinforcment for field wall. thanks |
2025/01/16 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Testing DW/CW/HW on Upper Con Area B women’s bathroom. Supply and drain 1)drain was not full and supply was not ready |
2025/01/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the field wall located east of grid WA between grids W9S-W11S. Contractor was still installing formwork. Note: Wall footer WF3 between grids W9S-W10S was placed in the wrong location so the Contractor doweled into the incorrectly located footer to get the footer in the right location. Reinforcing steel was not reviewed by BCA or BNI prior to concrete placement. After discussion, FSU and the Contractor agreed that photo documentation of reinforcing would suffice. Contractor emailed photo documentation. Filed in the job folder. |
2025/01/09 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the column footing located at grids WB/W11N |
2025/01/03 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed roof decking attachment to structure for the north bathroom group on the lower concourse |
2025/01/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for walk in cooler slab on the upper concourse and several column pour backs |
2024/12/30 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing drain lines in Area B men’s restroom. Block demoed to observe pipes. |
2024/12/27 | Building/Structural | Masonry | Passed | Rocky Wilde | MCJV is requesting a masonry reinforcement inspection for elevator 4 top out. thanks |
2024/12/19 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Testing DW on Founders level 1) water hammers missing on lavs and ice machine |
2024/12/19 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed RTU framing in area a2 main concourse. |
2024/12/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 3 isolation pads for walk-in coolers on the lower concourse level. Reinforcing steel was in substantial compliance with the contract documents. Waterproofing was replaced since the AM inspection. |
2024/12/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed masonry reinforcement for area A interior bathroom walls, lower concourse |
2024/12/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior restroom walls on lower concourse, north bathroom group. |
2024/11/22 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing the last remaining stacks in Area A bathroom perimeter. Stacks chase to level 2 and level 3 |
2024/11/21 | Building/Structural | Slab | Conditional | Kody Boswell | Sequence 2 rebar inspection topping slab Result is conditional pending photos from Contractor showing the following work is complete, prior to concrete placement: 1) Finish installing slip dowels at construction joint. 2) Finish installing form work 3) Finish installing one area of steel reinforcing Photos received by Contractor on 11-25-2024. Filed in job folder. |
2024/11/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls in the mens RR |
2024/11/21 | Fire Safety | Opening Protections | Passed | Mary Creason | framing inspection for North and South electrical rooms, Founders level Courtesy walk thru for fire penetrations inspections expectations with contractor |
2024/11/21 | Building/Structural | Framing | Passed | Kody Boswell | framing inspection for North and South electrical rooms, Founders level |
2024/11/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls in the womens RR |
2024/11/20 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Checking Founders level ductwork 1) plans call for turning veins on all 90* duct 2) expansion joint ducting missing |
2024/11/20 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls in the womens RR |
2024/11/20 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Checking single remaining drain cluster in Area A ADA restroom. |
2024/11/19 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Checking 2 remaining ADA toilet/sink clusters in Area A men’s room |
2024/11/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls for the south womens RR on the main concourse |
2024/11/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for two interior womens RR walls on the main concourse, 1st and 2nd lifts |
2024/11/18 | Building/Structural | Framing | NOT READY | Kody Boswell | FSU BCA arrived on site to review sheathing attachment to LG soffit framing at gate C. Upon arrival, the Contractor stated they were not ready for inspection. |
2024/11/18 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Waste drain testing in Area A men’s and women’s bathroom groups. Note: one cluster in the women’s will be left out due to underground electrical fix. Will inspect at a later date. |
2024/11/18 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Domestic water pressure test Area A men’s and women’s bathroom groups. Note: copper insulation may have started on the straight pipe. All joints will be left visible for leak checks and joint observation. |
2024/11/15 | Building/Structural | Masonry | Passed | Rocky Wilde | MCJV is requesting an inspection for first lift walls interior in women’s bathroom main concourse. Thanks |
2024/11/14 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Checking Area B men’s restroom sink cluster drainage pipe. |
2024/11/14 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls in the womens restroom, main concourse. |
2024/11/14 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls in the womens restroom, main concourse. |
2024/11/14 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Natural gas 60PSI pressure test, this will include all piping installed overhead in the building. We potentially will be ready tomorrow on the 13th but will let you know at time of inspection. |
2024/11/13 | Plumbing | Stack Piping & Test | Conditional | Paul Nitz | Testing in-wall drain waste and vent retest for women’s restroom area. 1) a visual inspection must be completed on the repairs where the test balls were placed |
2024/11/13 | Building/Structural | Slab | Conditional | Kody Boswell | Pour 3 sequence 1 topping slab rebar, corridor. Some dowel plates at construction joints were not installed at time of inspection. Contractor is to provide photos of plate dowel installation prior to concrete placement. |
2024/11/13 | Plumbing | Gas Piping & Test | NOT READY | Paul Nitz | Pressure testing overhead natural gas line. |
2024/11/13 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for two soffits located along grids W3S and W3N. There were 4 studs for the W3N soffit that had been overnotched to mimss structural steel framing. FSU BCA directed the contractor that these 4 studs be replaced with minimal notching and photos sent after work is complete. Photos received by Scottie Stuart with PSI on 11/13/24. Photos filed in the job folder. |
2024/11/13 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for some interior walls at womens bathroom in area B main concourse, 2nd lift |
2024/11/13 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for some interior walls at womens bathroom in area B main concourse, 1st lift |
2024/11/13 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Testing the high area insulated ductwork on south and north ends. As well as the ductwork on founders. 1) this was the supply and return duct over the mens and womens bathrooms that were already insulated |
2024/11/12 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the upper concourse topping slab for the womens RR, mens RR and concessions area in area B. Contractor to provide photos showing the following work is complete prior to concrete placement: 1) Finish installing expansion material along walls and curbs 2) Finish installing block outs around steel columns 3) Finish installing reinforcing at chases Photos received via email by Curry with MCJV, filed in job folder. |
2024/11/12 | Plumbing | Rough-in | NOT READY | Paul Nitz | Testing bathroom drain lines in south women’s bathroom group. |
2024/11/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior restroom walls for mens RR and womens RR located in area B on main concourse |
2024/11/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for a few interior masonry wallsa for the south mens RR, lower concourse |
2024/11/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel or several interior restroom walls for the south mens restroom, main concourse |
2024/11/08 | Building/Structural | Masonry | Passed | Kody Boswell | Upper Concourse SEQ3 rebar inspection |
2024/11/08 | Plumbing | Rough-in | Failed | Paul Nitz | Julius didn't select an option. I'm assuming mens RR plumbing inspection. -Kody 1) waist drains are covered and can not be inspected due to a CMU wall that was installed prior to inspection |
2024/11/08 | Building/Structural | Masonry | Passed | Kody Boswell | area b mens and womens bathroom interior walls |
2024/11/08 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed exterior sheathing attachment to portions of the service corridor wall located on the founders level |
2024/11/08 | Building/Structural | Slab | Passed | Kody Boswell | Upper Concourse SEQ1/Pour 1 topping slab |
2024/11/07 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinorcing steel for the following CMU walls: 1) Upper concourse: north grab n go concession, top out lift 2) Founders level: elevator 2, top out lift 3) Lower concourse: south mens restrooms interior walls, 1st lift Wall (2) note: Vertical reinforcing for 3 of the 4 elevator walls had insufficient lap splice length for rebar. This was discussed with the Contractor on site. FSU BCA left the site and returned around 1pm for re-inspection |
2024/11/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the north grab-n-go concessions on the upper concourse. |
2024/11/04 | Plumbing | Specialty Piping | Passed | Paul Nitz | |
2024/11/01 | Plumbing | Other | Passed | Paul Nitz | Copper pipe insulation |
2024/10/31 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the north grab-n-go concessions on the upper concourse. Vertical reinforcing did not have 27" lap length per structural drawings. Re-inspection is required prior to grout placement. |
2024/10/30 | Building/Structural | Masonry | Passed | Kody Boswell | Mcjv is requesting a masonry reinforcement inspection for upper concourse area A and south main con area B. Thanks Reviewed reinforcing steel for south restroom partition wall (1st lift) on lower concourse and for north custodian room (2nd lift) on the upper concourse. |
2024/10/30 | Building/Structural | Masonry | Passed | Kody Boswell | Inspecting masonry on upper concourse sequence 3 at the custodian room. |
2024/10/29 | Plumbing | Water Piping & Test | Passed | Paul Nitz | this inspection was completed on 10-29-2024 |
2024/10/28 | Mechanical | Duct Pressure Test | Cancelled | Paul Nitz | |
2024/10/28 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of north bathroom walls, upper concourse. |
2024/10/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for concession stand walls on the upper concourse, 2nd lift. |
2024/10/24 | Building/Structural | Framing | NOT READY | Kody Boswell | Reviewed soffit LG framing located over the main concourse walkway, approximately along grid W3S/WC-WE. LG framing was not completely installated at time of inspection. |
2024/10/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for a south bathroom wall on the lower concourse, 1st lift |
2024/10/23 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for concession stand walls on the upper concourse, 2nd lift. |
2024/10/23 | Mechanical | Duct Rough-in | Failed | Paul Nitz | 1) pressure and smoke test will be required 2) manufacture installation instructions required for the duct connections |
2024/10/22 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several grab-n-go concession walls on the upper concourse, 1st lift. |
2024/10/22 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | |
2024/10/22 | Plumbing | Water Piping & Test | Passed | Rocky Wilde | |
2024/10/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: (1) Founders level, elevator 2 top out course (2) Founders level, elevator 3 top out course (3) Ground floor, south electrical room walls top out course |
2024/10/17 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls for the concession stand on the upper concourse, 1st lift |
2024/10/16 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for upper concourse concession stand walls, second and first lifts |
2024/10/15 | Building/Structural | Masonry | Conditional | Paul Nitz | Masonry rebar inspection upper level elevator 1) not accessible |
2024/10/15 | Building/Structural | Masonry | Passed | Paul Nitz | MCJV is requesting an inspection for elevator 2 on founders level. thanks |
2024/10/14 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection sequence 2 concession (10/12) |
2024/10/14 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of elevator 4 |
2024/10/11 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/10/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed the 2nd lift of concession stand walls on the upper concourse |
2024/10/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of CMU walls for the concession stand on the upper concourse. |
2024/10/10 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | pipes were covered by plastic, inspection could not be completed |
2024/10/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the concession stand (upper concourse) and top out lift of elevator 4 (lower concourse). |
2024/10/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of a masonry wall located near elevator 4 on the lower concourse. |
2024/10/09 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a curb on the upper concourse, north concession stand. |
2024/10/09 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel the 2nd lift of masonry walls on the upper concourse. |
2024/10/07 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 1st and 2nd lifts of concession stand walls on the upper concourse. Result is conditional pending missing vertical bars are added at door jambs and vertical bars at sills are cut down in order to get sufficient top clear cover during grouting. |
2024/10/02 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 5th lift of elevator walls for elevators 3 and 4. |
2024/10/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel via photos for a small section of masonry curb on the upper concourse. Photos are filed in the job folder under photos, dated 2024-10-01. |
2024/09/30 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date |
2024/09/25 | Building/Structural | Masonry | Conditional | Paul Nitz | Inspection for elevators 3 and 4 clean outs for masonry grout. Was looked at 9/23 |
2024/09/25 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of masonry walls for elevator 2. |
2024/09/23 | Building/Structural | Masonry | Passed | Paul Nitz | Inspection for masonry reinforcement upper concourse |
2024/09/19 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone masonry inspection. |
2024/09/19 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of masonry for elevators 3 and 4 on the lower concourse. Masonry lifts were 10 feet in height with no cleanouts were provided. Contractor to provide cleanouts for high lift grouting. |
2024/09/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several masonry walls for the north restrooms (2nd lift) and north elevator (1st lift) |
2024/09/17 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for several curbs on the upper concourse in sequence 3. Some curbs needed to have the top two continuous bars raised. Some spots the bars were over 4" from top of concrete when the total curb height is 8"-10". Threshold inspector to verify proper placement prior to concrete placement. |
2024/09/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top out course of several north bathroom walls on the lower concourse |
2024/09/12 | Building/Structural | Structural | Passed | Kody Boswell | FSU BCA was contacted by the contractor to cancel and postpone reinforcing steel inspection for curbs on the upper concourse. |
2024/09/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top out lift of exterior walls for the north side bathrooms |
2024/09/11 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on the upper concourse towards the north ramp |
2024/09/10 | Building/Structural | Final Building | Conditional | Kody Boswell | Final inspection of the temporary bleachers installed by Inproduction for the additional 240 seats that were installed after Game 1 on 9/2/2024. Conditional upon receipt of completed punch list documentation or on site walk through. FSU BCA received the completed punch list with documentation on 9/11/2024 from Matt Noone with Nations Group annd received the threshold report for the stands structure on 9/11/2024 from Eric Kelly with Clark reder Engineering. |
2024/09/10 | Building/Structural | Masonry | Postponed | Kody Boswell | Masonry inspection was postponed to 9/11/2024 by Contractor to get more work done prior to inspection and grout. |
2024/09/09 | Building/Structural | Masonry | Passed | Paul Nitz | |
2024/09/09 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on the upper concourse |
2024/09/06 | Building/Structural | Structural | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection |
2024/09/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the north bathroom, 2nd lift |
2024/09/05 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several walls on the main concourse, 1st lift and 2nd lift |
2024/09/04 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for upper concourse curbs, main concourse diamonds, and main electrical room pads. |
2024/09/03 | Building/Structural | Slab | Postponed | Kody Boswell | South electrical room pads. Contractor contacted FSU BCA prior to site arrival to postpone the inspection to a later date. |
2024/08/30 | Building/Structural | Final Building | Passed | Kody Boswell | FSU BCA walked with Matt Noone from Nations Group to verify that outstanding punch list items for the temporary bleachers structure from a previous walk through were addressed. FSU BCA is content with the addressing of these items and can move forward with a temporary Certificate of Occupancy for the upcoming season. |
2024/08/30 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Inspection set up with Sam Sevor to have Mary Creason to review the egress lighting and exit sign placements. A prior walk-through was completed at 6:00 a.m. on Tuesday, August 27 that confirmed footcandles for the public concourse spaces. Conducted a final for the Temporary CCO and per Sam SeverFSU Fire Manager, Todd Peirce, SFM and Jason Grisel, TFD, all conditions were adequate. FIRE has approved the Temporary CCO. |
2024/08/27 | Building/Structural | Masonry | Passed | Paul Nitz | Masonry rebar inspection for area b. |
2024/08/26 | Building/Structural | Slab | Conditional | Paul Nitz | Rebar inspection for slab on grade at gate b. \\ 1) not ready, B&I are on site util completion |
2024/08/19 | Building/Structural | Structural | Passed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone reinforcing steel inspection for curbs on the upper concourse |
2024/08/16 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on grade at gate d. |
2024/08/16 | Building/Structural | Structural | Postponed | Kody Boswell | FSU BCA was on site doing a slab inspection when the Contractor contacted FSU BCA to cancel/postpone inspection for upper oncourse curbs. |
2024/08/15 | Building/Structural | Structural | Passed | Kody Boswell | FSU BCA defferred this inspection to the threshold inspector due to scheduling conflicts. Threshold inspector verbally informed FSU BCA reinforcing steel for curbs on the upper concourse was in substantial compliance with the contract documents. |
2024/08/15 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for masonry walls for the south restrooms and concession stands, 2nd lift, located in the approximate area between grids M-WF/8S-16S. During inspection it was observed that the precast lintel over the wide doorway (between grids 10S-12S) had moderate damage, exposing reinforcing. Result is conditional pending replacement of precast lintel or an approved repair procedure from the EOR. Contractor may grout over doorway if precast lintel is properly shored. |
2024/08/15 | Building/Structural | Other | Cancelled | Kody Boswell | Initial inspection for fireproofing of steel. FSU BCA discussed with the contractor that the third party testing agency will handle the fireproofing inspections. |
2024/08/14 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone the masonry inspection for south restrooms/concession stands |
2024/08/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for curbs on upper concourse, sequence 1 |
2024/08/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the elevated slab on the founders level, sequence 3 |
2024/08/12 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on the upper concourse in sequence 1 |
2024/08/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of the masonry wall running along University Center C |
2024/08/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the SOG for the north restroom on the main concourse. |
2024/08/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of the main concourse south restroom. Part of the area reviewed consisted of the failed inspection dated 8/9/2024. |
2024/08/09 | Building/Structural | Structural | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to cancel and postpone inspection for reinforcing steel for curbs on the upper concourse |
2024/08/09 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of restroom walls on the main concourse. There were several spots where reinforcing was not installed per contract drawings. |
2024/08/08 | Building/Structural | Slab | Passed | Kody Boswell | Inspecting rebar for curbs on upper concourse sequence 1. |
2024/08/08 | Building/Structural | Masonry | Passed | Kody Boswell | Rebar inspection masonry on upper concourse sequence 3 and main concourse sequence 1. |
2024/08/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on upper concourse sequence 1. |
2024/08/07 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls on upper concourse sequence 3 and on main concourse south restrooms/concession stands. |
2024/08/07 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the north portion of the main concourse slab on grade |
2024/08/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on upper concourse sequence 1. |
2024/08/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls on upper concourse in sequence 3. Inspected curbs on upper concourse at sequence 1. |
2024/08/02 | Electrical | Ground | Passed | James Melvin | Building ground at Gate "C " |
2024/08/02 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the SOG at gate C area labeled as pour area 6. |
2024/08/02 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls on the upper concourse |
2024/08/01 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for curbs on the upper concourse |
2024/08/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls on upper concourse (sequence 3) 2nd lift |
2024/07/31 | Building/Structural | Slab | Passed | Kody Boswell | Contractor verbally discussed with FSU while on site that there was no curb reinforcing inspection required. FSU was on site for a masonry inspection at the same time. |
2024/07/31 | Plumbing | Underground | Passed | Paul Nitz | Inspections for 10” water main. Pushed from 7/30 due to weather delay on site. |
2024/07/31 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of CMU walls on the upper concourse. |
2024/07/30 | Building/Structural | Slab | Postponed | Kody Boswell | Contracted contacted FSU prior to site arrival to postpone the inspection to a later date. |
2024/07/30 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift. upper concourse sequence 2. |
2024/07/30 | Plumbing | Underground | NOT READY | Paul Nitz | 10” water main at Gate D |
2024/07/29 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of cmu walls on the upper course, sequence 3. |
2024/07/29 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Inspecting thrust block for the fire riser and Flush system Flush passed today. Thrust block observed by Sam Sever 7/23/2024 and passed |
2024/07/29 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on upper concourse in sequence 1 |
2024/07/26 | Building/Structural | Masonry | Passed | Kody Boswell | |
2024/07/26 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for curbs on the upper concourse. |
2024/07/26 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for SOG South Restrooms/Concession stands. The following items are to be address by the contractor and verifed by threshold inspector prior to concrete placement: 1) Missing vertical dowels for the elevator shaft. 2) Missing reinforcing around slab turndowns for 2 isolation joints. 3) Several missing re-entrant corner bars. |
2024/07/25 | Plumbing | Underground | Passed | Paul Nitz | Storm line inspection |
2024/07/25 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of 12" CMU walls located at the north restrooms |
2024/07/25 | Plumbing | Underground | Passed | Paul Nitz | Grease inspection on north side. Looked at 7/24 at 10am |
2024/07/24 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Inspection for tying the fire riser into the existing underground fire line. Inspected underground fire line for: corrosion coating on bolts hydro to working pressure with fire pump. 150psi Will re-turn for seprate inspection on Monday 7/29 at 9:00am for flush. |
2024/07/23 | Plumbing | Underground | Passed | Paul Nitz | storm and sanitary |
2024/07/22 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to postpone slab on grade inspection to a later date |
2024/07/22 | Building/Structural | Masonry | Passed | Kody Boswell | Upper concourse reinforcing for masonry and reinforcing for north bathroom group on lower concourse |
2024/07/22 | Building/Structural | Masonry | Passed | Paul Nitz | Upper concourse reinforcing for masonry on the third floor first lift to the first colm and reinforcing for north bathroom group on lower concourse |
2024/07/19 | Plumbing | Underground | NOT READY | Paul Nitz | |
2024/07/19 | Plumbing | Underground | Passed | Paul Nitz | |
2024/07/19 | Building/Structural | Masonry | Passed | Kody Boswell | upper and lower concourse. |
2024/07/18 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to postpone slab on grade inspection to a later date. |
2024/07/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the 1st level north bathroom walls, 1st lift |
2024/07/18 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to postpone masonry inspection to a later date. |
2024/07/17 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the slab on grade on ground level in the area between grids WD-WE/W5S-W8S. Result is conditional because Contractor had not finished tying reinforcing, but work was almost complete. Threshold inspector to verify reinforcing is fully installed prior to concrete placement. |
2024/07/17 | Building/Structural | Masonry | Passed | Kody Boswell | Upper concourse rebar for masonry |
2024/07/16 | Building/Structural | Masonry | Passed | Paul Nitz | Rebar for walls 1,2,and three tiered section on the top floor, was inspectedn 7-16-2024 by Paul Nitz, |
2024/07/15 | Plumbing | Underground | Passed | Paul Nitz | sanitary |
2024/07/15 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar on upper concourse area b at restrooms and pantry. |
2024/07/15 | Plumbing | Underground | Passed | Paul Nitz | greese |
2024/07/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following masonry walls on level 3: 1) 2nd lift in the area between grids WD-WE/W10S-W11S 2) 2nd lift along grid M/W8S-W10S 3) 1st lift along grid M/W6S-W8S |
2024/07/12 | Building/Structural | Masonry | Cancelled | Kody Boswell | Contractor contacted FSU BCA prior to inspection to cancel. |
2024/07/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of masonry walls along grid M/W8S-W9S |
2024/07/11 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the level 3 elevated slab in the area between grids WD-M/W8N-W11N. There were several masonry dowels and curb dowels not yet installed. FSU BCA to verify with threshold inspetor that dowels are installed prior to concrete placement. |
2024/07/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift for the following walls on level 3: 1) In the area between grids WD-WE/W10S-W11S 2) Along grid M between grids W8S-W10S |
2024/07/10 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed precast welded connections for vomitory walls on level 3 between grids W2N-W3N, W2S-W3S and W4S-W5S. |
2024/07/10 | Building/Structural | Masonry | Cancelled | Kody Boswell | Contractor and FSU discussed only goinng to the 2pm masonry inspection, as 2 masonry inspections in the same day was not needed. |
2024/07/10 | Plumbing | Underground | Passed | Paul Nitz | |
2024/07/10 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to arrival on site to cancel/postpone a level 3 elevated slab inspection to a later date. |
2024/07/09 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the level 3 elevated slab in the area between grids WD-M/W4N-W7.9N. Several dowels for curbs supporting precast walls and dowels for load-bearing masonry walls were not in place. FSU BCA remained on site until enough work was complete to comfortably defer to the threshold inspector. Threshold inspector to verify remaining dowels in place prior to concrete placement. FSU BCA to follow up. |
2024/07/05 | Plumbing | Underground | Passed | James Melvin | I place of inspection on 7/5. |
2024/07/04 | Plumbing | Underground | Passed | Paul Nitz | Storm trunk line |
2024/07/04 | Plumbing | Underground | Passed | James Melvin | In place of inspection on 7/4. |
2024/07/03 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of 12" cmu walls in the area between grids WF-M/W2S-W3S. Main concourse level. |
2024/07/03 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for curbs on level 3 in the area between grids WD-WE/W10S-W11S and between grids WF-M/W8S-W10S. Contractor was still installing formwork at time of inspection. FSU to defer to threshold inspector to verify formwork is in place prior to concrete placement. |
2024/07/02 | Building/Structural | Slab | NOT READY | Kody Boswell | FSU arrived on site to review reinforcing steel for curbs on level 3 in the area between grids WD-WE/W10S-W11S. Contractor was not done tying reinforcing steel in place |
2024/07/02 | Plumbing | Underground | Passed | Paul Nitz | |
2024/07/02 | Building/Structural | Structural | Cancelled | Kody Boswell | precast inspection Contractor contacted FSU BCA to cancel and postpone inspection prior to arrival on site |
2024/07/02 | Plumbing | Underground | Passed | Paul Nitz | Small section of grease replaced once storm piping was set below it. |
2024/07/02 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry inspection for the remaining block in area b. 1st lift of reinforcing steel was reviewed. |
2024/06/28 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) 3rd level (Upper concourse) curbs for precast in the area between grids WD-WE/W6S-W7S and grids WD-WE/W4S-W5S 2) 2nd level (Founders level) elevated slab on deck in the area between grids WD-WF/ W3.9N-W3.9S |
2024/06/28 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of masonry located in the approximate area between grids WE-WF/3-4. |
2024/06/27 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm and sanitary |
2024/06/27 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of masonry located approximately in the area between grids WF-M/W3S-W4S. |
2024/06/26 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/26 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for bond beams below grade located at the intersection of gridines WE/W8S and WE/W9S |
2024/06/25 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/25 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/06/25 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/06/24 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of bathroom and concession stands masonry walls in area B. First lift goes from top of foundation elevation to top of slab elevation. There were two areas where bond beam reinforcing was not installed per RFI response. These locations are at the intersection of grids WE/W8S and WE/W9S. Other areas had reinforcing steel in substantial completion with the contract documents. |
2024/06/24 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/21 | Building/Structural | Masonry | Passed | Kody Boswell | Foundation block area b restrooms. |
2024/06/20 | Building/Structural | Masonry | Passed | Kody Boswell | Foundation block for area b restrooms. |
2024/06/20 | Building/Structural | Slab | Passed | Kody Boswell | Rebar inspection for slab on metal deck at upper concourse sequence 2 |
2024/06/20 | Plumbing | Underground | Passed | Dwayne Mahony | |
2024/06/19 | Building/Structural | Masonry | Passed | James Melvin | Foundation block inspection area b restroom. |
2024/06/18 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar before cell grout |
2024/06/07 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for the elevated slab on deck on level 3 in the area between girds M-WD/W8S-W11S. Contractor had not finished tying reinforcing in place. There were deck penetrations that need additional reinforcing and one curb did not have reinforcing tied in place. Contractor to reschedule once work is complete. |
2024/06/06 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to arriving on site to postpone the inspection for a later date. |
2024/06/04 | Plumbing | Underground | Failed | Paul Nitz | Inspecting storm line taps and sanitary leveling 1) sloope not met for waist drain fbc p704.1 |
2024/06/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the founders level elevated slab in the area between grids WD-M/W4S-W11S. |
2024/06/03 | Plumbing | Underground | Failed | Paul Nitz | slope not met for waist drain fbc p704.1 |
2024/06/03 | Plumbing | Underground | NOT READY | Paul Nitz | this was for the storm drain connections, all were ok but the 16'' needs to be looked at |
2024/05/31 | Building/Structural | Slab | NOT READY | Kody Boswell | Contractor was not ready for inspection and will reschedule for a later date. |
2024/05/31 | Plumbing | Underground | Failed | Paul Nitz | Sanitary and grease as per our conversation in regards to the drain line that was laid above grade the entire area will have to be reinspected after its corrected |
2024/05/28 | Building/Structural | Structural | Cancelled | Kody Boswell | Phase 1 structural steel inspection FSU communicated to Contractor that structural steel inspection to be done by threshold inspector. |
2024/05/28 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Inspected the megalug restraints. The open ditch had excessive water and I could not complete the inspection. I will return on 5/29 to reinspect remaining portion of the pipe, bolt coatings and thrust block installation. No leaks were present on the visible pipe section at the time of inspection. |
2024/05/21 | Building/Structural | Footing | Cancelled | Kody Boswell | This was a request for observation of grout placement under steel column baseplates. Threshold inspector was on site. |
2024/05/21 | Plumbing | Underground | Passed | Neely Lewis | |
2024/05/20 | Plumbing | Underground | Failed | Paul Nitz | 5/21/2024:Slope was not accordig to FBC requirements. |
2024/05/20 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following: 1) Pedestal at grids W11N/WF 2) Wall footing along grid M/W5S-W6S |
2024/05/17 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Column footing at grids WC.1/W11N 2) Column footing at grids WC.1/W9N 3) Column footing at grids WE/W10N 4) Column footing at grids WF/W11N 5) Column footing at grids WF/W10N 6) Wall footing in the area between grids WA-WB/W10N-W11N |
2024/05/17 | Plumbing | Underground | NOT READY | Paul Nitz | not ready for inspection |
2024/05/09 | Plumbing | Underground | Passed | Neely Lewis | storm |
2024/05/09 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid W9N/WA-WB 2) Along grid W10N/WA-WB 3) Along grid W11N/WA-WB 4) Along grid WA/W9N-W11N 5) At grids WE/W11N 6) In the area between grids WC-WD/W8N-W9N 7) In the area between grids WC-WD/W8S-W9S |
2024/05/08 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the following foundations: 1) Contractor to request re-inspection prior to concrete placement |
2024/05/07 | Plumbing | Underground | Failed | Paul Nitz | 1) slope not met on drain fbcp 704.1 2) cleanouts required min every 100' fbcp 708.1 |
2024/05/06 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Inspection on the UG fire line had passed earlier, but this inspection is to review the thrustblock installation. All previous items corrected and passed |
2024/05/06 | Electrical | Ground | Passed | Dwayne Mahony | 4/0 Ufer ground |
2024/05/02 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Reinspection to insure coating on magalugs and full review of the bolts and tightening. Reinspection of mega lugs and corrosion coating passed. Note: 1) Will need to verify clearance of sanitary pipe once the sanitary lline has been installed over the fire line. 2) We will need to conduct a visual inspection of the thrust blocks once installed and conduct funtional hydro test via the fire pump. |
2024/05/02 | Plumbing | Underground | Passed | Dwayne Mahony | Approved 16" trunk line as marked on paper plans in trailer. |
2024/05/02 | Electrical | Ground | Postponed | Dwayne Mahony | |
2024/05/01 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following wall footings: 1) Along grid M/W3S-W5S 2) Along grid M/W3N-W10N |
2024/05/01 | Fire Safety | Fire Water Underground | Failed | Sam Sevor | Inspection of UG 10" fire main pipe per RFI-0151 new pipe & valve (North section only). Inspection did not pass, the following items need correction: 1. Mega lugs not tightened. 2. Mega lugs not coated with anti-corrosion material. 3. Provide Contractors UG certification paperwork. 4. Ensure all bolts for mega lugs are visible for reinspection No leaks were identified at time of visual inspection. Fire water system has been re-pressurized under city pressure only. A follow-up inspection will be required for a hydro test at fire pump pressure (160PSI) after placement before work is covered up. Note: Contractor to provide mega lug manufacturers instruction sheet. |
2024/04/30 | Plumbing | Underground | Passed | Neely Lewis | |
2024/04/29 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following wall footings: 1) In the area between grids WE-M/W8.5N-W9.5N 2) In the area between grids WF-M/W5.5S-W8.5S |
2024/04/29 | Plumbing | Underground | Failed | Neely Lewis | 4/29: Slops of drains not per FBC-P Table 704.1. |
2024/04/26 | Building/Structural | Footing | Passed | Dwayne Mahony | approved elevator walls foundation to slab level. |
2024/04/25 | Plumbing | Underground | Passed | Neely Lewis | |
2024/04/25 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/04/24 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) Wall footing east of grid WA between grids 5N-7N 2) Column & wall footings along grid W5N/WA-WB 3) Column & wall footings along grid W4N/WA-WB 4) Elevator walls in the area between grids WD-WE/W7N-W8N 5) Column & wall footings along grid WF/W5S-W6S Items (1) thru (4) have a "passed" result. Item (5): Column footing at grids WF/W5S has a 1'-0" tall pedestal on top of it. Reinforcing is called out on elevation view 1 on sheet S4-4. It is unclear if the pedestal reinforcing needs to be hooked at the top or not. Also, anchor bolt embedment at this pedestal is 1'-0" which would be at the construction joint between top of footing and top of pedestal. These two items should be clarified with the EOR. Inspection result is conditional pending EOR response. |
2024/04/24 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the elvator mat foundation located in the area between grids WF-M/W5S-W6S. Top and bottom reinforcing layers do not have the proper out-to-out dimension. The foundation is 33" thick, so the out-to-out dimension should be 28". I measured between 25"-26" consistently in several areas of the foundation. This issue is to be corrected and called for a reinspection. |
2024/04/23 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) Elevator walls located between grids WD-WE/W7N-W8N 2) Elevator mat foundation located between grids WE-WF/W4N-W5N 3) Field wall footing located east of grid WA between grids W5N-W5S 4) Elevator walls located between grids W4S-W5S Item (1): Elevator walls were missing 2#5 continuous at the top and bottom of wall per detail 2/S5-5-1. Result is conditional until missing reinforcing is installed. |
2024/04/22 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Spread footings in the area between grids WB-WC/W2N-W3N 2) Spread footing and elevator pad located near grids WD-W8N 3) Elevator pad in the area between grids WE-WF/W4S-W5S |
2024/04/19 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids WC.1/W8N 2) At grids WC/W7N 3) At grids WC/W6N |
2024/04/19 | Plumbing | Underground | Passed | Dwayne Mahony | Cleanouts added as required. |
2024/04/18 | Plumbing | Underground | Failed | Neely Lewis | Grease waste line. Insufficient cleanouts. FBC708.1.1. |
2024/04/18 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid W10N/WA-WB 2) At grids WC/W5N 3) At grids WC/W4N 4) Along grid WD/W2N-W3N 5) In the area between grids WB-WC/Ww2N-W3N |
2024/04/17 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids WD/W11N 2) Along grid WF/W8N-W9N 3) Along grid WF/W5N-W6N 4) At grids WD/W5N 5) At grids WD/W4N 6) Along grid WE/W6S-W9S 7) In the area between grids WB-WC/W2S-W3S |
2024/04/16 | Building/Structural | Footing | Passed | Dwayne Mahony | Approved single column footing at column line WF @ W7, and column footings and CMU wall footings column line W5.5 to W3 on line WE. CMU wall footings do not have vertical dowels. An email has been sent requesting clarifiaction on use of epoxy dowels: During todays inspection at the west stands project I questioned the lack of dowels for CMU walls on column line WE. A RFI was provided that allowed epoxy installed dowels at the field wall and at thickened slabs. These walls are on continuous grade beam foundations and will not be in the area of the temporary stands. I do not think (subjective opinion) that epoxy dowels are equivalent to dowels that are cast-in-place since to achieve the same structural value the dowel holes, preparation, cleaning, and epoxy mixing all must be near perfect, not likely. With this I am requesting greater clarity from the engineer of record, Dylan Richard, on the extent of epoxy dowels for CMU walls, and concurrence from the owners representative, Mike Materna, that 100% epoxy dowels for the CMU walls are acceptable to the owner if that is to be the case. |
2024/04/16 | Plumbing | Underground | Passed | Neely Lewis | GW, DW piping southwest side |
2024/04/15 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids WC.1/W10N 2) Along grid WD/W9N-W10N 3) In the area between grids WE-WF/W3N-W4N |
2024/04/12 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) Along grid W1/WB-WC 2) Along grid WD/W6N-W7N |
2024/04/11 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to cancel and postpone inspection due to overnight rain |
2024/04/10 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Several column footings and wall footings along grid WE/W6N-W9.5N 2) Several column footings and wall footings in the area between grids WB-WC/W2S-W3S |
2024/04/10 | Plumbing | Underground | Passed | Neely Lewis | sewer, and grease waste |
2024/04/10 | Plumbing | Underground | Passed | Neely Lewis | Sewer waste, grease waste |
2024/04/09 | Plumbing | Underground | Conditional | Neely Lewis | sewer waste inspection. Need to reslop;e about 20' of pipe. Slope is 0 deg. |
2024/04/09 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid WD/W9S-W10S 2) In the area between grids WA-WB/W10S/W10.5S 3) At grids WE/W1 4) At grids WE/W2S 5) At grids WD/W1 6) Along grid WD/W2S-W3S 7) In the area between grids WE-WF/W3N-W6N |
2024/04/08 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid WF/W3S-W4S 2) At grids WF/W1 3) At grids WF/W2S 4) At grids WF/W2N 5) At grids WE/W2N |
2024/04/05 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) Along grid W11S/WA-WB 2) At grids W11S/WC.1 3) At grids W11S/WD 4) In the area between grids W10.5S-W11S/WE-M 5) In the area between grids W8S-W10S/WE-M 6) At grids W7S/WF |
2024/04/05 | Plumbing | Underground | Passed | Neely Lewis | grease waste inspection |
2024/04/04 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) Along grid W11S/WA-WB 2) At grids W11S/WC.1 Locations 1 & 2 above were not per structural drawings and RFIs. Contractor to correct reinforcing to match structural drawings or contact EOR to verify field conditions are acceptable. |
2024/04/04 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) At grids W11S/WD 2) In the area between grids WA-WB/W8S-W9S |
2024/04/02 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings for columns/walls: - Along grid W4S/WA-WB - Along grid W5S/WA-WB - Along grid WD/W6S-W7S - At grids W4S/WD - At grids W5S/WD - At grids W4S/WC - At grids W5S/WC - At grids W6S/WC - At grids W7S/WC - At grids W8S/WC.1 - At grids W9S/WC.1 - At grids W10S/WC.1 |
2024/04/02 | Plumbing | Underground | Passed | Neely Lewis | sewer line on North elevation |
2024/04/01 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for spread footings for columns/walls along grids W7S/WA-WB, W8S/WA-WB and WA/W5S-W8S. |
2024/03/29 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several spread footings for walls/columns along grids W10S, W8S and between grids W5S-W8S. |
2024/03/27 | Plumbing | Underground | Conditional | Neely Lewis | underground grease piping 03/27/2024. Pressure test passed. Awaiting information on slope from EOR. |
2024/03/26 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several wall footings and column footings in the area between grids WA-WB/W8S-W9S. The field wall footing reinforcing (WF3) was reviewed approximately from grids W7S-W10S. |
2024/03/25 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | Inspected and approved new feeders for west stadium lights, from the ground level electrical room to the roof - junction at old Musco contactors. |
Electrical | Wall Rough-in | Postponed | James Melvin | partial inwall rough inspection on founder's level | |
Building/Structural | Masonry | Cancelled | Kody Boswell | Sequence 2 masonry rebar inspection. Inspection was cancelled due to Hurricane Debby | |
Electrical | Underground | Passed | Rocky Wilde | Duct bank under ramp by Gate D . | |
Building/Structural | Structural | Postponed | Kody Boswell | Decking in seq 2 on upper concourse. This inspection was postponed to tomorrow morning. | |
Electrical | Wall Rough-in | James Melvin | south grab and go 3rd floor in wall electrical inspection | ||
Electrical | Wall Rough-in | Passed | Al Smythe | electrical in wall rough inspection at the entry portal soffit at gate C | |
Building/Structural | Masonry | Cancelled | Kody Boswell | Inspecting masonry rebar on upper concourse. Inspection was cancelled due to Hurricane Debby | |
Building/Structural | Framing | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
Plumbing | Underground | Passed | Rocky Wilde | -Upper con women’s restroom insulation inspection -Upper con copper & drain/vent in grab-n-go -Main con underground partial grease inspection (back fill before rain Wednesday) | |
Plumbing | Underground | Neely Lewis | |||
Plumbing | Stack Piping & Test | Passed | Rocky Wilde | -Upper con women’s restroom insulation inspection -Upper con copper & drain/vent in grab-n-go -Main con underground partial grease inspection (back fill before rain Wednesday) | |
Plumbing | Water Piping & Test | Passed | Rocky Wilde | -Upper con women’s restroom insulation inspection -Upper con copper & drain/vent in grab-n-go -Main con underground partial grease inspection (back fill before rain Wednesday) | |
Building/Structural | Framing | Postponed | Kody Boswell | Interior framing area b main concourse founders level. | |
Building/Structural | Framing | Postponed | Kody Boswell | Framing on founders level area b phase 1. Contractor postponed inspection to a later date | |
Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone founders level slab inspection to a later date | |
Building/Structural | Framing | Postponed | Kody Boswell | Framing on upper concourse area B Grab and Go, and front knee wall on speed of concession. Contractor cancelled/postponed inspection to a later date | |
Building/Structural | Sheetrock | Kody Boswell | Inspection for screws on dens glass for field club stairs and Field club area A sofit. | ||
Building/Structural | Structural | Kody Boswell | Stair one, joist/decking upper concourse at existing slab, stair 6 north and south, and south endzone party decks. | ||
Plumbing | Stack Piping & Test | Paul Nitz | 3rd floor north single bathroom, 3rd floor south grab and go, 3rd floor speed of concession. | ||
Plumbing | Water Piping & Test | Paul Nitz | 3rd floor north single bathroom, 3rd floor south grab and go, 3rd floor speed of concession. | ||
Building/Structural | Framing | Postponed | Kody Boswell | Framing for upper concourse area B rooms speed of service concession and the concession prep. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection | |
Building/Structural | Framing | Postponed | Kody Boswell | exterior framing in area a founders level. Inspection was postponed to a later date | |
Building/Structural | Slab | Postponed | Kody Boswell | Inspection for reinforcing steel for topping slabs on founders level, area B. Contractor contacted FSU BCA prior to site arrival to cancel/postpne inspection to a later date | |
Building/Structural | Wall/Ceiling | Postponed | Kody Boswell | MCJV is requesting a reinforcement inspection for field wall on north side. Contractor contacted FSU BCA prior to site arrival to postpone inspection until tomorrow due to severe weather | |
Building/Structural | Framing | Conditional | Rocky Wilde | Founders area A food service prep and last walls need to be inspected in the area. | |
Building/Structural | Structural | Postponed | Kody Boswell | Stadia Steel Deck Extension Inspection @ SEZ lvl 6 West side. Inspection has been postponed due to incoming weather | |
Building/Structural | Structural | Postponed | Kody Boswell | East portion of south endzone steel for curtainwall. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
Building/Structural | Re-Inspection | Kody Boswell | RE-inspection for upper concourse area B speed of concessions back wall access panel opening has been enlarged and framed out. | ||
Building/Structural | Slab | Postponed | Kody Boswell | Mcjv is requesting a reinforcement inspection for upper part of north founders. Thanks Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
Building/Structural | Wall/Ceiling | Postponed | Kody Boswell | Mcjv is requesting a reinforcement inspection for curb on founders level north side. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
Plumbing | Water Piping & Test | Passed | James Melvin | Inspecting overhead plumbing on upper concourse | |
Plumbing | Stack Piping & Test | Passed | James Melvin | Inspecting overhead plumbing on upper concourse | |
Building/Structural | Framing | Kody Boswell | MCJV is requesting a framing inspection for north and south side exterior founders level. thanks | ||
Electrical | Underground | Postponed | Rocky Wilde | Penetrations into manhole and underground duct bank | |
Electrical | Underground | James Melvin | Reinspection of 15kva Duct Bank at Gate D (Partial inside of gate ) | ||
Building/Structural | Structural | Kody Boswell | Inspection on south end zone boxes level four and six. |
BCA Project #: 23-03418-A Doak Campbell - West Stands Renovation DEMOLITION
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/03/15 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | Construction Trailers Inspections 1. Electrical breaker missing on 1st offices panel. 2. Mechanical trailer - need 5LB ABC fire extinguisher. And not florida state approved sticker on trailer. |
BCA Project #: 23-03418- Doak Campbell - West Stands Enabling Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/03/10 | Electrical | Underground | Failed | James Melvin | Conduit in the Duct bank at Gate D . Building out to sidewalk beside the bus top . 1) red die not installed per plans nor installation instructions, contractor is going to ask the electrical engineer if they will allow a alternative method in leu of the red die. Contractor is ok to cover the trench so that other trades can continue their work but is aware that he may have to uncover to address not following the plans. |
2025/03/10 | Plumbing | Underground | NOT READY | Paul Nitz | -Looking at underground sanitary line area L4. -Inspecting copper insulation upper concourse women’s restroom Area A |
2025/03/07 | Electrical | Underground | Failed | James Melvin | Concrete inspection for the duct bank at Gate D by the ramp . 1) red die not installed per plans nor installation instructions, contractor is going to ask the electrical engineer if they will allow a alternative method in leu of the red die. Contractor is ok to cover the trench so that other trades can continue their work but is aware that he may have to uncover to address not following the plans. |
2025/02/21 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing Main Con Market Concession overhead roof drains. Tested and passed in 1/21/25, calling in for 1/22/25 |
2025/02/20 | Building/Structural | Slab | Failed | Paul Nitz | MCJV is requesting a SOG reinforcement inspection for south side slab. Thanks |
2025/02/20 | Building/Structural | Framing | Passed | Paul Nitz | Entry portal soffit by gate c. |
2025/02/10 | Electrical | Underground | Failed | James Melvin | Underground duct bank at Gate D sidewalk out to manhole . 1) coverage not met 2) minimum supports not met |
2025/02/05 | Building/Structural | Framing | Passed | Paul Nitz | Interior framing for mother's room in area b main concourse. |
2025/01/28 | Building/Structural | Masonry | Passed | Kody Boswell | Interior CMU Inspection in area B of Upper Concourse 12" and 8" CMU |
2025/01/28 | Building/Structural | Roofing | Failed | Paul Nitz | Re-Inspection at Upper Concourse North and South grab and go Sub-roofing Framing 1) missing fasteners |
2025/01/28 | Building/Structural | Structural | Passed | Kody Boswell | SEZ stadium deck extension structural framing and plate install on level 6 |
2025/01/28 | Building/Structural | Framing | NOT READY | Paul Nitz | Inspection for framing fixed in area b main concourse. Inspecting while MEP inspection is going on 01/27/25. |
2025/01/28 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the field wall and a footer |
2025/01/28 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the field wall and a footer |
2025/01/27 | Building/Structural | Masonry | Failed | Paul Nitz | Inspected Upper Concourse CMU 1/27/25. Failed. This is taking place for missed reschedule from last week’s ice closure days. 1) not ready |
2025/01/27 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing in-wall/overhead in the framing portion of wall. Main Con, multiple areas. |
2025/01/27 | Electrical | Ceiling Rough-in | Passed | James Melvin | Rough in on Main Con Area B. From market concession up to men’s bathroom. |
2025/01/27 | Electrical | Wall Rough-in | Passed | James Melvin | Rough in on Main Con Area B. From market concession up to men’s bathroom. |
2025/01/27 | Building/Structural | Framing | Failed | Paul Nitz | Framing for area b main concourse restrooms and concession stands. 1) Framing was not secured |
2025/01/27 | Building/Structural | Roofing | Passed | Paul Nitz | Roofing in area b main concourse at restrooms and concession stands. |
2025/01/27 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing in-wall/overhead in the framing portion of wall. Main Con Area B, multiple rooms. |
2025/01/24 | Fire Safety | Opening Protections | Failed | Sam Sevor | Inspect in wall floor penetrations for plumbing pipe. Area B1 Upper Concourse. Nova arrived to conduct inspection on 1/24 and the appropriate paperwork was not available. |
2025/01/22 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing small corner of HW copper line in the NE corner of Main Con Market Concession. Tested and passed in 1/21/25, calling in for 1/22/25 |
2025/01/21 | Building/Structural | Roofing | Passed | Kody Boswell | In progress roofing inspection for the south bathroom, area B, main concourse. Contractor was installing insulation layer. |
2025/01/21 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing copper pipe sink wall in upper con women’s bathroom. |
2025/01/21 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing drain pipe in sink wall of upper con women’s restroom. |
2025/01/21 | Plumbing | Specialty Piping | Passed | Paul Nitz | Checking off copper insulation in multiple areas: upper con women’s restroom (minus sink wall), main con Area B market concession. |
2025/01/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing for a portion of the field wall, area A |
2025/01/10 | Plumbing | Water Piping & Test | Passed | Paul Nitz | DW/CW/HW in main concourse Area B Market Concession. Looked at on 1/9/25 along with Founders inspection. |
2025/01/10 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Mcjv is requesting a reinforcement inspection for field wall on south side. Thanks 1) columns 6-11 only |
2025/01/09 | Plumbing | Water Piping & Test | Conditional | Paul Nitz | Testing DW/CW/HW on founders level 1) water arresters missing |
2025/01/07 | Fire Safety | Opening Protections | Failed | Sam Sevor | Upper concourse firestopping inspection - Need to provide UL or EJ for all fire stopping applications Nothing has currently been approved by FSU fire nor NOVA. |
2025/01/07 | Plumbing | Water Piping & Test | Conditional | Paul Nitz | Testing DW/CW/HW copper lines on Level 2 Founders. 1) water aresters missing |
2025/01/06 | Electrical | Wall Rough-in | Passed | James Melvin | Courtesy walk upper concourse |
2025/01/03 | Fire Safety | Fire Water Underground | Passed | Curtis Rogers | Inspecting underground fire main. Inspected repair on underground fire main on 1-3-2025 |
2024/12/26 | Building/Structural | Slab | Passed | Rocky Wilde | Upper bowl area A stairs/ decking |
2024/12/23 | Plumbing | Water Piping & Test | Passed | Rocky Wilde | Testing 3” and 4” main on main concourse |
2024/12/20 | Building/Structural | Slab | Passed | Kody Boswell | Mcjv is requesting an inspection for walk in cooler slabs. Thanks |
2024/12/20 | Plumbing | Water Piping & Test | Conditional | Paul Nitz | DW pressure testing on northern-most bathroom group, Founders level. 1) check plans for water hammers installed on LAV sinks |
2024/12/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the upper bowl slab and aisle steps for area B |
2024/12/17 | Building/Structural | Structural | Passed | Kody Boswell | Decking area b screw and weld inspection |
2024/12/16 | Building/Structural | Structural | Passed | Kody Boswell | Decking inspection for area b main concourse. RTU and joist in area a1 on main concourse. |
2024/12/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for upper concourse sequence 1 pantry walls |
2024/12/12 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for 3 isolation pads for walk-in coolers on the lower concourse level. Reinforcing steel was in substantial compliance with the contract documents. Waterproofing membrance had many punctures and holes present. Contractor to repair or replace waterproofing membrance and schedule reinspection. |
2024/12/10 | Building/Structural | Masonry | Conditional | Kody Boswell | Masonry rebar inspection, elevator 4 Result is conditional pending missing reinforcing at jamb for rough opening. Threshold inspector will verify prior to grout placement. |
2024/12/09 | Building/Structural | Masonry | Passed | Kody Boswell | Inspecting interior cmu walls on main concourse area a. |
2024/12/09 | Building/Structural | Slab | Passed | Kody Boswell | Inspecting void areas diamonds and walk in cooler areas on upper concourse. |
2024/12/06 | Building/Structural | Masonry | Passed | Kody Boswell | Interior masonry walls in area a main concourse. |
2024/12/06 | Building/Structural | Framing | Passed | Kody Boswell | Joist bridging rtu frames on main concourse area b. Upper bowl decking and bent plate. |
2024/12/05 | Building/Structural | Slab | Conditional | Kody Boswell | Upper concourse topping slab rebar inspection. Result is conditional pending photos of items to be addressed prior to concrete placement. |
2024/12/05 | Building/Structural | Masonry | Passed | Kody Boswell | Interior masonry walls in area a main concourse. |
2024/12/04 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection at North and South electric and comm rooms. Interior walls only |
2024/12/04 | Building/Structural | Masonry | Passed | Paul Nitz | Elevator 4 and interior walls in area a main concourse. |
2024/12/03 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Reinspect of level 2 sanitary drains/vents. |
2024/12/03 | Building/Structural | Masonry | Failed | Rocky Wilde | Elevator 4 on upper concourse. Area a main concourse interior walls. 1) no access to the inspection |
2024/12/03 | Building/Structural | Slab | Failed | Rocky Wilde | Seq 3 corridor rebar (topping slab) 1) minimum lap splicing not met 2) bars missing |
2024/12/03 | Building/Structural | Structural | Cancelled | Rocky Wilde | Inspecting decking on upper bowl. |
2024/12/02 | Building/Structural | Slab | Passed | Kody Boswell | Seq 2 topping slab rebar inspection |
2024/12/02 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior masonry partition walls for the north bathroom group on the main concourse. |
2024/12/02 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | Testing Founders level stub up drains. 1) Clamp Coupling not toqued to specs 2) vent and drain lines are not holding water |
2024/11/26 | Building/Structural | Slab | Passed | Al Smythe | Sequence 3 topping slab rebar inspection |
2024/11/26 | Building/Structural | Masonry | Failed | Rocky Wilde | Mcjv is requesting a masonry reinforcing inspection for area A main concourse bathroom walls. Thanks Lap insufficient for corners, lap inisufficient for all uprights |
2024/11/25 | Building/Structural | Slab | Passed | Rocky Wilde | Sequence 1 topping slab |
2024/11/20 | Electrical | Wall Rough-in | Passed | Rocky Wilde | 2nd floor ( Founders Level ) electrical closet wall close in . North and Southside |
2024/11/20 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing for main concourse soffit infront of gate C north and south sections |
2024/11/20 | Building/Structural | Slab | Postponed | Kody Boswell | Sequence 2 rebar inspection topping slab. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date |
2024/11/20 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Checking main drain line supporting Founders level. Riser near gate C. |
2024/11/15 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Inspection on Area B men’s sink cluster and back side of mother’s room plumbing through masonry walls. All waste water. |
2024/11/06 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor called FSU BCA prior to site arrival to cancel/postpone masonry reinforcing inspection |
2024/10/03 | Plumbing | Water Piping & Test | Passed | Paul Nitz | |
2024/10/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st and 2nd lifts of masonry walls on the upper concourse |
2024/09/23 | Building/Structural | Masonry | Passed | Paul Nitz | CMU rebar inspection sequence 1 |
2024/08/30 | Fire Safety | Final Egress/Emergency Lights | Passed | Mary Creason | Inspection set up with Sam Sevor to have Mary Creason to review the egress lighting and exit sign placements. A prior walk-through was completed at 6:00 a.m. on Tuesday, August 27 that confirmed footcandles for the public concourse spaces. TCO is approved by Sam Sever, FIRE Manager FSU, Todd Pierce, State Fire Marshal office, and Jason Grisel, TFD. |
2024/08/23 | Building/Structural | Masonry | Passed | Paul Nitz | Masonry inspection for first lift on main concourse area a. |
2024/08/22 | Building/Structural | Masonry | Passed | Paul Nitz | Masonry rebar at area b main concourse. |
2024/08/22 | Building/Structural | Slab | Failed | Paul Nitz | Inspecting diamonds on main concourse. 1) electrode not connected 2) rebar was not in the forms |
2024/08/21 | Building/Structural | Masonry | Passed | Paul Nitz | masonry rebar inspection for 1st level concourse south side |
2024/08/21 | Building/Structural | Footing | NOT READY | Paul Nitz | reinforcing inspection for diamonds around columns 1st level south side |
2024/08/21 | Building/Structural | Footing | NOT READY | Paul Nitz | reinforcing inspection for diamonds around columns 1st level south side |
2024/08/20 | Building/Structural | Footing | NOT READY | Paul Nitz | rebar for diamonds |
2024/07/23 | Fire Safety | Fire Water Underground | Cancelled | Mary Creason | Inspection for tying the new fire riser into the existing fire line in area a main concourse. Cancelled by contractor |
2024/07/23 | Building/Structural | Masonry | NOT READY | Paul Nitz | Masonry inspection for first course at upper concourse. |
2024/07/23 | Building/Structural | Masonry | Failed | Paul Nitz | Masonry curb inspection for upper concourse. 1) missing bars on the corner and on each side of the control joint |
2024/07/23 | Building/Structural | Masonry | Cancelled | Paul Nitz | Masonry inspection for curbs and second course on upper concourse. |
2024/07/23 | Building/Structural | Slab | Passed | Paul Nitz | Rebar inspection for slab on grade for the corridor between W3.9N and W5S. |
2024/07/23 | Plumbing | Underground | Passed | Paul Nitz | No notification of first request attempted was received, double checking inspection scheduled. |
2024/07/16 | Building/Structural | Slab | Cancelled | Paul Nitz | slab on grade. |
2024/07/16 | Building/Structural | Slab | NOT READY | Paul Nitz | Inspection for precast curb reinforcing 1) this was for 11:00am and they were not ready |
2024/07/16 | Building/Structural | Slab | NOT READY | Paul Nitz | Inspection for precast curb reinforcing 1) this was scheduled for 8:00am and they were not redy |
2024/07/15 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm piping checked at 2pm 7/15 |
2024/07/01 | Plumbing | Underground | Failed | Paul Nitz | Storm pipe was not accessible |
2024/07/01 | Building/Structural | Masonry | Passed | Paul Nitz | Masonry inspection for cmu along WE line. |
2024/06/28 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/27 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm and sanitary |
2024/06/25 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/06/18 | Plumbing | Underground | Passed | Paul Nitz | 16'' storm section |
2024/06/13 | Building/Structural | Slab | Passed | Alex Masterton | Slab on Metal Deck Sequence 1B |
2024/06/13 | Plumbing | Underground | Passed | Paul Nitz | Grease |
2024/06/12 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/12 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/12 | Building/Structural | Slab | Passed | Alex Masterton | Slab on Metal Deck sequence 1c |
2024/06/11 | Building/Structural | Slab | Passed | Dwayne Mahony | Rebar inspection for slab on deck Sequence 1 area c. Approval is conditional to T.I. approval after curbs are completed. |
2024/06/11 | Plumbing | Underground | Passed | Paul Nitz | |
2024/05/24 | Plumbing | Underground | Passed | Dwayne Mahony | |
2024/04/04 | Building/Structural | Structural | Passed | Kody Boswell | Visually inspection of cementitious spray applied fireproffing to column stiffeners of UCC. Contractor to forward thickness and adhesion reports to FSU BCA. |
2024/02/27 | Building/Structural | Structural | Passed | Dwayne Mahony | last 4 stiffening steel columns 2 and 6 North and 2 5 South |
2024/02/20 | Mechanical | Insulation | Passed | Neely Lewis | insulation inspection on hw and cw piping |
2024/02/16 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed column stiffeners for UCC located at gridlines 6S and 8S. There was two locations on each stiffener that were partially missing a weld located at the existing column splice. Contractor to send photos after welds have been complete. Photos received 2/19/2024 . See Folder dated 2024-02-16 Inspection. (KB) |
2024/02/13 | Building/Structural | Structural | Passed | Kody Boswell | col,12 and 10 North stiffening steel Reviewed structural steel stiffening of columns located at gridlines 10N and 12N (KB) |
2024/02/12 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed 2nd layer of interior sheathing attachment in room 5301. Contractor emailed photos of 1st layer attachment and insulation installation. See folder "2024-02-12 C5301 screws" in "West Stands Demolition" --> "Contractor Photos" folder (KB) |
2024/02/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed column stiffeners for UCC located at gridlines 10S and 12S. (KB) |
2024/02/08 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing located where steel stiffening occurred at grids 2N and 2S. (KB) |
2024/02/08 | Electrical | Ground | Passed | Dwayne Mahony | 301 hendry service for new office trailer |
2024/02/02 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed column stiffeners for UCC on grids 14N & 16N with the threshold inspector. Stiffener plate within stiffener columns did not align with UCC floor slabs, as required by structural drawings. Threshold inspector contacted the EOR about the condition and EOR confirmed the stiffeneer plates were to align with UCC floor slabs. (KB) |
2024/02/02 | Building/Structural | Structural | Passed | Dwayne Mahony | inspecting steel column reinforcing, column line 16 and 14 North Reviewed column stiffeners for UCC on grids 14N & 16N with the threshold inspector. Inspection was initially failed by Kody Boswell so I returned in the afternoon after issues were corrected. Stiffener plate within stiffener columns were corrected per EOR direction. |
2024/01/30 | Building/Structural | Structural | Passed | Kody Boswell | Looking at stiffening steel connections, at column 16 and 14 South Reviewed stiffening connections as stated above. (KB) |
2024/01/25 | Building/Structural | Insulation | Passed | Kody Boswell | Looking at intumescent paint on columns in room 5301 before insulation and framing. |
2024/01/24 | Building/Structural | Structural | Conditional | Kody Boswell | structural steel inspection for enabling package 5th, and 6th floor Reviewed existing bracing strengthening for the 5th and 6th floor along grids 2N & 2S. Contractor was touching up a few small areas with additional welded plated. FSU deferring to BNI (threshold inspector) to verify the touch-ups were complete. |
2024/01/18 | Building/Structural | Slab | Passed | Kody Boswell | There was no detail on how to replace a portion of a slab on grade that had been chipped out for underground piping installation. Concrete area that was chipped out was approximately 2' wide by 25' long. Contractor doweled #5 bars at 24" OC into each side of existing slab and ran 1#5 continuous with the strip to be replaced. Reinforcing installed was more than what was in the existing slab. (KB) |
2024/01/18 | Mechanical | CHW Piping & Test | Conditional | Neely Lewis | inspect welds and insulation for chilled and hot water piping. 1. Add proper supports for vertical risers on piping per FBC requirements FBC-P Table 308.5. 2. Separate piping of dissimilar metals from ubolt hangers. |
2024/01/16 | Plumbing | Underground | Passed | Neely Lewis | All ok except for last 10' before turning up against the wall, which doesw not have the required slope. Site personnel promised to fix and provide pictures of pipe with required slope. Additionally, contractor is to provide pictures of grout around piping at manhole. 1/17/2024: Items listed above were resolved. Passed |
2024/01/10 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | was approved on previous inspection. |
2024/01/10 | Building/Structural | Sheetrock | Conditional | Kody Boswell | Reviewed drywall screws for new LG framing walls at grids 18N and 18S on 5th and 6th floors (4 locations). In 3 locations there were areas where screw spacing was excessive. This was discussed with the Contractor. Contractor to send photos after screw spacing is corrected. (KB) Photos from Contractor received. See Folder dated 2024-01-10 Inspection |
2024/01/09 | Building/Structural | Framing | Passed | Dwayne Mahony | |
2024/01/08 | Building/Structural | Framing | Conditional | Dwayne Mahony | Approval is conditional to providing a 2-hour rated fire stop at floor penetrations at the existing rainwater leaders. If the unrated penetration was existing it constitutes an existing condition code deficiency that must be remedied in all "work areas", per the Existing Building code, section EB 803.2.1. |
2024/01/08 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Contractor called and requested the original 2pm request to 8:30am (KB) |
2023/12/21 | Electrical | Ground | Passed | Dwayne Mahony | This inspection is for the temp power release for the Manhattan construction's job trailers. Approved, with the understanding that all feeder breakers are to be identified to which trailer unit, and backfed breakers in the trailers must have supplemental restraint. |
2023/12/21 | Building/Structural | Structural | Passed | Kody Boswell | This will be for inspection of the stiffening steel on the north end of the 5th and 6th floors. BNI will be on site in conjunction as the third-party inspector for the project. Work completed appears to be in conformance with the EOR Construction documents Thold inspector on site and approved work |
2023/12/12 | Building/Structural | Structural | Passed | Kody Boswell | Would like to request an inspection for the interior stiffening steel installation on the south side of the sixth floor to allow for demolition of stadia to be performed. New bracing reviewed at levels 5 & 6, along grid 18S/N-O (KB) |
2023/01/18 | Mechanical | HW Piping & Test | Conditional | Neely Lewis | inspect welds and insulation for chilled and hot water piping. 1. Add proper supports for vertical risers per FBC. FBC-P Table308.5. |
Electrical | Wall Rough-in | NOT READY | Rocky Wilde | We will look at the walls on the main concourse, A-side (north) of the building. | |
Building/Structural | Masonry | Cancelled | Kody Boswell | Inspecting elevator 4. | |
Electrical | Wall Rough-in | Passed | Al Smythe | partial inwall rough inspection on founder's level | |
Building/Structural | Slab | Postponed | Kody Boswell | Topping slab in void areas on upper concourse. Contractor contacted FSU BCA prior to site arrival to cancel/postpone the inspection to another date. | |
Building/Structural | Roofing | Passed | Rocky Wilde | Roofing inspection for area b main concourse roof. | |
Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | MCJV is requesting an inspection for secondary field wall. Thanks |
BCA Project #: 22-03410- UCA - AT&T Mods
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/02/18 | Building/Structural | Final Building | Failed | Kody Boswell | FSU BCA reviewed the sled mount modifications per drawings provide by B+T Group, dated 5/26/2023 and found the follwing: -Alpha sled mount is in compliance with contract documents. -Beta sled mount is not in compliance with the contract documents. There are several 1/2" bolts not installed (as shown on sheet S1) -Gamma face mount is not in compliance with the contract documents. The new support HSS tube is not in the location shown on sheet S3. The findings of FSU BCA does not agree with the JCL Jurisdiction Closeout Letter, dated 8/12/2024, provided by Raphael I. Mohamed. Based on the closeout letter, it appears Mr. Mohamed may have been provided a revised set of drawings that FSU BCA is not in possession of. If this is the case, FSU BCA is to be provided these drawings and accompanying structural analysis report verifying the new vertical support HSS tube location is structurally adequate. |
BCA Project #: 22-03400- New College of Florida College Hall Welcome Center Electrical Improvements
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/11/09 | Electrical | Wall Rough-in | Passed | Hank Fulmer | The electrical wall rough is approved. Wires were ran for 2 new floor outlets and several wall lights. The floor outlets were ran through the crawl space in the floor and are correctly protected and sized for the circuit. The wall lights also were ran to NEC code. |
BCA Project #: 22-03391- Housewright - Student Svcs. Office Remodel
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/09/18 | Mechanical | Final Mechanical | Conditional | Dwayne Mahony | Conditional to providing ventilation to the cabinet which will house the refrigerator. All refrigerators require ventilation. All electrical and mechanical equipment must be installed in compliance with the manufacturer's product instructions. Without ventilation this refrigerator will not last long, and could present a fire hazard. |
2023/09/18 | Plumbing | Final Plumbing | Passed | Dwayne Mahony | |
2023/09/18 | Building/Structural | Final Building | Conditional | Dwayne Mahony | Some work is on-going, so final not fully ready. The Dean's office is complete, and may be occupied. |
2023/09/18 | Electrical | Final Electrical | Conditional | Dwayne Mahony | Provide receptacle box extensions at cabinets in Dean's office. |
2023/09/18 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Fire alarm, sprinkler, em. Lights and life safety pass final. |
2023/09/07 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | They need to finish some of the pipe insulation in the morning on mechanical. I can call Nealy if they wint be done by 10am to come later, but hopefully by 10am they will be done |
2023/09/07 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | They need to finish some of the pipe insulation in the morning on mechanical. I can call Nealy if they wint be done by 10am to come later, but hopefully by 10am they will be done |
2023/09/07 | Mechanical | Wall & Ceiling | Passed | Neely Lewis | They need to finish some of the pipe insulation in the morning on mechanical. I can call Nealy if they wint be done by 10am to come later, but hopefully by 10am they will be done |
2023/09/07 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | They need to finish some of the pipe insulation in the morning on mechanical. I can call Nealy if they wint be done by 10am to come later, but hopefully by 10am they will be done Note: sprinkler head missing in room 204A closet. Will check on final. |
2023/09/07 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | They need to finish some of the pipe insulation in the morning on mechanical. I can call Nealy if they wint be done by 10am to come later, but hopefully by 10am they will be done |
2023/08/24 | Mechanical | HW Piping & Test | Passed | Neely Lewis | |
2023/08/02 | Mechanical | Duct Rough-in | Passed | Neely Lewis | Anytime! |
2023/08/02 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Anytime! |
2023/08/02 | Building/Structural | Framing | Conditional | Dwayne Mahony | Door 203C-1 is scheduled to be 2'-8". This door (all egress doors) must be 3'-0" to provide the minimum 32" clear opening required by FBC 1010.1.1. Please consult with the architect and obtain direction for code compliance. |
BCA Project #: 22-03387- Pepper Building - Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/09/12 | Building/Structural | Roofing | Passed | Dwayne Mahony | In progress inspection |
2023/08/01 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspection - Decking Main roof decking seems to be in sound condition. Membrane is fully adhered so the actual wood can not be seen. Looking from below the roof it appears that screw attachment is adequate, so inspection is passed. |
2023/07/27 | Building/Structural | Roofing | Conditional | Dwayne Mahony | In-Progress Inspection - DECKING In roofing areas where the plywood decking is decayed and the insulation is wet understandably this must all be replaced. When insulation is replaced it must be brought up to current code requirements, per Florida Energy Conservation code section R503.1.1. That code section requires replacement thermal envelope components to meet the requirements of commercial energy code section C402.1.3. This Table requires R-25 minimum insulation in this case (it varies based on specific construction type and location of thermal insulation). Please plan accordingly. This only applies where the insulation is removed and replaced. |
BCA Project #: 22-03364- President's House Camera Installation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/15 | Electrical | Final Electrical | Failed | Dwayne Mahony | Outdoor electrical receptacles shall be GFCI protected as required by NEC 210.8. |
BCA Project #: 22-03329- Rovetta Buildng B - ReRoof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/06/26 | Building/Structural | Roofing | Conditional | Tom Deckert | Final Inspection Walk-thru- General observation SPM installation complete with minor corrections needed The following items were incomplete or present 1) Lightning protection not re-installed 2) 2 water blisters present on east side 3) Drain covers not attached- Clamping ring not installed 4) Cap metal at building Joints and parapetl not yet replaced (separate contract?) 5) Minor ponding present at several of the drains- Ponds still present after 48 hours |
2023/06/05 | Building/Structural | Roofing | Passed | Dwayne Mahony | Replacing Wet Insulation |
2023/05/30 | Building/Structural | Roofing | Passed | Dwayne Mahony | Installing Single Ply Membrane |
2023/05/26 | Building/Structural | Roofing | Passed | Dwayne Mahony | Tearing out wet insulation. |
2023/05/25 | Building/Structural | Roofing | Passed | Dwayne Mahony | Replacing more wet insulation. |
2023/05/19 | Building/Structural | Roofing | NOT READY | Dwayne Mahony | Replacing more wet insulation. No work lots of rain. |
2023/05/16 | Building/Structural | Roofing | Passed | Dwayne Mahony | Tearing-out Wet Insulation |
2023/05/16 | Building/Structural | Roofing | Passed | Dwayne Mahony | Installing membrane over areas of wet insulation. (Not new single ply membrane) |
2023/05/11 | Building/Structural | Roofing | Passed | Dwayne Mahony | We will be flashing walls and doing detail work. |
2023/05/10 | Building/Structural | Roofing | Passed | Dwayne Mahony | We will be installing single-ply field membrane. |
BCA Project #: 22-03328- Shaw Building - ReRoof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/05/10 | Building/Structural | Roofing | Conditional | Dwayne Mahony | Final Inspection Request Need to verify with Kent how utilities on wood blocks will be secured against wind load. |
2023/04/11 | Building/Structural | Roofing | NOT READY | Tom Deckert | Installing Single Ply No additional work performed to be inspected |
2023/04/10 | Building/Structural | Roofing | NOT READY | Tom Deckert | Installing Single Ply Membrane No additional work performed to be inspected |
2023/04/07 | Building/Structural | Roofing | NOT READY | Tom Deckert | Single Ply Installation. - In-progress - second section east flashing continuing Next inspection wll be on third section mod. Bit clean up and adhesive install for conver sheet. |
2023/04/06 | Building/Structural | Roofing | Passed | Tom Deckert | Installing single ply membrane In progress- second section east roof flashing in progress. Material adhesive per specs |
2023/04/05 | Building/Structural | Roofing | Passed | Tom Deckert | Installing Single Ply - in progress - section 2 of east roof existing surface cleaned and cap sheet fully adheared |
2023/04/04 | Building/Structural | Roofing | NOT READY | Tom Deckert | Installing Single Ply Membrane this work was postponed until tomorrow |
2023/04/03 | Building/Structural | Roofing | Passed | Tom Deckert | Installing more of the single ply membrane. |
2023/03/31 | Building/Structural | Roofing | Failed | Tom Deckert | We plan to install the field membrane over the existing modified roof system on 3/31. No insulation or coverboard is being installed. We plan to work 7:30 - 3:30ish. Our foreman, Eric Morris will be on-site with any questions/concerns. The following observations were made during this in progress inspection and need correction/resolution. 1) only east of building has membrane application in progress 2) existing roofing may require additional cleaning to remove loose granules before applying adhesive and cap sheet. 3) In several location cap sheet material is not bonding to existing membrane where adhesive is applied. Contractor to investigate cause 4) Several locations cap membrane is being applied with wrinkles resulting limited adhesion. 5) Detail flashing of curbs not complete and exposed to water infiltration |
2023/03/29 | Fire Safety | Opening Protections | Passed | Mary Creason | Required Building and Fire Site Safety Inspections Prior to Commencement. Make sure single back exit door is not blocked and an 36in area to the side walk is maintained for staff. |
2023/03/29 | Building/Structural | Roofing | Passed | Andy Howard | Required Building and Fire Site Safety Inspections Prior to Commencement. The roof surface preparation inspection was done and passed for the installation of the first membrane. Andy Howard and Mary Creason met with Tom McCaughey and Eric Morris from TWI. |
BCA Project #: 22-03326- Biomedical Research Facility - ReRoof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/06/29 | Building/Structural | Roofing | Passed | Dwayne Mahony | |
2023/05/03 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-progress inspection approved. |
2023/04/21 | Building/Structural | Roofing | Passed | Tom Deckert | TPA install on penthouse roof In progress- cap sheet application. Ribbon adhesive, roller application and sheet welds per manufactures instruction |
2023/04/12 | Building/Structural | Roofing | Passed | Tom Deckert | In progress - first section of North roof. Installed per manufacturers FPA details |
2023/04/04 | Building/Structural | Roofing | Passed | Tom Deckert | visit 1- Iso board being installed with fasteners pattern per manufactureres spec. Visit 2- deck board and Innerply being installed per specs |
2023/04/03 | Building/Structural | Roofing | Passed | Tom Deckert | In proress- removal of old roof membrane and insultaion in progress on east upper roof. Insulation and inner ply being installed per manufactureres spec |
2023/03/22 | Building/Structural | Roofing | Passed | Andy Howard | Andy Howard met with Tom McCaughey for this inspection. The base sheet torch down was being performed correctly. This in progress base sheet inspection passed. |
2023/03/21 | Building/Structural | Roofing | NOT READY | Andy Howard | Andy Howard, Kent Malik, with FSU, Oliver Volkmann, Ellis Brown with Perry Roofing, Tom McCaughey, Jeromy DeMuth with TWI, and James Hartman with Tremco met at the site to discuss the inspection process. No tear off had commenced at the time of this inspection, only the asbestos flashing was removed. Tom McCaughey will reschedule the inspection for installation tomorrow. |
2023/03/21 | Building/Structural | Roofing | NOT READY | Andy Howard | ACM abatement, roof tear off and installation of Insulation board. Andy Howard, Kent Malik, with FSU, Oliver Volkmann, Ellis Brown with Perry Roofing, Tom McCaughey, Jeromy DeMuth with TWI, and James Hartman with Tremco met at the site to discuss the inspection process. No tear off had commenced at the time of this inspection, only the asbestos flashing was removed. Tom McCaughey will reschedule the inspection for installation tomorrow. |
2023/03/17 | Building/Structural | Roofing | Passed | Andy Howard | Inspection for scaffolding improvements. The deficiencies noted on the previous inspection of March 10th, 2023 were corrected satisfactorily. |
2023/03/10 | Building/Structural | Roofing | NOT READY | Andy Howard | This inspection covers the building ground site pedestrian protection as required by 2020 FBC-Building and Accesibility Volumes. The following in place items require modifications: 1.) The building exit on the north side of the northeastern corner of the building overhead protection scaffolding is blocking the accessibility sidewalk route to the west and to the east. The sidewalk is required to be unobstructed to allow passage in the east and west directions on the existing accessible sidewalk. 2.) The overhead protection at the Northeast corner of the building where the roof trash shoot is located requires extended overhead protection and the addition of more protection screening than is currently placed. Multiple locations. 3.) On the southwest corner of the building where the exit of the building is located, more protective netting is required than is currently in place. 4.) On the southeast corner of the building at the loading dock the overhead protection at the southeastern most corner of the building can be either extended to provide complete overhead protection, or that route can be closed, rerouting the exiting path to the north side of the loading dock. Please notify Andy Howard (305-799-7095), FSU Deputy Building Official, for any questions regarding the required enhancements of the currently in place pedestrian protections. |
Building/Structural | Roofing | Conditional | Andy Howard | No result entry by Andy as of June 28, 2023. Dwayne | |
Building/Structural | Roofing | Conditional | Andy Howard | Base Sheet Dry-in. Inspection date changed to 3/30/2023. No result entry by Andy as of June 28, 2023. Dwayne | |
Building/Structural | Roofing | Conditional | Andy Howard | Insulation of new roof. Inspection date and time changed to 3/30/2023 at 2:00 P.M.. No result entry by Andy as of June 28, 2023. Dwayne |
BCA Project #: 22-03302- COM Thrasher Building - Thrasher, Rotunda & Connector Bldg. Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/09/24 | Building/Structural | Final Building | Conditional | Kody Boswell | Final inspection for roofing. Inspection is conditional upon the following items being addressed: 1) General clean up. There is some roofing material collecting around roof drains. 2) Receipt of Lightning Protection certification required 3) Expansion joint material and surrounding coping metal to be installed. Waiting on materials to arrive per Contractor. After LP certification and photo documentation of item #3 above are received, FSU BCA may issue a Certificate of Completion Photos received on 10/31/2024 for item #3 above. LP certification received on 10/31/2024 |
2024/07/12 | Building/Structural | Roofing | Passed | Kody Boswell | In progress inspection of flat roof insulation installation. |
2024/05/10 | Building/Structural | Roofing | Postponed | Kody Boswell | In-progress inspection was cancelled and postponed due to severe weather |
2024/03/15 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed new roof hatch framing on the northern most gable roof, south side, for access to the flat roof. |
2024/03/07 | Building/Structural | Roofing | Passed | Kody Boswell | Contractor is to send photos showing roof panel clips attachment to the sloped roof receiving standing seam metal deck. Inspection result and date to be left blank until photos received. FSU requested photos on 3/11/24, awaiting Contractor response. Contractor provided a video received by FSU on 3/12/2024 showing panel clip spacing at roof valley. Clips are approximately 2'-0" OC. |
2024/02/20 | Building/Structural | Roofing | Passed | Kody Boswell | In progress review of tapered insulation layer for roof area TC (flat roof). Insulation is adhesively anchored using ribbon pattern. (KB) |
2023/12/21 | Building/Structural | Roofing | Passed | Tom Deckert | We will be ready earlier than 9am if y’all would like to come sooner tile tear off in progress. Contratcor to expose deck to verify fastener frequency |
2023/12/08 | Building/Structural | Roofing | Passed | Dwayne Mahony | brief review of roof over MRI entry. |
Building/Structural | Roofing | Passed | Kody Boswell | in-progress inspection |
BCA Project #: 22-03298- C.A.P.S. High Bay Lab 2 - Solar PV System and Tie-in
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/02/01 | Electrical | Underground | Passed | Dwayne Mahony | I will be away from work on the 31st, Wallis Walker will be covering the job. Wallis can be reached at 850-933-2305. RT Electric the electrical contractor. Todd Jones is the supervisor. Todd can be reached at 850-544-4424. Thank you, Larry |
BCA Project #: 22-03294- Palm Court Communications Compound - Wireless Antenna Installations
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/27 | Building/Structural | Final Building | Passed | Kody Boswell | Work appears to be code compliant and per contract documents |
BCA Project #: 22-03275- McCollum Hall - AT&T Cell Site Modifications
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/03/04 | Building/Structural | Final Building | Failed | Dwayne Mahony | Ms. Rodriguez, I was provided this letter of inspection today. I just visited the site for my own inspection. This installation is on a roof, so easily accessed. The only aspect of the installation I inspected was the ballast of the sleds that carry the antennas. The total ballast is significantly short of that called for on the submitted permit documents. These documents require (140) 8x4x16 solid concrete blocks at each mount. There are at most 120 blocks at each mount. Some of the blocks are 8x8x16 hollow CMU (taking up the space of 2 solid units, less weight). Accordingly, the final inspection is not approved. Re-inspection is required. FSU Building Department requires the contractor to request inspection on all permits we issue, including all cell equipment on our buildings. Please have additional ballast added to meet requirements of the construction documents, and then schedule an inspection with my office via our website, as directed in the cover letter provided with the permit issuance. Regards, Dwayne Mahony, FSU BCA inspector Cell 850 294 1581 |
BCA Project #: 21-03229-B COB, Legacy Hall - Buildout
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/08 | Fire Safety | Hydro-Test | Passed | Mary Creason | Kenny/Randy Visual of Sprinklers observed in South Penthouse - passed (need guards on heads still) Hydro start 7;06AM AT 216PSI End at 10:46am at 216psi |
2025/04/08 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Kenny/Randy South Penthouse visual - Passed need head guards and 1 head under 7 ft duct. |
2025/04/08 | Fire Safety | Hydro-Test | Passed | Mary Creason | Kenny/Randy Standpipe Hydro Start at 7:06am at 246psi End at 10:06am at 245psi |
2025/04/08 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Kenny/Randy visual of standpipe |
2025/04/08 | Fire Safety | Fire Alarm Rough-In | Conditional | Mary Creason | Kenny --- Showed Kenny where one of the inline detectors are blocked and not easily accessable. There are several more per Chris - SunCoast and Park - Johnson Control These all must be corrected prior to finals |
2025/04/04 | Fire Safety | Hydro-Test | NOT READY | Mary Creason | Pent House & stairs-------Kenny Sam called to cancel again - they found a major blow out in pipe. He will call in to reschedule |
2025/04/04 | Electrical | Ceiling Rough-in | Passed | Al Smythe | Above ceiling inspection Seq1,2 Floors 2,3,4 |
2025/04/03 | Fire Safety | Hydro-Test | NOT READY | Mary Creason | Pent House & stairs-------Kenny Sam called to cancel - he discovered a leak in the dry wall. |
2025/03/28 | Fire Safety | Hydro-Test | Passed | Mary Creason | 4th Floor- hydro passed start = 7:23am at 248psi end = 9:35am at 248psi |
2025/03/27 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Sprinkler Inspection Seq 3,4 Floor 4 ---Thursday 8:30am---3-27-25 Visual inspection of sprinklers pass however several rooms not ready see approved plans Hydro did not pass - guage dropped 10 psi |
2025/03/26 | Electrical | Ceiling Rough-in | Passed | James Melvin | Inspection for Fsu sequence for first floor hard ceiling inspection |
2025/03/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for east retaining wall |
2025/03/20 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | 3rd Floor-----------------------Randy Visual on floor 3 - see marked plans to see what we skipped. |
2025/03/20 | Fire Safety | Hydro-Test | Passed | Mary Creason | 3rd Floor-----------------------Randy Start Hydro - 647am at 259psi Finish Hydro - 859am at 255 psi - lost 4 lbs due to small leak in pipe. Will fix pipe today. |
2025/03/14 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | All Sequences Floor 2 above ceiling Fire Inspection visual 2nd floor - a couple of some areas weren't ready - will see on next inspection. All other areas approved. |
2025/03/14 | Electrical | Re-Inspection | Passed | Al Smythe | Above ceiling inspection------------Kenny |
2025/03/14 | Fire Safety | Hydro-Test | Passed | Mary Creason | 2rd floor ------------------Randy Start test 7:33am 250psi Finish test 11:27pm 252psi |
2025/03/13 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the landscaping retaining wall footer located near the NE corner of the job site. |
2025/03/12 | Fire Safety | Hydro-Test | NOT READY | Mary Creason | All Sequences Floor 2 above ceiling Fire Inspection CANCELLED - SPRINKLER COMPANY NOT READY |
2025/03/10 | Plumbing | Rough-in | Partial Approval | Paul Nitz | Above ceiling cover up inspection Seq1,2 Floors 1,2,3,4 Seq3,4 Floors1---------------Kenny |
2025/03/10 | Electrical | Ceiling Rough-in | Partial Approval | James Melvin | Above ceiling cover up inspection Seq1,2 Floors 1,2,3,4 Seq3,4 Floors1---------------Kenny |
2025/03/10 | Mechanical | Duct Rough-in | Partial Approval | Paul Nitz | Above ceiling cover up inspection Seq1,2 Floors 1,2,3,4 Seq3,4 Floors1---------------Kenny |
2025/03/06 | Fire Safety | Hydro-Test | Passed | Mary Creason | 1st floor hydro - Approved Start 11:09am 211psi End 1:55pm 209Psi |
2025/03/06 | Building/Structural | Framing | Passed | Paul Nitz | Seq 1 Floor G hard ceiling inspection electrical, framing---------Kenny |
2025/03/06 | Electrical | Ceiling Rough-in | Passed | James Melvin | Seq 1 Floor G hard ceiling inspection electrical, framing---------Kenny |
2025/03/06 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Above ceiling visual - 1st floor Please see sprinkler plans in office for areas we have checked on 1st floor |
2025/03/04 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Storm South porch floor 1 Domestic -water heater-------------Eddie/MillerWorks |
2025/03/04 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm South porch floor 1 Domestic -water heater-------------Eddie/MillerWorks |
2025/02/28 | Mechanical | Re-Inspection | Partial Approval | Paul Nitz | Above ceiling/grid inspection floors 1,2,3,4 Sequence 1,2----------Kenny 1) hangers, insulation, lights, unistrut need addressed in some rooms. 2) 80+ rooms have been passed and been approved |
2025/02/28 | Electrical | Re-Inspection | Partial Approval | James Melvin | Above ceiling/grid inspection floors 1,2,3,4 Sequence 1,2----------Kenny 1) hangers, insulation, lights, unistrut need addressed in some rooms. 80+ rooms have been passed and been approved |
2025/02/28 | Plumbing | Re-Inspection | Partial Approval | Paul Nitz | Above ceiling/grid inspection floors 1,2,3,4 Sequence 1,2----------Kenny 1) hangers, insulation, lights, unistrut need addressed) hangers, 2)80+ rooms have been passed and been approved |
2025/02/27 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | sprinkler visual inspection G500 Multipurpose room----------Kenny Above Ceiling Hard Inspection (Passed) Flex Drops |
2025/02/21 | Fire Safety | Re-Inspection | NOT READY | Curtis Rogers | Above ceiling grid inspection floors 1,2,3 Sequence 1,2--------Kenny |
2025/02/21 | Mechanical | Re-Inspection | NOT READY | Paul Nitz | Above ceiling grid inspection floors 1,2,3 Sequence 1,2--------Kenny |
2025/02/21 | Plumbing | Re-Inspection | NOT READY | Paul Nitz | Above ceiling grid inspection floors 1,2,3 Sequence 1,2--------Kenny |
2025/02/21 | Building/Structural | Re-Inspection | NOT READY | Rocky Wilde | Above ceiling grid inspection floors 1,2,3 Sequence 1,2--------Kenny |
2025/02/21 | Electrical | Re-Inspection | NOT READY | Rocky Wilde | Above ceiling grid inspection floors 1,2,3 Sequence 1,2--------Kenny |
2025/02/14 | Building/Structural | Framing | Conditional | Kody Boswell | Framing West entrance Result is conditional pending photos from Contractor showing fasteners attaching LG clip angle to steel angle. FSU BCA did not have access during the inspection. |
2025/02/13 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Mechanical piping and storm piping ground floor Sequence 4 |
2025/02/13 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Mechanical piping and storm piping ground floor Sequence 4 |
2025/02/13 | Electrical | Ground | Passed | James Melvin | Meter release |
2025/02/13 | Electrical | Re-Inspection | Passed | James Melvin | Meter release |
2025/02/12 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Mechanical piping and storm piping ground floor Sequence 4 |
2025/02/12 | Building/Structural | Framing | Failed | Kody Boswell | South Colonnade Framing Most of the built up column members had the bottom clip connection occuring at a pre-punched opening in the member. |
2025/02/12 | Electrical | Ground | Failed | James Melvin | Meter Release 1) bonding not complete |
2025/02/11 | Building/Structural | Framing | Passed | Paul Nitz | Framing and electrical rough in stair 7, Sequence 1 floors 2&3 and ground floor commons video wall. 1) 2:50pm inspection per pics |
2025/02/11 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Chilled and Hot water piping pressure test - NE and SW penthouses |
2025/02/11 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Chilled and Hot water piping pressure test - NE and SW penthouses |
2025/02/11 | Building/Structural | Framing | Failed | Paul Nitz | Framing and electrical rough in stair 7, Sequence 1 floors 2&3 and ground floor commons video wall. 1) stud fasteners missing 2) track not connected to the wall |
2025/02/10 | Electrical | Ceiling Rough-in | NOT READY | James Melvin | Floors 1,2 grid inspection for cover up. |
2025/02/07 | Building/Structural | Framing | Passed | Paul Nitz | East entry high ceiling framing and deans terrace framing---Cliff/Nelson |
2025/02/07 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | *******For record only******300 seat hard ceiling electrical done by Rocky on 2-2-25 |
2025/02/04 | Fire Safety | Fire Water Above Ground | Postponed | Sam Sevor | Sprinkler head Inspection Postponed until 2/4/2025 New inspection created |
2025/02/04 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Sprinkler visual for ground floor lecture hall and auditorium, also electrical and framing for 150 seat lecture hall and top half of auditorium, and wall sequence 1 1st floor by buckhoist. *Above Ceiling Sprinkler (Hard Ceiling) visual for ground floor lecture hall and auditorium PASSED |
2025/01/31 | Fire Safety | Hydro-Test | Passed | Sam Sevor | Fire pressure/flush inspection Hydro inspection and flush on 8" fire line and 6" FDC line on |
2025/01/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed curtain wall attachment to structure along the west entry, levels 2-4 |
2025/01/30 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Fire pipe cover up. Conducted visusal inspection of FDC fire line. |
2025/01/30 | Building/Structural | Framing | Passed | Paul Nitz | Ground Floor framing and electrical rough in.--Kenny/Culpepper and Cliff/Nelson add access for the cleanout in the hall |
2025/01/30 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Ground Floor framing and electrical rough in.--Kenny/Culpepper and Cliff/Nelson |
2025/01/29 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Ground Floor-----Eddie/MillerWorks |
2025/01/28 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Partial visual for 8"fire line and FDC for cover up. |
2025/01/17 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | Ground Floor Sanitary------Eddie/MillerWorks 1) test ball was not holding |
2025/01/16 | Electrical | Ceiling Rough-in | Failed | Rocky Wilde | (Above Ceiling Inspection) Ceiling Grid Sequence 1 & 2 Floors1&2 ---------Culpepper/Kenny 1) covers missing |
2025/01/16 | Mechanical | Wall & Ceiling | Failed | Paul Nitz | (Above Ceiling Inspection) Ceiling Grid Sequence 1 & 2 Floors1&2 ---------Culpepper/Kenny 1) buckets, saddles and strapping were missing |
2025/01/07 | Fire Safety | Rough Fire Sprinkler | Passed | Sam Sevor | Sprinkler inspection for cover up. |
2024/12/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the bus loop slab on the north side of the building |
2024/12/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the west side soffit at the roof |
2024/12/31 | Electrical | Wall Rough-in | Passed | James Melvin | Sequence 3 floor 4 Bathroom Electrical and Framing rough in inspection------Kenny |
2024/12/19 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct visual inspection for the auditorium.---------Nate/Kelly Sheet Metal--This was done by Paul on 12/18/24 and is for record. |
2024/12/18 | Electrical | Wall Rough-in | Passed | James Melvin | Seq3 Floor3 bathrooms electrical and framing inspection-------Kenny |
2024/12/18 | Building/Structural | Framing | Passed | Paul Nitz | Seq3 Floor3 bathrooms electrical and framing inspection-------Kenny |
2024/12/12 | Plumbing | Final Plumbing | Conditional | Paul Nitz | Seq1,Seq 2 Floor 1 Above Ceiling Courtesy Inspection Kenny->Paul 1) courtesy inspection |
2024/12/11 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for Forum stairs on ground level |
2024/12/11 | Electrical | Final Electrical | Conditional | James Melvin | Seq1,Seq 2 Floor 1 Above Ceiling Courtesy Inspection Kenny->Paul 1) courtesy inspection |
2024/12/11 | Mechanical | Final Mechanical | Conditional | Paul Nitz | Seq1,Seq 2 Floor 1 Above Ceiling Courtesy Inspection Kenny->Paul 1) courtesy inspection |
2024/11/21 | Electrical | Ceiling Rough-in | Passed | Alex Masterton | Framing above stair 6 parapet wall-see Cliff Electrical Rough in AV 1st floor Seq2---see Kenny/Suncoast Hard ceiling Seq3,4 |
2024/11/21 | Electrical | Wall Rough-in | Passed | Alex Masterton | Framing above stair 6 parapet wall-see Cliff Electrical Rough in AV 1st floor Seq2---see Kenny/Suncoast Hard ceiling Seq3,4 |
2024/11/21 | Building/Structural | Framing | Passed | Paul Nitz | Framing above stair 6 parapet wall-see Cliff Electrical Rough in AV 1st floor Seq2---see Kenny/Suncoast Hard ceiling Seq3,4 |
2024/11/21 | Mechanical | CHW Piping & Test | Failed | Paul Nitz | See Eddie/Miller Works 1) pressure dropped |
2024/11/21 | Plumbing | Water Piping & Test | Passed | Paul Nitz | See Eddie/Miller Works |
2024/11/21 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | See Eddie/Miller Works |
2024/11/19 | Building/Structural | Framing | Passed | Kody Boswell | Ground Floor Seq 2 bathroom Framing |
2024/11/19 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | Stack Piping and Test @nd Floor Drains Eddie/Miller Works |
2024/11/18 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Eddie /Miller Works |
2024/11/18 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Eddie /Miller Works |
2024/11/18 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Eddie /Miller Works 1)m oisgj[ej[ehppompok |
2024/11/14 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed fasteners and steel angles for the east entry curtain wall, levels 2 and 3 |
2024/11/14 | Mechanical | HW Piping & Test | Failed | Paul Nitz | Plumbing Floor1 SW Mechanical Floor3 SW----------Eddie/Miller Works The gauge was broken |
2024/11/14 | Mechanical | CHW Piping & Test | Failed | Paul Nitz | Plumbing Floor1 SW Mechanical Floor3 SW----------Eddie/Miller Works 1) The gauge was broken |
2024/11/14 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Plumbing Floor1 SW Mechanical Floor3 SW----------Eddie/Miller Works |
2024/11/13 | Plumbing | Specialty Piping | Passed | Paul Nitz | Sanitary Floor 1 bathrooms Mechanical Ground Seq1&2--------------Eddie/Miller Works----850-879-1036 |
2024/11/13 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | Sanitary Floor 1 bathrooms Mechanical Ground Seq1&2--------------Eddie/Miller Works----850-879-1036 1) test ball broke loose |
2024/11/13 | Building/Structural | Framing | Conditional | Kody Boswell | Seq 3 Floors 1 & 2 hard ceiling framing Some framing members are to be stiffened and/or replaced where other trades have cut framing. Photos are to be provided by the Contractor after work is complete. |
2024/11/13 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Seq3 Floors 1,2 hard ceiling rough in-------Kenny |
2024/11/08 | Plumbing | Water Piping & Test | Passed | Paul Nitz | 2nd Floor Bathrooms ------Eddie/Millerworks overhead supply lines |
2024/11/06 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | For visual on hard ceilings (Seq3,4 Floors 1,2,3) One flex head was crimped (Less than 90 degree angle) and needs to be widened |
2024/11/05 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the south gable roof, south side soffit. |
2024/11/01 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Eddie / Miller Works 850-879-1036 |
2024/11/01 | Building/Structural | Structural | Passed | Kody Boswell | Seq4 floors 3,4 columns fireproofing |
2024/10/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for seq4 floors 3 and 4. Reviewed LG framing for seq3 floor 4 |
2024/10/30 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed fireproofing application to several columns (seq4 floor2) |
2024/10/28 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Seq 3 Risers Floors G-4 ---------Miller Works Eddie---850-879-1036 |
2024/10/28 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for sequence 4, levels 1-4. Result is conditional pending the following items being addressed/corrected: 1) Bottom track to be cleaned out in a few locations. 2) Top track for exterior walls that have been cut need to be reattached to exterior masonry walls in several locations. 3) Bracing at midheight of furred walls that was cut needs to be reattached. 4) Areas where fireproofing has been scraped off of structural steel need to remain accessible for reapplication of fireproofing spray. The above items were provided to the Contractor via marked up plan sheets. |
2024/10/25 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for ground floor, multipurpose room. |
2024/10/24 | Electrical | Wall Rough-in | Passed | Alex Masterton | Sequence 4 floors 2, 3, and 4 wall rough in Provide 6-feet of dedicated space above electrical panels P-246, P-225, and P-226 (NEC 110.26 E(1) (a)) See interference with mechanical ductwork. Continue to support conduit within 3-feet of all junction boxes and every 10-feet. Note-Wall is not a listed support. |
2024/10/23 | Electrical | Wall Rough-in | Passed | James Melvin | Sequence 4 Floor 1 electrical rough in -----------Kenny |
2024/10/22 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing for seq. 1 and 2 on the ground floor. This was a reinspection. The following items must be addressed in order to pass inspection: 1) Design professional letter or industry standard repair for LG studs that were cut/damaged during other trades' work. Per previous failed inspection and direction by Paul Nitz and Rocky Wilde. 2) Repairs were done since the prior failed inspection. These repairs will have to be verified after receipt of item (1). 3) It appears some areas weren't repaired at all. Repairs will have to be done and verifed after receipt of item (1). This was briefly discussed with the Contractor prior to FSU leaving the site. FSU attempted to contact the subcontractor in charge of LG work via phone call with no success. |
2024/10/22 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the dumpster enclosure walls located near the loading dock, north side of building. Walls were constructed in a single high lift. Cleanouts were provided. |
2024/10/22 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG soffit framing located at the roof along the south elevation, towards the southeast corner of the building. The following item must be addressed in order to pass inspection: 1) A moderate amount of studs used were pre-punched with a lot of connections occuring right at the punches, decreasing connection capacity. This was briefly discussed with the Contractor prior to FSU leaving the site. FSU attempted to contact the subcontractor in charge of LG work via phone call with no success. |
2024/10/22 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the tie beam at the south gable roof located near the SW corner of the building. |
2024/10/18 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Visual on duct supply/return/outside air --N penthouse, Basement Mechanical room---This was done Friday10/18/24 by Paul. |
2024/10/17 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | We would like to request an inspection at the FSU College of business/ Legacy Hall on this Thursday morning at 9am for Sequence 3 Atrium and catwalk for caulking and a visual inspection on the heads.-----------See Kenny Visual of fire sprinklers in the above areas. - Passed |
2024/10/17 | Electrical | Wall Rough-in | Passed | Alex Masterton | Atrium Seq1,2 floor 3 electrical rough in.----------Kenny |
2024/10/16 | Building/Structural | Framing | Failed | Paul Nitz | Seq 1,2 Floor G Window opening Framing Southeast, South Seq 2---------Cliff 1) studs missing 2) studs over notched 3) headers cut out 4) nail plates missing |
2024/10/15 | Building/Structural | Framing | Failed | Paul Nitz | Seq 1,2 Floor G Window opening Framing Southeast, South Seq 2---------Cliff 1) studs missing 2) studs over notched 3) headers cut out 4) nail plates missing |
2024/10/10 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the loading dock slab on the north side of the building |
2024/10/04 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Pressure test and visual inspection of the middle riser-----------Nate |
2024/10/03 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Duct pressure test ground floor east side Visual inspection low pressure Floor 4------------this was inspected on 10-2-24 - in the afternoon by Paul- |
2024/10/02 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Miller Plumbing is requesting a sanitary inspection on the ground floor of Sequence 2. |
2024/09/23 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | sanitary drain------Inspected by Paul on Monday pm 9-23-24 1) line was not holding water |
2024/09/23 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm drains 1st to ground floor and bathrooms------Inspected by Paul on Monday pm 9-23-24 |
2024/09/23 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Domestic water Sequence 3 Floor2 Sanitary Re-inspection----------------Eddie 1) line was not holding water |
2024/09/23 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Storm drains 1st to ground floor and bathrooms------Inspected by Paul on Monday pm 9-23-24 |
2024/09/20 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Pressure test and visual inspection on 1st floor middle riser-----------------Nate this inspection was completed on 9-20-2024 |
2024/09/20 | Building/Structural | Masonry | Passed | Paul Nitz | a masonry rebar inspection for the west gable first lift for tomorrow morning @9am, pouring grout at 10am |
2024/09/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls on the south elevation fourth floor top out of the southwest building |
2024/09/17 | Building/Structural | Structural | NOT READY | Kody Boswell | FSU BCA arrived on site to review reinforcing steel for Stair 9 on ground level. Formwork was not yet installed so FSU BCA will review once formwork is complete. |
2024/09/16 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed interior LG framing for several hard ceilings and atrium walls on levels 1 and 2 |
2024/09/16 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the ADA ramp located near the north stair on the ground floor |
2024/09/16 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | See shop drawings for areas that were looked at in sequence 1&2 floors 1 and 2. Visual Approved |
2024/09/12 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Mechanical ---North riser pressure test and visual.---------Nate(Paul checked Thursday am) Framing ---shaft wall 1st& 2nd floors-------Cliff(Kody checked Thursday am) |
2024/09/12 | Building/Structural | Framing | Passed | Kody Boswell | Southeast Parapet wall inspection at the roof and shaft inspection on levels 1 and 2 |
2024/09/12 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a ramp on the ground floor, located near the North stair. |
2024/09/12 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Rebar inspection @9am tomorrow with a planned pour at 10:15 for the ramp on the ground floor.----Tucker Domestic water ground floor Sequence 2 bathroom---------Eddied w/Millers 1) water hammer Arresters are missing 2) separation required between the supply lines and studs |
2024/09/10 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | ------------Eddie w/Millers |
2024/09/10 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Duct pressure test Seq4 floor 4 ---------This has already been inspected by Paul on Monday 9-9-24 as well the Mechanical piping inspection that was put in for today. |
2024/09/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top out lifts of levels 2-4 at the southwest corner and sout elevation of the building. |
2024/09/10 | Mechanical | HW Piping & Test | Passed | Paul Nitz | ------------Eddie w/Millers |
2024/09/06 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the tie beam at the north gable roof |
2024/08/30 | Fire Safety | Opening Protections | Passed | Mary Creason | an inspection floor penetrations at FSU COB this Friday 8/30/24@9amin the morning. Walked with 3rd party inspector - penetrations were properly caulk - Passed |
2024/08/29 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Northeast visual/pressure test---------------performed on 8/28/24 per Paul N. (for record) low pressure High pressure |
2024/08/29 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Northeast visual/pressure test---------------performed on 8/28/24 per Paul N. (for record) low pressure High pressure |
2024/08/29 | Building/Structural | Framing | Passed | Paul Nitz | Sequence 4 Floor 1 Framing |
2024/08/29 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Sequence 4 Floor1 and Sequence 3 fourth floor = wall Rough in |
2024/08/28 | Electrical | Wall Rough-in | Passed | James Melvin | Sequence4Floor1---------Chris |
2024/08/28 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Pressure test Seq1,2 Floor 4--------------------------------Nate CW & HW Seq3,4 Floor 2------------------- Eddie |
2024/08/28 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Pressure test Seq1,2 Floor 4--------------------------------Nate CW & HW Seq3,4 Floor 2------------------- Eddie |
2024/08/28 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Pressure test Seq1,2 Floor 4--------------------------------Nate CW & HW Seq3,4 Floor 2------------------- Eddie |
2024/08/23 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Re-Inspection HW Piping and Test CHW Piping and Test Also Mech Low pressure level 2 |
2024/08/23 | Mechanical | HW Piping & Test | Passed | Paul Nitz | First Floor Sequence 3&4--------Eddie ----Miller Works |
2024/08/23 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Re-Inspection HW Piping and Test CHW Piping and Test Also Mech Low pressure level 2 |
2024/08/23 | Mechanical | CHW Piping & Test | Failed | Paul Nitz | First Floor Sequence 3&4--------Eddie ----Miller Works 1) pressure not met, I will come back later in the day to check again |
2024/08/23 | Mechanical | Re-Inspection | Passed | Paul Nitz | Re-Inspection HW Piping and Test CHW Piping and Test Also Mech Low pressure level 2 |
2024/08/22 | Building/Structural | Framing | Cancelled | Paul Nitz | Framing inspection in South Penthouse |
2024/08/20 | Electrical | Wall Rough-in | Passed | James Melvin | Seq3 Floors 1,2,3 wall rough in |
2024/08/20 | Building/Structural | Framing | Passed | Paul Nitz | Requesting a framing inspection on west entry parapet wall |
2024/08/20 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Fire alarm - wall rough in 3,4th floor section 3 and stairwell 5 - passed |
2024/08/19 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the loading dock wall foundations |
2024/08/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of the east gable masonry wall on the 5th floor |
2024/08/19 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Courtesy walk - I looked at 3 sprinkler heads in soffit - hard ceilings needed to cover them. And they passed Spoke to Todd cuulpepper, kevin century fire, burritio suncoast, etc. Went over my expectations for sprinkler inspections, Kevin needs to have a measurment for the angles of the flex head. I will do partial inspections. Just call them in. Electric /IT/Fire Alarm/Mechanical ducts will need to make no wires etc. are not sitting on the sprinkler pipes. Electrical, I would like to see rough in of fire alarm boxed, exits signs, pull stations. Todd, I want to be called in for the 3rd party fire penetration inspection. Also have someone walk with me that has the approved plans. |
2024/08/16 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | 3rd floor sequence 3 & 4 pressure test 1) this inspection was done on 8-16-24 |
2024/08/15 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 9th lift of CMU walls at stair 6. |
2024/08/14 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the south porch slab on grade. |
2024/08/13 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Low pressure Floor 1 Seq4 visual inspection------------Nate Cooksey 1) All low pressure ducting was good, ok to insulate . Exhaust duct was not ready, contractor was waiting for a lift |
2024/08/13 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for stair 6, the 8th lift. |
2024/08/12 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed LG framing for the roof soffit at the east side of the south gable roof. Some fasteners were not installed. This was discussed with the contractor. |
2024/08/09 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the west entrance columns |
2024/08/08 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for stair 6, seventh lift |
2024/08/07 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Duct pressure test and visual inspection of South Duct shaft - level 1 - 3. |
2024/08/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed Z-purlin attachment to walls above the commons area roof. |
2024/08/07 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls for stair 6 |
2024/08/07 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 2 ramps in the auditorium on the ground floor |
2024/08/07 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | an inspection for riser tomorrow, pressure ready and visual south duct shaft sew 3 ground to 2nd 1) thisa inspection was done on 8-7-2024 Paul |
2024/07/31 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Floor 2 Visual and Pressure Test section Seq 3 (E&F) -----------Nate |
2024/07/31 | Mechanical | Re-Inspection | Passed | Paul Nitz | Floor 2 Visual and Pressure Test section Seq 3 (E&F) -----------Nate |
2024/07/31 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Floor 2 Visual and Pressure Test section Seq 3 (E&F) -----------Nate |
2024/07/31 | Plumbing | Re-Inspection | Passed | Paul Nitz | Sanitary Vent Sequence 2 Floor 4 |
2024/07/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing at the north gable roof on the north side. Framing is only to fill the space between the overhang of the roof and CMU wall in the attic. |
2024/07/29 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | 4th Floor Sequence 2 Mechanical |
2024/07/29 | Plumbing | Rough-in | Failed | Paul Nitz | 4th Floor Sequence 2 Mechanical and Sanitary Vent 1) water was not in the vent for testing |
2024/07/29 | Mechanical | HW Piping & Test | Passed | Paul Nitz | 4th Floor Sequence 2 Mechanical |
2024/07/26 | Mechanical | Duct Pressure Test | Failed | Paul Nitz | Pressure Test Floor 2 Supply Seq3/4 (E&F on shops) Visual for Trunk return-----------------------------------------------Nate Cooksey 1) supply ducts had multiple leeks |
2024/07/26 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the south elevation of the northeast building the top out of the 1st, 2nd, 3rd, and fourth floors as well as the next lift on stair 7 |
2024/07/25 | Fire Safety | Opening Protections | Cancelled | Mary Creason | Fire inspection for the atrium/commons 2nd and 3rd floor this Friday 7-26-24 @10am. Cliff with sub Nelson Cancelled by contractor |
2024/07/25 | Fire Safety | Opening Protections | Cancelled | Mary Creason | Please cancel the Fire inspection for the atrium/commons 2nd and 3rd floor this Friday 7-26-24 @10am. Apologies for any inconvenience. |
2024/07/23 | Building/Structural | Framing | NOT READY | Paul Nitz | Seq1&2 Framing in bathrooms all floors. 1) floors 1&2 were ok but 3&4 were not ready. |
2024/07/18 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing, decking and reinforcing steel for a portion of elevated slab in the area between grids E.3-F/3.7-4.6 |
2024/07/17 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Plumbing Sequence 2 Floor 4 Domestic water, Sanitary water ---Eddie/Millers plumbing Electrical rough in Sequence 1,2 Floors 1,2,3 bathrooms---Matt/Suncoast electric Framing inspection Sequence 1,2 Floors 1,2,3 bathrooms & soffits---Cliff/Nelson 1) pipe seperation not met going through the studs on 1,2 and 3rd floors. I informed Eddie 2) sanitary line was leaking on 3rd floor |
2024/07/17 | Electrical | Wall Rough-in | Passed | James Melvin | Plumbing Sequence 2 Floor 4 Domestic water, Sanitary water ---Eddie/Millers plumbing Electrical rough in Sequence 1,2 Floors 1,2,3 bathrooms---Matt/Suncoast electric Framing inspection Sequence 1,2 Floors 1,2,3 bathrooms & soffits---Cliff/Nelson |
2024/07/17 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | *********This inspection has already been done by Paul *********** Pressure test duct section F Floor 1 *********Input is for record only**************************************** 1) inspection passed on 7-16-2024 Paul Nitz |
2024/07/17 | Building/Structural | Framing | Failed | Paul Nitz | Plumbing Sequence 2 Floor 4 Domestic water, Sanitary water ---Eddie/Millers plumbing Electrical rough in Sequence 1,2 Floors 1,2,3 bathrooms---Matt/Suncoast electric Framing inspection Sequence 1,2 Floors 1,2,3 bathrooms & soffits---Cliff/Nelson 1) blocking for ADA handrails were not installed on 1,2 and 3rd floor |
2024/07/16 | Building/Structural | Roofing | Passed | Paul Nitz | Roof Observation |
2024/07/15 | Plumbing | Rough-in | Passed | Paul Nitz | 2nd floor bathroom |
2024/07/15 | Mechanical | Re-Inspection | Passed | Paul Nitz | third floor seq 1&2 |
2024/07/15 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | 3rd floor chilled |
2024/07/10 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | Water piping and test 2nd Floor HW piping and test 3rd Floor CHW piping and test 3rd Floor Eddie with Millers-850-879-1036 |
2024/07/10 | Mechanical | HW Piping & Test | NOT READY | Paul Nitz | Water piping and test 2nd Floor HW piping and test 3rd Floor CHW piping and test 3rd Floor Eddie with Millers-850-879-1036 |
2024/07/10 | Mechanical | CHW Piping & Test | NOT READY | Paul Nitz | Water piping and test 2nd Floor HW piping and test 3rd Floor CHW piping and test 3rd Floor Eddie with Millers-850-879-1036 |
2024/07/08 | Plumbing | Storm Piping & Test | NOT READY | Paul Nitz | Contact is Eddie with Millers Plumbing Pent house- Storm Sanitary-Domestic-Seq1 Floor2 & Seq2 Floor 4 |
2024/07/08 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Contact is Eddie with Millers Plumbing Pent house- Storm Sanitary-Domestic-Seq1 Floor2 & Seq2 Floor 4 1) third floor waist only |
2024/07/03 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Chiller Pipe Pressure |
2024/07/01 | Building/Structural | Slab | Passed | James Melvin | Chiller Pad inspection Monday 7-1-24 @2pm for pour on Tuesday 7-2-24 @1pm |
2024/07/01 | Building/Structural | Framing | Passed | James Melvin | Sequence 3 Floors 1,2,3 |
2024/06/28 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Sequence 3 floor1 Pressure and Return Sequence 1 floor 4 Return low pressure 1) 4th floor |
2024/06/28 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Sequence 3 floor1 Pressure and Return Sequence 1 floor 4 Return low pressure 1) 1st floor |
2024/06/26 | Fire Safety | Opening Protections | Passed | Mary Creason | We would like to request an inspection for FSU COB on Wednesday (06/26/2024)@1pm Sequence 1 Stair 5---Floors1 & 2. We would also like to request an inspection for FSU COB Sequence 1&2 Floors 3&4 for floor penetrations. 3rd party will send their results to me for this installation. |
2024/06/25 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | 3rd Floor Seq. 3 partial wall inspection |
2024/06/24 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | first and third floor duct pressure test that was approved per the commissoning report |
2024/06/21 | Mechanical | Duct Pressure Test | Passed | Dwayne Mahony | Supply Pressure Sequence 3 Floor 3 |
2024/06/20 | Building/Structural | Wall/Ceiling | Failed | Kody Boswell | Reviewed shafts for stairs 5 & 7 shafts. There are several penetrations that need to be fire caulked as well as drywall joints at corners need to be installed correctly. |
2024/06/20 | Building/Structural | Structural | Passed | Kody Boswell | Chiller pad wall rebar |
2024/06/13 | Mechanical | Duct Pressure Test | NOT READY | Paul Nitz | Low Pressure and Return Sequence 1,2&3 Floor 3 |
2024/06/12 | Plumbing | Water Piping & Test | Passed | Paul Nitz | SOG 112’ rebar inspection for tomorrow (Wednesday 6-12-24) @ 1pm with a scheduled pour for Thursday morning @3am. Domestic water Sequence 1&2 Floors2&3 1) third floor seq 1&2 only |
2024/06/05 | Mechanical | Duct Pressure Test | Conditional | Paul Nitz | Ground and First Floor see Tito (850-528-0997) for locations I need the commissioning report with results for the first and third floor |
2024/06/04 | Fire Safety | Opening Protections | Pass | Mary Creason | Through floor penetrations Sequence 1 & 2 floors 1 & 2 on Tuesday 6-4-24 @1pm NOTE: THIS WAS A MEETING TO GO OVER JOBS AND REQUIRER FOR THE FIRE PENETRATION INSPECTIONS. |
2024/06/04 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG wall framing and soffit sheathing fastening for the commons area on levels 2 and 3. There were some missing fasteners for LG to LG connections and one verticla stud that was damaged nd needed to be replaced. |
2024/06/04 | Mechanical | Insulation | Passed | Neely Lewis | Ground and First Floor see Tito (850-528-0997) for locations mastic inspection only. Not insulation. Ready to begin insulating ductwork. |
2024/05/29 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade on the ground floor in the approxximate areas between grids E-H/9-13 |
2024/05/28 | Mechanical | Cond. Piping & Test | NOT READY | Neely Lewis | Mechanical piping Ground floor ,Refrigerant piping Floors 1&2 Tuesday 5-28-24 @ 10 am. Refrigerant piiping test was not perfored proerly. |
2024/05/21 | Building/Structural | Framing | Conditional | Kody Boswell | Framing inspection for Seq1 &2 Floors 3&4 @1pm Only approved seq. 1 & 2 on floor 3, and did not include any walls with plumbing or floor pipe penetrations which still need fire stopping and inspection. |
2024/05/20 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Ground Floor Domestic Water ,Mechanical Water, Sanitary Monday @10:30 (Eddie) |
2024/05/02 | Building/Structural | Masonry | Passed | Dwayne Mahony | Rebar inspection for the north and west elevation of the auditorium 3rd lift,1pm Concrete is scheduled at 2pm |
2024/05/01 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | Storm Drain 2nd Floor Seq 1 San 3rd Floor Seq 2 Also, some wast piping 2.3 floor |
2024/04/30 | Building/Structural | Framing | Conditional | Dwayne Mahony | Sequence 1 and 2, Levels 1 and 2. Approved conditional to: Repair all damaged studs where marked during inspection. Repair fire spray insulation on columns and beams as noted, where damaged or material removed. Provide correct depth trim rings (double gypsum layers) for thermostats. Walls at floor penetrations for pipes are not approved for complete gypsum board installation. Leave open one side until you have fire stopping inspection approval. |
2024/04/30 | Fire Safety | Fire Alarm Rough-In | Passed | Dwayne Mahony | Wall rough in. All electrical rough-ins (including power, data, door and lighting controls, toilet flush valves, thermostats and fire alarms) have been inspected in all requested areas (partial inspections listed by floor numbers and sequence numbers) to date. All fire alarm inspections will continue to be done by the electrical inspector. |
2024/04/30 | Plumbing | Stack Piping & Test | Passed | Neely Lewis | Storm drains 3rd floor, Sequence 1, 2 & 3 And Sanitary Piping 2nd floor, Sequence 2 Inspected sttorm drains only. |
2024/04/24 | Building/Structural | Wall/Ceiling | Conditional | Dwayne Mahony | Window inspection Conditional to enginer of record providing verification that the components and cladding loads listed on sheet S0.02 are Vult, not Vasd. |
2024/04/24 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 3 Second floor Wall inspection. |
2024/04/05 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 1&2 Ground floor electrical rough in and added sequense 3, second floor. |
2024/04/03 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | Framing inspection for behind the elevator Seq1 & 2 |
2024/04/03 | Building/Structural | Structural | Passed | Dwayne Mahony | Framing inspection for behind the elevator Seq1 & 2 |
2024/04/02 | Mechanical | Duct Rough-in | Passed | Neely Lewis | an inspection on duct work any time – ready now. Seq. 1 & 2, Floors 1 & 2. Visual inspection on duct work. Low pressure & return. |
2024/03/22 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 1&2 fourth floor |
2024/03/19 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Sequence 1 First Floor Sanitary, Domestic and Mechanical. Need to add pipe guards at studs for plumbing lines |
2024/03/15 | Mechanical | HW Piping & Test | Passed | Neely Lewis | Need inspections please for 3/15/24, at 9:00 a.m. The request is for: Mechanical piping, Sequence 1 & 2, 1st & 2nd floors Domestic water, Sequence 1, 1st floor Storm piping, Sequence 1 & 2, 1st floor |
2024/03/15 | Plumbing | Stack Piping & Test | Passed | Neely Lewis | Need inspections please for 3/15/24, at 9:00 a.m. The request is for: Mechanical piping, Sequence 1 & 2, 1st & 2nd floors Domestic water, Sequence 1, 1st floor Storm piping, Sequence 1 & 2, 1st floor |
2024/03/15 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Need inspections please for 3/15/24, at 9:00 a.m. The request is for: Mechanical piping, Sequence 1 & 2, 1st & 2nd floors Domestic water, Sequence 1, 1st floor Storm piping, Sequence 1 & 2, 1st floor INSPECTED: includes extension of CHWS,CHWR at building edge from chillers NOT INSPECTED: Chilled water piping inside building. Domestic water inside building. |
2024/03/01 | Electrical | Wall Rough-in | Conditional | Dwayne Mahony | Partial electrical wall inspection Sequence 1&2 third floor. |
2024/02/23 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Masonry rebar inspection for tomorrow morning 02-23-24, 1st floor, 4th lift on the west elevation. Pouring cell fill at 9am Electrical wall inspection Seq 1 & Seq 2 second floor |
2024/02/09 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 1 & 2 Floor 1 |
2024/02/01 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Riser |
2024/01/12 | Plumbing | Underground | Passed | Dwayne Mahony | Underground Sanitary NE Seq2 section C. |
2024/01/04 | Plumbing | Underground | Passed | Neely Lewis | Storm Water on NE quadrant. Underground slab |
Electrical | Ceiling Rough-in | Al Smythe | Above ceiling inspection Seq 3,4 Floor 4----- Friday 8:30am---3-28-25 | ||
Electrical | Ceiling Rough-in | Passed | James Melvin | Electrical rough in and framing in stair 6,7 as well as lecture hall 150 upper and lower soffits. | |
Building/Structural | Framing | Passed | Rocky Wilde | Sprinkler visual for ground floor lecture hall and auditorium, also electrical and framing for 150 seat lecture hall and top half of auditorium, and wall sequence 1 1st floor by buckhoist. | |
Electrical | Wall Rough-in | James Melvin | Stair 7 electrical and commons av wall electrical | ||
Electrical | Wall Rough-in | Passed | Rocky Wilde | Sprinkler visual for ground floor lecture hall and auditorium, also electrical and framing for 150 seat lecture hall and top half of auditorium, and wall sequence 1 1st floor by buckhoist. | |
Building/Structural | Framing | Passed | Paul Nitz | Electrical rough in and framing in stair 6,7 as well as lecture hall 150 upper and lower soffits. | |
Electrical | Wall Rough-in | James Melvin | Ground Floor framing and electrical rough in.--Kenny/Culpepper and Cliff/Nelson | ||
Electrical | Ceiling Rough-in | Conditional | James Melvin | above ceiling inspection Seq1,2Floor3,4------------------Kenny Seq3,4 Floor3 | |
Building/Structural | Framing | James Melvin | Ground Floor framing and electrical rough in.--Kenny/Culpepper and Cliff/Nelson | ||
Electrical | Wall Rough-in | Alex Masterton | Sun Coast has requested electrical wall rough-in inspection on the following: Sequence 2 / Penthouse and Sequence 3 / 4th Floor | ||
Electrical | Wall Rough-in | James Melvin | Framing and electrical rough in stair 7, Sequence 1 floors 2&3 and ground floor commons video wall. |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/01/28 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | ground floor sanitary---Eddie/MillerWorks 1) water was on the floor and drain lines 2) missing clamps |
2025/01/27 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | Ground floor --------Eddie/MillerWorks 1) test ball blew out again |
2025/01/21 | Plumbing | Stack Piping & Test | Cancelled | Paul Nitz | Ground floor Eddie/Miller Works 1) campus is closed |
2025/01/15 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | plumbing ground floor mechanical 4th floor-----Eddie/MillerWorks |
2025/01/15 | Building/Structural | Structural | Passed | Kody Boswell | Screw inspection Seq 3&4 all floors storefronts |
2025/01/15 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | plumbing ground floor mechanical 4th floor-----Eddie/MillerWorks |
2025/01/15 | Mechanical | HW Piping & Test | Passed | Paul Nitz | plumbing ground floor mechanical 4th floor-----Eddie/MillerWorks |
2025/01/15 | Plumbing | Water Piping & Test | Failed | Paul Nitz | plumbing ground floor mechanical 4th floor-----Eddie/MillerWorks 1) not ready |
2025/01/14 | Plumbing | Gas Piping & Test | Conditional | Paul Nitz | Eddie ---MillerWorks 1) inspection 1 of 2 for pressure 2) hangers were missing on the gas line |
2025/01/14 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Eddie ---MillerWorks 1) ground floor only to the top of the ramp |
2025/01/14 | Plumbing | Water Piping & Test | Conditional | Paul Nitz | Eddie ---MillerWorks 1) supply lines only, the sanitary line was leaking |
2025/01/14 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Eddie ---MillerWorks |
2025/01/13 | Electrical | Wall Rough-in | Passed | James Melvin | G112 teaching wall, Auditorium west wall framing and electrical rough in -----------Kenny |
2025/01/13 | Building/Structural | Framing | Conditional | Paul Nitz | G112 teaching wall, Auditorium west wall framing and electrical rough in -----------Kenny 1) need pics for stud repair 2) need pics for where the fireproofing was missing on interior beam |
2025/01/10 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | We would like to request an inspection for sprinkler heads tomorrow (1-10-25) @ 9am Ground floor and 4th floor. *4th Floor N/A (heads are going in tile, not Soffit) |
2025/01/10 | Building/Structural | Slab | Passed | Paul Nitz | Reschedule of rebar for generator pad. |
2025/01/08 | Plumbing | Water Piping & Test | Conditional | Paul Nitz | 4th floor gang bathrooms------Eddie/Millerworks850-879-1036 1) wall insulation needs to be verified in between 3rd and 4th floors before the walls can be covered 2) HVAC Insulation in the third floor bathroom that was saturated needs to be torn off, inspected and reinstalled before it can be covered |
2025/01/08 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | 4th floor gang bathrooms------Eddie/Millerworks850-879-1036 |
2024/12/24 | Electrical | Wall Rough-in | Passed | Al Smythe | Pressure test chilled water piping - basement Sanitary - level 4 sequence 3 gang restrooms Electrical wall rough - sequence 2 basement Framing to follow electrical wall rough |
2024/12/24 | Building/Structural | Framing | Passed | Al Smythe | Pressure test chilled water piping - basement Sanitary - level 4 sequence 3 gang restrooms Electrical wall rough - sequence 2 basement Framing to follow electrical wall rough |
2024/12/24 | Plumbing | Stack Piping & Test | Passed | Al Smythe | Pressure test chilled water piping - basement Sanitary - level 4 sequence 3 gang restrooms Electrical wall rough - sequence 2 basement Framing to follow electrical wall rough |
2024/12/24 | Mechanical | HW Piping & Test | Passed | Al Smythe | Pressure test chilled water piping - basement Sanitary - level 4 sequence 3 gang restrooms Electrical wall rough - sequence 2 basement Framing to follow electrical wall rough |
2024/12/24 | Mechanical | CHW Piping & Test | Passed | Al Smythe | Pressure test chilled water piping - basement Sanitary - level 4 sequence 3 gang restrooms Electrical wall rough - sequence 2 basement Framing to follow electrical wall rough |
2024/12/18 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Hard ceiling inspection sequence, three and four floors three |
2024/12/18 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Seq3,4 Floor 4 San/WP test-----Millerworks/Eddie 1) could not test because the floor was to wet 2) HVAC insulation seq (3) 3rd floor was saturated with water and needs to be replaced |
2024/12/18 | Building/Structural | Structural | Passed | Paul Nitz | West Curtainwall Fasteners---------Isaac/Rhyno |
2024/12/13 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Hard lid Electrical Inspection ------Kenny |
2024/12/11 | Building/Structural | Framing | Passed | Paul Nitz | Seq 3 Floor 1&2 Bathroom Framing and Electrical rough in. |
2024/12/10 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Seq 3 Floor 1&2 Bathroom Framing and Electrical rough in. |
2024/12/09 | Mechanical | Duct Rough-in | Passed | Paul Nitz | SOUTH PENTHOUSE ROUGH IN |
2024/12/04 | Building/Structural | Framing | Conditional | Paul Nitz | Exterior Curtain Wall fasteners for Seq1 and 2 all floors. Isaac/ Rhyno Seq 1,2&3 on the 1st floor Seq 1&2 on the 2nd 3rd & 4th floors 1) engineered letter required for attachment modifications |
2024/12/04 | Building/Structural | Slab | Passed | Paul Nitz | Rebar inspection Jeff/Tucker850-251-6949 |
2024/12/03 | Building/Structural | Structural | Failed | Paul Nitz | East curtainwall head fasteners. Isaac/Rhyno 1) elevation 32 needs an engineered letter for the change in connection points at the top of the windows |
2024/12/03 | Plumbing | Rough-in | Passed | Paul Nitz | Above ceiling Floor 2 Seq 3, and 3rd floor in wall |
2024/12/03 | Building/Structural | Structural | Passed | Paul Nitz | East curtainwall head fasteners. Isaac/Rhyno 1) elevation 31 passed |
2024/12/02 | Plumbing | Rough-in | Failed | Paul Nitz | Above ceiling Floor 2 Seq 3 already done by Paul on 12-2-24 This is for record. 1) Dain lines were leaking |
2024/11/25 | Plumbing | Water Piping & Test | Passed | Al Smythe | |
2024/11/25 | Plumbing | Stack Piping & Test | NOT READY | Rocky Wilde | Sanitary piping 3rd floor Gang Restrooms Miller Works/Eddie |
2024/11/25 | Plumbing | Stack Piping & Test | Passed | Al Smythe |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/10/15 | Building/Structural | Structural | Passed | Paul Nitz | Tie beam rebar |
2024/10/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the south gable wall. Photos were provided by the Contractor since there was no access to review in person. Photos are saved in the job folder. |
2024/09/25 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection - South Gable. |
2024/09/24 | Building/Structural | Masonry | Passed | Paul Nitz | a masonry rebar inspection Monday @11:30 am for the south gable second lift. Concrete is scheduled at 12:30-Antonio |
2024/09/20 | Building/Structural | Slab | Passed | Paul Nitz | Stair 9 rebar inspection- For record as inspection was performed on 9/19/24 Kody |
2024/09/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the ground floor and fisrt floor of the southwest building on the southwest building elevation. |
2024/08/29 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection for the north gable on the southwest building, third lift |
2024/08/28 | Building/Structural | Masonry | Passed | Paul Nitz | masonry rebar inspection for tomorrow @10:30am at the north gable of the southwest building 2nd lift. Concrete is scheduled at 11:30. |
2024/08/27 | Building/Structural | Masonry | Passed | Paul Nitz | This was done on 8/27/24 and is for record only(Paul Nitz) a masonry rebar inspection for @9am on the south elevation under the deck porch, hand grouting at 10am |
2024/08/26 | Building/Structural | Masonry | Passed | Paul Nitz | a masonry rebar inspection for Monday @12pm for stair 6. Concrete is scheduled at 1pm. |
2024/08/22 | Building/Structural | Masonry | Passed | Paul Nitz | Requesting a masonry rebar inspection for the East gable on the Southwest building, top out lift, for morning of 8/22/24 Pouring cell fill at 10:00 a.m. |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/08/21 | Building/Structural | Footing | Passed | Paul Nitz | Need rebar inspection for loading dock |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/08/21 | Building/Structural | Structural | Passed | Paul Nitz | Masonry, Inc. needs a rebar inspection for the East gable on the Southwest building, second lift Thank you |
2024/08/21 | Building/Structural | Structural | Passed | Paul Nitz | Masonry, Inc. needs a rebar inspection for the East gable on the Southwest building, second lift Concrete is scheduled for 11:00 a.m. tomorrow, 8/21/24 Thank you |
2024/08/20 | Building/Structural | Masonry | Passed | Paul Nitz | a rebar inspection for stair 6 tomorrow@12pm, concrete is scheduled at 1pm. |
2024/08/14 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the east elevation of the southwest building for the top out of first, second, third, and fourth floors. |
2024/07/25 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for stair 6 fifth lift |
2024/07/24 | Building/Structural | Masonry | Passed | Kody Boswell | masonry rebar inspection tomorrow for the fourth floor of the southwest building, second lift |
2024/07/24 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a curb at the southeast entrance and 2 duct infill slabs ( level 1 and level 3) |
2024/07/24 | Building/Structural | Masonry | Passed | Kody Boswell | masonry rebar inspection tomorrow for the ground floor of the southwest building, 4th lift |
2024/07/23 | Building/Structural | Masonry | Passed | Paul Nitz | Masonry rebar inspection 7-23-24 @9am for the ground floor 12” CMU on the southwest building, 3rd lift. And the fourth lift of stair 6. Concrete is scheduled at 10am |
2024/07/19 | Building/Structural | Masonry | Passed | Kody Boswell | masonry rebar inspection for the ground floor 12" CMU on the southwest building, 3rd lift tomorrow |
2024/07/18 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the second lift of walls located on the fourth floor, southwest portion of the building. Result is conditional pending the completion of installing vertical reinforcing for about a 20' section of wall. Threshold inspector to verify reinforcing is installed prior to concrete placement. |
2024/07/17 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection @12pm for the ground floor, 12" CMU on the southwest building |
2024/07/17 | Building/Structural | Slab | Passed | Paul Nitz | Rebar inspection for ground floor ramps at FSU COB for Wednesday 7-17-24 @1pm. |
2024/07/15 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of several walls on the ground floor, southwest area of building. |
2024/07/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade ramp ramp located on the ground floor in the area between grids E-F/4-7 |
2024/07/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the fourth floor southwest building, first lift |
2024/07/08 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of CMU walls on level 4, south elevation and west elevation. Masonry block was very wet at time of inspection so the Contractor was directed to hold off on grouting. |
2024/07/01 | Building/Structural | Masonry | Passed | James Melvin | A masonry rebar inspection for the southeast corner of the third floor on the southwest building on Monday 7-1-24 @10am ,concrete pour is scheduled at 11am. |
2024/06/26 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 1st lift of the following walls on level 3: 1) Along grid K/2-3 2) Along grid 2/H-K Result is conditional until contractor rebuilds a window jamb where mortar joints broke. |
2024/06/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the south elevation wall on level 3. |
2024/06/20 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection for Thursday on the west elevation third floor, third lift. |
2024/06/18 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection for the southeast elevation on the second floor of the southwest building, third lift. And the second lift of the west elevation on the third floor. |
2024/06/14 | Building/Structural | Masonry | Passed | Dwayne Mahony | masonry rebar inspection for the east elevation of the second floor of the southwest building, second lift. Tomorrow 6-14-24 @1pm -Concrete is scheduled at 1:30. |
2024/06/13 | Building/Structural | Masonry | Passed | Dwayne Mahony | masonry rebar inspection for tomorrow (6-13-24) @9:30 for the third and fourth lift on the second floor, southwest building. Pour scheduled for 10am. |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/12 | Building/Structural | Slab | Passed | Dwayne Mahony | SOG 112’ rebar inspection for tomorrow (Wednesday 6-12-24) @ 1pm with a scheduled pour for Thursday morning @3am. |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/06/11 | Building/Structural | Masonry | Passed | Dwayne Mahony | Masonry rebar inspection @9am on 6-11-24 for the first lift of the third floor on the west elevation of the southwest building. Concrete is scheduled at 10am |
2024/06/07 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection for 6/7/24 on the second floor of the southwest building. |
2024/06/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the tie beam at the north gable wall |
2024/06/06 | Building/Structural | Structural | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to arriving on site to postpone the inspection for a later date. |
2024/06/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the fourth lift of the west elevation of the southwest building, 1st floor. And the 1st lift on the second floor of the southwest building. |
2024/05/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the retaining wall footer at the chiller yard |
2024/05/31 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection, 1st floor, southwest building, third lift on the west elevation and first lift on the second floor of the southwest building. |
2024/05/29 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the wall along grid 2/E.3-K |
2024/05/24 | Building/Structural | Masonry | Passed | Dwayne Mahony | Masonry rebar inspection for tomorrow morning. 1st floor, south west building second and third lift. Concrete is scheduled at 10:30 |
2024/05/23 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the roof tie beam along grid 5/L-M |
2024/05/20 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following CMU walls: - 1st floor, 2nd lift along grid 2/B-D - 1st floor, 2nd lift along grid D/1-2 - 1st floor, 2nd lift along grid 1/D-E - 1st floor, 2nd lift along grid E/1-2 - 1st floor, 2nd lift along grid 2/E-H |
2024/05/15 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Ground floor, top out along grid A/3-7 - 1st floor, 1st course along grid A/3-7 - 1st floor, 1st course along grid 3/A-B - 1st floor, 1st course along grid B/2-3 - 1st floor, 1st course along grid 2/B-D - 1st floor, 1st course along grid 2/E.3-K |
2024/05/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the 5th floor slab on deck in the area between grids B-K/2-3 |
2024/05/07 | Building/Structural | Structural | NOT READY | Kody Boswell | FSU arrived on site for inspection of reinforcing steel for the 5th floor slab on deck in the area between grids B-K/2-3, but was informed by the Contractor that they were not ready for inspection |
2024/05/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following CMU walls: - Ground floor, 3rd lift along grid A/2-7 - Ground floor, 3rd lift along grid 7/A-D - Ground floor, 2nd lift in the area between grids E-F/1A-2 |
2024/05/03 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the east gable tie beam at the roof, located along grid N/14-17 |
2024/04/30 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Ground floor: 2nd lift along grid A/2-7 - Ground floor: 1st lift in the area between grids E-F/1-2 - Ground floor: 1st lift along grid 7/A-D |
2024/04/30 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the 4th level slab on deck in the area between grids B-K/1-3 |
2024/04/26 | Building/Structural | Masonry | Passed | Dwayne Mahony | Rebar inspection for the west elevation of the ground floor tomorrow 4-26-24 at 9am Pour to follow the inspection. |
2024/04/25 | Building/Structural | Slab | Passed | Dwayne Mahony | Sequence 4 deck 3 S1 East gable Tie beam for 4-25-2024 @2pm Thank you. |
2024/04/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Level 4, 3rd lift along grid 5/L-M - Penthouse, 4th lif of south gable wall along grid 5/L-M |
2024/04/22 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following CMU walls: - Ground level, 2nd lif in the area between grids M-P/12-14 - 4th level, 3rd lift along grid 5/L-M |
2024/04/22 | Building/Structural | Structural | NOT READY | Kody Boswell | FSU was requested to review reinforcing steel for the tie beam located along the east gable roof along grid N/14-17. Reinforcing steel was tied in place but no formwork was installed. Contractor to reschedule inspection. |
2024/04/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - level 4, 4th lift along grid 19/L-M - level 4, 3rd lift along grid 5/L-M |
2024/04/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following CMU walls: - Level 4, 3rd lift along grid 19/L-M - Level 4, 3rd lift along grid L/5-7 |
2024/04/18 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the slab on deck on level 1 in the area between grids B-K/1-3 |
2024/04/17 | Building/Structural | Masonry | Conditional | Kody Boswell | FSU BCA deferred CMU wall inspection to BNI (threshold) so result is conditional pending BNI's review. |
2024/04/16 | Building/Structural | Masonry | Passed | Dwayne Mahony | masonry rebar inspection for the fourth floor East gable and the fourth floor south elevation 1st lift for tomorrow 4-16-24 @8am with a planned pour at 9am Also inspected and approved 4th level exterior densglass board screws. |
2024/04/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following masonry walls: - Top out courses for levels 3 and 4 along grid 19/L-M - 2nd course on level 4 along grid L/17.5-19 |
2024/04/11 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for level 1 slab on deck in the approximate area between grids A-K/1A-3. |
2024/04/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior partition walls on the ground floor |
2024/04/09 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top out course of the east gable wall and north balcony wall. |
2024/04/08 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor informed FSU BCA they would like to postpone the slab on deck inspection to a later date. |
2024/04/05 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several walls on the north, east and south building elevations. |
2024/04/05 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a a portion of a retaining wall footing for the chiller yard. |
2024/04/04 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the slab on grade in the approximate area between grids E.3-Y/4-9. There were missing #8 bars for a column strip running east-west near grids H/4.6. Threshold inspector (BNI) to verify bars are in place prior to concrete placement |
2024/04/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of the wall along grid 19/J-L |
2024/04/02 | Building/Structural | Masonry | Passed | Kody Boswell | CMU rebar inspection for North elevation gable fourth lift. North elevation loading dock, third lift. East elevation gable second lift. |
2024/04/01 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on grade in the approximate area between grids E-H/3-9. |
2024/04/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Ground floor, 1st lift along grid 19/J-L - Ground floor, 2nd lift along grid 19/L-M |
2024/03/29 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Fourth floor: 1st lift along grid J/16.6-18 - Penthouse: 1st lift along grid N/14-17 |
2024/03/28 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Fourth floor: 3rd lift along grid M/17-19 - Fourth floor: 3rd lift along grid 17/M-N - Fourth floor: 3rd lift along grid N/14-17 - Fourth floor: 3rd lift along grid 14/M-N - Ground floor: 2nd lift along grid 17/L-M |
2024/03/25 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the loading dock wall along grid 19/J-L. Dowels for the loading dock slab were not tied in place yet. Threshold inspector (BNI) to verify dowel installation prior to concrete placement. |
2024/03/25 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of several interior CMU walls in the approximate area bewteen grids L-N/12-19. |
2024/03/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following CMU walls: - 3rd floor: 3rd lift along grid M/17-19 - 3rd floor: 3rd lift along grid 17/M-N - 3rd floor: 3rd lift along grid N/14-17 - 3rd floor: 3rd lift along grid 14/M-N - 3rd floor: 3rd lift along grid - 4th floor: 3rd lift along grid 14/M-N - 4th floor: 3rd lift along grid M/5-14 |
2024/03/20 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - Ground floor, 4th lift: Along grids M/17-19, 17/M-N and N/14-17 - 2nd floor, 3rd lift: Along grids M/17-19, 17/M-N and N/12-17 |
2024/03/20 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the 4th floor slab on deck in the approximate area between grids D-L/3-10. There was reinforcing steel surrounding the roof deck (between grids G.5-L/3-101) that was not the correct length per detail 7/S4.03. This was discussed with the Contractor. Threshold inspector to verify correct reinforcing steel is installed prior to concrete placement. |
2024/03/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of the following masonry walls on the ground floor: - Along grid M/17-19 - Along grid 17/M-N |
2024/03/18 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed reinforcing steel for the concrete beam at the roof level along grid D.8/15-18. This was a re-inspection from a 3/15/24 inspection marked NOT READY. |
2024/03/18 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the concrete beam at the roof level along grid D.8/15-18. This was a re-inspection from a 3/15/24 inspection marked NOT READY. |
2024/03/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for 2nd lift of masonry walls on the ground floor located along grid 19/J-L. |
2024/03/15 | Building/Structural | Masonry | Passed | Dwayne Mahony | Reviewed reinforcing steel for the 2nd lift of masonry walls, ground floor, located: - Along grid 19/L-M - Along grid M/17-19 - Along grid 17/M-N - Along grid N/14-17 |
2024/03/14 | Building/Structural | Masonry | Passed | Dwayne Mahony | Masonry rebar inspection request for tomorrow morning, 3/14/24 at 9:00 a.m. of North elevation, ground floor |
2024/03/13 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top out lift of the masonry wall along grid N/14-17 on level 2. |
2024/03/13 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for slab on deck on level 3 in the approximate area between grids B-G/3-13. |
2024/03/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lif of the masonry wall located along grid 18/D.8-J on level 3. |
2024/03/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry wall located at the 4th level, 4th lift located along gridline D.8/15/18. |
2024/03/11 | Building/Structural | Structural | Passed | Kody Boswell | Rebar inspection for sequence 3 deck 3 as well as the Deans Terrace on Monday (03-11-24) @2pm Reviewed reinforcing steel for level 3 slab on deck in the approximate area between grids G-J.7/3-13 and grids M-P/6-14. Some clean up of the steel deck needed to be done. BNI (threshold) to verify deck is cleaned prior to concrete placement. |
2024/03/08 | Building/Structural | Masonry | Conditional | Dwayne Mahony | Masonry needs a rebar inspection tomorrow morning, Friday, March 8, 2024 on the north elevation first and second floor. Pour observation will follow at 9:00 AM Masonry approved. Another issue found: The big sag in the floor deck we saw today was due to not following detail 8 on S0.07 which states the decking at the proposed opening is not to be cut out until after casting the floor concrete (box out opening). The condition we saw today may not be an issue structurally since it happened while the concrete was plastic, still being placed, and the additional reinforcing is now functional. If the engineer of record desires load testing for additional deflection can be done, at the contractors expense. The structural engineer of record must review this condition, with the Threshold Inspector in consultation. Cutting these floor openings prior to concrete placement has happened several times, all such shall be reviewed and acknowledged. This is another non-conforming structural condition which should be on the T.I. record until resolved. |
2024/03/07 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for the Dean's Terrace located approximately in the area between grids M-P/6-14. Contractor was performing clean up of deck and had not finished placing reinforcing. |
2024/03/07 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: - 4th level: 3rd lift located along gridline D.8/15/18. - 2nd level: top our course for the walls along grids P/6-12, 6/M-P and M/5-6 |
2024/03/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel of the 2nd lift of the masonry wall on the 4th level located along gridline D.8/15/18. |
2024/03/05 | Building/Structural | Masonry | Postponed | Kody Boswell | Inspection was postponed to 3/6/24 due to weather |
2024/03/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed top out course for the following walls on 1st floor: - Along grid 18/G-H - Along grid P/6-12 - Along grid 6/M-P - Along grid M/5-6 - Along grid 5/L-M |
2024/03/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of wall along grid D.8/15-18 on 4th floor. |
2024/03/01 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade for the ground floor in the approximate area between grids J.7-P/12-19. |
2024/03/01 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the slab on deck for the 2nd floor in the approximate areas between grids D-J/3-13. During review there was concern about the metal deck span directly west from the opening in the area between grids E.3-F/3-5. Deck span length for a single span condition per manufacturer's load tables appears to have been exceeded. EOR to be notified of this condition. This was discussed with the Contractor who is to contact EOR. EOR provided direction that a steel beam be added to support the steel deck in the area noted above. Beam to be added at levels 2-4. Level 2 concrete has not been placed yet whereas levels 3 and 4 have concrete placed. (noted on 3/7/2024) |
2024/02/28 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 4th lift of the masonry wall on the 3rd floor located along grid D.8/15-18. |
2024/02/28 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for elevated slab on deck on 2nd floor in the approximate area between grids F-K/3-13. There were a few deck penetrations where reinforcing steel was not installed per structural drawings. These areas were corrected prior to FSU leaving the job site. |
2024/02/27 | Building/Structural | Masonry | Passed | Dwayne Mahony | Masonry rebar inspection for tomorrow Tuesday 2-27-24 @10am (no pour time given yet) The remaining portion of Seq2 slab on grade rebar is ready for inspection as well |
2024/02/22 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade in the approximate area between grids J.7-P/5-12. (KB) |
2024/02/22 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the wall located along grid D.8/15-18. (KB) |
2024/02/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of masonry walls on the 4th level at the following locations: - Along grid L/17.5-19 - Along grid 19/L-M - Along grid M/17.5-19 - Along grid 17/M-N - Along grid N/14-17 - Along grid 14/M-N - Along grid M/5-14 - Along grid 5/L-M |
2024/02/20 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on deck for level 1 approximately in the area between grids 3-13/A-E.3. There was one deck penetration where reinforcing steel was not placed correctly. This issue was resolved while FSU was on site. |
2024/02/19 | Building/Structural | Slab | NOT READY | Kody Boswell | Reviewed reinforcing steel for slab on deck for level 1 approximately in the area between grids 3-9/A-E.3. Contractor was still installing reinforcing and was not ready for inspection. Contractor to reschedule inspection for a later date. |
2024/02/16 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 5th lift of masonry walls on the ground level located: - Along grid D.8/15-19 - Along grid 18/D.8-J |
2024/02/15 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for 1st level slab on deck in the approximate areas between gridlines D.9-J.7/3-9. There was a condition around the slab perimeter on the north side that needed to be corrected prior to concrete placement. BNI (threshold) to verify condition is corrected. |
2024/02/15 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of masonry walls on the 4th level at the following locations: - Along grid L/17.5-19 - Along grid 19/L-M - Along grid M/17.5-19 - Along grid 17/M-N - Along grid N/14-17 - Along grid 14/M-N - Along grid M/5-14 - Along grid 5/L-M |
2024/02/14 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 4th lift of the following masonry walls on the ground floor: - Along grid 15/D.8-E - Along grid D.8/15-18 - Along grid 18/D.8-J |
2024/02/09 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of masonry walls on ground floor located: - Along gridline 15/D.8-E - Along gridline D8./15-18 - Along gridline 18/D.8-J |
2024/02/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade in the approximate area between gridlines A-E/3-7. |
2024/02/07 | Building/Structural | Framing | Passed | Dwayne Mahony | Top out for duct penetrations. |
2024/02/07 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed the reinforcing steel for the following CMU walls on the ground floor: - 2nd lift of wall along grid 15/D.8-E - 2nd lift of wall along grid D.8/15-18 - 2nd lift of wall along grid 18/G-J |
2024/02/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls on the ground floor: - 1st lift of the wall along grids D.8/15-18 and 15/D.8-D.9 - 2nd lift of the wall along grid 18/D.8-G |
2024/02/05 | Building/Structural | Structural | Passed | Dwayne Mahony | We would like to request a rebar inspection for S colonnade wall and seq2 slab on grade hole inspection @11am Monday (2-5-24). |
2024/02/05 | Building/Structural | Slab | Passed | Dwayne Mahony | We would like to request a rebar inspection for S colonnade wall and seq2 slab on grade hole inspection @11am Monday (2-5-24). |
2024/02/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of masonry walls on level 3 located along gridlines L/17-19, 19/L-M, M/17-19 and N/14-17. (KB) |
2024/01/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade located in the area between gridlines A-E.3/1A-3. |
2024/01/30 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of CMU walls on level 3 along grids: - 19/L-M - M/17-19 - 17/M-N - N/12-17 - P/6-12 - 6/M-P - M/5-6 |
2024/01/29 | Building/Structural | Structural | NOT READY | Kody Boswell | Reviewed reinforcing steel for wall and pilasters along grid 1A/E.3-H.6 between ground floor and level 1. Work was still in-progress. FSU informed Contractor to reschedule once work was complete. |
2024/01/26 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of masonry walls on level 3 located along grids: - 18/D.8-J - 17.5/J-L - L/17.5-19 |
2024/01/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed the 3rd lift of masonry walls on level 2 along grids: - 19/L-M - M/17-19 - 17/M-P - N/12-17 - P/6-12 - 6/M-P - M/5-6 |
2024/01/23 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed grade beam and pilasters along grid 1A/E.3-H.6 (South). Grade beam and pilasters along grids 3/K-L and L/3-5 (East) were not ready for inspection. East grade beam and pilasters to be rereviewed at a later date. South grade beam and pilasters had minor issues to be corrected. (KB) |
2024/01/23 | Building/Structural | Roofing | Passed | Kody Boswell | Roofing In-progress review of the insulation layer of the north gable roof |
2024/01/22 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed the 2nd lift of masonry walls on the 2nd level located along grids 6/M-P, M/5-6, 5/L-M and D.8/15-18 |
2024/01/22 | Building/Structural | Slab | Passed | Kody Boswell | Rebar inspection for Monday (1-22-24) 1PM Slab on Grade Seq1 to pour 3am Tuesday1-23-24 Reviewed reinforcing for slab on grade in the approximate area between grids D.8-L/13-18. |
2024/01/22 | Building/Structural | CIP Beam | NOT READY | Kody Boswell | While on the job site, the concrete subcontractor informed me they were not ready for inspection of grade beams/pilasters. Inspection to be rescheduled. (KB) |
2024/01/19 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar East 2nd floor 2nd lift Reviewed reinforcing for the 2nd lift of the masonry wall on the 2nd level along grids 19/L-M, M/17-19, 17/M-N, N/14-17 and P/6-16 (exterior walls on the east side) |
2024/01/18 | Building/Structural | Structural | Postponed | Kody Boswell | Rebar Grade Beam south porch and east porch Contractor called and informed FSU they were not ready for inspection. (KB) |
2024/01/17 | Building/Structural | Structural | Passed | Kody Boswell | Masonry rebar 2nd floor North Wall Reviewed reinforcing steel for the 3rd lift of the masonry wall between grids 18/D.8-L. |
2024/01/16 | Building/Structural | Masonry | Postponed | Kody Boswell | 2nd Floor North Masonry Rebar Postponed due to weather. Contractor is resubmitting request for 1/17/2024. (KB) |
2024/01/12 | Building/Structural | Structural | Conditional | Kody Boswell | Rebar Seq2 Penthouse Deck Reviewed elevated slab reinforcing in the area between grids J-N/5-19. Reinforcing was in substantial compliance with the contract documents with exception to the area between grids J-J.7/ 16.3-16.7. This area is marked as a roof in architectural drawings. Contractor to verify the area is supposed to receive roof deck as opposed to composite deck with concrete. Contractor verified the area noted above is to be composite deck with concrete. (noted 3/7/2024) |
2024/01/12 | Building/Structural | Structural | Passed | Kody Boswell | Masonry rebar east 2nd floor planned pour is 11am Reviewed the 1st lift of the east exterior wall on the 2nd level |
2024/01/10 | Building/Structural | Structural | Passed | Kody Boswell | Rebar Due to FSU closure (severe weather), inspections for masonry reinforcing and retaining wall reinforcing were deferred to the threshold inspector, BNI. (KB) |
2024/01/08 | Building/Structural | Structural | Passed | Kody Boswell | Rebar inspection in foundation wall Reviewed reinforcing around doorway near the SW corner of retaining wall. Reinforcing reviewed per direction in RFI #287. |
2024/01/05 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry reinforcing inspection level 1 Reviewed reinforcing for the 1st lift of the wall along grid 18/D.8-J on level 2. (KB) |
2024/01/04 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry reinforcing level 1 Reviewed reinforcing for the following walls: - 3rd lift of the west wall on level 1 (along grid D.8/15-18) |
2024/01/03 | Building/Structural | Structural | Passed | Kody Boswell | Re-inspection of the concrete foundation wall rebar 1.5 in cover was achieved (KB) |
2024/01/02 | Building/Structural | Masonry | Passed | Tom Deckert | ****************This inspection is for Tuesday 1-2-24 **********The system will not let anything schedule for 2024 masonry inspection and wall/pilaster inspection level 2 3rd lift north and 2nd life east- Masonry reinforcing (dowells and tie beam) in place per cd's |
2024/01/02 | Building/Structural | Structural | Failed | Tom Deckert | ****************This inspection is for Tuesday 1-2-24 **********The system will not let anything schedule for 2024 masonry inspection and wall/pilast RI steel cover for west wall interior face does not meet minimum 1.5 inches. Contract to adjust an recall inspection |
2023/12/28 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | Seq 1 storm line 8" running North & South with 6" branch line running East |
2023/12/28 | Plumbing | Underground | Passed | Neely Lewis | Seq 1 storm line 8" running North & South with 6" branch line running East |
2023/12/21 | Building/Structural | Structural | Conditional | Kody Boswell | Rebar Slab on Deck 4th level slab reinforcing reviewed in the area between grids J.7-N/5-19 Contractor was still tying vertical masonry dowels and slab reinforcing bars and had not installed the construction joint. BNI to verify completion of reinforcing placement and construction joint installation prior to concrete placement. (KB) |
2023/12/21 | Building/Structural | Structural | Conditional | Kody Boswell | Block mason rebar.---------- Also entering a 12 pm rebar Slab on Deck Reviewed the following: -1st lift of CMU along grids M, N & P between grids 5-19 -2nd lift of CMU along grids 18 & 19 between grids D.8-N A few individual CMU blocks broke loose from wall assembly at window jambs. BNI to verify block is re-laid with fresh mortar. |
2023/12/21 | Building/Structural | Structural | Postponed | Kody Boswell | Pilaster Rebar East and South Contractor requested to postpone pilaster inspection once FSU arrived on site for other inspections (KB) |
2023/12/15 | Building/Structural | Structural | Passed | Kody Boswell | Sequence 1 First floor rebar on block Reinforcing for 1st lift of CMU along grid 18/D.8-N on first floor reviewed |
2023/12/15 | Plumbing | Underground | Passed | Neely Lewis | waste piping north 6" line |
2023/12/13 | Building/Structural | Structural | Conditional | Kody Boswell | Sequence4 Slab on Grade Reviewed SOG reinforcing at the SW corner of the building between grids (E-L/2-3). Several minor corrections to be made: 1. Fix top cover issue for #8 column strip bars 2. Rotate hooks where the slab edge meets the retaining wall so sufficient cover is met. 3. Bend slab dowels protruding from pile caps and grade beams so that they are in the slab. 4. Install #8 column strip reinforcing running N-S between grids 2 & 3. FSU BCA to verify with BNI (threshold) above mentioned corrections are completed prior to concrete placement. (KB) |
2023/12/11 | Building/Structural | Structural | Passed | Kody Boswell | Slab on deck inspection (for Tuesday 3am pour) |
2023/12/07 | Building/Structural | Structural | Passed | Kody Boswell | Retaining Wall 21-03229-A |
2023/12/04 | Building/Structural | Structural | Passed | Kody Boswell | **************** This inspection is for 12-4-23 @2pm (today) and has been coordinated over the phone. Due to Building Code Inspection System limitations not allowing same day appt this is for record. Seq2-Level2-Slab On Deck 21-03229-A ********** FSU BCA: Request sent after 7:30am on 12/4/2023, accomodation was made. |
2023/11/29 | Building/Structural | Structural | Passed | Kody Boswell | Slab on Deck Rebar/Wire 1st level. Sequence 2 reviewed |
2023/11/28 | Building/Structural | Structural | Passed | Kody Boswell | Retaining Wall 21-03229-A Retaining wall rebar at the south wall of the southwest portion of the building. Brick ledge rebar per EOR direction was installed during inspection. |
2023/11/27 | Building/Structural | Structural | Conditional | Kody Boswell | Wall Rebar 21-03229-A Retaining wall rebar at the south wall of the southwest portion of the building. Brick ledge rebar per EOR direction not fully installed during inspection. FSU to review brick ledge after installation. |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/11/21 | Building/Structural | Structural | Passed | Kody Boswell | Foundation Inspection 21-03229- |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/11/16 | Building/Structural | Slab | Passed | Kody Boswell | Slab inspection Seq1Level4 21-03229-A |
2023/11/14 | Building/Structural | Slab | NOT READY | Kody Boswell | Slab Inspection 21-03229-A 4th level, Sequence 1 Contractor was still placing slab reinforcing upon site arrival |
2023/11/14 | Plumbing | Storm Piping & Test | Passed | Dwayne Mahony | Partial storm inspection for cover up. 21 03229-A |
2023/11/13 | Building/Structural | Structural | Conditional | Kody Boswell | Retaining wall rebar (south) and concrete pilasters/columns at the exterior of the retaining wall (south and east) Some cover issues, but rebar is in substantial compliance. Threshold inspector to verify cover issues remedied prior to concrete placement. |
2023/11/09 | Building/Structural | Structural | Passed | Kody Boswell | South Wall 21-03229-A |
2023/11/09 | Plumbing | Underground | Passed | Dwayne Mahony | Underground Plumbing |
2023/11/08 | Building/Structural | Structural | Passed | Kody Boswell | Sequence 1 level 3 deck slab 21-03229-A |
2023/11/06 | Building/Structural | Structural | Failed | Dwayne Mahony | Pilaster rebar 21-03229-A Work is not in accordance with the plans: all ties shall have 135 degree hooks where required by ACI 318. Consult with engineers and provide alternate direction if necessary. One P5 column #8 bars have too short of laps to dowels. Other columns rebar dowel placement was inaccurate: dowel bars will not have required 2" clear cover. Increase coverage by increasing column size as needed. |
2023/11/02 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | Sanitary and storm in seq 4 slab on grade for partial cover up. |
2023/11/02 | Building/Structural | Structural | Conditional | Kody Boswell | Retaining Wall 21-03229-A Concrete pilasters missing cross ties. BNI to verify ties installed prior to concrete placement |
2023/11/02 | Building/Structural | Slab | Passed | Kody Boswell | Slab inspection 2nd floor. 21-03229-A |
2023/10/30 | Building/Structural | Slab | Passed | Kody Boswell | 1st elevated deck |
2023/10/26 | Building/Structural | Structural | Conditional | Kody Boswell | Foundation Wall inspection Corner bars for outside face of horizontal wall reinf was not installed BNI to verify installation of bars prior to concrete placement |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/10/25 | Building/Structural | Structural | Passed | Kody Boswell | 40' Foundation Wall and Concrete Pedestals X2 21-03229-A |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/10/24 | Building/Structural | Structural | NOT READY | Dwayne Mahony | Foundation/Wall inspection 21-03229-A |
2023/10/13 | Building/Structural | Structural | Passed | Kody Boswell | Retaining Wall Rebar 21-03229-A |
2023/10/13 | Building/Structural | Structural | Passed | Kody Boswell | Elevator Shaft 21-03229-A west wall was formed up upon arrival. BNI was contacted to verify reinforcing was in compliance. N, S and E walls were reviewed |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/10/10 | Building/Structural | Structural | Conditional | Kody Boswell | Retaining wall and foundation rebar. 21-03229- Contractor to finish providing clearance around reinforcing steel around earth-formed components. BNI threshold to verify work complete prior to concrete palcement. (KB) |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/10/04 | Plumbing | Underground | Passed | Neely Lewis | Chiller piping prior to covering. 21-03229-A |
2023/10/04 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Chiller piping prior to covering. 21-03229-A |
2023/10/03 | Building/Structural | Structural | Passed | Dwayne Mahony | Elevator Rebar 21-03229-A Link Beam tie spacing was wrong at time of my inspection (@12") corrected to 10" while I waited. |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/09/28 | Building/Structural | Structural | Passed | Kody Boswell | Retaining wall rebar. |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/09/22 | Building/Structural | Structural | Passed | Kody Boswell | Elevator shaft rebar, Retaining wall rebar 21-03229-A |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/09/19 | Building/Structural | Footing | Conditional | Kody Boswell | Wall footings, piles caps, grade beams KB: Contractor to verify reinf around pipe penetration along south wall footing. BNI threshold will also verify. |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/09/13 | Building/Structural | Structural | Passed | Kody Boswell | Elevator Shaft Rebar Vertical permit 21-03229-A |
2023/09/12 | Building/Structural | Structural | Postponed | Kody Boswell | Elevator Shaft Rebar Vertical permit 21-03229-A Inspection postponed to 9/13/23 due to incoming weather |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/09/11 | Electrical | Ground | Passed | Dwayne Mahony | This inspection is for 9/8/23 am for grounding and re-inspect on gridlines 15-18. |
2023/09/08 | Building/Structural | Structural | Passed | Kody Boswell | This inspection is for 9/8/23 am for grounding and re-inspect on gridlines 15-18. |
2023/09/07 | Building/Structural | Footing | Conditional | Dwayne Mahony | Foundations/Foundation Walls 21-03229 Foundation Permit |
2023/08/25 | Building/Structural | Structural | Passed | Dwayne Mahony | For rebar Gridline 3 to 1A to Gridline F 11am pour |
2023/08/14 | Building/Structural | Footing | Passed | Dwayne Mahony | Rebar inspection - piles caps and grade beams - sequence #3 |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/08/10 | Building/Structural | Structural | Passed | Dwayne Mahony | Rebar inspection for elevator shaft. First lift approved, corrections completed. |
2023/08/09 | Building/Structural | Structural | Failed | Dwayne Mahony | North , South, and West elevator shaft rebar. Reinforcing not in compliance with the approved construction documents: Horizontal bars not corrected to outside of verticle bars. U-bars #3, but #4 are required. |
2023/08/08 | Building/Structural | Structural | Failed | Dwayne Mahony | Rebar on the East side of the elevator shaft. Reinforcing not in compliance with the approved construction documents: Horizontal bars not outside of verticle bars. U-bars at wall opening are missing. Rebar couplers not tightened. |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/07/28 | Building/Structural | Footing | Passed | Dwayne Mahony | Pile cap and grade beams - remainder of sequence 2. 11:00 concrete pour. |
2023/07/19 | Electrical | Service Release | Passed | Dwayne Mahony | Temp service (#3) for the building as well as Crane #2. South East corner of the site. Service approved. Approval sticker placed on CT cabinet. |
2023/07/12 | Building/Structural | Foundation | Passed | Dwayne Mahony | Scheduled to pour 5am Thursday |
2023/07/12 | Electrical | Lightning Protection | Passed | Dwayne Mahony | Scheduled to pour 5am Thursday Just one column downleader inspected. |
2023/07/12 | Building/Structural | Structural | Passed | Dwayne Mahony | Scheduled to pour 5am Thursday |
2023/06/30 | Electrical | Ground | Passed | Dwayne Mahony | Bonding ground to column inspection. Approved Ufer ground in grade beam. |
2023/06/30 | Building/Structural | Footing | Passed | Dwayne Mahony | 11:30 Concrete for gridlines 18-16. |
2023/06/27 | Building/Structural | Footing | Passed | Andy Howard | Continuation of grid line 18. Andy Howard met with Todd Nedley, Kenny Heierman, and Robbie Tucker at the north east corner of the building site. This inspection was a preliminary inspection requiring another BCA structural inspection prior to placing the concrete. The area of the inspection covered gridlines J throughP from west to east and gridline 16 through 19 from south to north. The items inspected are pile caps and beams supported by piles. |
2023/06/16 | Building/Structural | Footing | Passed | Dwayne Mahony | Pile cap and grade beam rebar inspections gridline 18,15 and 13. We are pouring concrete at 11am on this date. This has to be a morning inspection. |
2023/06/13 | Electrical | Ground | Passed | Dwayne Mahony | Service inspection for meter release at the jobsite trailer. 2 services approved, one per trailer. |
2023/06/06 | Building/Structural | Footing | Passed | Dwayne Mahony | Modular buildings earth anchors/setup approved. |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/01/24 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed grade beam and pilasters along grid 1A/E.3-H.6 (South) and along grids 3/K-L and L/3-5 (East). |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Building/Structural | Structural | NOT READY | Dwayne Mahony | Foundation Rain delay | |
Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone generator pad reinforcing | |
Electrical | Ground | NOT READY | Dwayne Mahony | rain delay |
BCA Project #: 21-03229-A Legacy Hall - Vertical Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Building/Structural | Structural | NOT READY | Kody Boswell | Contractor requested inspection of reinforcing steel for the concrete beam at the roof level along grid D.8/15-18. Reinforcing steel was not in place and not ready for inspection. |
BCA Project #: 21-03229-a New COB Building - Legacy Hall Foundation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Electrical | Lightning Protection | NOT READY | Dwayne Mahony | rain delay | |
Building/Structural | Footing | NOT READY | Dwayne Mahony | Foundation Rain delay |
BCA Project #: 21-03227- Football Operations Facility
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/15 | Fire Safety | Opening Protections | Passed | Mary Creason | Exterior soffit south. Edge of slab fire stopping on west wall. |
2025/04/11 | Plumbing | Water Piping & Test | Passed | Paul Nitz | 1) Area C and D - Level 1 - DW Mains & Branch Lines 2) Area D - Level 1 - DWV (PVC) - All Locations |
2025/04/11 | Plumbing | Rough-in | Passed | Paul Nitz | 1) Area C and D - Level 1 - DW Mains & Branch Lines 2) Area D - Level 1 - DWV (PVC) - All Locations |
2025/04/10 | Building/Structural | Structural | Passed | Paul Nitz | Joist added support. |
2025/04/10 | Building/Structural | Sheetrock | Passed | Paul Nitz | Sheathing inspection for Area-C level 400 south, Area-D level 100 East. |
2025/04/10 | Mechanical | HW Piping & Test | Passed | Paul Nitz | *Inspected on 4/08/2025* - Area C and D - Level 1 - HW Piping Mains |
2025/04/09 | Plumbing | Rough-in | Passed | Paul Nitz | Area C - Level 2 - In-Wall and Overhead PVC Piping (re-inspection) |
2025/04/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed roof deck attachment to structure for level 400 sloped roof |
2025/04/08 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Area C - Level 1 & 2 - Remaining In-Wall Plumbing - (Re-inspection) |
2025/04/08 | Plumbing | Rough-in | NOT READY | Paul Nitz | Area C - Level 1 & 2 - Remaining In-Wall Plumbing - (Re-inspection) |
2025/04/08 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Exterior framing area C Framing L200 |
2025/04/08 | Building/Structural | Framing | Passed | Kody Boswell | Exterior framing area C Framing L200 C |
2025/04/08 | Fire Safety | Opening Protections | Passed | Mary Creason | Roof at 400area B. Exterior framing area C Framing L200 C Mary/ Fireproof penetrations. Fire penetrations observed = Passed (Handbook available to reference) Informed Shawn that I will need the paperwork from Aramond contractors for previous installs that were not called into our department. |
2025/04/07 | Plumbing | Rough-in | Cancelled | Paul Nitz | Area A - Level 2 - All overhead MEP insulation (prior to ceiling close up) Area B - Level 2 - All overhead MEP insulation (prior to ceiling close up) |
2025/04/07 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Area C and D - Level 1 - CW and HW (Supply and Return) Mains |
2025/04/07 | Electrical | Wall Rough-in | NOT READY | James Melvin | Area D - Level 1 - In-Wall Electrical Rough-In - Column Line's M to T & 22.7 to 27 |
2025/04/07 | Fire Safety | Opening Protections | NOT READY | Mary Creason | Framing in-wall final inspection for Area-C level 200 walls. CL 19-27 Hilti fire sleeve inspection and pipe penetrations in Area-C walls. |
2025/04/07 | Plumbing | Rough-in | NOT READY | Paul Nitz | Area C - Level 1 and 2 - DWV (PVC re-inspection) - Remaining Areas |
2025/04/07 | Mechanical | Insulation | Cancelled | Paul Nitz | Area A - Level 2 - All overhead MEP insulation (prior to ceiling close up) Area B - Level 2 - All overhead MEP insulation (prior to ceiling close up) |
2025/04/07 | Mechanical | CHW Piping & Test | Cancelled | Paul Nitz | Area C and D - Level 1 - CW and HW (Supply and Return) Mains |
2025/04/04 | Building/Structural | Wall/Ceiling | Failed | Kody Boswell | Reviewed reinforcing steel for stair wall at area development. There were missing vertical hook bars at the brick ledge. This was discussed with the Contractor while on site. |
2025/04/04 | Plumbing | Rough-in | Passed | Paul Nitz | 1) Area C - Level 2 - DW and DWV - Remaining Restroom & Lobby Piping 2) Area C - Level 1 - DW and DWV - Restroom & Barber Shop 3) Area D - Level 1 - DWV - Miscellaneous Rooms (to be tracked on marked up paperwork) |
2025/04/04 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab infill at IPF per RFI 460 |
2025/04/04 | Plumbing | Water Piping & Test | Failed | Paul Nitz | 1) Area C - Level 2 - DW and DWV - Remaining Restroom & Lobby Piping 2) Area C - Level 1 - DW and DWV - Restroom & Barber Shop 3) Area D - Level 1 - DWV - Miscellaneous Rooms (to be tracked on marked up paperwork) 1) vent not filled with water 2) water closet was leaking |
2025/04/03 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Duct/Fire Smoke Damper Visual - Hydrotherapy Pit Rated Shaft - Area A level 1 - *this was inspected on 4/03* 2) VAV Visuals - Area B/C - Level’s 1 and 2 |
2025/04/03 | Building/Structural | Framing | Passed | Kody Boswell | Exterior soffit on level 400 roof. |
2025/04/03 | Mechanical | Equipment | Passed | Paul Nitz | 1) Duct/Fire Smoke Damper Visual - Hydrotherapy Pit Rated Shaft - Area A level 1 - *this was inspected on 4/03* 2) VAV Visuals - Area B/C - Level’s 1 and 2 |
2025/04/02 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct Visual - A100, C100, D100 - Ongoing Inspections |
2025/04/02 | Building/Structural | Sheetrock | Passed | Kody Boswell | Exterior screw inspection area C and D, level 100 |
2025/04/01 | Building/Structural | Structural | NOT READY | Kody Boswell | Reviewed reinforcing steel for area development wall., area D |
2025/04/01 | Mechanical | Insulation | NOT READY | Paul Nitz | Area B and C - Level 1 - Locker Room & Hydrotherapy Area - All duct insulation |
2025/04/01 | Plumbing | Rough-in | NOT READY | Paul Nitz | Area C - Level 2 - In-wall and overhead DW & DWV - Remaining Areas - CL's A to K & 18 to 27 |
2025/04/01 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Area C - Level 2 - In-wall and overhead DW & DWV - Remaining Areas - CL's A to K & 18 to 27 |
2025/04/01 | Building/Structural | Slab | Passed | Kody Boswell | Sidewalk section on west side of building. |
2025/04/01 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | 1) Duct Visual - Level 1 - A100 (Hydro pit rated shaft), C100, and D100 - Ongoing Inspections |
2025/03/31 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct Visual - Ongoing Inspections - L100 - Area’s B, C, and D |
2025/03/28 | Electrical | Wall Rough-in | Cancelled | Rocky Wilde | In-wall electrical rough-in for Area-C level 200. CL 19-27. Visual duct inspection Area-D Level 100 CL M-T. 1) this area was previously lookedat byy Al Smythe |
2025/03/28 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area D - Level 1 - Duct Visual - Ongoing inspections |
2025/03/28 | Mechanical | Duct Rough-in | Passed | Paul Nitz | In-wall electrical rough-in for Area-C level 200. CL 19-27. Visual duct inspection Area-D Level 100 CL M-T. |
2025/03/27 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | In-progress inspection for Insulated Metal Panels (East facade K-line) Fasteners and panel install. |
2025/03/27 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed sheathing attachment to interior LG partition walls for Area A and Area B, level 100. |
2025/03/27 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for exterior players entrance ramp wall and loading dock |
2025/03/25 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Area C - Level 2 - In-Wall FA rough-in FA rough in passed however one strobe light required in restroom (mens) - See approved plans |
2025/03/25 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct Visual - Areas: L100 Area C & L100 Area D - Ongoing Inspections |
2025/03/25 | Electrical | Wall Rough-in | Passed | Al Smythe | Area C - Level 2 - In-Wall Electrical R/I - Column Line’s 18-27 & A to K |
2025/03/25 | Plumbing | Rough-in | Passed | Paul Nitz | Area C - Level 2 - In-Wall & OH DW + DWV (PVC and Copper) - Remaining Areas - Column Line's 18 to 27 & A to K |
2025/03/24 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct Visual - Area C L100, Area D L100, Area B L300 - Ongoing inspection |
2025/03/24 | Electrical | Wall Rough-in | NOT READY | James Melvin | Area C - Level 2 - In-Wall electrical rough-in (prior to wall close up) - Column line's 18 to 27: A to K |
2025/03/24 | Fire Safety | Fire Alarm Rough-In | NOT READY | Mary Creason | Area C - Level 2 - In-Wall Fire Alarm Rough-In - Column line's 18 to 27 & A to K Inspected one device and then Alex -WT said they weren't ready and for me to come back tomorrow. |
2025/03/24 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Area C - Level 2 - In-Wall & OH DW + DWV (PVC and Copper) - Remaining Areas - Column Line's 18 to 27 & A to K |
2025/03/24 | Building/Structural | Slab | Passed | Kody Boswell | reviewed reinforcing steel fo site sidewalk at North end of the building |
2025/03/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for Area-B level 100 |
2025/03/21 | Mechanical | Duct Rough-in | Passed | James Melvin | Area B/C - Level 1 - Duct Visual - Ongoing inspections prior to insulation |
2025/03/20 | Plumbing | Rough-in | Passed | Paul Nitz | Area B Level 1 - In-Wall Piping Insulation - *Re-inspection* - Column Lines A to K & 10 to 18 |
2025/03/19 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for loading dock slab on grade in area C |
2025/03/19 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for loading dock slab on grade in area C |
2025/03/19 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of ongoing roofing in areas C and D |
2025/03/19 | Plumbing | Rough-in | Failed | Paul Nitz | Area B - Level 1 - In-Wall Plumbing Insulation - Column Line's 10 to 18 & A to K 1) insulation was not sealed properly and was missing in multiple locations |
2025/03/18 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for 2 knee walls on level 100, area A. |
2025/03/18 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | Miscellaneous Duct OH Visuals - Area A level 1+2 and Area C |
2025/03/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed 2nd lift of a wall in the hydrotherapy pit, this wall is topped out. |
2025/03/18 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress of inspection of ongoing roofing in areas C and D. Area C, level 300, cap sheet installation. Area D, level 200, foam insulation and LWE concrete. |
2025/03/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed masonry bond beam at hydro pit. This was the 2nd lift, wall is topped out. |
2025/03/18 | Building/Structural | Framing | NOT READY | Kody Boswell | Exterior soffit level 400 B. Contractor was not ready for inspection at time of arrival of FSU BCA on site |
2025/03/18 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed interior sheathing for several walls on Level 200, Area B between grids 17-21 |
2025/03/17 | Building/Structural | Sheetrock | NOT READY | Kody Boswell | There was no sheathing inspection ready |
2025/03/17 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls down in the hydrotherapy pit. Walls are nonload bearing |
2025/03/17 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Duct Rough-In (Visual) - Area B Level 1 - Partial Inspection 2) Duct Insulation - Area A Level 2 - Fire Rated Shaft at Team Meeting Room |
2025/03/17 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the landscape retaining wall south of the building in area D. Resuls is conditional pending pipe sleeve pentration installation and vertical control joint installation. |
2025/03/17 | Mechanical | Insulation | Passed | Paul Nitz | 1) Duct Rough-In (Visual) - Area B Level 1 - Partial Inspection 2) Duct Insulation - Area A Level 2 - Fire Rated Shaft at Team Meeting Room |
2025/03/17 | Plumbing | Rough-in | Passed | Paul Nitz | In-Wall Plumbing Insulation - Area A and B Level 1 - *Prior to Wall Close Up* |
2025/03/17 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing for exterior wall along grid E/21-24, between levels 200 and 300. LG wall was not in compliance with the contract documents. The following issues need to be addressed: 1) Missing clip angles for window sills need to be installed. 2) Window jamb framing was not verifiable due to windows being installed. Jamb framing must be verified. 3) Built-up header beams for openings were constructed with punched members. Per "Headers" note 1 on sheet LG0.1, headers must be constructed with unpunched membrs. This was discussed on site. It is acceptable for the LG Engineer to provide a statement allowing headers to be constructed with punched members. |
2025/03/17 | Plumbing | Water Piping & Test | Partial | Paul Nitz | Area C - Level 2 - OH and In-Wall Plumbing (DW and DWV) |
2025/03/17 | Plumbing | Rough-in | Passed | Paul Nitz | Area C - Level 2 - OH and In-Wall Plumbing (DW and DWV) |
2025/03/17 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the level 400 roof soffit (west elevation) and LG framing for exterior walls along grid E/24-27. |
2025/03/17 | Building/Structural | Roofing | NOT READY | Kody Boswell | Ongoing roofing area C level 300. FSU BCA did not observe any progress on roofing. |
2025/03/14 | Building/Structural | Masonry | Passed | Paul Nitz | Screw inspection level 2 for mud up. courtesy inspection stairs C1 Masonry at hydro pit. ongoing roof at D Exterior sheeting |
2025/03/14 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection level 2 for mud up. courtesy inspection stairs C1 Masonry at hydro pit. ongoing roof at D Exterior sheeting |
2025/03/14 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Fire Alarm wall rough-in - Level 1 - Area B and Area D Visual inspection conducted - passed |
2025/03/14 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | 1) Area B - Levels 1/2 - Duct pressure/leak test #'s 8 and 9 2) Area A - Level 2 - Duct & Fire Damper Visual - Fire Rated Shaft at Team Meeting Room 3) Area B/C - Level 1 - Duct Visual - Locker Room & Other Misc. Rooms |
2025/03/14 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Area B - Levels 1/2 - Duct pressure/leak test #'s 8 and 9 2) Area A - Level 2 - Duct & Fire Damper Visual - Fire Rated Shaft at Team Meeting Room 3) Area B/C - Level 1 - Duct Visual - Locker Room & Other Misc. Rooms |
2025/03/14 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Fire alarm rough-in - Walls only - Level 100 Area's B and D visual - passed |
2025/03/14 | Building/Structural | Roofing | Passed | Paul Nitz | Screw inspection level 2 for mud up. courtesy inspection stairs C1 Masonry at hydro pit. ongoing roof at D Exterior sheeting |
2025/03/14 | Building/Structural | Framing | Passed | Paul Nitz | Screw inspection level 2 for mud up. courtesy inspection stairs C1 Masonry at hydro pit. ongoing roof at D Exterior sheeting |
2025/03/13 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Area C - Level 2 - CW and HW piping - Visual and pressure test |
2025/03/13 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for level 400 roof, south side, along grid 20/E-L |
2025/03/13 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Area C - Level 2 - CW and HW piping - Visual and pressure test |
2025/03/13 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Duct Visual Inspections - Area A L100 (remaining areas), Area B L100, and Area C L200 1) missing straps in multiple areas |
2025/03/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs and pour backs Area C level 1. This was a re-inspection. |
2025/03/13 | Building/Structural | Roofing | Passed | Kody Boswell | Reviewed roof deck attachment for level B 400 in the area between grids E-L/13-20 |
2025/03/13 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs and pour backs Area C level 1. This was a re-inspection. |
2025/03/13 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed insulated metal Panels east facade on grid K |
2025/03/12 | Building/Structural | Slab | NOT READY | Kody Boswell | Reviewed reinforcing steel for several curbs in area C. Contractor was not ready. |
2025/03/11 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs in area C |
2025/03/11 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs in area C |
2025/03/10 | Mechanical | Equipment | Failed | Paul Nitz | Area A and B - Level 2 - VAV install and duct tie-ins - Column Line's 1 to 18 & A to K - *Not including walk thru space* 1) straps missing on VAV's 2) Access panels required for VAV's above the hard lid 3) Framing was blocking one VAV Access |
2025/03/10 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Area A and B - Level 2 - VAV install and duct tie-ins - Column Line's 1 to 18 & A to K - *Not including walk thru space* 1) straps missing on VAV's 2) Access panels required for VAV's above the hard lid 3) Framing was blocking one VAV Access |
2025/03/10 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Area A - Level 1 - In-Wall Fire Alarm Rough-In - Column Line's 1 to 10 & A to K Visual on rough in for FA - Passed |
2025/03/07 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Area A Level 2 - Duct Insulation/Fire-Smoke Damper - Rated Shaft in Female GA locker room 2) Area B Level 1 - OH Duct visual - Hydrotherapy Area |
2025/03/07 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | OH Gas Main - Level 1 - Column line’s 7 to 21 |
2025/03/07 | Mechanical | Insulation | Passed | Paul Nitz | 1) Area A Level 2 - Duct Insulation/Fire-Smoke Damper - Rated Shaft in Female GA locker room 2) Area B Level 1 - OH Duct visual - Hydrotherapy Area |
2025/03/07 | Mechanical | Equipment | Passed | Paul Nitz | 1) Area A Level 2 - Duct Insulation/Fire-Smoke Damper - Rated Shaft in Female GA locker room 2) Area B Level 1 - OH Duct visual - Hydrotherapy Area |
2025/03/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for interior walls in the follwing areas: 1) Level 100, area A, between grids C-D/1-3 2) Level 100, area A, between grids D-G/6.9-10 3) Level 200, area B, between grids A-F/10-18 |
2025/03/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the following: 1) Exterior parapet wall on level 200 roof along grid 27/M-L 2) Exterior wing wall framing located at grids K/13 and K/19 |
2025/03/07 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | OH Gas Main - Level 1 - Column line’s 7 to 21 |
2025/03/06 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on grade in the area between grids 22.7-26/L-M |
2025/03/06 | Building/Structural | Framing | Postponed | Kody Boswell | LG framing for wing walls located at grids L/13 and L/18. FSU BCA arrived on site at 4pm. Inspection postponed due to subcontractor not on site. |
2025/03/05 | Building/Structural | Structural | Passed | Kody Boswell | FTG for area development at stairs |
2025/03/05 | Building/Structural | Footing | Passed | Kody Boswell | FTG for area development at stairs |
2025/03/05 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area A - Level 1 - OH Duct Visual - Remaining Areas |
2025/03/04 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reiinforcing steel for several footings for the ramp located in area D |
2025/03/04 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed exterior LG framing for the following: 1) West soffit framing, level 400 roof 2) Pop up roof framing in area C West soffit framing was missing a screw at each vertical stud into the horizontal custom track. Pop up roof framing and built up column framing did not match shop drawings at the NE and NW corners. Re-inspection is required for the soffit and pop up roof. |
2025/03/04 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Interior framing screw inspection level 2, CL 7 to 12. |
2025/03/04 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Area A - Level 1 - OH Duct Rough-In Visual - Partial Inspection 1) straps missing |
2025/03/04 | Plumbing | Storm Piping & Test | Failed | Paul Nitz | Area B and C - Levels 2+3 - OH Storm piping - Column Line's 10 to 20:A to D 1) PVC horizontal spacing not met per fbcP308.5 |
2025/03/03 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Area B - Level 2 - In-Wall Fire Alarm Rough-In - Column Line's 10 to 18 & A to K - *Does not include team meeting room and walk thru space |
2025/03/03 | Plumbing | Storm Piping & Test | NOT READY | Paul Nitz | Area B and C - Levels 2+3 - OH Storm piping - Column Line's 10 to 20:A to D |
2025/02/28 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for the washroom slab located in the area between grids D-E/15-16. There were some cover issues around the trench and excessive debris where concrete is to be placed. |
2025/02/28 | Building/Structural | Framing | Passed | Kody Boswell | level 200 area A screw inspection from GL-1-10 |
2025/02/28 | Building/Structural | Footing | Passed | Kody Boswell | Re-inspection for reinforcing steel for retaining wall footing from grids Q.5- M on the south side of the site |
2025/02/28 | Plumbing | Storm Piping & Test | NOT READY | Paul Nitz | Area B - Levels 2 to 3 - OH Storm Piping (6" and 8") - Column Line's 10-14 & A-D |
2025/02/28 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | 1) Area A - Level 2 - Duct Pressure/Leakage Test - Test #7 (AHU 1-2, Riser Area A2) 2) Area B - Level 2 - Duct Rough-In Visual 3) Area A - Level 1 - Duct Rough-In Visual |
2025/02/28 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Area A - Level 2 - Duct Pressure/Leakage Test - Test #7 (AHU 1-2, Riser Area A2) 2) Area B - Level 2 - Duct Rough-In Visual 3) Area A - Level 1 - Duct Rough-In Visual |
2025/02/27 | Building/Structural | Framing | NOT READY | Kody Boswell | There was no framing ready for inspection. FSU BCA was on site for another inspection |
2025/02/27 | Building/Structural | Slab | NOT READY | Kody Boswell | Contractor informed FSU BCA after site arrival that the washing machine room slab /curb was not ready for inspection |
2025/02/27 | Electrical | Wall Rough-in | Passed | Al Smythe | 1) Area B - Level 2 - In-Wall Electrical Rough-In - Column Line's 15-18 & A to F 2) Area A - Level 1 - In-Wall Electrical Rough-In - Column Line's 1 to 10 & A to K - *Not including weight room* |
2025/02/27 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Area A - Level 2 - Duct Pressure/Leakage Test - Test #7 - AHU 1-2 (Riser Area A2) 2) Area A - Level 2 - Duct Rough-In Visual - Remaining Areas 3) Area B - Level 2 - Duct Rough-In Visual - Column Line's 10 to 15 & A to F |
2025/02/27 | Mechanical | Duct Pressure Test | NOT READY | Paul Nitz | 1) Area A - Level 2 - Duct Pressure/Leakage Test - Test #7 - AHU 1-2 (Riser Area A2) 2) Area A - Level 2 - Duct Rough-In Visual - Remaining Areas 3) Area B - Level 2 - Duct Rough-In Visual - Column Line's 10 to 15 & A to F |
2025/02/27 | Electrical | Wall Rough-in | Passed | James Melvin | 1) Area B - Level 2 - In-Wall Electrical Rough-In - Column Line's 15 to 18 - *Does not include walk thru space* 2) Area A - Level 1 - In-Wall Electrical Rough-In - Column Line's 1 to 10 & A to K - *Does not include weight room* |
2025/02/27 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Area B - Level 2 - OH Storm (6" & 8") - Column line's 10 to 14 & A to D |
2025/02/27 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the south site wall footing between grids Q-N |
2025/02/26 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment in the electrical room in area C |
2025/02/26 | Building/Structural | Framing | NOT READY | Kody Boswell | nterior framing Exterior framing. FSU BCA arrived on site and there was no framing ready for inspection |
2025/02/26 | Building/Structural | Wall/Ceiling | NOT READY | Kody Boswell | FSU BCA arrived on site and there was not wall to review |
2025/02/26 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the foundtion for the southern site wall, between grids Q-T |
2025/02/26 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | 1) Area A - Level’s 1 and 2 - OH duct rough-in and pressure test (supply - medium pressure and return mains) - *does not include Weight room* |
2025/02/26 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Area A - Level’s 1 and 2 - OH duct rough-in and pressure test (supply - medium pressure and return mains) - *does not include Weight room* |
2025/02/26 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Area B - Level’s 1 and 2 - OH duct rough-in and pressure test (supply - medium pressure and return mains) - does not include team meeting room, walk thru space, and hydrotherapy area) |
2025/02/26 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area B - Level’s 1 and 2 - OH duct rough-in and pressure test (supply - medium pressure and return mains) - does not include team meeting room, walk thru space, and hydrotherapy area) |
2025/02/26 | Plumbing | Storm Piping & Test | Conditional | Paul Nitz | 1) Area B - Level 1 - In-Wall and OH DWV re-inspection 2) Area B - Level 2 - Storm piping mains feeding gutter system (level 2 to level 3) 1) test ball needs to be removed from the pipe it is stuck in |
2025/02/26 | Plumbing | Rough-in | Passed | Paul Nitz | 1) Area B - Level 1 - In-Wall and OH DWV re-inspection 2) Area B - Level 2 - Storm piping mains feeding gutter system (level 2 to level 3) |
2025/02/26 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the foundation for the southern site wall, between grids Q-T |
2025/02/25 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Area B - Level 1 - In-Wall and Overhead Piping (DW and DWV) - *Does not include Hydrotherapy and Resistance Pool Areas* 1) venting needs to be retested |
2025/02/25 | Plumbing | Rough-in | Passed | Paul Nitz | Area B - Level 1 - In-Wall and Overhead Piping (DW and DWV) - *Does not include Hydrotherapy and Resistance Pool Areas* |
2025/02/24 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on level one, areas C and D |
2025/02/24 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed LG framing insulation on level 2 area A, between grids 1-4. |
2025/02/24 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing on level 2 area A, between grids 7-10. Result is conditional pending some repairs to be done where vertical studs were cut excessively by the plumbing subcontractor. |
2025/02/21 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Area B - Level 2 - In-Wall Rough-In - Column Line's 10 to 19 & A to K - *Does not include main team meeting room or walk-thru space* |
2025/02/21 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for curbs in area C |
2025/02/20 | Building/Structural | Slab | NOT READY | Paul Nitz | Courtesy on Exterior stairs near score board. Fireproofing level 1 and 2. Area A. Curb inspection area C level 1&2 |
2025/02/20 | Building/Structural | ADA | Passed | Paul Nitz | Courtesy on Exterior stairs near score board. Fireproofing level 1 and 2. Area A. Curb inspection area C level 1&2 |
2025/02/20 | Fire Safety | Fire Alarm Rough-In | Passed | Sam Sevor | Area A - Level 2 - In-Wall Fire Alarm Rough-In - Column Line's 1 to 10 & A to K In Wall rough in only. |
2025/02/20 | Building/Structural | Framing | Passed | Paul Nitz | Courtesy on Exterior stairs near score board. Fireproofing level 1 and 2. Area A. Curb inspection area C level 1&2 Fireproofing |
2025/02/18 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed renforcing steel for the several curbs. 2 areas on ground floor (area C & area D) and 1 area on second floor (patio) |
2025/02/18 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed storefront framing attachment to structure in the following areas: (1) Level 1 to level 2, east elevation, between grids 13-15 (2) Level 2 to level 4 roof, east elevation, between grids 11-13 Notes: Storefront (1) head fastening was not in compliance with shop drawings\installation instructions. Shop drawings show connections occuring at vertical jambs. Contractor installed connections occuring approximately in the middle of each vertical jamb. Contractor to correct connections per shop drawings or get approval from the delegated design engineer |
2025/02/17 | Building/Structural | Slab | NOT READY | Paul Nitz | Ongoing stair inspection Ongoing Roof Curbs |
2025/02/17 | Building/Structural | Roofing | NOT READY | Paul Nitz | Ongoing stair inspection Ongoing Roof Curbs |
2025/02/17 | Building/Structural | ADA | NOT READY | Paul Nitz | Ongoing stair inspection Ongoing Roof Curbs |
2025/02/17 | Building/Structural | Structural | Passed | Paul Nitz | Ongoing stair inspection Ongoing Roof Curbs |
2025/02/14 | Building/Structural | Structural | Passed | Kody Boswell | |
2025/02/14 | Building/Structural | Roofing | NOT READY | Kody Boswell | |
2025/02/14 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a curb in area D |
2025/02/13 | Building/Structural | Structural | NOT READY | Kody Boswell | Ongoing roof. No no roofing to be reviewed |
2025/02/13 | Building/Structural | Roofing | NOT READY | Kody Boswell | Ongoing roof Courtesy inspection for stairs |
2025/02/13 | Building/Structural | ADA | NOT READY | Kody Boswell | Courtesy inspection for stairs. No new stairs ready to be reviewed |
2025/02/12 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed exterior LG soffit framing along the east elevation along grids 11 and L/11-19 |
2025/02/12 | Building/Structural | ADA | Passed | Kody Boswell | Courtesy inspection on stairs A1, A2,B2. Contractor requested FSU BCA to review riser dimensional uniformity |
2025/02/12 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the NW exterior stair |
2025/02/12 | Building/Structural | Roofing | Passed | Kody Boswell | |
2025/02/12 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | |
2025/02/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the NW exterior stair |
2025/02/11 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Area C - Level 1 - OH Storm Piping and Test (10") - Primary and Overflow lines |
2025/02/11 | Building/Structural | Framing | Postponed | Kody Boswell | East soffit framing was postponed |
2025/02/11 | Building/Structural | Slab | NOT READY | Kody Boswell | Reviewed reinforcing steel for curb on area D |
2025/02/11 | Building/Structural | Roofing | Passed | Kody Boswell | Ongoing roof |
2025/02/10 | Building/Structural | Roofing | Passed | Paul Nitz | Slab on grade area C Pour#2. Curbs area D On going Roof ON going IMP west side of building. |
2025/02/10 | Building/Structural | Structural | Passed | Paul Nitz | Slab on grade area C Pour#2. Curbs area D On going Roof ON going IMP west side of building. |
2025/02/10 | Building/Structural | Framing | Passed | Paul Nitz | Slab on grade area C Pour#2. Curbs area D On going Roof ON going IMP west side of building. |
2025/02/10 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Area B - Level 2 - Copper piping to Team Meeting Room Area B - Level 3 - OH Copper piping to equipment and devices |
2025/02/10 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Area B - Level 2 - Copper piping to Team Meeting Room Area B - Level 3 - OH Copper piping to equipment and devices |
2025/02/10 | Building/Structural | Slab | Passed | Paul Nitz | Slab on grade area C Pour#2. Curbs area D On going Roof ON going IMP west side of building. |
2025/02/07 | Building/Structural | Roofing | Passed | Paul Nitz | Ongoing roofing area C. Bolt inspection for East glazing. Area B and C level 2. Curb in area D. Ongoing IMP panels west side. |
2025/02/07 | Building/Structural | Structural | Passed | Paul Nitz | Ongoing roofing area C. Bolt inspection for East glazing. Area B and C level 2. Curb in area D. Ongoing IMP panels west side. |
2025/02/07 | Building/Structural | Slab | Passed | Paul Nitz | Ongoing roofing area C. Bolt inspection for East glazing. Area B and C level 2. Curb in area D. Ongoing IMP panels west side. |
2025/02/07 | Building/Structural | Framing | Passed | Paul Nitz | Ongoing roofing area C. Bolt inspection for East glazing. Area B and C level 2. Curb in area D. Ongoing IMP panels west side. |
2025/02/06 | Building/Structural | Wall/Ceiling | NOT READY | Kody Boswell | Curbs area D ongoing Roof in C ongoing IMP Exterior framing / Interior framing FSU BCA arrived on site and there was nothing ready for inspection |
2025/02/06 | Building/Structural | Framing | NOT READY | Kody Boswell | Curbs area D ongoing Roof in C ongoing IMP Exterior framing / Interior framing FSU BCA arrived on site and there was nothing ready for inspection |
2025/02/06 | Building/Structural | Slab | NOT READY | Kody Boswell | Curbs area D ongoing Roof in C ongoing IMP Exterior framing / Interior framing FSU BCA arrived on site and there was nothing ready for inspection |
2025/02/06 | Building/Structural | Roofing | NOT READY | Kody Boswell | Curbs area D ongoing Roof in C ongoing IMP Exterior framing / Interior framing FSU BCA arrived on site and there was nothing ready for inspection |
2025/02/06 | Building/Structural | Structural | NOT READY | Kody Boswell | Curbs area D ongoing Roof in C ongoing IMP Exterior framing / Interior framing FSU BCA arrived on site and there was nothing ready for inspection |
2025/02/05 | Building/Structural | Roofing | Failed | Paul Nitz | Ongoing Roofing Housekeeping pads Insulated metal panels Exterior framing / East soffit. 1) not ready |
2025/02/05 | Building/Structural | Structural | Failed | Paul Nitz | Ongoing Roofing Housekeeping pads Insulated metal panels Exterior framing / East soffit. 1) not ready |
2025/02/05 | Building/Structural | Framing | Failed | Paul Nitz | Ongoing Roofing Housekeeping pads Insulated metal panels Exterior framing / East soffit. 1) not ready |
2025/02/04 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several column pour backs in area C |
2025/02/04 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to exterior LG wall framing for level 300, west and south elevations. There were some screws missing in a few locations. Contractor installed screws as FSU BCA pointed them out. |
2025/02/04 | Building/Structural | Roofing | NOT READY | Kody Boswell | There was no on-going roofing progress at time of inspection |
2025/02/03 | Building/Structural | Structural | NOT READY | Kody Boswell | There was no structural inspection |
2025/02/03 | Building/Structural | Slab | NOT READY | Kody Boswell | There was no slab inspection |
2025/02/03 | Building/Structural | Wall/Ceiling | NOT READY | Kody Boswell | There was no wall ready for inspection |
2025/02/03 | Building/Structural | Framing | NOT READY | Kody Boswell | Reviewed curtain wall frmaing attachment to the structure along the east elevation. Contractor was still installing framing and not ready for inspection |
2025/01/31 | Plumbing | Rough-in | Passed | Paul Nitz | Area's A and B (Level 1) - DW and DWV - All locations besides over Hydrotherapy and Resistance pools |
2025/01/31 | Building/Structural | Structural | Passed | Kody Boswell | |
2025/01/31 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Area's A and B (Level 1) - DW and DWV - All locations besides over Hydrotherapy and Resistance pools |
2025/01/31 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforicng steel for 10 coulmn pourbacks in area C |
2025/01/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed attachment of curtain wall framing to structure on the north elevation of the building. |
2025/01/30 | Building/Structural | Roofing | Passed | Kody Boswell | |
2025/01/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several column pourbacks in area D |
2025/01/30 | Building/Structural | Framing | Passed | Kody Boswell | |
2025/01/29 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the patio in a rea C, level 2 |
2025/01/29 | Building/Structural | Framing | NOT READY | Kody Boswell | There was no framing to be inspected. FSU BCA was on site for other inspections. |
2025/01/28 | Mechanical | HW Piping & Test | Passed | Paul Nitz | 1) Area B Level 1 - CHWS, CHWR, HHWS, & HHWR (ranges from 3/4" to 3") - Column lines 10-15 & A to K 2) Area B Level 2 - CHWS, CHWR, HHWS, & HHWR (ranges from 3/4" to 8") - Column lines 17-19.2 & A to F |
2025/01/28 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | 1) Area B Level 1 - CHWS, CHWR, HHWS, & HHWR (ranges from 3/4" to 3") - Column lines 10-15 & A to K 2) Area B Level 2 - CHWS, CHWR, HHWS, & HHWR (ranges from 3/4" to 8") - Column lines 17-19.2 & A to F |
2025/01/28 | Building/Structural | Footing | Passed | Kody Boswell | ongoing exterior store front ongoing IMP panels ongoing roof Pour backs framing exterior. framing interior. |
2025/01/28 | Building/Structural | Framing | Passed | Kody Boswell | Top out framing for area D |
2025/01/28 | Building/Structural | Structural | Passed | Kody Boswell | |
2025/01/28 | Building/Structural | Roofing | Passed | Kody Boswell | ongoing exterior store front ongoing IMP panels ongoing roof Pour backs framing exterior. framing interior. |
2025/01/28 | Plumbing | Underground | Passed | Paul Nitz | *1/27 Inspection* Area C/D - Underground Sanitary and Storm (ranges from 2" to 8") - remaining plumbing underground for all areas |
2025/01/27 | Building/Structural | Slab | Passed | Paul Nitz | |
2025/01/27 | Building/Structural | Framing | Cancelled | Paul Nitz | |
2025/01/27 | Building/Structural | Structural | Passed | Paul Nitz | |
2025/01/24 | Building/Structural | Slab | Cancelled | Paul Nitz | SOG final inspection Pour backs Exterior Framing 1) campus was closed due to weather |
2025/01/24 | Building/Structural | Framing | Cancelled | Paul Nitz | SOG final inspection Pour backs Exterior Framing 1) I was contacted by Tony, and I informed him that the university was closed due to weather, he was fine with rescheduling, no concrete was being poured and nothing was being held up |
2025/01/24 | Building/Structural | Footing | Cancelled | Paul Nitz | SOG final inspection Pour backs Exterior Framing 1) campus was closed due to weather |
2025/01/21 | Building/Structural | Slab | Passed | Kody Boswell | Exterior Framing Ongoing roofing exterior panels IMP Exterior glazing |
2025/01/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Exterior Framing Ongoing roofing exterior panels IMP Exterior glazing |
2025/01/21 | Building/Structural | Framing | Passed | Kody Boswell | Exterior Framing Ongoing roofing exterior panels IMP Exterior glazing |
2025/01/21 | Building/Structural | Structural | Passed | Kody Boswell | Exterior Framing Ongoing roofing exterior panels IMP Exterior glazing |
2025/01/21 | Building/Structural | Roofing | Passed | Kody Boswell | Exterior Framing Ongoing roofing exterior panels IMP Exterior glazing |
2025/01/17 | Building/Structural | Framing | Passed | Kody Boswell | Pour backs Ongoing Roof IPF panels ongoing Exterior framing area D |
2025/01/17 | Building/Structural | Slab | Passed | Kody Boswell | Pour backs Ongoing Roof IPF panels ongoing Exterior framing area D |
2025/01/17 | Building/Structural | Structural | Passed | Kody Boswell | Pour backs Ongoing Roof IPF panels ongoing Exterior framing area D |
2025/01/17 | Building/Structural | Roofing | Passed | Kody Boswell | Pour backs Ongoing Roof IPF panels ongoing Exterior framing area D |
2025/01/16 | Building/Structural | Roofing | Passed | Kody Boswell | Exterior framing D blockoutss / pour backs Roofing on going Exterior insulated metal panels. |
2025/01/16 | Building/Structural | Structural | Passed | Kody Boswell | Exterior framing D blockoutss / pour backs Roofing on going Exterior insulated metal panels. |
2025/01/16 | Building/Structural | Framing | Passed | Kody Boswell | Exterior framing D blockoutss / pour backs Roofing on going Exterior insulated metal panels. |
2025/01/16 | Building/Structural | Slab | Passed | Kody Boswell | Exterior framing D blockoutss / pour backs Roofing on going Exterior insulated metal panels. |
2025/01/15 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area A Level 2 - Ductwork Visual Inspection - Column Line's D to H & 7 to 9 - *Does Not Include Tie-Ins to Roof top AHUs as well as tie-ins to ceiling devices* |
2025/01/15 | Building/Structural | Roofing | Passed | Kody Boswell | |
2025/01/15 | Building/Structural | Framing | Passed | Kody Boswell | |
2025/01/15 | Building/Structural | Slab | Passed | Kody Boswell | |
2025/01/15 | Mechanical | CHW Piping & Test | Cancelled | Paul Nitz | Area B Level 1 - CHW & HW Piping Installation & Test - Column Line's 10 to 18 & A to J |
2025/01/15 | Mechanical | HW Piping & Test | Cancelled | Paul Nitz | Area B Level 1 - CHW & HW Piping Installation & Test - Column Line's 10 to 18 & A to J |
2025/01/14 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the roof parapet over area D |
2025/01/14 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress roofing |
2025/01/13 | Building/Structural | Framing | Cancelled | Paul Nitz | ongoing roof. Interior framing /exterior framing Pour backs in area B and D. |
2025/01/13 | Building/Structural | Slab | Cancelled | Paul Nitz | ongoing roof. Interior framing /exterior framing Pour backs in area B and D. |
2025/01/13 | Building/Structural | Roofing | Cancelled | Paul Nitz | ongoing roof. Interior framing /exterior framing Pour backs in area B and D. |
2025/01/10 | Building/Structural | Framing | Passed | Paul Nitz | ongoing roof. Interior framing Pour backs in area B and D. |
2025/01/10 | Building/Structural | Slab | Passed | Paul Nitz | ongoing roof. Interior framing Pour backs in area B and D. |
2025/01/10 | Plumbing | Underground | Passed | Paul Nitz | Underground - 3" Storm - Column Line's G to K:23 to 23.5 Water Piping & Test (DW) - 3/4" & 1-1/2" Lines - Two Restrooms (01.02.02 & 01.02.03) - Column Line's C to D:1 to 7 |
2025/01/10 | Building/Structural | Roofing | Passed | Paul Nitz | ongoing roof. Interior framing Pour backs in area B and D. |
2025/01/10 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Underground - 3" Storm - Column Line's G to K:23 to 23.5 Water Piping & Test (DW) - 3/4" & 1-1/2" Lines - Two Restrooms (01.02.02 & 01.02.03) - Column Line's C to D:1 to 7 |
2025/01/09 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several column blockouts in area B |
2025/01/08 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Area B - Level 2 - DW Rough-In & Pressure Test - In-Wall & OH Piping - Column Line's 9.5 to 11.5 : A to D |
2025/01/08 | Plumbing | Underground | Passed | Paul Nitz | Area C - Level 1 - UG Sanitary (4") - CL's 20 to 21 : G to E |
2025/01/08 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of PVC roofing membrane around roof penetrations in area A, level 300 roof. |
2025/01/08 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed sheathing attachment for the roof-side parapet sheathing, area C, level 300 roof, east parapet. |
2025/01/08 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 5 pourbacks around steel columns located on level 100, area B |
2025/01/07 | Building/Structural | Roofing | Passed | Kody Boswell | |
2025/01/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed interior LG framing (top out) on level 200, area C |
2025/01/06 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for several interior walls, top out only. Area C |
2025/01/06 | Building/Structural | Roofing | Postponed | Kody Boswell | There was no roofing ready for inspection due to impending weather. Inspection to be postponed to a later date. |
2025/01/06 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a curb on the east side of the building, ground floor |
2025/01/03 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of PVC roofing installation for level 3 roof in area B |
2025/01/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for ground floor curbs on the east side of the building, areas B and C |
2024/12/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed 2nd lvl and roof lvl exterior framing on the east side of the building, area C |
2024/12/31 | Plumbing | Water Piping & Test | Passed | Paul Nitz | |
2024/12/31 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | |
2024/12/31 | Mechanical | HW Piping & Test | Passed | Paul Nitz | |
2024/12/31 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/12/31 | Plumbing | Specialty Piping | Passed | Paul Nitz | Pressure test |
2024/12/30 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the parapet walls at the expansion joint located in area C, 3rd lvl roof |
2024/12/30 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of PVC roofing in area A, 3rd lvl roof |
2024/12/30 | Building/Structural | Slab | NOT READY | Kody Boswell | While on site for other inspections, the Contractor informed FSUthey were not ready for curb reinforcing inspection aong the east side of the building, areas B and C |
2024/12/26 | Building/Structural | Roofing | Conditional | Rocky Wilde | ongoing inspection for PVC roof |
2024/12/26 | Building/Structural | Framing | Passed | Rocky Wilde | SOG inspection exterior framing area C and A and miss. areas. |
2024/12/26 | Building/Structural | Slab | Passed | Rocky Wilde | SOG inspection exterior framing area C and A and miss. areas. |
2024/12/20 | Plumbing | Rough-in | Conditional | Paul Nitz | Area A - Level 2 - Column Line's 7.5-9 & A-D - Overhead and In-Wall Plumbing Rough-In (DW & DWV) Area B - Level 2 - Column Line’s 9-11.3 & A-K - Overhead and In-Wall Plumbing Rough-in (DW & DWV) 1) copper on A was Ok 2) vent slope on A needs to addressed 3) Vent s need to be supported |
2024/12/20 | Mechanical | HW Piping & Test | Cancelled | Paul Nitz | Area A - Level 2 - Overhead HW & CHW Piping - Column Line's 8.5-11 & A-D Area B - Level 2 - Overhead HW & CHW Piping - Column Line's 11-17 & C-J |
2024/12/20 | Mechanical | CHW Piping & Test | Cancelled | Paul Nitz | Area A - Level 2 - Overhead HW & CHW Piping - Column Line's 8.5-11 & A-D Area B - Level 2 - Overhead HW & CHW Piping - Column Line's 11-17 & C-J |
2024/12/19 | Building/Structural | Structural | Passed | Kody Boswell | Inspection for puddle welds, lap screws, decking. Level 300 Area-C. |
2024/12/19 | Mechanical | HW Piping & Test | Conditional | Paul Nitz | Area A - Level 1 - Overhead HW & CHW Rough-In & Test - Column Line's A-K & 6-10 1) horizontal supports missing |
2024/12/19 | Plumbing | Rough-in | Conditional | Paul Nitz | Area A - Level 2 - Column Line’s 7-10 & A-K - Overhead and In-Wall Plumbing Rough-in (DW & DWV) 1) water hammers are missing on the lavs 2) shut off valve missing on hose bibs 3) Vent pipe is missing vertical supports 4) access panels required for all valves |
2024/12/19 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection for LWIC (Lightweight insulated concrete). This inspection is for Area-A grout and EPS board. |
2024/12/19 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Area A - Level 1 - Overhead HW & CHW Rough-In & Test - Column Line's A-K & 6-10 |
2024/12/18 | Plumbing | Rough-in | Cancelled | Paul Nitz | Area A - Level 2 - Column Line’s 7-10 & A-K - Overhead and In-Wall Plumbing Rough-in (Sanitary and Domestic Water) |
2024/12/17 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed several LG interior partition walls on level 1 |
2024/12/17 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Area A - Level 2 - OH Duct Rough-In - Column Line's 7-10 & A-K - Does not include VAV's and FCU's 1) Duct supports not secured 2) Duct supports are missing 3) Damper lever clearance not met 4) inspection canceled per contractor |
2024/12/16 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd level slab on deck located in the area between grids A-L/21-27.3 |
2024/12/13 | Building/Structural | Framing | Passed | Kody Boswell | Interior framing |
2024/12/13 | Building/Structural | Slab | Passed | Kody Boswell | Curb at North Line 1. |
2024/12/11 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for level 2 slab on metal deck in area C. The following items are to be addressed/corrected prior to concrete placement: 1) Deck to be cleaned of excessive debris 2) Missing reinforcing steel around the slab edge at elevator needs to be installed 3) Missing nelson studs along the slab edge bent plate at elevator need to be welded 4) Reinforcing steel at the outdoor patio transition needs to be corrected 5) Structural steel framing to be complete near the brace located along grid 20.8/D-E Items above were a work in progress when BCA left the job site. The Contractor assured wprk would be complete prior to concrete placement. Threshold inspector will verify. Note: BCA remained on site until approximately 6pm |
2024/12/11 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several column encasements in Area C level 1. |
2024/12/10 | Building/Structural | Framing | Passed | Kody Boswell | Level 400 East elevation exterior sheathing. |
2024/12/06 | Building/Structural | Framing | Passed | Kody Boswell | Interior framing Level 100 east wall near IPF top track. |
2024/12/06 | Fire Safety | Fire Water Underground | Conditional | Sam Sevor | Conducted a visual inspection only for the partially completed fire underground. The completed portion passed the visual inspection. The original route has chnge from the original approved cicil drawings. Please note before any further inspections are conducted for this underground an updated approved set of plans will be required. |
2024/12/06 | Building/Structural | Structural | Passed | Kody Boswell | Decking,Studs,lap screws, puddle welds. level 300 CL 10-18 Exterior framing at east near IPF wall. Level 400. PLEASE BRING HARNESS. |
2024/12/04 | Building/Structural | Framing | Passed | James Melvin | Level 300 Mechanical room drywall. Level 300 roof sheathing screws. Level 100 North exterior wall sheathing at stair. |
2024/12/04 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area A - AHU + Exhaust Fan Curb attachment (fastening) to roof decking - AHU #'s 1-1, 1-2, 2-1, & 2-2; EF #'s 3A-01 & 3A-02 |
2024/12/04 | Building/Structural | Slab | Passed | James Melvin | |
2024/12/04 | Building/Structural | Framing | Passed | James Melvin | |
2024/12/02 | Building/Structural | Framing | Passed | Kody Boswell | Level 300 Section B top track LG framing |
2024/12/02 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | |
2024/12/02 | Building/Structural | Structural | Passed | Kody Boswell | |
2024/12/02 | Building/Structural | Framing | Passed | Kody Boswell | Level 200 Area A roof parapet framing, NE corner |
2024/11/29 | Building/Structural | Framing | Passed | Rocky Wilde | Track seal on exterior east elevation ClL10-18. |
2024/11/26 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | exterior framing line 1 |
2024/11/26 | Building/Structural | Structural | Passed | Rocky Wilde | exterior framing line 1 |
2024/11/26 | Plumbing | Water Piping & Test | Passed | Al Smythe | |
2024/11/26 | Plumbing | Rough-in | Passed | Al Smythe | |
2024/11/25 | Building/Structural | Wall/Ceiling | NOT READY | Rocky Wilde | |
2024/11/25 | Building/Structural | Framing | NOT READY | Rocky Wilde | |
2024/11/22 | Plumbing | Underground | Passed | Paul Nitz | Area D - UG Sanitary piping (2", 3", & 6") - piping runs to Janitor closet and storage room |
2024/11/21 | Building/Structural | Structural | Passed | Kody Boswell | |
2024/11/21 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed top track framing and sheathing top out for a few walls in area B |
2024/11/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed top track framing and sheathing top out for a few walls in area B |
2024/11/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed top track framing and sheathing top out for a few walls in area B |
2024/11/21 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for partial slab on grade in area B. Contractor was not finished installing formwork for slab depression areas and needed to clean up the pour area. Threshold inspector to verify prior to conrete placement. |
2024/11/20 | Building/Structural | Structural | Passed | Kody Boswell | |
2024/11/20 | Building/Structural | Roofing | Passed | Kody Boswell | Reviewed partial level 2 roof deck attachment, area B |
2024/11/20 | Plumbing | Underground | Passed | Paul Nitz | *11/19/2024 Inspection* Area D - UG Sanitary piping (2" & 4") - Pipe run from sanitary main to head coach bathroom and grooming areas |
2024/11/19 | Building/Structural | Slab | NOT READY | Kody Boswell | FSU BCA showed up on site for several inspections. Contractor was not ready for slab inspection at this time. |
2024/11/19 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a ramp wall for the players entrance located near the Sw corner of the building. |
2024/11/19 | Building/Structural | Sheetrock | Passed | Kody Boswell | Inspection for Top out of area-B level 200 electrical rooms. |
2024/11/19 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG top track framing and sheathing top out for several walls on level 2 located in the area between grids A-F/12-17 |
2024/11/15 | Building/Structural | Framing | Passed | Rocky Wilde | 1) Area's A and B - Level 2 - Framing inspection 2) Area's A and B - Level 2 - Drywall screw inspection |
2024/11/15 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | 1) Area's A and B - Level 2 - Framing inspection 2) Area's A and B - Level 2 - Drywall screw inspection |
2024/11/14 | Plumbing | Underground | Passed | Paul Nitz | Area B - UG Storm piping (12") - Column Line's G to F:13.5 to 14 - Piping run to stub up near column F14 |
2024/11/13 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed top and bottom tracks for LG framing along grid J/8.5-11. LG spans from 3rd level to 4th level roof |
2024/11/13 | Electrical | Wall Rough-in | Conditional | James Melvin | Area A - Level 2 - Column Line's 1 to 10 - Electrical wall rough-in - *Courtesy inspection to ensure we are starting off on the right track* 1) verify that MC cable can be used as well a running the lines horizonal |
2024/11/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the curb on ground level along grid 1/A-J. Contractor did not have waterproofing installed at time of inspection. Contractor sent photos after FSU BCA left the site. Photos are filed in the job folder. |
2024/11/13 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Area A - Level 2 - Column Line's 1 to 10 - Fire Alarm wall rough-in - *Courtesy inspection to ensure we are starting off on the right track* Cortesy walk-thru only for F/A rough-in. |
2024/11/12 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing, top track, located at stair A2. |
2024/11/12 | Plumbing | Underground | Passed | Paul Nitz | Area B - UG Sanitary piping - UG runs to Grooming room, Showers (01.14.01), Janitary drying area, and Toilets (01.14.04) |
2024/11/12 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed fasteners for interior sheathing to LG framing located at stair A2. Only the first layer, top couple of feet of wall, was reviewed. |
2024/11/06 | Building/Structural | Slab | Passed | Kody Boswell | Area A - Rebar inspection - SOG from CL's A-J:5-10 |
2024/11/05 | Plumbing | Underground | Passed | Paul Nitz | *11/05/2024 Inspection* Area B - UG Sanitary (2" & 4") - Column line's A-G & 15.5-17.5 this inspection was completed on 11/5/24 |
2024/11/05 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed the following LG wall framing on the 2nd floor: 1) Top track installation and drywall for the corridor between stair A1 and cardio balcony 2) Top track installation for 4 trainer offices near stair A1 3) Top track installation for partition wall along grid 7/A-K 4) Top track installation for femal staff locker room and wet area |
2024/11/04 | Plumbing | Underground | Passed | Paul Nitz | Remaining 3" at North run of resistance pools. |
2024/11/04 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for level 3 slab on deck located in the area between grids D-K/11.3-13. There were several kicker braces and one HSS tube beam that had not been installed on structural steel framing. FSU BCA remained on site to verify the HSS tube beam was installed. Result is conditional pending receipt of photos showing kicker braces were installed. Photos received on 11-4-2024 from the steel erector. Filed in job folder. |
2024/11/01 | Plumbing | Underground | Passed | Paul Nitz | Area B - UG Sanitary (3") - Trench drain main line and stub ups running from hydro pit to around resistance pools |
2024/10/31 | Electrical | Wall Rough-in | Passed | James Melvin | Level 2 Area A electrical room (02.07.07) - In-wall device rough-in - Duplex receptacle & single pole switch (release for wall close-up) |
2024/10/30 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing (top track only) for the following rooms on level 2, area A: 1) Storage 02.09.04 2) IDF 02.07.06 3) Electrical 02.07.07 4) AV closet 02.08.05 5) Male GA locker room, restroom & showers 02.08.04, 02.08.03 & 02.07.05 6) Female GA locker room, restroom & showers 02.07.03, 02.07.02 & 02.07.04 Locations above are also marked on contractor's plans on site |
2024/10/30 | Plumbing | Underground | Passed | Paul Nitz | Area B - Underground DCW (2") & DHW (1-1/4") - Running from Hydro pit to above grade stub up locations |
2024/10/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several pourbacks around steel columns, ground floor area A |
2024/10/28 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for concrete encasements around steel columns at the following locations: 1) At grids F/12 2) At grids F/13 |
2024/10/28 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for level 2 slab on metal deck in the approximate areas between grids A-K/14-16. There were a few deck penetrations that didnt have required additional reinforcing. This was discussed with the contracotr while on site and was corrected prior to FSU leaving the site. |
2024/10/28 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for 2 column footings located near the intersection of gridlines F.2/27 |
2024/10/25 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several column footings and loading dock wall foundation in area C. |
2024/10/23 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the level 2 elevated slab on deck in the approximate area between grids A-K/9-14. There were some minor cover issues in a few places and the deck had excessive dirt and debris scattered throughout. Cover issues were corrected prior to FSU BCA leaving the job site. Threshold inspector will verify deck is cleaned properly prior to concrete placement. |
2024/10/22 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: - At the intersection of grids K/21 - At the intersection of grids K/22 - At the intersection of grids K/23 - At the intersection of grids G.7/21 - At the intersection of grids G.5/22 - At the intersection of grids G.4/23 - At the intersection of grids F.4/21 - At the intersection of grids F.6/22 - At the intersection of grids F.7/23 - At the intersection of grids E/23 |
2024/10/21 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor informed FSU there were no footings ready for inspection while FSU was on site. Inspection is cancelled/postponed. |
2024/10/21 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG exterior wall framing located along grid A/7-12. Some clips were missing a fastener or two. |
2024/10/21 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on grade located in the area between grids A-J/1-5. There some minor cover issues present throughout the area and minor detail reinforing missing at the lighting trenches. These issues were discussed with the contractor and corrected prior to FSU leaving the site. |
2024/10/18 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the exterior wall along grid A/1-7. Framing size, spacing and connections were reviewed. |
2024/10/18 | Building/Structural | Framing | Passed | Kody Boswell | Parapet wall LG framing in area A, level 3 |
2024/10/17 | Plumbing | Underground | Passed | Paul Nitz | Area A - Sanitary UG (3" & 4") - Sanitary runs coming out of hydrotherapy pit (tying into main sanitary system) |
2024/10/17 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several housekeeping pads in the hydrotherapy pit. |
2024/10/17 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for the following wall footings: (1) Along grid D.9/23.7-27 (2) Along grid E/23.7-27.3 Footing (2) deficiencies noted on 10/16 footing inspection were addressed and or/corrected. Result is conditional pending several cover issues are addressed. Threshold inspector will verify prior to concrete placement. |
2024/10/16 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the following wall footings: 1) Along grid D.9/23.7-27 2) Along grid E/23.7-27.3 Footing (2) above had several deficiences: a) Overall top/bottom reinforcing was not per structural drawings. Per structural drawings the out-to-out dimension of top to bottom reinforcing should be 37". Measuring in the field in several areas, it was consistently between 34-35" b) The incorrect anchor bolts are laid out at grids E/24 (c) There is a missing anchor bolt at grids E/27 |
2024/10/15 | Building/Structural | Footing | NOT READY | Paul Nitz | FTgs in Area C and Framing on the roof. |
2024/10/15 | Building/Structural | Framing | Passed | Paul Nitz | FTgs in Area C and Framing on the roof. |
2024/10/15 | Plumbing | Underground | Passed | Paul Nitz | Area A - UG Plumbing (2" & 3") - Column line's C to G & 7 to 8 |
2024/10/11 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for parapet walls over the locker room area (Area A) |
2024/10/10 | Building/Structural | Slab | Passed | Kody Boswell | Re-inspection on slab on metal deck. We have confirmation from EOR. |
2024/10/09 | Plumbing | Underground | Passed | Paul Nitz | Area A - UG Plumbing (3" piping) - Running parallel with CL 10 - Sanitary drain & vents |
2024/10/08 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for a portion of the 2nd floor elevated slab on metal deck in the area between grids 1-10/A-J. Re-inspection to be called in after the following deficencies are addressed and/or corrected: 1) Some shear connector studs on a W24x68 girder (located near grids G/10) were not fully welded to the top flange. These studs need to be replaced so they are fully welded. 2) Verify shear connector stud diameter and length. This information is not clear in the structural drawings or specs. 3) Girder top steel needs to be chaired up along grids D, F and G. It is currently sitting on top of the deck. 4) The slab edge bent plate located where stairs come up from the first floor is missing studs. Studs need to be added. 5) Deck support angles need to be installed at columns per detail 12/S5-3-3 6) Verify the EOR response for RFI #273. The detail given in the response (12/S5-1-3) differs from the typical openings in composite slab detail (12/S5-3-2). The EOR response also does not address the cutting of the deck prior to concrete curing, only reinforcing around openings and penetrations. 7) Reinforcing needs to be added around other penetrations and openings not addressed in RFI #273. 8) While leaving the site, it was noticed that there are several columns along grid A that are missing nuts washers and nuts that secure the column baseplate to the top of foundation. These have to be installed. |
2024/10/07 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the loading dock retaining wall located in the area between grids A-D.9/21-24. Result is conditional pending rebar cover issues are addressed and formwork is complete. Threshold inspector toverify prior to concrete placement. |
2024/10/03 | Plumbing | Underground | Passed | Paul Nitz | Area A - Shallow UG Sanitary & Storm - 2", 3", and 4" sanitary plus 6" storm - Column line's 7.5 to 9.5 & F to J |
2024/10/01 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for a portion of a parapet wall along grid J on level 3. This level is the roof level for the weightroom in area A. |
2024/09/25 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the wall footing and spread footings for the loading dock in the area between grids B-D.9/30.9-24 |
2024/09/24 | Building/Structural | Footing | Failed | Paul Nitz | 1) coverage not met for rebar |
2024/09/24 | Plumbing | Underground | Passed | Paul Nitz | Area B - UG Resistance Pool plumbing piping (2", 3", 4" & 6") - Pool main lines & tie-ins to skimmers, wall inlets, & therapy jets (routing from hydrotherapy pit) - Sheets SP-3-01 & SP-3-02 |
2024/09/23 | Plumbing | Underground | Passed | Paul Nitz | Area A - UG Storm Piping (6", 8", and 12") - Column Line's 6-6.9 & D-G.8 - Storm Main & Branch Lines/stub-ups Area B - |
2024/09/20 | Electrical | Underground | Passed | James Melvin | Area A - Riser A Electrical Room - Primary and Secondary UG Feeders to Riser A electrical room (1st layer) |
2024/09/19 | Building/Structural | Slab | Conditional | Paul Nitz | Housekeeping pads for pools. 1) Slab penetrations need to have a detailed repair |
2024/09/18 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for 6 spread footings in area C |
2024/09/17 | Plumbing | Underground | Passed | Paul Nitz | Area A - UG Sanitary (2" & 4") - Sanitary run from main line to Weight Room bathrooms |
2024/09/16 | Plumbing | Underground | NOT READY | Paul Nitz | Area A - UG Sanitary (2" & 4") - Sanitary run from main line to Weight Room bathrooms |
2024/09/11 | Plumbing | Underground | Passed | Paul Nitz | Area D - UG Plumbing (4") - Pipe run to boiler room and floor drain |
2024/09/11 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several footings located at the intersection of grids E/19.2, E/20, D/19.2 and E/20. |
2024/09/10 | Electrical | Ground | Passed | Al Smythe | Resistance Pools - Grounding loop installation (prior to backfill) |
2024/09/10 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of the elevator walls at the intersection of grids B/20 |
2024/09/05 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator foundation at grids C/20. |
2024/08/30 | Plumbing | Underground | Failed | Paul Nitz | Area D - Underground sanitary - 4" & 6" piping to Boiler Room & Storage (01.24.15 & 01.25.13) 1) slopre not met on drain pipe FBC P 704.1 they are fixing it and in will come back to inspect again at 12:00pm |
2024/08/30 | Plumbing | Underground | Passed | Paul Nitz | Area D - Underground sanitary - 4" & 6" piping to Boiler Room & Storage (01.24.15 & 01.25.13) |
2024/08/28 | Building/Structural | Structural | NOT READY | Paul Nitz | Column footers CL- 22.4-27.2/S-M. |
2024/08/28 | Building/Structural | Structural | Passed | Paul Nitz | A-Line wall CL 18-21. Area-D footers CL 22.4-27.3/T-M.- These were inspected by Paul on Wednesday 8/28/2024. |
2024/08/26 | Building/Structural | Structural | NOT READY | Paul Nitz | CL- 19.2-21 A-line wall. |
2024/08/23 | Building/Structural | Structural | Passed | Paul Nitz | CL- T/23.1-27 footers. |
2024/08/23 | Building/Structural | Structural | Passed | Paul Nitz | CL- T/23.1-27 column footers. |
2024/08/22 | Building/Structural | Structural | Passed | Paul Nitz | A-line wall rebar CL 19.2-21. |
2024/08/21 | Building/Structural | Structural | Passed | Paul Nitz | A-line wall rebar CL 18-19.2 |
2024/08/19 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel cover and steel embeds for steel framing for the 2nd lift of elevator wall located between grids H-K/24-25 |
2024/08/15 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the resistance pools in the area between grids C-F.7/12-13. |
2024/08/15 | Electrical | Ground | Passed | Alex Masterton | Resistance Pools - Grounding - sheet SP-4-02 on Aquatic drawing set |
2024/08/15 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: - Footings at the intersection of grids E/18, F.2/18, H/18 and K/18 - 2nd lift of elevator wall located between grids H-K/24-25 |
2024/08/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: - 2nd lift of elevator wall located between grids H-K/24-25 |
2024/08/15 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: - Footings at the intersection of grids E/18, F.2/18, H/18 and K/18 |
2024/08/13 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for building retaining wall along grid A/15-18. |
2024/08/13 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for resistance pool slab on grade, walls and stairs in the area between grids C-F.7/12-13. Reinforcing at plumbing encasements in walls and slab was not per contract documents. This was discussed with the contractor and will be corrected. Re-inspection is required prior to concrete pour. |
2024/08/12 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several column footingsin the area between grids F-F.6/14-17 |
2024/08/09 | Building/Structural | Structural | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to cancel and postpone inspection for reinforcing steel for footings. |
2024/08/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several column footers on Grid lines F-G/11.3-12.8. A-Line Wall Footing CL 11-13 |
2024/08/02 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for column footers on Grid lines F-G/7-9, Elevator B1 walls. |
2024/08/01 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for footings on Grid lines F-G/7-9 |
2024/07/31 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to cancel and postpone the inspection of several spread footings. |
2024/07/31 | Plumbing | Underground | Passed | Paul Nitz | Area A - U/G Storm & Sanitary lines (8") - From Hydro pit to sanitary main tie-in; from hydro pit storm main (partial) - Column Lines D.5 to G & 9 to 10 |
2024/07/30 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator mat foundation located in the area between grids G-G.4/11.3-12.8 |
2024/07/30 | Plumbing | Underground | Passed | Paul Nitz | Area A - U/G Storm & Sanitary lines (8") - From Hydro pit to sanitary main tie-in; from hydro pit storm main (partial) - Column Lines D.5 to G & 9 to 10 |
2024/07/26 | Plumbing | Underground | Passed | Paul Nitz | Resistance Pools - U/G piping (8” & 10”) - (4) Main Drains and Corresponding Piping - Sheet #SP-3-01 |
2024/07/26 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the hydrotherapy pit lid in the area between grids B-D.9/7-12. |
2024/07/25 | Plumbing | Underground | Failed | Paul Nitz | Resistance Pools - U/G piping (8” & 10”) - (4) Main Drains and Corresponding Piping - Sheet #SP-3-01 1) slope not met for the second time |
2024/07/25 | Electrical | Ground | Passed | Alex Masterton | Hydrotherapy Pit Lid - Grounding - Sheet #SP-4-02 No comments |
2024/07/25 | Plumbing | Underground | Failed | Paul Nitz | Resistance Pools - U/G piping (8” & 10”) - (4) Main Drains and Corresponding Piping - Sheet #SP-3-01 1) slope not met |
2024/07/25 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the wall fotting along grid A/18-19.2 |
2024/07/23 | Building/Structural | Structural | Conditional | James Melvin | Hydrotherapy pit lid. CL 6-12/D-B. 1) partial approval |
2024/07/23 | Electrical | Ground | Passed | James Melvin | Inspection for release of temporary site power, specifically drop pole and panel assembly installed near SW corner of project limits |
2024/07/22 | Building/Structural | Structural | Passed | Paul Nitz | Footers CL S/R/Q/. |
2024/07/20 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | FSU was contacted Saturday morning (7/20) by the contractor requesting inspection of reinforcing steel at the elevator located in the area between grids J-K/24-25. FSU was not available, but had looked at approximately 90% of reinforcing at prior inspections. With the threshold inspector on site, FSU defered the inspection to threshold. FSU spoke to Dan Bendix (threshold inspector) and he stated reinforcing was in substantial compliance with the contract documents. |
2024/07/19 | Electrical | Ceiling Rough-in | Passed | James Melvin | Hydrotherapy Pit Lid (Ceiling) - All required rough-in (receptacle raceways, smoke detectors, etc) |
2024/07/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/6-10 |
2024/07/12 | Plumbing | Underground | Passed | Paul Nitz | *7/11/2024 Inspection* Area B (Hydro Pit Area) - U/G Pool Plumbing - (2) Recirculation Lines (6") & (2) Suction lines (4") - Column Line's 9.5 to 12 & D to D.5 |
2024/07/12 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) SF4.0 at grids R/22.7 2) SF4.0 at grids S/22.7 3) SF4.0 at grids R/25 4) SF4.0 at grids S/25 5) Building retaining wall along grid A/6.1-12 |
2024/07/11 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | In-progress review of reinforcing steel for the building retaining wall located along grid A/6.1-12.5 prior to formwork being fully installed. There will be another inspection once formwork is up, prior to concrete placement. |
2024/07/11 | Plumbing | Underground | Passed | Paul Nitz | Area B (Hydro Pit Area) - U/G Pool Plumbing - Resistance Pool Main Drain Lines (8" & 10") - Column Line's 9.5 to 12 & D to D.5 |
2024/07/10 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for site walls and stari walls in the area between grids A-C/0-1 |
2024/07/10 | Plumbing | Underground | Passed | Paul Nitz | Area C - U/G Storm Main Line (12" & 15") - Column Line's G.4 to F.7 & 25 to 27.5 |
2024/07/08 | Building/Structural | Wall/Ceiling | Postponed | Kody Boswell | Contractor contacted FSU prior to arrival on site to postpone inspection to a later date. |
2024/07/03 | Plumbing | Underground | Passed | Paul Nitz | U/G Rough-In - Resistance Pool Piping (6") - Wall Inlet & Skimmer feeds - Column Line's 9 to 12 (along West hydro pit wall) |
2024/07/03 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator walls in the area between grids K-H/24-25 from top of foundation to 2nd level. Reinforcing steel was in substantial compliance with the contract documents. Contractor to call in another inspection after forms and steel embeds have been set. |
2024/07/02 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the footer CF12.0 along grid F/14-15. |
2024/07/01 | Building/Structural | Structural | Passed | James Melvin | A-line wall in Area-B. |
2024/07/01 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | this inspection passed on Friday 6-28-24 |
2024/07/01 | Building/Structural | Footing | Passed | Paul Nitz | this inspection passed on Friday 6-28-24 |
2024/06/28 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for stair walls located NW of grids B/1 |
2024/06/28 | Plumbing | Underground | Passed | Paul Nitz | Area C - U/G Storm Main Line (10" & 12") - Column Line's G.4 to F.7 & 20 to 25 |
2024/06/28 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the following foundations: 1) Wall footer CF9.0A along grid A/6.5-12.5 2) Wall footer CF12.0 along grid 7/A-D.5 Result is conditional pending installation of stirrups per detail 13/S6-1-2 at grids D/7. Threshold inspector to verify prior to concrete placement. |
2024/06/25 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/12.5-15.5. Result is conditional pending minor corrections to reinforcing, anchor bolt installation and form installation. |
2024/06/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/3-6 |
2024/06/21 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/3-6 |
2024/06/20 | Plumbing | Underground | Passed | Dwayne Mahony | Area D - UG Storm Mains (two lines total - 8", 10", & 12") - Column Line's 25 to 29:P to S) |
2024/06/18 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Area A - Retaining Wall - Wall Rough-in (receptacles, fire alarm, etc.) - Column line's A:4 to 6 |
2024/06/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the footer CF12 along grid 13/D-F. |
2024/06/14 | Plumbing | Underground | Passed | Paul Nitz | Area C - UG Storm Main (16") - last 20' of storm line (future tie in to exterior storm system at CL 21) |
2024/06/12 | Building/Structural | Structural | Passed | Paul Nitz | Hydrotherapy pit. |
2024/06/12 | Plumbing | Underground | Passed | Paul Nitz | *FOR RECORD* Area B/C - UG Storm Main (16") - Column line's C-D:16-20 *Inspected on Tuesday, June 11th by FSU* |
2024/06/10 | Plumbing | Underground | Passed | Paul Nitz | Area D - UG Sanitary Main (6") - Column Line's 23-23.7:K-S |
2024/06/10 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/10 | Building/Structural | Footing | Passed | Dwayne Mahony | FTgs on line A, between 12 and 18. Interior wall at hydro pit. |
2024/06/10 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | FTgs on line A, between 12 and 18. Interior wall at hydro pit. |
2024/06/07 | Building/Structural | Structural | Passed | Kody Boswell | Hydrotherapy pit walls (South,East,North). Footers CL D6, F7,F8. Reviewed reinforcing steel for the following: 1) For north, south and east hydrotherapy walls 2) Footer at grids D/6 3) Footer at grids F/8 |
2024/06/06 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the west hydrotherapy pit wall along grid B/8-12. Result is conditional upon installation of waterstop, chamfer installation on forms at vertical control joints and clarification of blockouts for beams bearing on wall. |
2024/06/06 | Plumbing | Underground | Passed | Paul Nitz | Area B - UG Storm Main (16") - Column Line's 16-17: G-D Area D - UG Sanitary Main (6") - Column Line's 23-23.7:K-S 1) this was for the the storm drain only |
2024/06/05 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. |
2024/06/04 | Electrical | Wall Rough-in | Passed | Tom Deckert | Electrical Wall R/I - Hydrotherapy Pit Cast-In-Place Walls - All required wall R/I (receptacles, fire alarm, telecom, etc.) 3 boxes installed per code |
2024/06/03 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. Hairpins around anchor bolts were not installed and several horizontal bars were not cut at vertical control joints. |
2024/06/03 | Plumbing | Underground | Passed | Paul Nitz | UG Storm Main (16") - Area B - Column Line's 13.5 to 16.5: F.7 to G.4 UG Sanitary Main (6") - Area C/D - Column Line's 23 to 24: F.7 to K |
2024/05/31 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the footer loacted at grids F/12 |
2024/05/30 | Building/Structural | Structural | NOT READY | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. Contractor was still installing rebar towards the top of the wall where the anchor bolts were. Contractor to reschedule after work is complete. |
2024/05/30 | Plumbing | Underground | Passed | Neely Lewis | 16" UG Storm - Area B - Column Line's 12.8 to 13.5 - Per conversation in the field on 5/29, WT to call FSU as soon as the pipe is ready to be inspected (due to logistical constraints). Inspection may differ from 1 PM, pending completion. |
2024/05/29 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following foundations: - At grids K/11.3 - At grids K/12 - At grids K/13 - At grids K/14 - At grids K/15 - At grids K/16 - At grids K/17 |
2024/05/29 | Plumbing | Underground | Passed | Paul Nitz | UG Storm main - Area B |
2024/05/28 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator mat foundation located between grids H-K/24-25 |
2024/05/28 | Plumbing | Underground | Passed | Neely Lewis | 40 ft of sanitary line. |
2024/05/28 | Electrical | Underground | Passed | Tom Deckert | Rought in underground south of IPF. Conduit installed at 36" deep with marking tape 12 inched above. |
2024/05/22 | Plumbing | Underground | Passed | Paul Nitz | 1) UG Storm Main - Area A/B - Column line's 9 to 10.5 - 12" & 16" Piping 2) UG Sanitary Main - Area B/C - Column line's 16 to 20.9 - 6" Piping |
2024/05/22 | Plumbing | Underground | Passed | Paul Nitz | Hydrotherapy Pit plumbing UG - final sign-off prior to pit slab pour |
2024/05/22 | Electrical | Ground | Passed | Dwayne Mahony | Grounding for the hydrotherapy pit (prior to hydrotherapy pit slab pour) |
2024/05/22 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. |
2024/05/22 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/4-6. Wall dowels were corrected as required from inspection on 5/21/2024 |
2024/05/21 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/4-6. Wall dowels were not centered on the footing, as required per plan note 9. |
2024/05/21 | Building/Structural | Slab | Failed | Kody Boswell | FSU arrived on site to review reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. Contractor had to rip out an area of reinforcing and waterproofing due to weekend storm erosion into the formwork so the area was not ready for review. |
2024/05/21 | Electrical | Ground | Conditional | Dwayne Mahony | Grounding for the hydrotherapy pit (prior to hydrotherapy pit slab pour) Partial. Work is not complete. |
2024/05/21 | Plumbing | Underground | Failed | Neely Lewis | 1) UG Sanitary piping (6") - Area C - Column Line's 16-19:F-G 2) Hydrotherapy Pit UG - final sign-off prior to pit slab pour 5/21/2024: slope was not per FBC requirements |
2024/05/20 | Plumbing | Underground | Postponed | Paul Nitz | Electrical: Hydrotherapy Pit Grounding Plumbing: Hydrotherapy Pit UG - final sign-off prior to pit slab pour |
2024/05/20 | Building/Structural | Slab | Failed | Kody Boswell | FSU arrived on site to review reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. Contractor had to rip out an area of reinforcing and waterproofing due to weekend storm erosion into the formwork so the area was not ready for review. |
2024/05/20 | Building/Structural | Footing | Failed | Kody Boswell | FSU arrived on site to review reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. Contractor had to rip out an area of reinforcing and waterproofing due to weekend storm erosion into the formwork so the area was not ready for review. |
2024/05/17 | Plumbing | Underground | Passed | Paul Nitz | 1) Underground Storm Main (12") - Area A - Column line's 6.5-9.5:G-J 2) Underground Sanitary Drain (2") - Hydrotherapy Pit - Column line's 11-12:C-D - Remaining portion of piping within concrete pit slab |
2024/05/17 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids G.2/1 2) At grids J/1 3) At grids J/2 4) At grids J/4 5) At grids J/5 6) At grids J/6 7) At grids J/7 |
2024/05/16 | Plumbing | Underground | Passed | Paul Nitz | UG Sanitary piping (6" and 8") - Area B - Column Line's 12-16:F-G |
2024/05/16 | Building/Structural | Structural | NOT READY | Kody Boswell | FSU BCA arrived on site and was told by the Contractor they were not ready for inspection |
2024/05/15 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. Reinforcing was not fully installed and tied in place. The following deficiencies are as follows: 1) #4 hairpins around anchor bolts (detail 14/S6-1-2) 2) Anchor bolts were not installed at plinths 3) Vertical control joint reinforcing was not installed (detail 8/S5-1-3) |
2024/05/13 | Plumbing | Underground | Passed | Neely Lewis | UG Sanitary Piping - Area B - Column Lines 9.5-12:F-G UG 2" drain line - Hydrotherapy Pit - Column Lines 9-12:B-D - Re-Inspection UG 8" Sanitary Line, SSMH-5, & Conflict Box - Tie-In to Building Sanitary Stub Out - Sheet C6-0-N Section X-X |
2024/05/09 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids J/8 2) At grids J/9 |
2024/05/08 | Plumbing | Underground | Conditional | Paul Nitz | Re-inspection of the two 2" sanitary drain lines for the two hydroworx pools underneath the hydrotherapy pit slab. WT has email confirmation from Aquatics engineer stating these two lines can be ran flat (no slope). 1) provide positive slope, reinspection required after rebar is placed |
2024/05/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At the intersection of grids D.9/1 2) At the intersection of grids D/2 3) At the intersection of grids D/3 4) At the intersection of grids D/4 5) At the intersection of grids D/5 6) Along grid 1/A-D.5 7) Along grid A/0.5-4 8) Stair footer located north of grid 0.7 |
2024/05/07 | Plumbing | Underground | Failed | Paul Nitz | Underground Sanitary Piping - Area A - Column Lines 8-9.5:F-G Remaining Underground Sanitary & Pool Piping - Hydrotherapy Pit - Column Lines 9-12:B-D 1) Slope not met for 2" pipe fbcp 704 2) rock support for 2" pipe is not approved |
2024/04/30 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor informed FSU they were not ready for inspection prior to FSU arriving on site. |
2024/04/30 | Plumbing | Underground | Passed | Neely Lewis | Hydrotherapy Pit U/G piping - Hydroworx and Resistance Pool U/G - column line's 9-12:B-E - (2) 6" suction lines, (4) 4" suction lines Area A Deep sanitary U/G piping - column line's 3-8:F-G |
2024/04/29 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU while FSU was on site to postpone the inspection of building foundations to a later date. |
2024/04/29 | Plumbing | Underground | Passed | Neely Lewis | Hydrotherapy Pit - Underground sanitary piping - Column line's 10-12:B-D |
2024/04/26 | Building/Structural | Structural | NOT READY | Dwayne Mahony | Rebar Inspection For CF7&CF9 Footer |
2024/04/26 | Plumbing | Underground | Conditional | Neely Lewis | Area A underground sanitary main (column line's J-F.7:1-3) 4/26: Slope was too steep. They will reslope for 1/8". |
2024/04/25 | Plumbing | Underground | Passed | Neely Lewis | Underground sanitary piping underneath hydrotherapy pit slab (column line's 8-9:C-D) |
2024/04/25 | Building/Structural | Structural | Passed | Dwayne Mahony | Hydrotherapy sewage ejector and sump pit slabs (2 total) reinforcement on 4/24/2024 |
2024/04/25 | Building/Structural | Structural | Passed | Dwayne Mahony | Inspection for CF9&CF7 footer at North stair. |
2024/04/25 | Building/Structural | Slab | Passed | Dwayne Mahony | slab at hydrotherapy pit for sump pump and ejector pit |
2024/04/23 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the site retaining wall at the north side of the project site. |
2024/04/19 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for more of the retaining wall spread footing located at the NW corner of the site (sheet S2-1-A). There was a conflict with the shotcrete wall piers and retaining wall footing. RFI 20.2 addresses this concern. Reinforcing steel was corrected and in substantial compliance with the contract documents. |
2024/04/19 | Plumbing | Underground | Passed | Dwayne Mahony | Underground 8" sanitary sewer inspection prior to backfill. First 20' stick of pipe at CL's J:1.5 (NW corner of IPF building). Approved, filled with 10' of head pressure test for this pipe section and the two clean-outs. |
2024/04/18 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for more of the retaining wall spread footing located at the NW corner of the site (sheet S2-1-A). There was a conflict with the shotcrete wall piers and retaining wall footing. RFI 20.2 addresses this concern. Reinforcing steel was not placed per typical site retaining wall detail near the conflict with the shotcrete wall. Contractor to correct reinforcing and schedule re-inspection. |
2024/04/15 | Plumbing | Underground | Passed | Neely Lewis | Courtesy inspection - new plumbing contractor on-site (Comfort Systems) - want to go over underground plumbing inspection expectations |
2024/04/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the site retaining wall at the north side of the project site. Contractor added a control joint near the corner of the wall per last inspection on 4/12/2024. |
2024/04/12 | Building/Structural | Wall/Ceiling | Conditional | Kody Boswell | Reviewed reinforcing steel for a portion of the site retaining wall at the north side of the project site. Result is conditional due to vertical control joint location at the corner of the wall where it turns south. Contractor to either add a control joint at the correct spacing or move existing control joint to the correct location. |
2024/04/08 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for more of the retaining wall spread footing located at the NW corner of the site (sheet S2-1-A) |
2024/04/05 | Electrical | Underground | Passed | Dwayne Mahony | This inspection is for the first layer of conduits for our U/G duct bank coming from the East Annex building. Would like this inspection first thing in the morning, if possible. Thank you. |
2024/04/02 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for retaining wall spread footing located at the NW corner of the site (sheet S2-1-A) |
2024/03/11 | Electrical | Service Release | Passed | Dwayne Mahony | Inspection for release of temporary power for job-site trailer offices, specifically the drop poles. Approved all four 200-amp services for utility connection. Dwayne Mahony, Electrical Inspector, cell 850 294 1581 |
2024/03/06 | Fire Safety | Final Egress/Emergency Lights | Passed | Mary Creason | We need an inspection on our temporary offices. (Trailers) Inspecting annex building sofit The planning trailer has no violations: Passed The following items need to be corrected forTrailer that is not in operation as of yet. 1. Fire extinguisher required in large trailer for meeting room/staff offices 2. Exit signs need to be in working order when trailer is in operation. 3. Electrical panel in first office has a breaker missing.(Gap in panel observed) 4. Two hand rails required on stairs from exits out of buildings. 5. Occupancy load sign needed for trailer that will have over 50 people. |
2024/03/06 | Building/Structural | Final Building | NOT READY | Dwayne Mahony | We need an inspection on our temporary offices. (Trailers) Inspecting annex building sofit Electrical work is incomplete. |
2024/03/06 | Building/Structural | Framing | Passed | Dwayne Mahony | Inspecting annex building sofit |
2024/02/27 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | framing at end wall where section of building will be demolished. |
2023/11/08 | Plumbing | Specialty Piping | Passed | Dwayne Mahony | Inspection on new back flow and water meter |
2023/11/08 | Plumbing | Underground | Passed | Dwayne Mahony | Inspection on new back flow and water meter |
2023/10/25 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Screw inspection on ceiling bathrooms |
2023/09/22 | Plumbing | Rough-in | Failed | Dwayne Mahony | Inspection on water fountains Early am inspection not approved, piping not under test. Late am inspection not approved, only potable water piping under test, need to test DWV too. What we have here is a failure to communicate. |
2023/07/11 | Building/Structural | Footing | Passed | Dwayne Mahony | Inspection on Retaining Wall rebar in footer Wall on baseball side approved. A wee different from the plan, which dimensions / drafting did not agree. |
2023/06/06 | Building/Structural | Masonry | Conditional | Dwayne Mahony | Inspection on CMU re-bar |
2023/05/18 | Building/Structural | Slab | Passed | Dwayne Mahony | Inspection on slab and footing re-bar |
2023/05/18 | Building/Structural | Footing | Passed | Dwayne Mahony | Inspection on slab and footing re-bar |
2023/05/12 | Plumbing | Underground | Passed | Dwayne Mahony | Inspection on remainder of underground Storm and sanitary piping |
2023/04/10 | Plumbing | Underground | Passed | Neely Lewis | Partial inspection on underground main. Main line ok. No branches inspected. |
Fire Safety | Opening Protections | Mary Creason | Edge of slab detail for West exterior A-line wall. | ||
Electrical | Ground | Passed | Al Smythe | Exterior Ground Loop - Along Column Line A retaining wall - column line's 1 to 21 | |
Building/Structural | Slab | NOT READY | Dwayne Mahony | elevator pit and FTGs | |
Plumbing | Rough-in | Passed | Rocky Wilde | 1) Area A - Level 1 - Remaining In-Wall Plumbing (Copper & PVC) 2) Area C - Level 2 - Storm Piping (Primary and Overflow lines) - System #2 3) Area B - Level 1 - Storm Piping (Primary and Overflow lines) - System feeding storm gutter | |
Plumbing | Water Piping & Test | Passed | Rocky Wilde | 1) Area A - Level 1 - Remaining In-Wall Plumbing (Copper & PVC) 2) Area C - Level 2 - Storm Piping (Primary and Overflow lines) - System #2 3) Area B - Level 1 - Storm Piping (Primary and Overflow lines) - System feeding storm gutter | |
Plumbing | Storm Piping & Test | Passed | Rocky Wilde | 1) Area A - Level 1 - Remaining In-Wall Plumbing (Copper & PVC) 2) Area C - Level 2 - Storm Piping (Primary and Overflow lines) - System #2 3) Area B - Level 1 - Storm Piping (Primary and Overflow lines) - System feeding storm gutter | |
Building/Structural | Framing | Passed | Al Smythe | exterior framing area C and A and miss. areas. | |
Electrical | Wall Rough-in | Rocky Wilde | Area D - Level 1 - In-Wall Rough-In - Column Line's M to T & 22.7 to 27 | ||
Building/Structural | Framing | Postponed | Kody Boswell | Framing in-wall final inspection for Area-C level 200 walls. CL 19-27 Hilti fire sleeve inspection and pipe penetrations in Area-C walls. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date | |
Building/Structural | Slab | Passed | Rocky Wilde | Curbs and exterior framing. | |
Building/Structural | Framing | Kody Boswell | Exterior soffit south. Edge of slab fire stopping on west wall. | ||
Building/Structural | Framing | Passed | Rocky Wilde | Final inspection for framing, in wall.Area A level 2 housekeeping pads area D, and area C level 1 and 2. | |
Building/Structural | Sheetrock | Kody Boswell | Screw inspection for GWB in Area-A level 200 Large Team Meeting Room. | ||
Electrical | Wall Rough-in | Passed | Al Smythe | Area B - Level 1 - In-wall electrical rough-in - Column line's 10 to 18 & A to K - *Does not include locker room* | |
Electrical | Wall Rough-in | Passed | Rocky Wilde | Area A - Level 2 - In-wall electrical rough-in - Column line's A to K & 1 to 10 | |
Building/Structural | Framing | Cancelled | Kody Boswell | Contractor request: Inspection for framing at level 300 roof expansion joint CL 6.9/7 | |
Plumbing | Storm Piping & Test | Paul Nitz | Area-B level 300 roof gutter storm drain water test. | ||
Building/Structural | Slab | Passed | Rocky Wilde | Slab pour backs | |
Mechanical | CHW Piping & Test | Passed | Rocky Wilde | Area A - Level 2 - Overhead HW & CHW Piping - Column Line's 8.5-11 & A-D Area B - Level 2 - Overhead HW & CHW Piping - Column Line's 11-17 & C-J | |
Mechanical | HW Piping & Test | Passed | Rocky Wilde | Area A - Level 2 - Overhead HW & CHW Piping - Column Line's 8.5-11 & A-D Area B - Level 2 - Overhead HW & CHW Piping - Column Line's 11-17 & C-J | |
Building/Structural | Footing | NOT READY | Dwayne Mahony | rain delay | |
Building/Structural | Framing | Postponed | Kody Boswell | Exterior framing for North parapet for level 400 roof. FSU BCA spoke to the Contractor prior to site arrival. Inspection has been postponed to a later date due to impending severe weather. | |
Building/Structural | Framing | Postponed | Kody Boswell | Area-B level 100 In-wall close up inspection. Postponed to due a failed plumbing/mechanical in-wall inspection. | |
Electrical | Wall Rough-in | Al Smythe | 1) Area B - level 2 - in-wall electrical rough-in - column line's 10 to 19 & A to K - *does not include large team meeting room and walk through space* 2) Area D - level 1 - in-wall electrical rough-in - column line's 22.7 to 27 & M to T | ||
Building/Structural | Slab | Postponed | Kody Boswell | Inspection was cancelled/postponed to a later date | |
Building/Structural | Footing | NOT READY | Dwayne Mahony | elevator pit and FTGs | |
Building/Structural | Footing | Postponed | Kody Boswell | Footing inspection was cancelled/potponed to a later date due to them not being ready for inspection. | |
Electrical | Ground | Postponed | Dwayne Mahony | Electrical: Hydrotherapy Pit Grounding Plumbing: Hydrotherapy Pit UG - final sign-off prior to pit slab pour |
BCA Project #: 21-03215- FSU- IRCB - Construction of New Research Building
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/03/12 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Test and inspect heating hot water piping for AHU 6 coil change order. |
2025/03/06 | Fire Safety | Final Fire Safety | Passed | Sam Sevor | |
2025/03/05 | Fire Safety | Final Fire Safety | Passed | Sam Sevor | Per Sam's request he wanted to walk the building with the building inspector. Relocate sprinkler head as discussedin the laser room due to the proximaty of the laser curtain. (removed curtain) We will do on more walkthrough once construction fencing has been removed and all stairwell doors are not blocked open and all egress paths are cleared of obstructions. ( all has been cleared on 3/6) |
2025/03/05 | Fire Safety | Radio Enhancement Check | Passed | Sam Sevor | witnessed BDA radio check with the city of Tallahassee fire dept. Tested all supervisory signal between the fire alarm sysem and BDA. Siemens to provide final paperwork. |
2025/02/17 | Electrical | Final Electrical | Passed | James Melvin | Requesting reinspection for FSU IRCB electrical panels ID and markerboards handles. This was part of the previous final electrical inspection comment by electrical inspector. |
2025/02/07 | Mechanical | Final Mechanical | Passed | Paul Nitz | |
2025/02/03 | Fire Safety | Final Fire Alarm | Passed | Sam Sevor | Conducted Final Fire alarm Inspection. Received ROC. |
2025/01/30 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the south retaining wall in courtyard. |
2025/01/27 | Mechanical | Re-Inspection | Conditional | Paul Nitz | 1. Requesting reinspection for final electrical inspection for IRCB. 2. Requesting reinspection for final plumbing inspection for IRCB. 3. Requesting reinspection for final mechanical inspection for IRCB. 1) Test and Balance report required |
2025/01/27 | Fire Safety | Re-Inspection | Passed | Sam Sevor | Requesting reinspection for continuation of final fire alarm inspection: - Testing of American signal - Testing for laser control panel relay |
2025/01/27 | Electrical | Final Electrical | Conditional | James Melvin | 1. Requesting reinspection for final electrical inspection for IRCB. 2. Requesting reinspection for final plumbing inspection for IRCB. 3. Requesting reinspection for final mechanical inspection for IRCB. 1) panel access and labeling |
2025/01/27 | Electrical | Re-Inspection | Conditional | James Melvin | 1. Requesting reinspection for final electrical inspection for IRCB. 2. Requesting reinspection for final plumbing inspection for IRCB. 3. Requesting reinspection for final mechanical inspection for IRCB. 1) panel access and labeling |
2025/01/27 | Fire Safety | Final Fire Alarm | Passed | Sam Sevor | Requesting reinspection for continuation of final fire alarm inspection: - Testing of American signal - Testing for laser control panel relay Will conduct final Inspection on Monday 2/3 at 9:00am to test Clean room mag locks. Final Fire alarm passed on 2/3/2025 |
2025/01/27 | Plumbing | Final Plumbing | Passed | Paul Nitz | 1. Requesting reinspection for final electrical inspection for IRCB. 2. Requesting reinspection for final plumbing inspection for IRCB. 3. Requesting reinspection for final mechanical inspection for IRCB. |
2025/01/27 | Mechanical | Final Mechanical | Conditional | Paul Nitz | 1. Requesting reinspection for final electrical inspection for IRCB. 2. Requesting reinspection for final plumbing inspection for IRCB. 3. Requesting reinspection for final mechanical inspection for IRCB. 1) Test and Balance report required |
2025/01/27 | Plumbing | Re-Inspection | Passed | Paul Nitz | 1. Requesting reinspection for final electrical inspection for IRCB. 2. Requesting reinspection for final plumbing inspection for IRCB. 3. Requesting reinspection for final mechanical inspection for IRCB. |
2025/01/23 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | Inspection for final sprinkler for L1,2,3 and PH DONE Hydro standpipes on Thursday 1/23/2025 DONE Install pressure guage at Riser DONE Provde above ground paperwork |
2025/01/23 | Plumbing | Final Plumbing | Failed | Paul Nitz | Requesting final plumbing inspection for FSU IRCB: - Level 1, 2, 3, and Penthouse 1) broken shower heads need to be replaced 2) resolve why there is water leaking on the floor in the penthouse by the mechanical unit 3) minimum air gap distance not met in penthouse drains 4) backflow certification paperwork on all backflow devices |
2025/01/23 | Fire Safety | Final Fire Alarm | Passed | Sam Sevor | Requesting reinspection/continuation of final fire alarm inspection at IRCB. - Fire alarm smoke detector recalls - Fire smoke detectors for AHU 3 - Fire smoke detector for Level 3 Shaft 8 - Door closures in Level 2/3 at 2000A/3000A The above items have been inspected and passed. Will coinduct Final Fire alarm inspection on 2/3 at 9:00am. |
2025/01/23 | Fire Safety | Fire/Smoke Damper | Passed | Sam Sevor | Requesting a fire damper inspection for fire dampers that were add it to the project in RM 2005 and 3005. |
2025/01/23 | Fire Safety | Re-Inspection | Passed | Sam Sevor | Requesting reinspection/continuation of final fire alarm inspection at IRCB. - Fire alarm smoke detector recalls - Fire smoke detectors for AHU 3 - Fire smoke detector for Level 3 Shaft 8 - Door closures in Level 2/3 at 2000A/3000A |
2025/01/21 | Electrical | Final Electrical | Cancelled | Rocky Wilde | Requesting reinspection/continuation of final electrical inspection for Level 1, 2, 3, and penthouse at IRCB. 1) campus is closed |
2025/01/21 | Fire Safety | Re-Inspection | Passed | Sam Sevor | Requesting continuation of final fire alarm for Level 1, 2, 3, and Penthouse: - Test smokes recall for elevators in all floors - Test all remaining FSD in Penthouse - Retest FSD in Level 3 south at shaft 8 - Test American Signal FA RFI about AHU shutdown sequence and laser equipment shutdown These items have been inspected and passed by FSU Fire Safety. |
2025/01/21 | Fire Safety | Final Fire Alarm | Passed | Sam Sevor | Requesting continuation of final fire alarm for Level 1, 2, 3, and Penthouse: - Test smokes recall for elevators in all floors - Test all remaining FSD in Penthouse - Retest FSD in Level 3 south at shaft 8 - Test American Signal FA |
2025/01/21 | Fire Safety | Fire/Smoke Damper | Passed | Sam Sevor | Requesting a fire damper inspection for fire dampers that were add it to the project in RM 2005 and 3005. Room 2005 PASSED. 3RD FL DAMPER ASSOCIATED WITH DUCT DETECTOR 1-75 TESTED THE SWITCH LEG FOR DAMPER POWER WILL NEED TO BE CORRECTED. |
2025/01/21 | Plumbing | Final Plumbing | Cancelled | Paul Nitz | Requesting final plumbing inspection for FSU IRCB: - Level 1, 2, 3, and Penthouse 1) campus is closed |
2025/01/21 | Building/Structural | Footing | Passed | Kody Boswell | South Paver Flush curb. |
2025/01/17 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | Requesting the following final electrical and fire alarm inspections: - Fire alarm for Level 1, 2, 3, and Penthouse - Electrical for Level 1, 2, 3, and Penthouse Fire has been resolved. |
2025/01/17 | Electrical | Final Electrical | NOT READY | Al Smythe | Requesting the following final electrical and fire alarm inspections: - Fire alarm for Level 1, 2, 3, and Penthouse - Electrical for Level 1, 2, 3, and Penthouse |
2025/01/17 | Fire Safety | Final Egress/Emergency Lights | Passed | Curtis Rogers | Requesting a final egress and emergency lights inspection per FSU. - Level 1, 2, 3, and Penthouse |
2025/01/17 | Fire Safety | Re-Inspection | Passed | Curtis Rogers | Re-inspection of penthouse sprinkler system to include the added line in the north penthouse |
2025/01/17 | Fire Safety | Hydro-Test | Passed | Curtis Rogers | Re-inspection of penthouse sprinkler system to include the added line in the north penthouse |
2025/01/17 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Re-inspection of penthouse sprinkler system to include the added line in the north penthouse |
2025/01/16 | Mechanical | Final Mechanical | Failed | Paul Nitz | Requesting final mechanical inspection for FSU IRCB on: - Level 1 - Level 2 - Level 3 - Penthouse 1) final test and balance report required 2) lab exhaust hood results 3) confirmation of receipt of the commissioning report |
2025/01/15 | Building/Structural | Structural | Passed | Kody Boswell | South seating wall in courtyard. |
2025/01/10 | Building/Structural | Slab | Passed | Paul Nitz | This inspection is to look at the level 3 rebar at the walkout patio. |
2025/01/10 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting OH ceiling inspection for MEP in Equipment Corridor RM 3060/3068/3067. |
2025/01/10 | Mechanical | Insulation | Passed | Paul Nitz | Requesting OH ceiling inspection for MEP in Equipment Corridor RM 3060/3068/3067. |
2025/01/10 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting OH ceiling inspection for MEP in Equipment Corridor RM 3060/3068/3067. |
2025/01/10 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Requesting OH ceiling inspection for MEP in Equipment Corridor RM 3060/3068/3067. |
2025/01/10 | Fire Safety | Re-Inspection | Passed | Sam Sevor | Requesting a Generator Electrical and Fire Safety Inspection per FSU. Please provide final acceptance records and documentation reports. FSU Fire Safety received reports n 1/28/2025 |
2025/01/10 | Electrical | Appliance/Equipment | Conditional | Alex Masterton | Requesting a Generator Electrical and Fire Safety Inspection per FSU 1. Complete the full generator acceptance tests and documentation including 4-hour load test and required documentation of NFPA 110 7.13.4.1.4. 2.Provide a battery heater as indicated by approved plans. 3.Identify emergency life safety conduit as indicated by approved plans. Satifactory power transfer within 10 seconds and all trouble signals verified at remote annunciator panel. 4.Update electrical panel E1GL2 schedule in the generator shelter. NEC 408.4 (A) |
2025/01/09 | Building/Structural | Footing | Passed | Paul Nitz | Rebar inspection for seating wall south elevation. |
2025/01/06 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for seating wall and curb located near the NW corner of the building, exterior |
2024/12/20 | Building/Structural | Footing | Passed | Kody Boswell | Rebar inspection for retaining wall footing on the northwest corner of the property |
2024/12/18 | Fire Safety | Fire Water Above Ground | NOT READY | Curtis Rogers | Overall penthouse fire sprinkler system hydro and visual inspection. The following items need to be adrressed before this inspection is ready. N.W section of attic needs additional sprinkler coverage of south wall area for the entire length. N.W. South duct needs to be sprinkled or close area off below duct work. South section needs sprinkler heads raised up to meet the 22 inch requirements. Hydro will need to be rescheduled once work is complete. |
2024/12/18 | Fire Safety | Hydro-Test | NOT READY | Curtis Rogers | Overall penthouse fire sprinkler system hydro and visual inspection. Hydro not ready due to the additional work that needs to happen. |
2024/12/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for curbs at the north entrance |
2024/12/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the remaining two light pole bases. |
2024/12/12 | Building/Structural | Structural | Passed | Kody Boswell | Virtual inspection for light pole bases in the parking lot. Email with photos received by Wade Ruhl with WT. Email filed in job folder under "Field Photos" |
2024/12/10 | Fire Safety | Fire Water Above Ground | Passed | Sam Sevor | Re-inspection of L1 north Lobby 6’ ceiling sprinkler line |
2024/12/10 | Fire Safety | Hydro-Test | Passed | Sam Sevor | L3 glass sprinkler system hydro and visual inspection Hydro start at 11:13pm at 2:03PSI FINISH 1:13PM AT 200PSI |
2024/12/10 | Fire Safety | Fire Water Above Ground | Passed | Sam Sevor | L3 glass sprinkler system hydro and visual inspection |
2024/12/10 | Fire Safety | Re-Inspection | Passed | Sam Sevor | Re-inspection of L1 north Lobby 6’ ceiling sprinkler line |
2024/12/06 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting above ceiling inspection for MEP in ACT ceiling: - RM 3064A, 3064, 3064D, 3064E - RM 3066 |
2024/12/06 | Electrical | Ceiling Rough-in | Passed | Paul Nitz | Requesting above ceiling inspection for MEP in ACT ceiling: - RM 3064A, 3064, 3064D, 3064E - RM 3066 |
2024/12/06 | Mechanical | Insulation | Passed | Paul Nitz | Requesting above ceiling inspection for MEP in ACT ceiling: - RM 3064A, 3064, 3064D, 3064E - RM 3066 |
2024/12/06 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting above ceiling inspection for MEP in ACT ceiling: - RM 3064A, 3064, 3064D, 3064E - RM 3066 |
2024/11/26 | Mechanical | Wall & Ceiling | Passed | Rocky Wilde | Requesting above ceiling inspection for MEP overhead in ACT Corridor 3020. |
2024/11/26 | Mechanical | Insulation | Passed | Rocky Wilde | Requesting above ceiling inspection for MEP overhead in ACT Corridor 3020. |
2024/11/26 | Plumbing | Rough-in | Passed | Rocky Wilde | Requesting above ceiling inspection for MEP overhead in ACT Corridor 3020. |
2024/11/26 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Requesting above ceiling inspection for MEP overhead in ACT Corridor 3020. |
2024/11/25 | Electrical | Panel/Feeder | Passed | Rocky Wilde | Requesting electrical feeder and panel inspection for Level 3 3GL12. |
2024/11/22 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | L1 west vestibule visual overhead fire sprinkler inspection - passed NOTE: The lobby area has changed several sprinklers locations - make sure the new locations are on the final shop drawings. |
2024/11/22 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Requesting OH MEP inspection for the following ACT/Drywall rooms: - RM 1000A - RM 2021, 2052 - RM 3030, 3021, 3040, 3041, 3042, 3060 3052 & 3054 |
2024/11/22 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting OH MEP inspection for the following ACT/Drywall rooms: - RM 1000A - RM 2021, 2052 - RM 3030, 3021, 3040, 3041, 3042, 3060 3052 & 3054 |
2024/11/22 | Mechanical | Insulation | Passed | Paul Nitz | Requesting OH MEP inspection for the following ACT/Drywall rooms: - RM 1000A - RM 2021, 2052 - RM 3030, 3021, 3040, 3041, 3042, 3060, 3052 & 3054 |
2024/11/22 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting OH MEP inspection for the following ACT/Drywall rooms: - RM 1000A - RM 2021, 2052 - RM 3030, 3021, 3040, 3041, 3042, 3060 3052 & 30547 |
2024/11/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Vestibule 1000, west entrance ceiling framing inspection. |
2024/11/20 | Electrical | Ceiling Rough-in | Passed | James Melvin | Requesting inspection for overhead MEP inspections in ACT ceilings: - Level 3 Labs RM 3061, 3062, 3063, 3065, 3064A, 3064B, 3064E, 3051, 3066 - Level 3 3000E ACT, 3000B ACT, 3054, 3052, 3000C, 3000F - Level 2 Corr 2000C, 2020A 1`) act 3054 & 3052 not ready |
2024/11/20 | Mechanical | Insulation | Passed | Paul Nitz | Requesting inspection for overhead MEP inspections in ACT ceilings: - Level 3 Labs RM 3061, 3062, 3063, 3065, 3064A, 3064B, 3064E, 3051, 3066 - Level 3 3000E ACT, 3000B ACT, 3054, 3052, 3000C, 3000F - Level 2 Corr 2000C, 2020A 1`) act 3054 & 3052 not ready |
2024/11/20 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting inspection for overhead MEP inspections in ACT ceilings: - Level 3 Labs RM 3061, 3062, 3063, 3065, 3064A, 3064B, 3064E, 3051, 3066 - Level 3 3000E ACT, 3000B ACT, 3054, 3052, 3000C, 3000F - Level 2 Corr 2000C, 2020A 1`) act 3054 & 3052 not ready |
2024/11/20 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting inspection for overhead MEP inspections in ACT ceilings: - Level 3 Labs RM 3061, 3062, 3063, 3065, 3064A, 3064B, 3064E, 3051, 3066 - Level 3 3000E ACT, 3000B ACT, 3054, 3052, 3000C, 3000F - Level 2 Corr 2000C, 2020A 1`) act 3054 & 3052 not ready |
2024/11/19 | Fire Safety | Hydro-Test | Passed | Mary Creason | Hydro inspection of L2 glass sprinkler system completed with Mary on 11/19 L2 Hydro started at 10:02am at 205psi finished at 1205pm 205psi |
2024/11/19 | Fire Safety | Opening Protections | Passed | Mary Creason | Re-inspection of L2 above ceiling fire penetrations in office grad 2021 and 2051 Visual Passed in this area. |
2024/11/19 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Re-inspection of L2 glass sprinkler system to look at missing hangers Also inspected two heads in the bottom of elevators shaft - need head guards. |
2024/11/19 | Fire Safety | Re-Inspection | Passed | Mary Creason | Re-inspection of missing hangers on Level 3 - observed hangers now in place. Passed |
2024/11/19 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Re-inspection of missing hangers on Level 3 - Observed hangers newly installed - Pass |
2024/11/18 | Mechanical | Insulation | Passed | Paul Nitz | Requesting inspection for overhead MEP inspections in ACT ceilings: - Level 3 Labs RM 3050, 3055, - Level 3 Labs RM 3061, 3062, 3063, 3065 1) 3061, 3063, 3065 excluded |
2024/11/18 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting inspection for overhead MEP inspections in ACT ceilings: - Level 3 Labs RM 3050, 3055, - Level 3 Labs RM 3061, 3062, 3063, 3065 1) 3061, 3063, 3065 excluded |
2024/11/18 | Electrical | Ceiling Rough-in | Passed | James Melvin | Requesting inspection for overhead MEP inspections in ACT ceilings: - Level 3 Labs RM 3050, 3055, - Level 3 Labs RM 3061, 3062, 3063, 3065 1) 3061, 3063, 3065 excluded |
2024/11/18 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting inspection for overhead MEP inspections in ACT ceilings: - Level 3 Labs RM 3050, 3055, - Level 3 Labs RM 3061, 3062, 3063, 3065 1) 3061, 3063, 3065 excluded |
2024/11/18 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for 2 light pole bases |
2024/11/18 | Fire Safety | Hydro-Test | Failed | Mary Creason | Visual and hydro inspection of L2 Rms 2021 and 2051 glass sprinkler system Visual inspection of L1 L-shape hallway Hyrdo test failed - started at 8:57am at 209psi however at 11am dropped to 205psi. Dropped 4 psi |
2024/11/18 | Fire Safety | Fire Water Above Ground | Failed | Mary Creason | Visual and hydro inspection of L2 Rms 2021 and 2051 glass sprinkler system Visual inspection of L1 L-shape hallway Visual sprinklers - hangers required around the sprinkler pipe going around the circular columns and had wiring on the pipe from other trades. . |
2024/11/18 | Fire Safety | Opening Protections | Failed | Mary Creason | Visual and hydro inspection of L2 Rms 2021 and 2051 glass sprinkler system Visual inspection of L1 L-shape hallway Several fire penetrations were not fire caulked yet or not filled in correctly per manufacturers data sheet. Failed |
2024/11/15 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | Level 1 Shaft wall at stair 2 PH ceiling screw inspection. Call Chase -850-284-3042 |
2024/11/15 | Building/Structural | Framing | Passed | Rocky Wilde | Level 1 Shaft wall at stair 2 PH ceiling screw inspection. Call Chase -850-284-3042 |
2024/11/13 | Mechanical | Insulation | Passed | Paul Nitz | Contractor is requesting inspection for the following OH MEP systems in ACT ceilings: - Level 3 3025 lab A thru E, Corridor 2025 - RM 3026, 3023, 3022 - RM 3050A&B, C, D, E, F and 3055A&B, C - RM 3010&3011 |
2024/11/13 | Electrical | Ceiling Rough-in | Passed | James Melvin | Contractor is requesting inspection for the following OH MEP systems in ACT ceilings: - Level 3 3025 lab A thru E, Corridor 2025 - RM 3026, 3023, 3022 - RM 3050A&B, C, D, E, F and 3055A&B, C - RM 3010&3011 |
2024/11/13 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Contractor is requesting inspection for the following OH MEP systems in ACT ceilings: - Level 3 3025 lab A thru E, Corridor 2025 - RM 3026, 3023, 3022 - RM 3050A&B, C, D, E, F and 3055A&B, C - RM 3010&3011 |
2024/11/13 | Fire Safety | Fire Alarm Rough-In | Conditional | Mary Creason | Requesting inspection for Penthouse Level Fire Alarm rough in 3 devices need to be relocated in the Penthouse. |
2024/11/13 | Plumbing | Rough-in | Passed | Paul Nitz | Contractor is requesting inspection for the following OH MEP systems in ACT ceilings: - Level 3 3025 lab A thru E, Corridor 2025 - RM 3026, 3023, 3022 - RM 3050A&B, C, D, E, F and 3055A&B, C - RM 3010&3011 |
2024/11/12 | Electrical | Panel/Feeder | Passed | Alex Masterton | Requesting electrical feeders and electrical panel inspection for the following: - 3GL13, 3GL14, 3GL15, 3GL16 - S3GL3, S3GL4 |
2024/11/08 | Building/Structural | Framing | Passed | Paul Nitz | Requesting inspection for the following Room 3066 and 3066A: - MEP OH inspection - Framing inspection |
2024/11/08 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Drywall screw inspection corridor 1040. Chase Andrews 850-284-3042 |
2024/11/08 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Requesting inspection for the following Room 3066 and 3066A: - MEP OH inspection - Framing inspection |
2024/11/08 | Mechanical | Insulation | Passed | Paul Nitz | Requesting inspection for the following Room 3066 and 3066A: - MEP OH inspection - Framing inspection |
2024/11/08 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting inspection for the following Room 3066 and 3066A: - MEP OH inspection - Framing inspection |
2024/11/08 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Requesting inspection for the following Room 3066 and 3066A: - MEP OH inspection - Framing inspection |
2024/11/07 | Plumbing | Specialty Piping | Passed | Paul Nitz | Requesting mechanical refrigeration test inspection for Level 3 Cold and Warm Room. |
2024/11/07 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Visual - Fire sprinkler rough in to proceed dropping ceiling tiles area 1061 - 1st floor control room - 4 heads visual - passed |
2024/11/06 | Fire Safety | Opening Protections | Conditional | Mary Creason | Re-inspection of Level 2 sprinkler missing hangers We will walk Level 2 fire walls to check for fire caulking A couple of areas need to be inspected still. Was not ready |
2024/11/06 | Fire Safety | Fire Water Above Ground | Conditional | Mary Creason | Re-inspection of Level 2 sprinkler missing hangers We will walk Level 2 fire walls to check for fire caulking Partial level 2 inspection - a couple of areas still need to be inspected for sprinkler inspection and fire wall penetration. |
2024/11/05 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a site wall loacted southwest of the building. |
2024/11/04 | Plumbing | Rough-in | Conditional | Paul Nitz | Requesting the following OH MEP inspections in ACT ceilings: - RM 3070 thru RM 3076, RM 3080, RM 3081, RM 3011 & 3010 - Bathroom 3001, 3002 1) Pipe insulation is missing around vav in bathroom |
2024/11/04 | Mechanical | Insulation | Conditional | Paul Nitz | Requesting the following OH MEP inspections in ACT ceilings: - RM 3070 thru RM 3076, RM 3080, RM 3081, RM 3011 & 3010 - Bathroom 3001, 3002 1) access panel is missing on trunk line |
2024/11/04 | Electrical | Ceiling Rough-in | Passed | James Melvin | Requesting the following OH MEP inspections in ACT ceilings: - RM 3070 thru RM 3076, RM 3080, RM 3081, RM 3011 & 3010 - Bathroom 3001, 3002 |
2024/11/04 | Electrical | Panel/Feeder | Passed | James Melvin | Contractor is requesting the following feeder and electrical panel inspection prior energization: - Level 3 south normal panels 3GL13 thru 3GL19 - Level 3 south emergency panels S3GL3, S3GL4 1) this was for sections 3gl17,18,19 and 20 |
2024/11/04 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting the following OH MEP inspections in ACT ceilings: - RM 3070 thru RM 3076, RM 3080, RM 3081, RM 3011 & 3010 - Bathroom 3001, 3002 |
2024/11/01 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Stair 2 penthouse/level 4 ceiling inspection. |
2024/10/31 | Fire Safety | Fire Water Above Ground | Conditional | Mary Creason | Level 2 ACT visual inspection Violations: Several hangers missing, sprinkler heads not installed yet and a couple of side wall heads muddied - need to be changed out. Note: Fire penetrations still need to be looked at on this level. |
2024/10/31 | Fire Safety | Hydro-Test | Passed | Mary Creason | Level 2 ACT Hydro Start at 10:11am at 205psi and finish at 1:03pm at 206psi |
2024/10/30 | Mechanical | Insulation | Passed | Paul Nitz | Contractor is requesting the following MEP OH inspections in these rooms: - Corridor 2030, 2040, and 2000C. Office 2052. - Offices 3033, 2032, 3031, 3040A thru 3040K |
2024/10/30 | Plumbing | Rough-in | Passed | Paul Nitz | Contractor is requesting the following MEP OH inspections in these rooms: - Corridor 2030, 2040, and 2000C. Office 2052. - Offices 3033, 2032, 3031, 3040A thru 3040K |
2024/10/30 | Electrical | Ceiling Rough-in | Passed | James Melvin | Contractor is requesting the following MEP OH inspections in these rooms: - Corridor 2030, 2040, and 2000C. Office 2052. - Offices 3033, 2032, 3031, 3040A thru 3040K |
2024/10/30 | Electrical | Panel/Feeder | Passed | James Melvin | Contractor is requesting inspection for the following feeders and electrical panels: - 2GL18 - 3GL2, 3GL6, 3GL9, and 3GL10 |
2024/10/30 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Contractor is requesting the following MEP OH inspections in these rooms: - Corridor 2030, 2040, and 2000C. Office 2052. - Offices 3033, 2032, 3031, 3040A thru 3040K |
2024/10/30 | Building/Structural | Framing | Passed | Kody Boswell | L2,L3 remaining exterior framing and sheeting between CL E and F on north Elevation |
2024/10/28 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting inspection for overhead MEP hard ceiling in Corridor 2000C between shaft 3&4. |
2024/10/28 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting inspection for overhead MEP hard ceiling in Corridor 2000C between shaft 3&4. |
2024/10/28 | Mechanical | Insulation | Passed | Paul Nitz | Requesting inspection for overhead MEP hard ceiling in Corridor 2000C between shaft 3&4. |
2024/10/28 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Requesting inspection for overhead MEP hard ceiling in Corridor 2000C between shaft 3&4. |
2024/10/24 | Building/Structural | Sheetrock | Passed | Paul Nitz | Continuation of the screw inspection with Paul Nitz from 9/23 |
2024/10/23 | Plumbing | Rough-in | Passed | Paul Nitz | Area will be the 6" divider wall between spaces 3050 and 3055. |
2024/10/23 | Building/Structural | Framing | Passed | Paul Nitz | Area will be the 6" divider wall between spaces 3050 and 3055. |
2024/10/23 | Electrical | Wall Rough-in | Passed | James Melvin | Area will be the 6" divider wall between spaces 3050 and 3055. |
2024/10/22 | Fire Safety | Fire Water Above Ground | Conditional | Curtis Rogers | L3 visual inspection of all hard ceiling overhead pipe Several hangers not installed and items on pipes. Will need to reinspect prior to cover up. |
2024/10/22 | Fire Safety | Hydro-Test | Passed | Curtis Rogers | L3 full hydro L3 visual inspection of all hard ceiling overhead pipe Hydro start at 221pm at 205psi end at 431pm at 203psi |
2024/10/21 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting MEP OH inspections for the following: - Level 2 Corridor 2000, 2000E, 2000F, 2060, 20261, 2061A, 2062, 2062A, 2063, 2063A, 2064, 2064A, 2096, 2097, 2098 |
2024/10/21 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting MEP OH inspections for the following: - Level 2 Corridor 2000, 2000E, 2000F, 2060, 20261, 2061A, 2062, 2062A, 2063, 2063A, 2064, 2064A, 2096, 2097, 2098 |
2024/10/21 | Mechanical | Insulation | Passed | Paul Nitz | Requesting MEP OH inspections for the following: - Level 2 Corridor 2000, 2000E, 2000F, 2060, 20261, 2061A, 2062, 2062A, 2063, 2063A, 2064, 2064A, 2096, 2097, 2098 |
2024/10/21 | Electrical | Panel/Feeder | Conditional | James Melvin | Requesting electrical feeder and panel inspection for the following: - Level 2 2G13 thru 2GL20, 2GL2, 2LH1, S2GL3, and E2LH1 - Level 3 3GL3 thru 3GL12, 3GL2, S3GL2 1) panels SEGL2, 3GL6, 3GL9,3GL10 WERE NOT READY |
2024/10/21 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Requesting Level 3 Fire Alam rough in per discussion with FSU Mary A couple of devices were incorrectly installed or not installed per approved plans. |
2024/10/18 | Fire Safety | Hydro-Test | Cancelled | Mary Creason | We will be doing a hydro test on all overhead piping and heads in ACT and Hard ceilings across L3 Cancelled per contractor |
2024/10/16 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting MEP overhead inspection for: - Level 3 RM 3051 small hard ceilings - Level 2 ACT ceilings RM/Corr 2025, 2020, 2022, 2023, 2024, 2026 - Level 2 ACT ceilings RM 2041, 2054, 2070, 2055 thru 2029, 2001, 2002 |
2024/10/16 | Mechanical | Insulation | Passed | Paul Nitz | Requesting MEP overhead inspection for: - Level 3 RM 3051 small hard ceilings - Level 2 ACT ceilings RM/Corr 2025, 2020, 2022, 2023, 2024, 2026 - Level 2 ACT ceilings RM 2041, 2054, 2070, 2055 thru 2029, 2001, 2002 |
2024/10/16 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting MEP overhead inspection for: - Level 3 RM 3051 small hard ceilings - Level 2 ACT ceilings RM/Corr 2025, 2020, 2022, 2023, 2024, 2026 - Level 2 ACT ceilings RM 2041, 2054, 2070, 2055 thru 2029, 2001, 2002 |
2024/10/16 | Electrical | Ceiling Rough-in | Passed | James Melvin | Requesting MEP overhead inspection for: - Level 3 RM 3051 small hard ceilings - Level 2 ACT ceilings RM/Corr 2025, 2020, 2022, 2023, 2024, 2026 - Level 2 ACT ceilings RM 2041, 2054, 2070, 2055 thru 2029, 2001, 2002 |
2024/10/16 | Electrical | Panel/Feeder | Passed | James Melvin | Requesting electrical feeder and panel inspections for Level 2: - 2GL3 thru 2GL12 in Level 2 north Corridor 2020... These panels are fed from D2GL1 in RM 2004 - S2GL2 in Level 2 north corridor 2020... This panel is fed from DS2GL1 in RM 2004 |
2024/10/15 | Fire Safety | Fire Water Underground | Passed | Mary Creason | This inspection is to observe the west FDC standpipe for installation and pressure. Visual inspecrtion conducted on pipe. Passed |
2024/10/15 | Fire Safety | Hydro-Test | Passed | Mary Creason | Pressure test / Flush for underground and FDC Start at 7:52am 210psi Stop at 9:56am at 205psi. Passed |
2024/10/15 | Fire Safety | System Flush | Passed | Mary Creason | Pressure test / Flush for underground and FDC |
2024/10/11 | Electrical | Panel/Feeder | Passed | Rocky Wilde | Requesting electrical panel and feeder inspection for: - Electrical panel 1GL4, 1GL7,1GL8, 1GL9, 1GL10. These are fed from D1GL1. - Electrical panel S1GL2. Fed from DS1GL1. |
2024/10/09 | Mechanical | Wall & Ceiling | Conditional | Paul Nitz | Requesting inspection for MEP overhead: - Drywall Level 2 RM 2034 - Drywall Level 3 RM 3034, around shaft 2, 3051 1) room 2041,2052,2054,2070, 3051 have not been inspected |
2024/10/09 | Electrical | Ceiling Rough-in | Conditional | James Melvin | Requesting inspection for MEP overhead: - Drywall Level 2 RM 2034 - Drywall Level 3 RM 3034, around shaft 2, 3051 1) room 2041,2052,2054,2070, 3051 have not been inspected |
2024/10/09 | Plumbing | Rough-in | Conditional | Paul Nitz | Requesting inspection for MEP overhead: - Drywall Level 2 RM 2034 - Drywall Level 3 RM 3034, around shaft 2, 3051 1) room 2041,2052,2054,2070, 3051 have not been inspected |
2024/10/09 | Electrical | Ceiling Rough-in | Conditional | James Melvin | ACT Level 2 offices+Student desking+others: 2033, 2032, 2031, 2040A thru 2040K, 2041, 2042, 2054, 2052, 2070, 2071, 2072, 2080, 2081, 2011, 2010, 2051 1) room 2041,2052,2054,2070, 3051 have not been inspected |
2024/10/09 | Mechanical | Insulation | Conditional | Paul Nitz | Requesting inspection for MEP overhead: - Drywall Level 2 RM 2034 - Drywall Level 3 RM 3034, around shaft 2, 3051 1) room 2041,2052,2054,2070, 3051 have not been inspected |
2024/10/08 | Building/Structural | Structural | Postponed | Kody Boswell | Reviewed reinforcing steel for a site retaining wall foundation located west of the building. Upon site arrival, FSU BCA was informed concrete would be pushed back to a later date due to the discovery of a sink hole at the north end of the footer. FSU BCA to re-review reinforcing after the sinkhole issue is addressed. |
2024/10/07 | Mechanical | Insulation | Passed | Paul Nitz | Requesting MEP OH inspection for: - Drywall RM 1040 area - ACT RM 1030B/A and 1007 - ACT Lobby RM 1001 - ACT RM 1061 |
2024/10/07 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting MEP OH inspection for: - Drywall RM 1040 area - ACT RM 1030B/A and 1007 - ACT Lobby RM 1001 - ACT RM 1061 |
2024/10/07 | Electrical | Ceiling Rough-in | Passed | James Melvin | Requesting MEP OH inspection for: - Drywall RM 1040 area - ACT RM 1030B/A and 1007 - ACT Lobby RM 1001 - ACT RM 1061 |
2024/10/07 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting MEP OH inspection for: - Drywall RM 1040 area - ACT RM 1030B/A and 1007 - ACT Lobby RM 1001 - ACT RM 1061 |
2024/10/04 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of a seating wall foundation located in the area south of the building. There was no detail for reinforcing, but per the Contractor the EOR directed the Contractor to follow the retaining wall detail shown in structural drawings. |
2024/10/04 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to the elevator lobby walls on level 3 |
2024/10/02 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting Mechanical and plumbing above ceiling inspection for the following rooms: RM 2031, 2032, 2033, 2040A thru 2040K, 2041, 2042, 2070, 2071, 2072, 2080, 2081, 2051, 2054, 2052, 2010, 2011 |
2024/10/02 | Mechanical | Insulation | Passed | Paul Nitz | Requesting Mechanical and plumbing above ceiling inspection for the following rooms: RM 2031, 2032, 2033, 2040A thru 2040K, 2041, 2042, 2070, 2071, 2072, 2080, 2081, 2051, 2054, 2052, 2010, 2011 |
2024/10/02 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting Mechanical and plumbing above ceiling inspection for the following rooms: RM 2031, 2032, 2033, 2040A thru 2040K, 2041, 2042, 2070, 2071, 2072, 2080, 2081, 2051, 2054, 2052, 2010, 2011 |
2024/09/30 | Electrical | Panel/Feeder | Passed | James Melvin | Contractor is requesting electrical feeder/panel inspection for: - DS2GL1 and DS2GL1 feeds S2GL1... DS1GL1 feeds DS2GL1 - DS3GL1 and DS3GL1 feeds S3GL1... DS1GL1 feeds DS3GL1 - E1LH1, E3LH1, and E4LH1... DE1LH1 feeds these panels |
2024/09/30 | Electrical | Panel/Feeder | Passed | James Melvin | Contractor is requesting electrical inspection for feeder/panels: - Transformer T-D1GL1, D1GL1, 1GL4 thru 1GL6 - D1LH1, 1LH1, 3LH1, 4LH1 - 2GL1, 3GL1 - D1GH1 feeds L2 600A disconnect, T-D2GL1, D2GL1 - D1GH1 feeds L3 600A disconnect, T-D3GL1, D3GL1 |
2024/09/30 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed fasteners for sheathing attachment for the exterior soffit on the west side of the building |
2024/09/30 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Stair 2 & 3 vestibule framing. |
2024/09/30 | Electrical | Wall Rough-in | Passed | James Melvin | In wall rough-in for vestibule(s) in penthouse at stair 2 & 3. |
2024/09/19 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Visual fire inspection to proceed dropping ceiling tiles and closing up ceilings. Rooms 1025, Bathrooms 1002, 1002 Vending 1007 Student desking 1060 Open Lounge 1051 Reception 1044 Mail room 1045 Corridor 1040 |
2024/09/19 | Electrical | Ceiling Rough-in | Passed | Alex Masterton | Requesting MEP inspection for the following hard ceilings: 1. Corridor 3000F, 3000B, 3020A, 3000C Approved with comments: E-1: Continue to support all junction boxes from structures E-2: Continue to protect all penetrations through rated walls including west wall of 3rd floor telecom. |
2024/09/19 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting MEP inspection for the following hard ceilings: 1. Corridor 3000F, 3000B, 3020A, 3000C |
2024/09/19 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting MEP inspection for the following hard ceilings: 1. Corridor 3000F, 3000B, 3020A, 3000C |
2024/09/19 | Mechanical | Insulation | Passed | Paul Nitz | Requesting MEP inspection for the following hard ceilings: 1. Corridor 3000F, 3000B, 3020A, 3000C saddles will be added |
2024/09/13 | Mechanical | Wall & Ceiling | Failed | Paul Nitz | Requesting the following inspections: 1. L3 above ceiling Mechanical and Plumbing drywall RM 3000, 3077, 3078, 3000B 1) flex ducts were not hookd up |
2024/09/13 | Mechanical | Insulation | Failed | Paul Nitz | Requesting the following inspections: 1. L3 above ceiling Mechanical and Plumbing drywall RM 3000, 3077, 3078, 3000B 1) saddles missing |
2024/09/13 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting the following inspections: 1. L3 above ceiling Mechanical and Plumbing drywall RM 3000, 3077, 3078, 3000B |
2024/09/13 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Requesting a natural gas inspection from FSU regarding natural gas piping. City turned on the gas meter and Miller/WT need to do a final natural gas piping to the equipment. |
2024/09/12 | Electrical | Ceiling Rough-in | Passed | Al Smythe | Requesting the following inspections: 1. L3 above ceiling MEP drywall RM 3000, 3077, 3078, 3000B 2. L1 above ceiling MEP ACT RM 1006, 1031, 1041-1043, 1045-1048, 1060, 1001-1003 |
2024/09/11 | Mechanical | Equipment | Passed | Paul Nitz | Requesting remaining Level 1 fire damper inspection. |
2024/09/09 | Building/Structural | Framing | Passed | Paul Nitz | Framing inspection on 1060 furred out wall. |
2024/09/06 | Mechanical | Insulation | Passed | Paul Nitz | Requesting the following inspections: 1. L3 above ceiling MEP drywall RM 3077, 3078 2. L1 above ceiling MEP ACT RM 1006, 1007, 1031, 1041-1047, 1060, 1030A 3. L1 inwall electrical RM 1060 4. L1 Exterior canopy above ceiling electrical |
2024/09/06 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Requesting the following inspections: 1. L3 above ceiling MEP drywall RM 3077, 3078 2. L1 above ceiling MEP ACT RM 1006, 1007, 1031, 1041-1047, 1060, 1030A 3. L1 inwall electrical RM 1060 4. L1 Exterior canopy above ceiling electrical |
2024/09/06 | Plumbing | Rough-in | Conditional | Paul Nitz | Requesting the following inspections: 1. L3 above ceiling MEP drywall RM 3077, 3078 2. L1 above ceiling MEP ACT RM 1006, 1007, 1031, 1041-1047, 1060, 1030A 3. L1 inwall electrical RM 1060 4. L1 Exterior canopy above ceiling electrical and rooms 1001 and 1002 1) some saddles are missing |
2024/09/06 | Electrical | Ceiling Rough-in | Failed | James Melvin | Requesting the following inspections: 1. L3 above ceiling MEP drywall RM 3077, 3078 2. L1 above ceiling MEP ACT RM 1006, 1007, 1031, 1041-1047, 1060, 1030A 3. L1 inwall electrical RM 1060 4. L1 Exterior canopy above ceiling electrical 1) open boxes in ceiling |
2024/09/06 | Electrical | Wall Rough-in | Failed | James Melvin | Requesting the following inspections: 1. L3 above ceiling MEP drywall RM 3077, 3078 2. L1 above ceiling MEP ACT RM 1006, 1007, 1031, 1041-1047, 1060, 1030A 3. L1 inwall electrical RM 1060 4. L1 Exterior canopy above ceiling electrical and rooms 1001 & 1002 1) open boxes in ceiling |
2024/09/05 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Requesting inspection for: - Natural gas piping testing/inspection from Level 1 gas meter location to Penthouse |
2024/09/04 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed insulation installation for the exterior soffit overhang on the west side of the building |
2024/09/04 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to underside of the north stair, all level. |
2024/08/30 | Electrical | Panel/Feeder | Passed | James Melvin | Requesting electrical feeder/panel inspection for: - Transformer T-DS1GL1 feeding DS1GL1... This is fed from DS1GH1 and was inspected by FSU - Panel DS1GL1 feeding S1GL1.... This is fed from T-DS1GL1 - Panel S1GL1.... This is fed from DS1GL1 |
2024/08/27 | Building/Structural | Framing | Passed | Paul Nitz | Framing Inspection for stair 2 all levels Furred wall framing for shafts 3 and 4 on level 3 |
2024/08/26 | Building/Structural | Roofing | Passed | Paul Nitz | In Progress roofing inspection perforated paneling on the west gable. |
2024/08/26 | Fire Safety | Fire/Smoke Damper | Conditional | Paul Nitz | Continuing Damper testing and inspection: 1. Contractor will continue testing fire dampers in Level 2 thru Penthouse 2. Contractor will inspect fire smoke dampers in Level 2 thru Penthouse. This will have electrical power to FSDs. This inspection was for the Mechanical and electrical inspectors - not ready for fire per Abraham Lima 1) ground floor #2#3#4 spring loaded dampers 2) 2nd floor no power-#9 3) Penthouse needed access door installed to a damper |
2024/08/22 | Building/Structural | Sheetrock | Passed | Paul Nitz | L2 hard ceiling screw inspection for drywall |
2024/08/21 | Electrical | Ceiling Rough-in | Passed | Paul Nitz | Requesting overhead MEP inspection for: 1. Penthouse Stairs 3 S0403 MEP overhead ceiling 2. Level 3 Corridor 3000, S0301, RM 3000D, and Corridor 3000E |
2024/08/21 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting overhead MEP inspection for: 1. Penthouse Stairs 3 S0403 MEP overhead ceiling 2. Level 3 Corridor 3000, S0301, RM 3000D, and Corridor 3000E |
2024/08/21 | Mechanical | Insulation | Passed | Paul Nitz | Requesting overhead MEP inspection for: 1. Penthouse Stairs 3 S0403 MEP overhead ceiling 2. Level 3 Corridor 3000, S0301, RM 3000D, and Corridor 3000E |
2024/08/21 | Mechanical | Wall & Ceiling | Failed | Paul Nitz | Requesting overhead MEP inspection for: 1. Penthouse Stairs 3 S0403 MEP overhead ceiling 2. Level 3 Corridor 3000, S0301, RM 3000D, and Corridor 3000E 1) penthouse does not have access for removal of equipment FBCM502.5 |
2024/08/21 | Electrical | Ceiling Rough-in | Passed | James Melvin | Requesting overhead MEP inspection for: 1. Penthouse Stairs 3 S0403 MEP overhead ceiling 2. Level 3 Corridor 3000, S0301, RM 3000D, and Corridor 3000E |
2024/08/21 | Building/Structural | Slab | Passed | Paul Nitz | Rebar inspection for the loading dock concrete pavement slab |
2024/08/21 | Building/Structural | Roofing | NOT READY | Paul Nitz | First work/ongoing inspection for Perforated Metal panels at western elevation of roof. 1) not ready and spans for loover framing call for 16oc and they have 24oc |
2024/08/20 | Electrical | Panel/Feeder | Passed | James Melvin | Requesting electrical feeder/panel inspections for the following: - Leve 1 ATS-1 feeding DE1LH1. Fed from MSB and emergency EMSB - Level 1 DE1LH1 feeding T-E1GL1 - Level 1 T-E1GL1 and E1GL1 fed from DE1LH1 - Level 3 E3GL1 fed from E1GL1 |
2024/08/19 | Building/Structural | Sheetrock | Passed | Kody Boswell | L3 drywall screw inspection |
2024/08/14 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting MEP above ceiling inspection for Level 1 ACT: 1. RM 1026, 1022, 1023, 1024, 1027, 1028, 1029, 1025, 1020 |
2024/08/14 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Level 3 Shafts 1 and 2 West side furred walls To include framing, thermostat rough-in and electrical outlet rough-in Paul Nitz viewed and inspected on 8/14 |
2024/08/14 | Electrical | Panel/Feeder | Passed | James Melvin | Requesting electrical feeder and panel inspection for: - Penthouse electrical panel 4MH1 fed from D1MH1 - Penthouse electrical transformer T-4ML1 fed from 4MH1 - Penthouse electrical panel 4ML1 fed from T-4ML1/4MH1 |
2024/08/14 | Electrical | Ceiling Rough-in | Passed | James Melvin | Requesting MEP above ceiling inspection for Level 1 ACT: 1. RM 1026, 1022, 1023, 1024, 1027, 1028, 1029, 1025, 1020 |
2024/08/14 | Mechanical | Insulation | Passed | Paul Nitz | Requesting MEP above ceiling inspection for Level 1 ACT: 1. RM 1026, 1022, 1023, 1024, 1027, 1028, 1029, 1025, 1020 |
2024/08/14 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting MEP above ceiling inspection for Level 1 ACT: 1. RM 1026, 1022, 1023, 1024, 1027, 1028, 1029, 1025, 1020 |
2024/08/14 | Building/Structural | Framing | Passed | Paul Nitz | Framing inspection for shafts 5-8 furred walls |
2024/08/14 | Electrical | Wall Rough-in | Passed | James Melvin | Requesting following inspections: 1. MEP inspection for inwall Level 3 Shaft 5, 6, 7, 8 furred walls 2. Inwall plumbing testing for LW/LV, DCW/DHW, HPW, CA/N2 |
2024/08/14 | Electrical | Wall Rough-in | Passed | James Melvin | Level 3 Shafts 1 and 2 West side furred walls To include framing, thermostat rough-in and electrical outlet rough-in James Melvin viewed and inspected on 8/14 |
2024/08/14 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting following inspections: 1. MEP inspection for inwall Level 3 Shaft 5, 6, 7, 8 furred walls 2. Inwall plumbing testing for LW/LV, DCW/DHW, HPW, CA/N2 |
2024/08/14 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Requesting following inspections: 1. MEP inspection for inwall Level 3 Shaft 5, 6, 7, 8 furred walls 2. Inwall plumbing testing for LW/LV, DCW/DHW, HPW, CA/N2 |
2024/08/14 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Requesting following inspections: 1. MEP inspection for inwall Level 3 Shaft 5, 6, 7, 8 furred walls 2. Inwall plumbing testing for LW/LV, DCW/DHW, HPW, CA/N2 |
2024/08/14 | Building/Structural | Framing | Passed | Paul Nitz | Level 3 Shafts 1 and 2 West side furred walls To include framing, thermostat rough-in and electrical outlet rough-in Paul Nitz viewed and inspected on 8/14 |
2024/08/13 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Requesting plumbing inspection for: - Penthouse CA system test from riser to CA equipment - Penthouse hot water and cold water from riser to equipment Note - Eddie with Miller will walk this if WT is not available |
2024/08/13 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting plumbing inspection for: - Penthouse CA system test from riser to CA equipment - Penthouse hot water and cold water from riser to equipment Note - Eddie with Miller will walk this if WT is not available |
2024/08/12 | Electrical | Ceiling Rough-in | Passed | James Melvin | Requesting L2 drywall ceiling inspection for OH MEP: - Small ceilings north/south of shaft 2 - Corridor 2000F - South of office grad 2051 - Small ceilings north/south of shaft 4 |
2024/08/12 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting L2 drywall ceiling inspection for OH MEP: - Small ceilings north/south of shaft 2 - Corridor 2000F - South of office grad 2051 - Small ceilings north/south of shaft 4 |
2024/08/12 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting L2 drywall ceiling inspection for OH MEP: - Small ceilings north/south of shaft 2 - Corridor 2000F - South of office grad 2051 - Small ceilings north/south of shaft 4 |
2024/08/08 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting test for the following: - Level 2 Chilled Beam piping drops in alcove RMs 2061A, 2062A, 2063A, 2064A |
2024/08/08 | Fire Safety | Re-Inspection | Passed | Mary Creason | Interior open ceiling on 1st floor fire sprinkler line visual inspection. |
2024/08/07 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Exterior fire sprinkler line in soffit, visual inspection. Inspected outside dry heads, interior open ceilings, and one stairwell for first floor visual inspection Passed |
2024/08/07 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting a test for: - Level 3 Shaft 1-2 furred wall chilled beam piping testing - Level 2 Chilled Beam drops at alcove pumps |
2024/08/07 | Building/Structural | Structural | Passed | Paul Nitz | This inspection to pick up where we left off on the curtain wall assembly. Ground floor |
2024/08/02 | Building/Structural | Framing | Passed | Kody Boswell | Stair 2 walls and ceilings. Vestibule 4001 and Stair S0402 Call Chase 850-284-3042 |
2024/08/01 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting an inspection for: - Level 3 Shaft 1-2 furred wall compressed air and N2 pressure test |
2024/08/01 | Electrical | Ceiling Rough-in | Passed | Alex Masterton | Requesting MEP inspections: - Ceiling Inspection Level 2 RM 2073, 2074, 2000F, 2050, 2000B, - Inwall inspection Level 3 RM 3021 Protect electrical conduit penetrations through rated walls. Support flexible conduit within 12-inches of termination point including light fixtures above ceiling. NEC 348.30(A) |
2024/08/01 | Building/Structural | Framing | Passed | Kody Boswell | L1 Exterior ceiling overhang along CL F.1, CL 16 and CL A L3 Screw inspection for exterior sheathing |
2024/08/01 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting MEP inspections: - Ceiling Inspection Level 2 RM 2073, 2074, 2000F, 2050, 2000B, - Inwall inspection Level 3 RM 3021 |
2024/08/01 | Mechanical | Insulation | Passed | Paul Nitz | Requesting MEP inspections: - Ceiling Inspection Level 2 RM 2073, 2074, 2000F, 2050, 2000B, - Inwall inspection Level 3 RM 3021 |
2024/08/01 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting MEP inspections: - Ceiling Inspection Level 2 RM 2073, 2074, 2000F, 2050, 2000B, - Inwall inspection Level 3 RM 3021 |
2024/08/01 | Electrical | Wall Rough-in | Passed | Alex Masterton | Requesting MEP inspections: - Ceiling Inspection Level 2 RM 2073, 2074, 2000F, 2050, 2000B, - Inwall inspection Level 3 RM 3021 Support flexible conduit within 12-inches of termination point including light fixtures above ceiling. NEC 348.30(A) Continue to protect smoke tight penetrations to the corridor from Electrical Room 2004 |
2024/08/01 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | L1 Exterior ceiling overhang along CL F.1, CL 16 and CL A L3 Screw inspection for exterior sheathing |
2024/07/31 | Electrical | Panel/Feeder | Passed | James Melvin | Requesting Inspection for electrical panels: - D1GH1 fed from 1200A breaker in MSB - T-1GL1 fed from 250A breaker in D1GH1 - 1GL1 fed from T-1GL1 - 1GL2 fed from 1GL1/D1GH1 as MLO - 1GL3 fed from 1GL1/D1GH1 as MLO |
2024/07/31 | Building/Structural | Roofing | Passed | Kody Boswell | In progress inspection of the standing seam roofing on the south penthouse west elevation. |
2024/07/31 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Requesting Inspection for Level 2 FA rough-in (ceiling and wall). This was discussed with Mary Creason. No inspection needed since will walk when sprinkler inspection. |
2024/07/30 | Building/Structural | Roofing | Postponed | Kody Boswell | Contracted contacted FSU prior to site arrival to postpone the inspection to a later date. |
2024/07/29 | Building/Structural | Framing | Passed | Kody Boswell | PH Framing- North Vestibule and south ceiling |
2024/07/29 | Building/Structural | Sheetrock | Passed | Kody Boswell | L3 Drywall Screw inspection at the clearstory |
2024/07/25 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Requesting testing for the following: - Test reheat piping for Penthouse AHUs/Equipment |
2024/07/24 | Building/Structural | Framing | Passed | Paul Nitz | L2 North curtain pockets framing |
2024/07/24 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | L2 North curtain pockets framing |
2024/07/24 | Fire Safety | Hydro-Test | Passed | Mary Creason | Level 2 hydro test . Start 9:07am 206psi End 11:23am 206psi Passed |
2024/07/24 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Level 2 - visual for hard ceilings only approved |
2024/07/24 | Electrical | Panel/Feeder | Conditional | James Melvin | Requesting inspection for electrical panel: - S1MH1.... This panel is fed from DS1MH1. DS1MH1 has been inspected. 1) panel needs to be labeled |
2024/07/22 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | 2 locations of exterior ceiling framing on levels 2 and 3 |
2024/07/22 | Fire Safety | Hydro-Test | Failed | Mary Creason | This inspection is for level 2. This takes the place of Fridays inspection. Hydro test dropped 4 psi over the two hours - test failed |
2024/07/22 | Building/Structural | Framing | Passed | Kody Boswell | 2 locations of exterior ceiling framing on levels 2 and 3 |
2024/07/22 | Fire Safety | Fire Water Above Ground | Failed | Mary Creason | Level 2 hard lid visual and hydro inspection. Hydro start 11:59am 210psi End 2:04pm 204psi - drop 4psi. Failed Leaking piping fittings observed. |
2024/07/19 | Building/Structural | Framing | Passed | Paul Nitz | Requesting ceiling framing inspection for RMs 2000, 2000D, 2000E, and stairs S0201 - Requesting mechanical above ceiling inspection for RMs 2000, 2000D, 2000E, and stairs S0201*notes* |
2024/07/19 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | notes*Inspection was performed by Paul Nitz 7/18 2nd layer of drywall screw inspection shafts 1-6 in penthouse. *notes* |
2024/07/19 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting ceiling framing inspection for RMs 2000, 2000D, 2000E, and stairs S0201 - Requesting mechanical above ceiling inspection for RMs 2000, 2000D, 2000E, and stairs S0201*notes* |
2024/07/19 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Requesting ceiling framing inspection for RMs 2000, 2000D, 2000E, and stairs S0201 - Requesting mechanical above ceiling inspection for RMs 2000, 2000D, 2000E, and stairs S0201*notes* |
2024/07/19 | Electrical | Ceiling Rough-in | Passed | James Melvin | *notes*Level 2 OH electrical inspection. *notes* |
2024/07/19 | Mechanical | Insulation | Passed | Paul Nitz | Requesting ceiling framing inspection for RMs 2000, 2000D, 2000E, and stairs S0201 - Requesting mechanical above ceiling inspection for RMs 2000, 2000D, 2000E, and stairs S0201*notes* |
2024/07/19 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | *notes*Requesting inspection for: - Chilled Water Piping test for remaining systems in chiller yard and penthouse AHU/Equipment coils*notes* |
2024/07/18 | Building/Structural | Framing | Passed | Paul Nitz | framing on curtain pocket 1048-1040 |
2024/07/16 | Building/Structural | Sheetrock | Passed | Paul Nitz | L2- Screw inspection for board in restrooms L3- 2nd layer shafts GWB PH-1st layer screw on all shafts |
2024/07/16 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Overhead sprinkler piping / fire inspection south side of building and open office 1060 Visual inspection of hard ceilings on floor 1- office, kitchen, and closet = passed |
2024/07/16 | Fire Safety | Hydro-Test | Passed | Mary Creason | Hydro test for sprinklers at the clearstory above L3 Hydro started 7:45am 210psi and finished 10:25pm 209psi. |
2024/07/16 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | visual for sprinklers at the clearstory above L3 - hard ceiling - passed |
2024/07/16 | Electrical | Wall Rough-in | Passed | James Melvin | Student desking 1060 electrical rough-in |
2024/07/15 | Building/Structural | Sheetrock | Passed | Paul Nitz | L2 Shaft 5 furred wall framing Partial drywall inspection for walls from levels 1 to 3 in stairs 2 Drywall inspection for ceilings in RM 1030,1000,1000B,1000C |
2024/07/15 | Building/Structural | Framing | Passed | Paul Nitz | L2 Shaft 5 furred wall framing Partial drywall inspection for walls from levels 1 to 3 in stairs 2 Drywall inspection for ceilings in RM 1030,1000,1000B,1000C |
2024/07/15 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | All in-wall MEP systems for Furred walls in shafts 1-8 |
2024/07/15 | Plumbing | Rough-in | Passed | Paul Nitz | All in-wall MEP systems for Furred walls in shafts 1-8 |
2024/07/15 | Electrical | Wall Rough-in | Passed | James Melvin | All in-wall MEP systems for Furred walls in shafts 1-8 |
2024/07/11 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting inwall inspections: 1. Plumbing - Furred walls in L2 Shaft 1, 2, 3, 4, 6, and 7 for HPW,LA, N2, LV/LW, and Hot/Cold Water 2. Mechanical - Furred Walls in L2 Shaft 1-2 for Chilled beam, Tstats 3. Electrical - Furred Walls in L2 shaft 1-4 |
2024/07/11 | Plumbing | Specialty Piping | Passed | Paul Nitz | Requesting inwall inspections: 1. Plumbing - Furred walls in L2 Shaft 1, 2, 3, 4, 6, and 7 for HPW,LA, N2, LV/LW, and Hot/Cold Water 2. Mechanical - Furred Walls in L2 Shaft 1-2 for Chilled beam, Tstats 3. Electrical - Furred Walls in L2 shaft 1-4 |
2024/07/11 | Building/Structural | Framing | Passed | Kody Boswell | inspection of the furred wall framing for shafts 1-8 on level 2 |
2024/07/11 | Electrical | Wall Rough-in | NOT READY | James Melvin | Requesting inwall inspections: 1. Plumbing - Furred walls in L2 Shaft 1, 2, 3, 4, 6, and 7 for HPW,LA, N2, LV/LW, and Hot/Cold Water 2. Mechanical - Furred Walls in L2 Shaft 1-2 for Chilled beam, Tstats 3. Electrical - Furred Walls in L2 shaft 1-4 |
2024/07/11 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Requesting inwall inspections: 1. Plumbing - Furred walls in L2 Shaft 1, 2, 3, 4, 6, and 7 for HPW,LA, N2, LV/LW, and Hot/Cold Water 2. Mechanical - Furred Walls in L2 Shaft 1-2 for Chilled beam, Tstats 3. Electrical - Furred Walls in L2 shaft 1-4 |
2024/07/11 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Requesting inwall inspections: 1. Plumbing - Furred walls in L2 Shaft 1, 2, 3, 4, 6, and 7 for HPW,LA, N2, LV/LW, and Hot/Cold Water 2. Mechanical - Furred Walls in L2 Shaft 1-2 for Chilled beam, Tstats 3. Electrical - Furred Walls in L2 shaft 1-4 |
2024/07/10 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed LG ceiling framing for lobby 1000 and down to room 1060 |
2024/07/10 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting MEP above ceiling inspection for hard ceilings only on Level 1 Lobby RM 1000. |
2024/07/10 | Electrical | Ceiling Rough-in | Passed | Alex Masterton | Requesting MEP above ceiling inspection for hard ceilings only on Level 1 Lobby RM 1000. |
2024/07/10 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Requesting MEP above ceiling inspection for hard ceilings only on Level 1 Lobby RM 1000. |
2024/07/09 | Electrical | Panel/Feeder | Passed | James Melvin | Requesting Electrical Panel inspection: - 1) DS1GH1 panel for elevators.... 2) ATS 3 This is located in Emergency RM 1014 |
2024/07/02 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Requesting Duct Testing for: - Penthouse AHU 5 SA - Penthouse GE 22x22 to EF 3&4 |
2024/07/02 | Building/Structural | Framing | Passed | Paul Nitz | L2 and L3 South Exterior Framing between CL F.1 and G Re-inspection for L3 mechanical shafts |
2024/07/02 | Building/Structural | Re-Inspection | Passed | Paul Nitz | L2 and L3 South Exterior Framing between CL F.1 and G Re-inspection for L3 mechanical shafts |
2024/07/02 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Requesting Duct Testing for: - Penthouse AHU 5 SA - Penthouse GE 22x22 to EF 3&4 |
2024/06/27 | Electrical | Panel/Feeder | Passed | Alex Masterton | Requesting inspection for electrical panel feeder and panel inspection for: - DS1MH1 located in Emergency Room |
2024/06/26 | Plumbing | Rough-in | Passed | Paul Nitz | Requesting a test/inspection for Level 3 north casework: - HPW piping - Special gas piping - Nitrogen and compressed air piping - Lab waste and lab vent - Domestic hot and cold water piping |
2024/06/26 | Mechanical | CHW Piping & Test | Conditional | Paul Nitz | Require test/inspection for Level 3 remaining (including casework and coils): Chilled beam, reheat, and chilled water piping. Note - Mains have been tested in north and south. 1) saddles missing, hangers missing |
2024/06/26 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Requesting a test/inspection for Level 3 north casework: - HPW piping - Special gas piping - Nitrogen and compressed air piping - Lab waste and lab vent - Domestic hot and cold water piping |
2024/06/26 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Requesting a test/inspection for Level 3 north casework: - HPW piping - Special gas piping - Nitrogen and compressed air piping - Lab waste and lab vent - Domestic hot and cold water piping |
2024/06/26 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Requesting a test/inspection for Level 3 north casework: - HPW piping - Special gas piping - Nitrogen and compressed air piping - Lab waste and lab vent - Domestic hot and cold water piping |
2024/06/26 | Plumbing | Specialty Piping | Passed | Paul Nitz | Requesting a test/inspection for Level 3 north casework: - HPW piping - Special gas piping - Nitrogen and compressed air piping - Lab waste and lab vent - Domestic hot and cold water piping |
2024/06/26 | Mechanical | HW Piping & Test | Conditional | Paul Nitz | Require test/inspection for Level 3 remaining (including casework and coils): Chilled beam, reheat, and chilled water piping. Note - Mains have been tested in north and south. 1) saddles missing and hangers missing |
2024/06/25 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Visual on Floor 1 hard ceilings and a couple of soft ceilings: Still need sprinkler in partition pocket near kitchen. All other areas will be inspected next time. (See marked plans in Austin's office) |
2024/06/25 | Fire Safety | Hydro-Test | Passed | Mary Creason | This is a pressure test for level 1 Start of test - 9:36am at 214psi end of test 11:45am at 214psi No leak observed - test held for 2 hours - Passed |
2024/06/25 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Requesting above ceiling close in for Level 1 North hard ceilings: Conference RM 1030 Flexible RM 1030 Work RM 1032 Corridor 1000D Elevator Lobby 1000B Corridor 1000C |
2024/06/24 | Building/Structural | Framing | Conditional | Kody Boswell | Several shafts were reviewed on level 3. Most shafts were in substantial compliance with contract documents with the exception of shaft 1 and shaft 5. These shafts had several penetrations that need to be fireblocked. |
2024/06/24 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | Requesting above ceiling close in for Level 1 North hard ceilings: Conference RM 1030 Flexible RM 1030 Work RM 1032 Corridor 1000D Elevator Lobby 1000B Corridor 1000C |
2024/06/24 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Requesting above ceiling close in for Level 1 North hard ceilings: Conference RM 1030 Flexible RM 1030 Work RM 1032 Corridor 1000D Elevator Lobby 1000B Corridor 1000C |
2024/06/20 | Building/Structural | Framing | Passed | Kody Boswell | L1- Grand Stair, Elevator Lobby, Conference Room ceilings L2- Grand Stair Ceiling L3- Screw Inspection- 3080,3081,3055A-C,3050B-F,3052,3054, Corr 3000B,3010,3011 L3- Shafts 1 and look at shaft 5 Penthouse: Parapet wall framing |
2024/06/20 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | L1- Grand Stair, Elevator Lobby, Conference Room ceilings L2- Grand Stair Ceiling L3- Screw Inspection- 3080,3081,3055A-C,3050B-F,3052,3054, Corr 3000B,3010,3011 L3- Shafts 1 and look at shaft 5 Penthouse: Parapet wall framing |
2024/06/20 | Mechanical | Duct Pressure Test | Passed | Dwayne Mahony | Duct Testing for the following systems: 1. AHU 1 RA duct and SA duct 2. AHU 5 SA duct 3. 22x22 GE from shaft 6 to EF 3/Plenum |
2024/06/20 | Mechanical | Duct Rough-in | Passed | Dwayne Mahony | Duct Testing for the following systems: 1. AHU 1 RA duct and SA duct 2. AHU 5 SA duct 3. 22x22 GE from shaft 6 to EF 3/Plenum |
2024/06/20 | Building/Structural | Sheetrock | Passed | Kody Boswell | L1- Grand Stair, Elevator Lobby, Conference Room ceilings L2- Grand Stair Ceiling L3- Screw Inspection- 3080,3081,3055A-C,3050B-F,3052,3054, Corr 3000B,3010,3011 L3- Shafts 1 and look at shaft 5 Penthouse: Parapet wall framing |
2024/06/12 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | Need electrical inspection for temporary electrical panels serving temporary AC. TP7 and TP8 from TP1. |
2024/06/11 | Fire Safety | Fire Water Underground | Passed | Mary Creason | This inspection is to confirm pressure test to the underground fire water pipe and connection. Phoenix Fire will send Mary a picture in the morning of the gauge holding pressure. I f9am works for Mary that would be great. Partial underground inspection still need to do a visual, hydro and visual of FDC line. 1. The underground line to backflow was tested today. A. Hydrostatic test was start at 7:20am 225psi and end at 9:30am at 225PSI. Passed B. Visual inspection completed. DR18 pipe and megalug. Passed C. Flush conducted. Passed |
2024/06/10 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Screw inspection for sheet rock on shaft 6 level 2, LVL 3 offices 3040 A-J, 3071-3076 |
2024/06/10 | Electrical | Panel/Feeder | Conditional | Dwayne Mahony | Electrical panelboards inspections for downstream panels of main switchgear: 1. MSB 1200A breaker a. Penthouse D4MH1 2. MSB 600A breaker; Level 1 D1MH1, 4MH1, T-4ML1, 4ML1 3. MSB 1200A breaker; ATS-2, DS1MH1, T-S1ML1, S1ML1, DS4MH1, T-S4ML1, S4ML1 Conditional to inspection required at panel D4MH1 after installation of the C.T.s and the surge suppressor. |
2024/06/06 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Ductwork Leakage Testing at Penthouse: 1. AHU 2 Supply and Return 2. AHU 6 Supply and Return |
2024/06/06 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Ductwork Leakage Testing at Penthouse: 1. AHU 2 Supply and Return 2. AHU 6 Supply and Return |
2024/06/05 | Electrical | Wall Rough-in | Passed | Tom Deckert | Level 3 In-wall electrical: Open labs north and south, RMs 3061-3066,3010-3011,3022-3026 All power boxes indicated on approved plans in place and installed per code. |
2024/06/05 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Inwall Level 3 north Chilled Beam Piping Test 6/5/24: Ready for insulation. |
2024/06/04 | Plumbing | Re-Inspection | Conditional | Paul Nitz | Re-inspection of the failed level 3 in-wall plumbing pipes 1) 6'' wall or engineered repair detail |
2024/06/04 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Level 3 IN-wall and framing inspection: Open labs north and south, RMs 3061-3066,3010-3011,3022-3026 |
2024/06/04 | Building/Structural | Framing | Conditional | Paul Nitz | Level 3 IN-wall and framing inspection: Open labs north and south, RMs 3061-3066,3010-3011,3022-3026 1) 6'' walls or engineered repair detail |
2024/06/03 | Plumbing | Rough-in | Failed | Paul Nitz | Level 3 IN-wall and framing inspection: Open labs north and south, RMs 3061-3066,3010-3011,3022-3026 1) slope not net for twaist drains fbc p704.1 |
2024/05/29 | Plumbing | Stack Piping & Test | Conditional | Neely Lewis | Inspection to test the following OH systems in Level 3 North and NE inwall: 1. Lab gas, nitrogen, and special gas piping 2. Domestic water piping 3. High purity piping 4. Lab waste and vent piping 5/29/24: larger than 60% cutout in one stud wall |
2024/05/29 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Inspection to test the following OH systems in Level 3 North and NE inwall: 1. Lab gas, nitrogen, and special gas piping 2. Domestic water piping 3. High purity piping 4. Lab waste and vent piping |
2024/05/29 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Inspection to test the following OH systems in Level 3 North and NE inwall: 1. Lab gas, nitrogen, and special gas piping 2. Domestic water piping 3. High purity piping 4. Lab waste and vent piping |
2024/05/29 | Mechanical | Duct Rough-in | Passed | Neely Lewis | Testing the following: 1. Penthouse AHU 3 West 2. Shaft 4 EA |
2024/05/29 | Building/Structural | Sheetrock | Passed | Tom Deckert | Screw inspection for south stairs level 1-4, LVL 2 shaft walls 2nd layer all drywall secured per MI |
2024/05/29 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Testing the following: 1. Penthouse AHU 3 West 2. Shaft 4 EA |
2024/05/29 | Plumbing | Specialty Piping | Passed | Neely Lewis | Inspection to test the following OH systems in Level 3 North and NE inwall: 1. Lab gas, nitrogen, and special gas piping 2. Domestic water piping 3. High purity piping 4. Lab waste and vent piping |
2024/05/29 | Plumbing | Rough-in | Passed | Neely Lewis | Inspection to test the following OH systems in Level 3 North and NE inwall: 1. Lab gas, nitrogen, and special gas piping 2. Domestic water piping 3. High purity piping 4. Lab waste and vent piping |
2024/05/22 | Mechanical | HW Piping & Test | Passed | Neely Lewis | Testing the following Systems from shaft to AHU/equipment isolation valves: 1. Penthouse Chilled Beam OH piping 2. Penthouse Chilled Water OH piping 3. Penthouse reheat OH piping |
2024/05/22 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Testing the following Systems from shaft to AHU/equipment isolation valves: 1. Penthouse Chilled Beam OH piping 2. Penthouse Chilled Water OH piping 3. Penthouse reheat OH piping |
2024/05/20 | Plumbing | Rough-in | Passed | Neely Lewis | Level 3 restrooms in-wall plumbing inspection All passed except drain branch line at north end. Wall needs to be fixerd. |
2024/05/17 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Requesting Inspection for: 1. Level 3 Women 3001 and Men 3002: Domestic water pressure test and sanitary/vent head test 2. Level 3 South column line 5 thru 10 rooms: Lab waste/Vent, Domestic Water system, High Purity Water, and LA&N2 pressure test |
2024/05/17 | Plumbing | Rough-in | Failed | Paul Nitz | Requesting Inspection for: 1. Level 3 Women 3001 and Men 3002: Domestic water pressure test and sanitary/vent head test 2. Level 3 South column line 5 thru 10 rooms: Lab waste/Vent, Domestic Water system, High Purity Water, and LA&N2 pressure test 1) slope not met per fbc p704.1 |
2024/05/17 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Requesting Inspection for: 1. Level 3 Women 3001 and Men 3002: Domestic water pressure test and sanitary/vent head test 2. Level 3 South column line 5 thru 10 rooms: Lab waste/Vent, Domestic Water system, High Purity Water, and LA&N2 pressure test 1) slope and support not met fbc p704.1 p305.4 |
2024/05/17 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Requesting Inspection for: 1. Level 3 Women 3001 and Men 3002: Domestic water pressure test and sanitary/vent head test 2. Level 3 South column line 5 thru 10 rooms: Lab waste/Vent, Domestic Water system, High Purity Water, and LA&N2 pressure test |
2024/05/17 | Plumbing | Specialty Piping | Passed | Paul Nitz | Requesting Inspection for: 1. Level 3 Women 3001 and Men 3002: Domestic water pressure test and sanitary/vent head test 2. Level 3 South column line 5 thru 10 rooms: Lab waste/Vent, Domestic Water system, High Purity Water, and LA&N2 pressure test |
2024/05/15 | Building/Structural | Framing | Passed | Dwayne Mahony | Level 3 Office Spaces: Framing and in-wall electrical inpsection Level 2 Shafts 2nd layer drywall screw inspection Level 2 drywall screw inspection |
2024/05/15 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Level 3 Office Spaces: Framing and in-wall electrical inpsection Level 2 Shafts 2nd layer drywall screw inspection Level 2 drywall screw inspection |
2024/05/15 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Level 3 Office Spaces: Framing and in-wall electrical inpsection Level 2 Shafts 2nd layer drywall screw inspection Level 2 drywall screw inspection |
2024/05/14 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Hydro Test for Level 3 South HHW and Chilled Beam Piping 1) supports missing in multiple locations, will check at insulation |
2024/05/14 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Hydro Test for Level 3 South HHW and Chilled Beam Piping 1) supports missing in multiple locations, will check at insulation |
2024/05/13 | Mechanical | Duct Rough-in | Passed | Neely Lewis | Follow Up inspection for Level 2 Shaft Fire Dampers |
2024/05/13 | Plumbing | Rough-in | Passed | Neely Lewis | Level 2 North Casework Roughin Inspection 1. Waste Chem drain head test 2. Hight Purity Piping test 3. Domestic/Hot water piping test 4. Lab gases (Air, N2, special gases) |
2024/05/13 | Plumbing | Stack Piping & Test | Passed | Neely Lewis | Level 2 North Casework Roughin Inspection 1. Waste Chem drain head test 2. Hight Purity Piping test 3. Domestic/Hot water piping test 4. Lab gases (Air, N2, special gases) |
2024/05/13 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Level 2 North Casework Roughin Inspection 1. Waste Chem drain head test 2. Hight Purity Piping test 3. Domestic/Hot water piping test 4. Lab gases (Air, N2, special gases) |
2024/05/13 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Level 2 North Casework Roughin Inspection 1. Waste Chem drain head test 2. Hight Purity Piping test 3. Domestic/Hot water piping test 4. Lab gases (Air, N2, special gases) |
2024/05/09 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Duct Testing 1. Level 3 North AHU 1 SA 2. Level 3 South AHU 4 SA 3. Level 3 South EA check taps and straps at next inspection |
2024/05/08 | Building/Structural | Foundation | Passed | Paul Nitz | Pipe pedistole at the chiller yard. Nonstructural rebar inspection needed. |
2024/05/07 | Mechanical | Duct Rough-in | Neely Lewis | Fire damper testing #1 2 hours | |
2024/05/07 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Fire damper testing lot #1 1. Add some screws to sleeve/angle installation. 2.Relocate 2 doors. 3. Check reset on FD#11. |
2024/05/07 | Building/Structural | Framing | Passed | Kody Boswell | Wall panels at elevator at the penthouse (Kody) |
2024/05/07 | Building/Structural | Sheetrock | Passed | Kody Boswell | All shafts 1-8 partial screw inspection. (Kody) |
2024/05/02 | Building/Structural | Structural | Passed | Dwayne Mahony | Rebar for walls at the chiller yard |
2024/05/02 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | 2nd floor drywall screw inspection |
2024/05/02 | Mechanical | Duct Pressure Test | Passed | Dwayne Mahony | 1. 3rd floor shaft 5 26 round EA 2. 3rd floor RA north for AHU 1 3. 3rd floor EA southwest to Shaft 5 |
2024/05/02 | Mechanical | Re-Inspection | Passed | Dwayne Mahony | 1. 3rd floor shaft 5 26 round EA 2. 3rd floor RA north for AHU 1 3. 3rd floor EA southwest to Shaft 5 |
2024/05/02 | Building/Structural | Re-Inspection | Passed | Dwayne Mahony | Rebar for walls at the chiller yard |
2024/05/02 | Building/Structural | Framing | Conditional | Dwayne Mahony | The horizontal mullions have had the web of the C shaped sections cut away significantly at the F clips. This creates a structural deficiency at the connections to the shear block/F clip. Engineering review of this condition is required. |
2024/05/01 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | This inspection is to walk and look at above ceiling sprinkler pipe rough in level 1. Austin Marks will be happy to walk with you. Visual inspection on 1st floor hard ceilings and fire main line. Passed visual - see approved shop drawings on site |
2024/05/01 | Mechanical | Duct Insulation | NOT READY | Neely Lewis | Level 2 North Testing Fire Dampers per specifications 23 33 14.3.4.B Postponed until 5/7. Noeed installation instructions at inspection |
2024/05/01 | Building/Structural | Roofing | Passed | Kody Boswell | In progress inspection of bermuda roof panels installation. Clips were installed per Florida Product Approval. |
2024/05/01 | Mechanical | HW Piping & Test | Passed | Neely Lewis | Heating hot water mains, Chilled Beam mains 3rd floor North |
2024/05/01 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Heating hot water mains, Chilled Beam mains 3rd floor North |
2024/04/30 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the chiller yard foundation wall east of grid J between grids 4-6 |
2024/04/30 | Fire Safety | Opening Protections | Passed | Mary Creason | This inspection is to look at the fire stopping on level 1 north. And 1 pipe penetration on level 2 north. Nova Company inspected several areas on 1st floor for the fire assemblies of joints and conducted 2 deconstruction inspections. Need to have a life safety plan showing correct wall ratings for inspections. |
2024/04/25 | Building/Structural | Re-Inspection | Passed | Dwayne Mahony | Footer rebar inspection at the chiller yard Strapping inspection for all exterior framing |
2024/04/25 | Building/Structural | Structural | Passed | Dwayne Mahony | Footer rebar inspection at the chiller yard Strapping inspection for all exterior framing |
2024/04/25 | Building/Structural | Framing | Passed | Dwayne Mahony | Footer rebar inspection at the chiller yard Strapping inspection for all exterior framing |
2024/04/24 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | L2 Chilled Beam piping to include the casework skeletons. |
2024/04/23 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several equipment pads at the chiller yard. |
2024/04/23 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to several interior LG partition walls, including shaft walls on levels 1, 2 and penthouse. |
2024/04/23 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | a. L3 RA AHU 4 b. L3 GE to shaft 6 c. L2-L4 SA in Shaft 4 d. PH 34x44 FE in shaft 2 4/23: Add a few straps for hanging duct. Ok . |
2024/04/19 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for an equipment pad at the chiller yard. |
2024/04/18 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Remainder of Level 2 interior framing and in-wall |
2024/04/18 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | This inspection is looking at the fire alarm in walls. NO issued found with fire alarm locations or wiring. Well done. 1. Please take note of Standppipe/Riser in stairwell for clearance to equipment so that it maybe maintained. 2. Please take note to valve in wall that does not have proper clearance away from framing. |
2024/04/18 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Level 2 In-wall inspection for mechanical and plumbing piping Level 1 Chilled Beam piping for pump rooms |
2024/04/18 | Plumbing | Rough-in | Failed | Neely Lewis | Level 2 In-wall inspection for mechanical and plumbing piping Level 1 Chilled Beam piping for pump rooms Reasons for failure: 1. Steel shield plates are to be installed in areas where water piping is closer than 1.25" to the edge member. Shield plates also need to be installed in locations where cabinet backing is installed. FBC-P Sec 305.6. It is recommended that Whiting Turner verify the screws used to hang cabinetry to the wall not be longer than required to support the cabinetry. 2. Cutting of holes for water and drain lines are exceeding the maximum rewuirements set forth in FBC-M Section 302.5.3. Studs must be somehow reinforced per manufacturer's or UL requirements where the maximum is exceeded. Contact the building inspectior for further information. |
2024/04/18 | Mechanical | Wall & Ceiling | Passed | Neely Lewis | Level 2 In-wall inspection for mechanical and plumbing piping Level 1 Chilled Beam piping for pump rooms |
2024/04/18 | Building/Structural | Framing | Conditional | Dwayne Mahony | Remainder of Level 2 interior framing and in-wall Corrections required at 4" studs where a 2" horiziontal pipe passes through many studs that have holes punched in the webs in great excess of that allowed by code. Additionally add nail guaards where plumbing pipes are within 1 1/4" of the face of studs or backing wood. Reinspection of these items is required. May start gypsum board elsewhere. |
2024/04/17 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed several interior walls where sheathing was attached to LG framing, level 1 and penthouse. |
2024/04/17 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a wall footing at the chiller yard in the area between grids 7-8 and equipment pad in the area between grids 6-7 |
2024/04/15 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG bracing for exterior walls on levels 1-3. There are several areas on levels 2 and 3 where bracing was not installed. Contractor informed FSU they would like to reschedule at a later date. FSU did not review the ground floor. |
2024/04/12 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Electrical In-Wall and framing inspection for 2070,2071,2072,2080,2081,2010,2011,2054,2052,2003,2021,2051, Corridor 2060 Bulkhead framing all of level 2 |
2024/04/12 | Building/Structural | Framing | Passed | Dwayne Mahony | Electrical In-Wall and framing inspection for 2070,2071,2072,2080,2081,2010,2011,2054,2052,2003,2021,2051, Corridor 2060 Bulkhead framing all of level 2 |
2024/04/11 | Building/Structural | Framing | Passed | Tom Deckert | Framing inspection in PH south framing installed per manufacturers instructions for a "composite" wall. |
2024/04/11 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Framing inspection in PH south Tighten up 3 straps on duct. Pressure ok. |
2024/04/10 | Plumbing | Underground | Conditional | Neely Lewis | This inspection is to look at the main water connection to the building from the street. The back water preventer is not connected. The hole is currently open and ready for inspection. 4/10: connections passed. NO pressure test performed. Need pressure test for pipe in ditch next to building for passage. |
2024/04/09 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Framing and in-wall MEP inspection for office spaces 2040A-K, 2031-2033,2041,2042 |
2024/04/09 | Building/Structural | Framing | Conditional | Dwayne Mahony | Framing and in-wall MEP inspection for office spaces 2040A-K, 2031-2033,2041,2042 Approval is conditional to inspection and approval of pipe penetrations for fire stopping through the floor. Do not install gypsum board at plumbing pipes until this fire stopping inspection is approved. |
2024/04/05 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed attachment of interior sheathing for the sloped penthouse roofs |
2024/04/04 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | 3rd Floor AHU 3 North Supply 3rd Floor AHU 3 South Supply 3rd Floor Exhaust Shaft 2 3rd Floor exhaust Shaft 4 2nd Floor AHU 2 Supply |
2024/04/03 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Drywall inspection on the first floor Rebar inspection for added curb/wall at the penthouse |
2024/04/03 | Building/Structural | Structural | Passed | Dwayne Mahony | Drywall inspection on the first floor Rebar inspection for added curb/wall at the penthouse |
2024/04/02 | Electrical | Service Release | Passed | Dwayne Mahony | This inspection is to confirm the electrical gear on level 1. MSB Gear is terminated and ready to be released for COT. I inspected and approved main switchgear of MSB 1 (4000 amp main building service) and MSB 2 (2000 amps for chillers). All conforms to plan requirements and is approved for connection to City of Tallahassee utilitiy. The arc energy reduction switches are to be "on" as long as possible / final electrical inspection. All adjustable circuit breakers are to be set as directed by the engineer, based on the arc fault study, by the time of final electrical inspection. There shall be signage posted at each service denoting Service 1 of 2 and Service 2 of 2, with each sign indicating where the other service is located, as required by NEC 230.2(E). Coordinate these signs with signage required by NEC 700.7, signage at service entrance informing type and location of on-site generator. All doors to large equipment rooms shall have panic bar hardware. The contractor shall maintain a lock-out/tag-out safety program. Dwayne Mahony, FSU Electrical Inspector |
2024/03/27 | Building/Structural | Sheetrock | Passed | Kody Boswell | This inspection is to look at the screw pattern for some soffitts on level 1 north and some columns at the Penthouse. |
2024/03/21 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | duct pressure test in shaft 7 and 8 All but one passed. Will retest Tuesday. |
2024/03/20 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed the sheathing attachment to LG framing for the following walls/elements: - 1st floor: north and west stair shaft walls at the SE stair. - 1st floor: rooms 1029 and 1028 - 2nd floor: west stair shaft wall at the SE stair - 3rd floor: west stair shaft wall at the SE stair |
2024/03/20 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed the LG framing for the following walls/elements: - 1st floor: north and west stair shaft walls at the SE stair. - 2nd floor: west stair shaft wall at the SE stair - 3rd floor: west stair shaft wall at the SE stair - Penthouse: several column surrounds located in the penthouse |
2024/03/19 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed curtain wall frame attachment on levels 1 & 2 along grid J (east side). Contractor to email photos showing T-clip fastening for large windows on level 1. Inspection result is conditional until photos are received. |
2024/03/19 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | All L2 reheat to terminal boxes with 90 psi at the terminal boxes All L2 chilled beam for L2... North tested but doing south side |
2024/03/19 | Plumbing | Specialty Piping | Passed | Neely Lewis | L2 south LG/HPW/DWS/LW&LV |
2024/03/19 | Mechanical | HW Piping & Test | Passed | Neely Lewis | All L2 reheat to terminal boxes with 90 psi at the terminal boxes All L2 chilled beam for L2... North tested but doing south side |
2024/03/19 | Plumbing | Water Piping & Test | Passed | Neely Lewis | L2 south LG/HPW/DWS/LW&LV |
2024/03/19 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | L2 south LG/HPW/DWS/LW&LV |
2024/03/14 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Level 2 Low pressure - Level 2 SAT 3.5 (Office grad RM 2021) - Level 2 SAT 1.7 (Lobby/Corridor RM 2000) - Level 2 SAT 4.10 (Lab Entry RM 2050) Shaft 2 Supply AHU 3 2nd floor SA south AHU 1 – North of Shaft 5 2nd floor RA AHU 1 North – North of Shaft |
2024/03/13 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for conference room 1030 soffits. |
2024/03/13 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed second layer sheathing attachment to several interior LG walls located on level 1, north of grand stair. |
2024/03/11 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to several interior LG walls located on level 1, north of grand stair. These walls get two layers of sheathing. One layer is currently in place. |
2024/03/07 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | reheat and chilled beam riser from L1 to PH |
2024/03/07 | Mechanical | HW Piping & Test | Passed | Neely Lewis | reheat and chilled beam riser from L1 to PH |
2024/03/05 | Mechanical | HW Piping & Test | Passed | Neely Lewis | L1 to penthouse: chilled water riser, L2 chilled water piping,L1 chilled water piping L1 North and south heating and chilled beam piping CHW and HHW risers are to be supported at 15'Max vertical. FBC-P Table 308.5. Will reinspect risers at a later date. |
2024/03/05 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | L1 to penthouse: chilled water riser, L2 chilled water piping,L1 chilled water piping L1 North and south heating and chilled beam piping CHW and HHW risers are to be supported at 15'Max vertical. FBC-P Table 308.5. Will reinspect risers at a later date. |
2024/03/04 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed curtain wall attachment to structure located on 3rd floor along the east side of the building (grid J) |
2024/02/29 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | 1.2nd floor supply South AHU 4 2. 2nd Floor supply South AHU 5 3. Exhaust shaft 6 4. Supply Shaft 2 AHU 3 5. Exhaust 2nd floor Column line H |
2024/02/27 | Building/Structural | Structural | Passed | Dwayne Mahony | Rebar inspection for grand stairs going from level 1 to 2 |
2024/02/23 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Stair 2 south wall only. 1st layer. |
2024/02/23 | Mechanical | Duct Rough-in | Passed | Neely Lewis | This inspection is for Shaft 5 Return and supply duct riser. 1st floor through Penthouse. |
2024/02/22 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Shaft 6: L1/L2 to PH 16x16 GE Shaft 5 - L1/L2 to PH 16x12 RA 24x20 SA 12in FE 18in FE Shaft 1 – L1 to PH 24 FE 2 passed, 2 did not. Will repeat soon. |
2024/02/21 | Mechanical | Wall & Ceiling | Passed | Neely Lewis | In-wall inspection for level 1 North CL 5 to 1 |
2024/02/21 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | In-wall inspection for level 1 North CL 5 to 1 |
2024/02/21 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Level 2 Areas B, C, and F Inspecting in-wall / overhead DWV, LWV, LG, and HPW |
2024/02/21 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | In-wall inspection for level 1 North CL 5 to 1 The stair wall framing is 16 -2 high. In two sources I found limits of 16-5 and 16-8, so the framing construction is approved. The shower water piping is correct*, based on these showers being roll-in, with fold-down seats, as shown on plans. *Drew to verify that the hot water piping is roughed-in on the left, per code, not on the right as shown on sheet P5.01. |
2024/02/21 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Level 2 Areas B, C, and F Inspecting in-wall / overhead DWV, LWV, LG, and HPW |
2024/02/20 | Building/Structural | Framing | Postponed | Kody Boswell | Contractor called to postpone the inspection because the work was not complete. (KB) |
2024/02/15 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | In-wall inspection for 1014 and 1015 Normal and emergency electrical rooms exterior walls are approved for interior gypsum board installation. |
2024/02/14 | Building/Structural | Roofing | Conditional | Kody Boswell | First work inspection to see the underlayers of the bermuda roofing be installed on the sloped roof. Will need a harness to see everything. Reviewed insulation and coverboard layer for sloped roofs receiving Bermuda panels. Fastening of these layers did not agree with shop drawings. The Contractor stated the detail for roofing attachment changed from attachment directly to LG framing to attachment to plywood securely fastened to LG framing below. Conditional approval granted that FSU receives an updated detail showing what is being done in the field. (KB) |
2024/02/13 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Shaft 1&2 Duct Risers and L3 SS Oval Testing 2/13: all passed, including 1 fume exhaust. |
2024/02/09 | Building/Structural | Structural | Passed | Kody Boswell | Nano wall steel on the first floor for room 1030 Reviewed structural steel for room 1030. Steel framing attached to the underside of level 2 concrete slab. (KB) |
2024/02/08 | Plumbing | Underground | Passed | Neely Lewis | Underground sewer connection in the North Underground storm connetion on the West |
2024/02/08 | Building/Structural | Roofing | Passed | Kody Boswell | First work inspection of fan wells roofing In-progress inspection of densdeck roofing over insulation for the penthouse flat roof located at the fan well. (KB) |
2024/02/07 | Plumbing | Underground | Passed | Neely Lewis | Sewer line connection inspection on the North side of the building Storm line is not connected to the building storm line. 2/8:Storm line now has a fernwall coupling installed. Good to go. |
2024/02/06 | Plumbing | Underground | Passed | Neely Lewis | This inspection is to look at the underground at the north of the building for our storm drain. |
2024/02/05 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | Re-inspection of ceiling drop framing of the overhand on the West Inspection of overhead penthouse framing where it was left open for units, will potentially need a harness for the inspection |
2024/02/05 | Building/Structural | Framing | Passed | Dwayne Mahony | Re-inspection of ceiling drop framing of the overhand on the West Inspection of overhead penthouse framing where it was left open for units, will potentially need a harness for the inspection |
2024/02/01 | Plumbing | Re-Inspection | Passed | Neely Lewis | Level 2 Sanitary and Domestic water for restrooms Level 2 North High purity water, Lab Gas, San, DW |
2024/02/01 | Building/Structural | Framing | Failed | Kody Boswell | Exterior ceilings drop along the westside overhang of the building Reviewed LG framing for drop down ceiling located along the west exterior portions of the building at level 2. Ceiling framing does not comply with details in the LG shop drawings. This was discussed with the Contractor. Contractor to contact delegated engineer to either verify field conditions are acceptable or produce a new detail to alter current field conditions. (KB) |
2024/02/01 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Level 2 Sanitary and Domestic water for restrooms Level 2 North High purity water, Lab Gas, San, DW |
2024/02/01 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Level 2 Sanitary and Domestic water for restrooms Level 2 North High purity water, Lab Gas, San, DW |
2024/01/31 | Plumbing | Gas Piping & Test | NOT READY | Neely Lewis | Level 2 Sanitary and Domestic water for restrooms Level 2 North High purity water,Lab Gas, San, DW 1/31: No lb gas, HP water inspections |
2024/01/31 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | 2nd floor chiled beams |
2024/01/31 | Plumbing | Water Piping & Test | Failed | Neely Lewis | Level 2 Sanitary and Domestic water for restrooms Level 2 North High purity water,Lab Gas, San, DW Sanitary needs More supporting. |
2024/01/31 | Mechanical | HW Piping & Test | Passed | Neely Lewis | 2nd floor HW coils, south side |
2024/01/30 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | 1. Exhaust Riser (GE) in Shaft 6 56x30 (including 22x22 risers) and the 16x16 GE M4.41 for reference a. Part of LEF 5-6 b. Test at 6”WG 2. 2nd Floor AHU #3 North (20x18) and South Supply air (20x20) a. Test at 6”WG |
2024/01/30 | Building/Structural | Roofing | Passed | Kody Boswell | Watch the installation of foam roofing on the penthouse Observed in-progress install of tapered insulation board and coverboard for the modified bit flat roof |
2024/01/25 | Building/Structural | Framing | Passed | Kody Boswell | Finish sheeting inspection all levels south Look at framing and sheeting on the north around the transport platform all levels Reviewed LG framing and sheathing attachment at levels 1-3 at the NW corner and the S face of the building. |
2024/01/23 | Building/Structural | Framing | Passed | Kody Boswell | inspection to look at the remaining of parapet wall on the penthouse Reviewed LG parapet framing on the penthouse at the NW corner and a portion of the south near the temporary stair is located. (KB) |
2024/01/23 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | 1st floor AHU 6 Northwest Low -Pressure 2nd Floor (Northwest) Return Column A.6 Section A and C.... AHU 2 2nd Floor (South) Exhaust East Column J..... LEF 5-6 . 5% leakage at 4"SP. Ok. |
2024/01/22 | Building/Structural | Framing | Postponed | Kody Boswell | parapet wall on penthouse Contractor contacted me via text message to cancel the inspection. Inspection to be rescheduled. (KB) |
2024/01/19 | Building/Structural | Framing | Passed | Kody Boswell | Screw inspection for dens glass on west side of building and look at roofing being placed on the flat part of the roof Reviewed sheathing attachment to exterior LG walls along the south and west side of the building on levels 1-3. (KB) |
2024/01/19 | Building/Structural | Roofing | Passed | Kody Boswell | Screw inspection for dens glass on west side of building and look at roofing being placed on the flat part of the roof Reviewed in progress procedure of torch down vapor barrier for the modified bit flat roof. Contractor was not actively installing vapor barrier while FSU was on site because the site received rain overnight. (KB) |
2024/01/16 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Overhead DWV and High purity Level 1 |
2024/01/16 | Building/Structural | Structural | Passed | Kody Boswell | Rebar inspection for grand stairs level 1 to 2, in-fill framing at penthouse and continue exterior framing inspection Reviewed grand stair reinforcing steel from level 1 to 2 |
2024/01/16 | Building/Structural | Framing | Passed | Kody Boswell | Rebar inspection for grand stairs level 1 to 2, in-fill framing at penthouse and continue exterior framing inspection Reviewed LG framing at the penthouse roof (north) and south walls near the SE stair on levels 1-3 (KB) |
2024/01/05 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Overhead DWS,LG,HER,HPW on level 1 south |
2024/01/05 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Overhead DWS,LG,HER,HPW on level 1 south |
2024/01/05 | Building/Structural | Framing | Passed | Kody Boswell | Framing for the valley at the penthouse Framing for valley beam differed slightly from the detail on ship drawings. Chris Childers with BNI contacted the LG engineer, Carson Hicks, about the variations and Carson confirmed the condition wwas ok. |
2024/01/03 | Building/Structural | Framing | Conditional | Kody Boswell | framing inspection at the penthouse Framing inspection for the following exterior walls: - west gable knee wall at penthouse - west wall at levels 2 and 3 - south wall at levels 2 and 3 There is a condition at the west wall where bottom track is not supported and has a cantilever condition. WT to contact EOR for direction. (KB) |
2023/12/28 | Building/Structural | Structural | Passed | Dwayne Mahony | rebar inspection for the remainder of the ramp at the mechanical yard |
2023/12/22 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/22 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/22 | Plumbing | Specialty Piping | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/22 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/22 | Mechanical | Cond. Piping & Test | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/22 | Mechanical | HW Piping & Test | Passed | Neely Lewis | Inspection for Friday per Neely 1. Plumbing - Testing LG, Nitrogen, and DCW/DHW/DHR in Level 1 North/NE 2. HVAC - Testing chilled water, chilled beam water, and heating water in Level 1 North/NE 3. Ductwork- Testing Level 1 south GE and SA |
2023/12/19 | Plumbing | Rough-in | Passed | Neely Lewis | Level 1 Northwest Overhead DWS and LG |
2023/12/19 | Building/Structural | Framing | Passed | Kody Boswell | LG parapet wall framing inspection on the penthouse (north & west parapet walls) LG framing - gable end roof sections (east and west) |
2023/12/19 | Building/Structural | Slab | Passed | Kody Boswell | *Inspection requested by Drew Honnert once FSU was on site* Reviewed reinforcing for stair and ramp at the loading dock (KB) |
2023/12/19 | Plumbing | Specialty Piping | Passed | Neely Lewis | Level 1 Northwest Overhead DWS and LG |
2023/12/19 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | *Inspection requested once FSU was on site* Reviewed reinforcing for portion of loading dock north wall (KB) |
2023/12/14 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Level 1 Men and Women's restrooms in-wall and overhead DWS and DWV |
2023/12/14 | Plumbing | Rough-in | Passed | Neely Lewis | Level 1 Men and Women's restrooms in-wall and overhead DWS and DWV |
2023/12/14 | Building/Structural | Roofing | Passed | Kody Boswell | screw inspection for fire rated plywood on penthouse Fire rated plywood fastening to structure reviewed for the sloped penthouse roofs (KB) |
2023/12/14 | Building/Structural | Framing | Passed | Kody Boswell | framing on penthouse and knee wall. South gable roof LG framing and parapet wall along the north and west sides of the building reviewed (KB) |
2023/12/13 | Building/Structural | Framing | Passed | Kody Boswell | Sheathing attachment to exterior LG walls along north wall of building, levels 2 & 3 (KB) |
2023/12/12 | Fire Safety | Opening Protections | Passed | Tom Deckert | Exterior wall EJ installation reviewed Point was stressed the EJ is applied as a floor to floor seperation and not exterior wall fire rating. System should be installed as presented. |
2023/12/12 | Mechanical | Duct Pressure Test | Passed | Neely Lewis | - Level 2 north SA - Level 2 north EA Oval - Level 2 south SA - Level 2 south EA 3 systems passed. 2 failed, retest on Thursday |
2023/12/12 | Mechanical | Duct Rough-in | Passed | Neely Lewis | - Level 2 north SA - Level 2 north EA Oval - Level 2 south SA - Level 2 south EA |
2023/12/08 | Building/Structural | Framing | Conditional | Kody Boswell | penthouse exterior framing LG penthouse framing and parapet walls reviewed. Parapet wall corner at grids J/4.7 was missing some concrete fasteners and one clip angle connecting concrete slab to vertical parapet LG stud (KB) |
2023/12/05 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | re-inspection for heating hot water for VAVs in Level 1 North Chilled water piping for FCUs in level 1 north 110psi 15 min |
2023/12/05 | Building/Structural | Roofing | Passed | Kody Boswell | galvanized painting of puddle welds on decking at the penthouse Sloped penthouse roof deck puddle welds were painted. Flat roof sections were not done. (KB) |
2023/12/05 | Mechanical | HW Piping & Test | Passed | Neely Lewis | re-inspection for heating hot water for VAVs in Level 1 North Chilled water piping for FCUs in level 1 north 110psi 15 min passed |
2023/12/04 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | We need Rebar inspection at mechanical yard wall and ext. slab at FSU-IRCB on 12-4-23 at 11:00am. We also need a framing inspection on the north side all levels. and Ext. sheeting all levels. Rebar for slab and mech yard wall was tied and place and in substantiall compliance. |
2023/12/04 | Mechanical | CHW Piping & Test | Failed | Neely Lewis | heating hot water for VAV's in level 1 North and chilled water piping for FCU's level 1 north Wrong pressure gauges used. |
2023/12/04 | Mechanical | HW Piping & Test | Failed | Neely Lewis | heating hot water for VAV's in level 1 North and chilled water piping for FCU's level 1 north Wrong pressure gauges used. |
2023/12/04 | Building/Structural | Sheetrock | NOT READY | Kody Boswell | We need Rebar inspection at mechanical yard wall and ext. slab at FSU-IRCB on 12-4-23 at 11:00am. We also need a framing inspection on the north side all levels. and Ext. sheeting all levels. Contractor did not request sheathing inspection while FSU was on site. |
2023/12/04 | Building/Structural | Framing | Passed | Kody Boswell | We need Rebar inspection at mechanical yard wall and ext. slab at FSU-IRCB on 12-4-23 at 11:00am. We also need a framing inspection on the north side all levels. and Ext. sheeting all levels. Exterior LG walls reviewed on levels 1-3, North side of building (except area where buck hoist is located). Interior walls reviewed on level 3. |
2023/11/27 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | Storm system from CL 4 to 3. Still waiting on sway brackets for storm water. |
2023/11/27 | Building/Structural | Framing | Passed | Kody Boswell | Exterior framing on the 2nd and 3rd floor on the NE corner |
2023/11/20 | Building/Structural | Structural | Passed | Kody Boswell | Will need to look at rebar for the loading dock slab, and also exterior framing on the North Rebar for loading dock slab (KB) |
2023/11/20 | Building/Structural | Framing | Passed | Kody Boswell | Will need to look at rebar for the loading dock slab, and also exterior framing on the North LG framing for portion of east roof members, towards the SE corner of the building. LG framing for several interior partition walls on the 3rd floor (KB) |
2023/11/16 | Building/Structural | Framing | Passed | Kody Boswell | Exterior framing inspection on the 3rd floor Exterior sheathing on west and south sides of building have already been reviewed on levels 1 & 2. |
2023/11/14 | Plumbing | Storm Piping & Test | Passed | Dwayne Mahony | Testing storm from levels 2 and 3 in the south |
2023/11/13 | Building/Structural | Framing | Conditional | Kody Boswell | Sills and headers on 3rd floor (north side), parapet wall at penthouse (east side) Parapet wall is missing fasteners towards the north end. Contractor is aware and will finish fastener installation as they turn the corner of the building. The area needing fasteners is currently outside of the safety guard. |
2023/11/13 | Building/Structural | Sheetrock | Passed | Kody Boswell | Sills 3rd floor , headers parapet wall, sheathing for levels 1 and 2 |
2023/11/09 | Building/Structural | Framing | Passed | Kody Boswell | Rebar inspection at the mechanical yard. Header inspection on levels 2 and 3 on the southwest corner |
2023/11/09 | Building/Structural | Structural | Passed | Kody Boswell | Rebar inspection at the mechanical yard. Header inspection on levels 2 and 3 on the southwest corner |
2023/11/09 | Building/Structural | Framing | Passed | Kody Boswell | Exterior sheathing inspection on the west side of the building, levels 2 and 3 (KB) |
2023/11/08 | Building/Structural | Framing | Failed | Kody Boswell | re-inspection of the parapet wall on the penthouse, and inspection of the elevator cap on the penthouse parapet wall is still missing fasteners |
2023/11/08 | Building/Structural | Structural | Passed | Kody Boswell | re-inspection of the parapet wall on the penthouse, and inspection of the elevator cap on the penthouse elevator cap reinforcing was in substantial compliance |
2023/11/07 | Building/Structural | Framing | Failed | Kody Boswell | Framing inspection on the penthouse Reviewed east parapet wall on south portion of building. Each stud was missing one fastener attaching the stud to the floor track. (KB) |
2023/11/02 | Building/Structural | Framing | Conditional | Kody Boswell | Inspection of elevator cap lid. Please bring a harness we will provide a scissor lift for the inspection. Inspection of any exterior and interior framing that is available. West exterior LG wall reviewed on levels 2 and 3. one stud needs to be replaced on level 3. Misc. interior LG walls and drywall top out reviewed on level 2. Two pieces of drywall to be replaced. (KB) |
2023/11/02 | Building/Structural | Structural | NOT READY | Kody Boswell | Inspection of elevator cap lid. Please bring a harness we will provide a scissor lift for the inspection. Inspection of any exterior and interior framing that is available. Elevator cap lid was not accessible to review (KB) |
2023/11/01 | Building/Structural | Framing | Passed | Kody Boswell | Inspection of all bottom track along the south and west side of the building |
2023/10/31 | Building/Structural | Framing | Conditional | Dwayne Mahony | exterior framing inspection along the east side Gap at top of wall/floor in two areas must obtain 2-hour fire rating. Provide national laboratory listed details for all conditions where the concrete floor slab does not completely meet and seal to the exterior framing. 2-hour rating is required for horizontal (floor) separation between stories, per FBC for construction type IB (this building). |
2023/10/27 | Building/Structural | Framing | Conditional | Kody Boswell | Inspection of exterior framing along the east side of the building Damaged studs need to be replaced TI to verify |
2023/10/26 | Building/Structural | Framing | Conditional | Kody Boswell | inspection of the exterior framing along the east side of the building Some locations had missing screws One location with damaged stud Screws to be installed and damaged stud to be replaced |
2023/10/25 | Building/Structural | Structural | Passed | Kody Boswell | inspection of the grand stairs from level 2 to 3 |
2023/10/24 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | storm drain and overflows level 2 and 3 |
2023/10/24 | Building/Structural | Masonry | Passed | Dwayne Mahony | Rebar inspection for the final lift of CMU at the elevator shaft on the penthouse Screw inspection for Level 1 soffit east side, drywall top out on level 2 |
2023/10/24 | Building/Structural | Structural | Passed | Dwayne Mahony | Rebar inspection for the final lift of CMU at the elevator shaft on the penthouse Screw inspection for Level 1 soffit east side, drywall top out on level 2 |
2023/10/20 | Building/Structural | Masonry | Passed | Kody Boswell | Elevator shaft 3rd floor |
2023/10/20 | Building/Structural | Framing | Passed | Kody Boswell | Framing inspection for level 1 and 2 interior walls Bulkhead on lvl 2 has some studs that were cut thru punch at top track. One wall stud damaged on lvl 1. All studs with deficencies listed above to be replaced. |
2023/10/19 | Building/Structural | Masonry | Passed | Kody Boswell | rebar inspection for the second lift of the elevator shaft on the 3rd floor |
2023/10/18 | Building/Structural | Masonry | Passed | Dwayne Mahony | masonry rebar inspection for elevator shaft Final lift on second floor approved for grout. |
2023/10/17 | Building/Structural | Masonry | Passed | Kody Boswell | rebar inspection for the first lift of masonry on the 3rd floor |
2023/10/16 | Building/Structural | Masonry | Passed | Kody Boswell | rebar inspection for 2nd lift on elevator shaft on level 2 |
2023/10/13 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | Level 1 Storm: Areas A, H and all verticals on the East wall exteriors |
2023/10/13 | Building/Structural | Masonry | Passed | Kody Boswell | 1st lift of 2nd floor elevator shaft (KB) |
2023/10/12 | Building/Structural | Masonry | Passed | Kody Boswell | bond beam inspection pump rooms ok (KB) |
2023/10/12 | Building/Structural | Framing | Passed | Kody Boswell | |
2023/10/11 | Building/Structural | Masonry | Passed | Kody Boswell | rebar inspection at pump room 1051 and 1052 |
2023/10/10 | Building/Structural | Masonry | Passed | Kody Boswell | |
2023/10/09 | Building/Structural | Masonry | Passed | Kody Boswell | 2nd lift of masonry walls for pump room (KB) |
2023/10/06 | Building/Structural | Other | NOT READY | Kody Boswell | grand stairs rebar grandstair rebar was postponed due to stair formwork needing to be lowered (KB) |
2023/10/06 | Building/Structural | Masonry | Passed | Kody Boswell | masonry walls masonry walls passed (KB) |
2023/10/06 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | This inspection is for a partial second layer screw inspection North side level 1 top out only. We need to confirm on this inspection how BCA and WT is going to track completed inspections. I will address on your visit. Thanks. |
2023/10/05 | Building/Structural | Masonry | Passed | Dwayne Mahony | Bond beam inspection at pump room 1053 and vertical rebar inspection for second lift of 1056 |
2023/10/04 | Building/Structural | Masonry | Passed | Tom Deckert | Rebar inspection for 2nd lift of elevator shaft RI steel in place Cells clean OK to grout. TI rep on site |
2023/10/03 | Plumbing | Water Piping & Test | Passed | Neely Lewis | |
2023/10/03 | Plumbing | Gas Piping & Test | Passed | Neely Lewis | |
2023/10/03 | Building/Structural | Masonry | Passed | Tom Deckert | vertical rebar at pump room 1056 and 1053 RI steel in place per CD's cells cleaned TI rep. on site |
2023/10/03 | Plumbing | Storm Piping & Test | NOT READY | Neely Lewis | |
2023/10/02 | Building/Structural | Masonry | Passed | Kody Boswell | rebar inspection for second lift on the machine room and elevator shaft on the penthouse |
2023/10/02 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | partial wall rough-in on the 2nd floor |
2023/09/29 | Building/Structural | Framing | Passed | Dwayne Mahony | screw inspection on 1st layer |
2023/09/29 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Portions of the waste and acid drains on 1st floor. |
2023/09/28 | Building/Structural | Masonry | Passed | Kody Boswell | 1st lift of masonry for pump room 1051 (KB) |
2023/09/27 | Building/Structural | Masonry | Passed | Tom Deckert | Masonry walls s pump room lift 2- vertical dowells & lintel steel in place per cd's |
2023/09/26 | Building/Structural | Masonry | Postponed | Kody Boswell | 2nd lift Inspection rescheduled for 9/27/23 due to weather |
2023/09/25 | Building/Structural | Masonry | Passed | Dwayne Mahony | Masonry wall. Elevator shaft, first lift. |
2023/09/22 | Building/Structural | Masonry | Passed | Kody Boswell | knee walls at penthouse and masonry walls. CMU walls for elevator at penthouse level, 1st lift (KB) |
2023/09/22 | Building/Structural | Framing | Passed | Dwayne Mahony | This inspection is to inspect framing on level 1 so we can top out drywall and start MEP. |
2023/09/21 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry walls and knee walls on penthouse. Masonry walls for south pump room on level 1, 1st lift (KB) |
2023/09/21 | Building/Structural | Wall/Ceiling | NOT READY | Kody Boswell | Masonry walls and knee walls on penthouse. Knee walls not ready on penthouse (KB) |
2023/09/20 | Building/Structural | Masonry | Passed | Kody Boswell | we have Masonry walls level 1 and knee walls at the penthouse. rough in level 1. |
2023/09/20 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | we have Masonry walls level 1 and knee walls at the penthouse. rough in level 1. |
2023/09/20 | Plumbing | Rough-in | Passed | Dwayne Mahony | we have Masonry walls level 1 and knee walls at the penthouse. rough in level 1. R.I. of 2 acid waste drains and one sanitary vent in CMU approved. |
2023/09/18 | Electrical | Panel/Feeder | Conditional | Dwayne Mahony | This inspection is to have BCA look at the temp electric service inside our building. Approval is conditional to providing the secondary side of the transformer with a properly sized ground conductor, as discussed. Plan provided is in violation of NEC for ground conductor size, #2 minimum, not #4. |
2023/09/18 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | knee walls |
2023/09/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | knee wall. |
2023/09/12 | Building/Structural | Cast in Place Wall | Passed | Kody Boswell | knee walls |
2023/09/08 | Building/Structural | Structural | Passed | Kody Boswell | Final inspection pour #3 penthouse |
2023/08/28 | Building/Structural | Footing | NOT READY | Kody Boswell | cancelled due to hurricane prep |
2023/08/22 | Building/Structural | Slab | Passed | Dwayne Mahony | Knee wall on Penthouse - Next segment. |
2023/08/21 | Building/Structural | Cast in Place Wall | Conditional | Dwayne Mahony | knee walls and curbs at roof Approved partial segment. |
2023/08/16 | Building/Structural | Slab | Passed | Dwayne Mahony | Final Inspection on Penthouse slab Pour# 1. |
2023/08/15 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 3x columns |
2023/08/14 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | Columns |
2023/08/11 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour 1 Penthouse. |
2023/08/10 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 columns |
2023/08/10 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | This inspection was performed in February 2023. We feel that the temp electric panels TP1, TP2, TP3, have been sitting for 6 months and feel the best practice is to have them reinspected. |
2023/08/09 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 columns |
2023/08/07 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 4 columns at penthouse |
2023/08/03 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 1 column |
2023/08/02 | Building/Structural | Slab | Passed | Dwayne Mahony | Columns vans final on pour3 level 3 |
2023/08/02 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | Columns vans final on pour3 level 3 Approved final 5 round columns. |
2023/08/01 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour#3 level 3 |
2023/08/01 | Building/Structural | Slab | Conditional | Dwayne Mahony | 5 columns and ongoing rebar pour#3 level 3 Slab on-going work, no issues. |
2023/07/31 | Building/Structural | Slab | Conditional | Tom Deckert | In progress- level 3 beam steel in progress of install inspection condition until final deck inspection is compleed TI rep on site |
2023/07/31 | Building/Structural | Cast in Place Column | Passed | Tom Deckert | 5 columns on going rebar pour #3 level 3 I/4.7, J/4.7 F/3.9, G/3.9, I/3.9 RI steel in palce per CD's TI rep on site |
2023/07/28 | Building/Structural | Slab | NOT READY | Dwayne Mahony | 6 columns on going rebar pour #3 level 3. No inspection done for on-going work for next slab section |
2023/07/28 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 6 columns on going rebar pour #3 level 3. |
2023/07/27 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 3x columns |
2023/07/27 | Building/Structural | Footing | NOT READY | Dwayne Mahony | 3x columns Duplicate request so this is N/A. |
2023/07/26 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 colujmns and final for slab on deck pour #2 levl 3 |
2023/07/26 | Building/Structural | Slab | Passed | Dwayne Mahony | 5 colujmns and final for slab on deck pour #2 levl 3 |
2023/07/25 | Building/Structural | Slab | Passed | Dwayne Mahony | 5 columns on going rebar pour 2 level 3 |
2023/07/25 | Building/Structural | Footing | Passed | Dwayne Mahony | 5 columns on going rebar pour 2 level 3 |
2023/07/24 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour 2 level 3. |
2023/07/24 | Building/Structural | Slab | Conditional | Dwayne Mahony | 5 columns and ongoing rebar pour 2 level 3. Work on-going, a couple of minor concerns pointed out to contractor. |
2023/07/21 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | Columns and ongoing rebar pour#2 level 3 |
2023/07/21 | Building/Structural | Slab | Conditional | Dwayne Mahony | Columns and ongoing rebar pour#2 level 3 Slab on-going, doing well. |
2023/07/20 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5X columns |
2023/07/19 | Building/Structural | Slab | Passed | Dwayne Mahony | 2 columns |
2023/07/19 | Building/Structural | Footing | Passed | Dwayne Mahony | 2 columns |
2023/07/18 | Building/Structural | Slab | Passed | Dwayne Mahony | columns and final on slab on deck |
2023/07/18 | Building/Structural | Column | Passed | Dwayne Mahony | columns and final on slab on deck |
2023/07/17 | Building/Structural | Structural | Passed | Dwayne Mahony | LEVEL 3 POUR 1 FINAL AND 5X COLUMNS |
2023/07/13 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5 Columns and ongoing deck pour 1 level 3. |
2023/07/12 | Building/Structural | Footing | Passed | Dwayne Mahony | Columns and ongoing rebar for pour 1 level 1 |
2023/07/10 | Building/Structural | Footing | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour 1 level 3. 5 colums only, no deck inspection due to weather. |
2023/07/07 | Building/Structural | Slab | Passed | Dwayne Mahony | Looking at 5 Columns. please call me with any questions. |
2023/07/05 | Building/Structural | Structural | Passed | Dwayne Mahony | Final Inspection Pour#3 level 2 |
2023/06/30 | Building/Structural | Slab | Passed | Dwayne Mahony | Looking at columns and ongoing slab. |
2023/06/29 | Building/Structural | Structural | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour#3 level 2. |
2023/06/29 | Building/Structural | Footing | Passed | Dwayne Mahony | 5 columns and ongoing rebar pour#3 level 2. |
2023/06/26 | Building/Structural | Slab | Passed | Dwayne Mahony | Final for slab on deck level 2 pour 2. 4 columns. |
2023/06/23 | Building/Structural | Footing | Conditional | Dwayne Mahony | Ongoing rebar pour 2 and columns Approval is contingent on approval from T.I representative. |
2023/06/22 | Building/Structural | Slab | NOT READY | Dwayne Mahony | Ongoing slab pour #2 level 2. More delays due to seemingly endless lightning storms. |
2023/06/21 | Building/Structural | Slab | NOT READY | Tom Deckert | 5 columns and ongoing rebar pour#2 elevated slab Elevated slab steel in progress- Not ready for final inspection |
2023/06/16 | Building/Structural | Footing | Passed | Dwayne Mahony | Looking at 6 columns. 5 approved. |
2023/06/14 | Building/Structural | Slab | Passed | Dwayne Mahony | ongoing elevated slab on pour 1 level 2. Final inspection. Approved with the understanding that the T.I. will verify cut top steel (for recessed door opener) at column is reworked in accordance with a detail to be provided from the SEOR. |
2023/06/13 | Building/Structural | Slab | Conditional | Dwayne Mahony | ongoing elevated deck slab pour 1 On-going work. Contractor reminded that the shoring must be inspected by a P.E., and approval verified by T.I. |
2023/06/12 | Building/Structural | Slab | Passed | Dwayne Mahony | Stem walls on North, 1 column and ongoing rebar level 2 pour #1 2nd level deck, pour 1, on-going work reviewed, no concerns. |
2023/06/12 | Building/Structural | Cast in Place Column | Conditional | Dwayne Mahony | Stem walls on North, 1 column and ongoing rebar level 2 pour #1 One round column being prepared, but has clearance issues. All rebar is correct. T.I. will verify clearance requirements so BCA lists as passed. |
2023/06/09 | Building/Structural | Slab | Passed | Dwayne Mahony | curbs and ongoing beams level 2 |
2023/06/09 | Building/Structural | Footing | Conditional | Dwayne Mahony | curbs and ongoing beams level 2 Level 2 in-progress. No concerns. Conditional is just because it is not yet complete. |
2023/06/08 | Building/Structural | Cast in Place Column | NOT READY | Dwayne Mahony | column and reinspection on grade beam at Mechanical yard |
2023/06/08 | Building/Structural | Slab | Conditional | Dwayne Mahony | column and reinspection on grade beam at Mechanical yard Remaining mechanical yard grade beams approved conditional to finishing the tie installation which will be re-inspected by BNI T.I. representative. No additional columns ready today. |
2023/06/07 | Building/Structural | Slab | Passed | Dwayne Mahony | 3 columns and grade beams at mechanical yard. 3 columns approved. Grade beams not approved due to lack of required ties at beam intersections. |
2023/06/07 | Building/Structural | Footing | Failed | Dwayne Mahony | 3 columns and grade beams at mechanical yard Grade beams fail inspection due to a lack of required ties at the beam intersections. |
2023/06/06 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | columns on line 2 and 1 |
2023/06/05 | Building/Structural | Footing | Passed | Dwayne Mahony | Columns on line 1 and ongoing rebar level 2 deck Columns D E F -2 approved. No inspection on deck 2, work on hold pending rebar conflict issue resolution, new ties to be fabricated.. |
2023/06/02 | Building/Structural | Structural | Passed | Dwayne Mahony | Looking at columns. |
2023/06/01 | Building/Structural | Footing | Passed | Dwayne Mahony | columns and ongoing rebar for level 2 beams. |
2023/05/31 | Building/Structural | Footing | Passed | Dwayne Mahony | Columns and grade beams |
2023/05/30 | Building/Structural | Footing | Conditional | Dwayne Mahony | Columns and ongoing slab Conditional is actually one passed and one failed. Columns approved after minor adjustments. Grade beam at mechanical yard failed. Work is not per approved constucuction documents: 1. Cold joint bulkheads must be at the 1/3 span point of beams, not at end of beam/intersection of primary beam. 2. Beam ties for primary beam must be continuous through the beam, not stopped at pilings (3 foot gap in ties). This is the point of maximum shear, at the piling. 3. Clearance issues and debris to be removed. |
2023/05/26 | Building/Structural | Cast in Place Column | Passed | Tom Deckert | Columns RI steel in place per CDs T-hold rep on site and approved |
2023/05/25 | Building/Structural | Structural | Passed | Tom Deckert | Inspecting 5 columns. Please call me with any questions. Conumn RI steel in place per cd's TI representative on site |
2023/05/24 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | Looking at 5 round columns. |
2023/05/23 | Building/Structural | Slab | Passed | Dwayne Mahony | S.O.G final inspection. |
2023/05/23 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | looking at 2 columns |
2023/05/22 | Building/Structural | Slab | Passed | Dwayne Mahony | We are looking at columns and S.O.G for pour 3. Please call me with any questions. Approved columns at J 4.7, I 4.7, I 3.9 and F 4.8 Slab on grade in progress, no concerns except that any electrical bonding connections between lightning conductors and rebar are to be reinstalled if removed by rebar guys (two such locations observed). |
2023/05/19 | Building/Structural | Slab | Passed | Dwayne Mahony | Looking at 3 columns. S.O.G ongoing. please call me with any questions, Approved columns at G 5, 6 & I 5. Reviewed work in progress for final slab section, no concerns. |
2023/05/18 | Building/Structural | Slab | Passed | Dwayne Mahony | We are looking at columns. Approved columns 7, 8, 9 on line G. This included electrical PVC in the columns. |
2023/05/17 | Building/Structural | Slab | NOT READY | Dwayne Mahony | We will look at columns and stem walls. Tony called and canceled at 9 :30 am, rain delay. |
2023/05/16 | Building/Structural | Slab | Passed | Dwayne Mahony | columns line I, 6, 7, 8. |
2023/05/15 | Building/Structural | Slab | Passed | Tom Deckert | Final Inspection for slab on grade. Minor corrections for concrete cover were in progress. TI rep. will verify prior to pour |
2023/05/11 | Building/Structural | Slab | Passed | Dwayne Mahony | we are inspecting columns on J-line and ongoing for slab-on grade. Please call me with any questions. |
2023/05/11 | Plumbing | Underground | Conditional | Dwayne Mahony | This inspection is for the 4" water main the north Column line I.6 and J Starting at column line 1. This line is under pressure for testing. |
2023/05/10 | Building/Structural | Structural | Passed | Tom Deckert | We will look at columns and S.O.G for pour 2. ongoing. please call me with any questions, RI steel in place Contractor added Chairs to ensure cover while on site. OK to close form and place concrete TI rep. on site |
2023/05/08 | Building/Structural | Slab | Passed | Dwayne Mahony | 3 columns on grid line 11 approved. Pre inspection Pour 2, in progress inspection, conditional approval, bottom bars without contact lap need to be considered for required lap length. |
2023/05/05 | Plumbing | Underground | Conditional | Neely Lewis | under ground S.O.G complete. with head test. 5/5/23: All ok for covering. 10' pressure test on waste and acid waste. Cleanouts required for acid waste and waste lines as they exit the bullding, within 10' of the buiiding edge. FBC2020-P Section 708.1.3. |
2023/05/04 | Building/Structural | Slab | Passed | Dwayne Mahony | Final inspection for S.O.G pour 1. |
2023/05/03 | Plumbing | Underground | Passed | Neely Lewis | Inspection to include a head test Head test . 5/3/2023: Will check on outside building for cleanouts on both PCVC and CPVC lines, and acid resistant Fernwall coupling. |
2023/05/03 | Building/Structural | Slab | Passed | Dwayne Mahony | Pre inspection slab on grade |
2023/05/01 | Building/Structural | Slab | Conditional | Dwayne Mahony | Slab on grade from 11 to 6 In-progress inspection approved conditional to the engineer of record reviewing the slab edge condition at the doorway, and providing either approval or direction for reinforcing bars. |
2023/04/26 | Plumbing | Underground | Passed | Dwayne Mahony | Continuing the underground at column line 4.7.and J line. |
2023/04/26 | Electrical | Underground | Passed | Dwayne Mahony | This inspection is to capture the floor boxes at column line X.1 - 15. |
2023/04/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Fire stand pipe at north east of Building at line 1 and I.6 4/26/2023 4inch and 6inch standpipe stub in inspected. Passed |
2023/04/21 | Plumbing | Underground | Passed | Neely Lewis | Millers will be performing the head test for the underground plumbing from Column line 11 towards column line 6. |
2023/04/20 | Building/Structural | Footing | Passed | Tom Deckert | Grade beam complete on I.6 and stem wall. RI steel in place per CD's TI Rep on site |
2023/04/19 | Building/Structural | Footing | NOT READY | Tom Deckert | stem wall on line 1. Inspection rescheduled for 4-20-23 |
2023/04/17 | Building/Structural | Footing | Passed | Tom Deckert | Inspection for grade beam and caps on grid line I.6 from GL 1 to 4.7. with caps on I.6,1 / I.6, 2 RI steel in place per CDs. TI Rep on site |
2023/04/12 | Building/Structural | Footing | Passed | Tom Deckert | Stem wall on line 1 Wall RI steel installed per approved documents |
2023/04/11 | Building/Structural | Footing | Passed | Tom Deckert | Light poles at south parking lot 3 light pole based with electric RI- RI steel per documents |
2023/04/06 | Building/Structural | Footing | Passed | Tom Deckert | Stem wall online 1 from C to E.75. stem wall RI steel in place- sleeve detail being reviewed by SEOR TI rep on site |
2023/04/05 | Building/Structural | Footing | Passed | Mary Jo Spector | columns at elevator pit. RI steel in palce per CD's TI rep on site and passed inspection |
2023/04/04 | Building/Structural | Footing | Passed | Tom Deckert | We will look at grade beams and elevator wall complete Deficienceies in elevator wall and grade beam resolved Contractor awaiting dowell |
2023/04/04 | Electrical | Underground | Passed | Tom Deckert | Looking for an underground primary conduits at the Utility Yard. Conbduti material and depth verified, install was accepted by COT |
2023/04/03 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | We will be testing the underground chilled water pipes. 4/3: Pressure tested at 150 PSI. Held for 20 minutes. Ready for insulation to be completed. |
2023/04/03 | Building/Structural | Footing | Conditional | Tom Deckert | We will look at grade beam on line 1 from E.5 to I.6 and grade beam on I.6 from 1 to 1.75. Walls on elevator complete and columns on elevator slab. Please call me with any questions. Design steel in place per CD's contractor waiting on EOR to provide detail fro Bulkhead steel on Grade beam |
2023/03/31 | Building/Structural | Footing | Passed | Tom Deckert | looking at stem wall on grid line J from 8.5 to 10. Grade beam on line 1 and caps. RI steel in place per CD's TI rep on site and approved installation |
2023/03/31 | Electrical | Underground | Passed | Tom Deckert | We are requesting an underground inspection for the secondary transformer conduits in the utility yard. Conduits material and placement per design spec. Contractor advised additional inspection of conduits under structural slabs will be conducted by inspector on random basis when on site. |
2023/03/30 | Building/Structural | Footing | Passed | Tom Deckert | We need an inspection at FSU-IRCB on 3-30-23 at 11:00am. We will be looking at grade beam on A.6 , 1 from 4 to 1.3 and from A.6 to C on 1.3. And grade beam from 1 to from C to D.5. Possible wall section on J. All RI steel in place per CD;s TI on site and passed inspection |
2023/03/29 | Building/Structural | Footing | Passed | Tom Deckert | Looking at caps on I,4.7 /A.6 1/ Grade beams on A.6 ,Stem wall on J All RI steel in palce per CD's TI authorized Rep on site and passed inspection |
2023/03/28 | Building/Structural | Footing | Passed | Tom Deckert | We will look at the elevator slab with Caps. we will also look at Caps RI steel in place per CD's TI rep on site and passed inspection |
2023/03/24 | Building/Structural | Footing | Passed | Mary Jo Spector | we will look at caps on line 2 and 3. Please call me with questions. Thank you. Neely, Reinforcing steel at column caps H.1, I.2, and F.4 was inspected and approved. It was installed per the construction drawings. Contractor to remove debris at bottom prior to pouring concrete. Threshold inspector was onsite and approved the three column caps. Best, Mary Jo |
2023/03/23 | Building/Structural | Footing | Passed | Mary Jo Spector | Caps on line 2,3 and 4.7 including dilution pit walls. with possible 2 or 3 more caps at different location Neely, Reinforcing steel for pile caps at I.5 and F.2 was inspected. It was installed per the construction drawings. There was a bottom clearance (3 min.) issue noted at F.2. This was brought to the attention of the threshold inspector (Kody Boswell) and Tony Flores. Kody to verify that this is corrected prior to the concrete pour. Otherwise, the steel was approved. Debris at the bottom was noted and to be removed prior to the pour. The fiberglass rebar for the walls of the dilution pit was inspected and it was installed per the construction drawings. It was approved. The grade beam at column line J was reinspected. The corrective work noted by the threshold inspector on the previous day was done. This was approved. Threshold inspector (Kody Boswell) was present at the site. Best, Mary Jo |
2023/03/22 | Building/Structural | Footing | Passed | Mary Jo Spector | Inspection will be on J line grade beam and caps from 9.5 to 4.8. Caps on line 2 and 3. Reinforcing steel for pile caps A.2, E.2, and E.3 was inspected and approved. Concrete is not being poured until Thursday. Grade beam reinforcing steel along Column Line J was inspected and is conditionally approved. I will return Thursday to reinspect. Concrete will not be poured until Thursday. Reinforcing steel was installed per the construction documents. Threshold inspector (Kody Boswell) was onsite. |
2023/03/21 | Building/Structural | Footing | Passed | Mary Jo Spector | Caps on C,3 / D,3/C.5,2 /D,2 /D,4/E,5 Possible grade beam on J and caps. I inspected the reinforcing steel at Column caps B.3, C.3, C.5.2, D.2, D.3, D.4 and F.3. It was installed per the AE documents and all seven locations were approved. The threshold inspector (Kody Boswell) was present, and he approved the same 7 locations as well. Best, Mary Jo |
2023/03/20 | Building/Structural | Footing | Passed | Mary Jo Spector | We will look at grade beams and caps on Line J up to grid line 5. Also, 3 caps on 3. Neely, Inspection passed. Reinforcing steel inspected at pile caps C4 and B2 was per construction documents. Threshold inspector (Kody Boswell) was onsite for the inspection. Mary Jo |
2023/03/17 | Building/Structural | Footing | Passed | Tom Deckert | WE need an inspection on 3-17-23 at 11:00am for caps on gridlines I,7 / I,5 G,5 . Grade beam on Line J from 9.5 to 7.5 with caps on J,9 and J,8 RI steel in place per CD's TI representative on site |
2023/03/16 | Building/Structural | Footing | Passed | Tom Deckert | Looking at grade beam and pile caps on line A.6, Cap on b.4 all RI steel in place per Construction documents TI rep on site and confirmed results |
2023/03/15 | Building/Structural | Footing | Passed | Tom Deckert | We are inspecting the dilution Pit. With caps on G line and I line and grade beam following the pour 7 stop on X.1 Dilution pit - all reinforing material (fiberglass) in place per construction documents. waterproofing liner inspected by thirdparty prior to placement. Caps and Beams- RI steel in place per CD's. TI rep on site and confirmed conditions |
2023/03/14 | Building/Structural | Footing | Passed | Tom Deckert | Inspection will be on grade beam in grids line J and 11 , cap J,11 and grade beam on 15. We will be inspecting Grade beams on grid Line 11 and J. Cap on J,11/ Grade beam on GL 15.75 from X.5 to X.2 to 15.5. Caps on X,1 / X,2 X,3 /X,5 **ALSO, THE SITE IS PRETTY MUCKY SO BRING RUBEER BOOTS JUST INCASE** Inspected above work- All steel in palce per CD's TI rep on site conducting inspection |
2023/03/10 | Building/Structural | Footing | Passed | Tom Deckert | Inspection on Line J grade beam from Gridline 10 to 9.5 and Caps on J,10 / J,9. All steel in place per construction documents. TI inspection completed and confirmed |
2023/03/09 | Building/Structural | Footing | Passed | Tom Deckert | We need inspection on 3-9-23 at 11:00am for Grade beams on line F.4 from 9.5 to 16. And grade beam on 16 from F to D.5. Including caps on line F.4 ,9,8,7,6 and on line E,16. Steel in palce per CD's TI on site and completed his inspection |
2023/03/08 | Building/Structural | Footing | Passed | Tom Deckert | Inspection will be on caps I 6&7 steel in palce per cds. Bar size, quantity and placement verified |
2023/03/07 | Building/Structural | Footing | Passed | Tom Deckert | we are inspecting 3 caps on Gride line on I,7 / G,7 and picking up the grade beam on line F.4 to line 6.4 all steel in place per CD's |
2023/03/06 | Building/Structural | Footing | NOT READY | Tom Deckert | Grade Beam F.4 from 9.5 to 8.5 , Caps on Gridline F.4, 9 / G,9 Grade beam / pile caps steel install not completed |
2023/03/03 | Building/Structural | Footing | Passed | Tom Deckert | Caps on Gridline I, 10 / Gride line G,10 and Gridline F.1 ,10. Please call me with any questions. 5 Pile caps as indicated above Cap steel and column steel in place per cd's - TI rep on site and verified install |
2023/03/02 | Building/Structural | Footing | Passed | Tom Deckert | Inspection on rebar our first pour Visual inspection conducted steel in place per CD's TI on site for inspection |
2023/02/17 | Electrical | Ground | Passed | Andy Howard | This an inspection for the temp electric service on our project. Andy Howard met with Adam Dodson and Casey Dodson for the temporary job site electric service equipment installation. The equipment installed matches the CDs prepared by Toby Smith dated February 9th, 2023 Sheet TCE-1 Revision 2 with the following exception: as to be expected, not all the circuits are connected in panels TP1, TP2, and TP3. The equipment was checked for compliance with 2017 NEC service equipment requirements and labeled with FSU BCA's green sticker therby allowing the equipment to be energized by the servicing utility provider. |
2023/02/10 | Building/Structural | Final Building | Passed | Andy Howard | This will be the final for the construction trailer. The trailer tiedowns were installed according to the submitted documents. The ADA ramp meets code requirements. This completes the required inspections for the GC's construction trailers. Andy Howard met with Joshua Rodriguez of Whiting-Turner at the site. |
2023/02/10 | Electrical | Service Release | NOT READY | Andy Howard | This inspection is for the Temp job site service. Lewis & Thompson will be on site. This inspection is pending FSU BCA reviewed and approved engineered electrical drawings. Andy Howard spoke with Adam Dodson by telephone - this inspection is listed as not ready. When the CDs for this work are completed, Lewis & Thompson/Whting-Turner will reschedule the final electrical inpection with FSU BCA. |
2023/02/09 | Fire Safety | Final Fire Safety | Passed | Mary Creason | This is for the construction trailer... |
2023/01/09 | Building/Structural | Final Building | Conditional | Andy Howard | This is the final for our job site trailers on the project site. Andy Howard and Mary Creason both fropm FSU BCA, Scott Melber, Drew Honnert, and Tony Flores were present when this inspection was conducted. The accessible ramp is not yet installed and the final fire safety inspection is not yet passed. When these two items are completed, the final building inspection can be passed. Please schedule a follow up final building inspection when the previous two items are completed. |
2023/01/09 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | This is the fire final for our construction trailers on the project site. One fire extinguisher not state certified in main building at exit door. Fire extinguisher needs to be hung in storage trailer. Emergency light required in break area if occupancy over 50 people. (Considered Assembly occupancy) |
2022/11/14 | Electrical | Panel/Feeder | Passed | Andy Howard | This inspection is for our temp electric to our construction trailers. They sit across the street and in front of the Engineering School on Engineer way. ndy Howard/FSU BCA, Tom Deckert/FSU BCA, Trevor Kraeutler/ W-T, Drew Honnertr/W-T, Adam and Casey Dodson/ L&T Electric, et.al. were present for this inspection. The underground secondary feeders from the utility company transformer to the two temporary 400 amp service meter sockets and breaker panel combination were inspected for this project The services consist of two separate 400 amp meter socket panels numbered 2001-1 and 2001-2, and two 400 amp capacity circuit breaker panels. This portion of the work is the under ground service entrance conductors feeding the meter socket service equipment. One of the two 400 amp service panels feeds one manufactured building, and the other 400 amp panel feeds a complex of four connected together manufactured buildings. This portion of the work was installed and meets the requirements of the 2017 National Electrical Code Article 230 for Service Requirements and Article 250 for Grounding and Bonding Requirements. An FSU BCA sticker was attached to the each of the two meter socket panels 2001-1 and 2001-2 indicating the the panels are released by FSU BCA to be energized by the utility company. The two 400 amp service circuit breaker panels were inspected under a separate service panel to five separate structure subpanels. See Electric - Panel/Feeder inspection performed the same day. The service panels as well as the structure subpanels passed inspection as well. |
2022/11/14 | Electrical | Underground | Passed | Andy Howard | This inspection is for temporary electric to the site construction trailers. The trailers sit across the street and in front of the Engineering School on Engineer Way. Andy Howard/FSU BCA, Tom Deckert/FSU BCA, Trevor Kraeutler/ W-T, Drew Honnert/W-T, Adam and Casey Dodson/ L&T Electric, et.al. were present for this inspection. The underground secondary feeders from the utility company transformer to the two temporary 400 amp service meter sockets and breaker panel combination were inspected for this project The services consist of two separate 400 amp meter socket panels numbered 2001-1 and 2001-2, and two 400 amp capacity circuit breaker panels. This portion of the work is the under ground service entrance conductors feeding the meter socket service equipment. One of the two 400 amp service panels feeds one manufactured building, and the other 400 amp panel feeds a complex of four connected together manufactured buildings. This portion of the work was installed and meets the requirements of the 2017 National Electrical Code Article 230 for Service Requirements and Article 250 for Grounding and Bonding Requirements. An FSU BCA sticker was attached to the each of the two meter socket panels 2001-1 and 2001-2 indicating the the panels are released by FSU BCA to be energized by the utility company. The two 400 amp service circuit breaker panels were inspected under a separate service panel to five separate structure subpanels. See Electric - Panel/Feeder inspection performed the same day. The service panels as well as the structure subpanels passed inspection as well. |
2022/06/21 | Building/Structural | Footing | Passed | Tom Deckert | 7- level 2 columns inspected- RI steel in place per cd's TI representative on site |
2019/07/20 | Building/Structural | Cast in Place Column | Passed | Dwayne Mahony | 5X columns |
Building/Structural | Roofing | Postponed | Dwayne Mahony | Llyod roofing and Whiting-Turner would like to have the roofing slab inspected for primer and Vapor barrier. Postponed to go over roofing submittals with WT | |
Building/Structural | Slab | Dwayne Mahony | |||
Electrical | Wall Rough-in | Alex Masterton | Requesting inwall electrical inspection: - Level 3 furred wall shaft 1 and 2 - Penthouse stairs 2 inwall | ||
Building/Structural | Framing | Cancelled | Dwayne Mahony | Framing and sheeting for the parapet wall that was left out for the transport platform on the penthouse | |
Building/Structural | Sheetrock | Cancelled | Dwayne Mahony | Framing and sheeting for the parapet wall that was left out for the transport platform on the penthouse | |
Electrical | Final Electrical | Postponed | Rocky Wilde | Requesting reinspection/continuation of final electrical inspection for Level 1, 2, 3, penthouse, and exterior at IRCB. | |
Plumbing | Underground | Dwayne Mahony | |||
Electrical | Re-Inspection | Postponed | Rocky Wilde | Requesting reinspection/continuation of final electrical inspection for Level 1, 2, 3, penthouse, and exterior at IRCB. | |
Building/Structural | Final Building | Al Smythe | This inspection is to have a final walk through the building. I will invite Sam Sevor to join us on the walk per his request. | ||
Electrical | Re-Inspection | Cancelled | Rocky Wilde | Requesting reinspection/continuation of final electrical inspection for Level 1, 2, 3, and penthouse at IRCB. | |
Building/Structural | Footing | Tom Deckert | Stem wall complete on line I.6 from 2.25 to 4.7 | ||
Building/Structural | Slab | Passed | Alex Masterton | This inspection is to have FSU look at the IT duct bank required for the project. | |
Building/Structural | Footing | NOT READY | Dwayne Mahony | Ongoing Rebar Pour 1 level 3. please call me with any questions. Rain delay. | |
Plumbing | Rough-in | NOT READY | Neely Lewis | in wall rough in. | |
Building/Structural | Slab | NOT READY | Dwayne Mahony | Columns on level 3 Canceled, not ready. | |
Building/Structural | Slab | NOT READY | Dwayne Mahony | knee wall at penthouse | |
Building/Structural | Footing | NOT READY | Dwayne Mahony | ||
Building/Structural | Footing | NOT READY | Dwayne Mahony | columns and final pour 1 levl 3 Canceled due to heavy rain | |
Electrical | Ceiling Rough-in | Passed | James Melvin | Requesting MEP OH inspections for the following: - Level 2 Corridor 2000, 2000E, 2000F, 2060, 20261, 2061A, 2062, 2062A, 2063, 2063A, 2064, 2064A, 2096, 2097, 2098 1) panels SEGL2, 3GL6, 3GL9,3GL10 WERE NOT READY |
BCA Project #: 21-03205- Critchfield Hall - Classroom Improvements
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/02/27 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | Need Fire alarm and sprinkler ROC. All other violations completed. NOTE: Address on building is the responsibility of FSU not Southern standard. I inform Phil from Critchfield building maintenance that Numbers are required on building or a sign at front of property) |
2023/12/08 | Electrical | Final Electrical | Failed | Dwayne Mahony | Items from previous inspection have not been corrected. New breaker for feeder to new panel H1A is not a new breaker, rather a used old breaker that the AIC rating is inadequate for the panel has been installed. Install adjustable trip breaker as per plans. |
2023/12/08 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | Final The following items are still outstanding: 1. Need Fire alarm and sprinkler final paperwork 2. Em. Light not working near water fountain/kitchen 3. EXIT sign over the front entrance door not working 4. Em. Light over main door discharge did not work when tested. NEW item : need address on building and Sign stating where sprinkler risers located on outside door to riser room. |
2023/12/08 | Building/Structural | Final Building | Failed | Dwayne Mahony | Grab bar in one of the accessible toilet rooms is missing. |
2023/11/15 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | 1. Need final paperwork from Fire alarm and sprinkler contractors 2. Emergency light did not work near kitchen area. 3. Exterior em. Light at front exit door was not installed as required on plans. |
2023/11/15 | Fire Safety | Final Fire Sprinkler | Conditional | Mary Creason | Need to provide the Contractors Material and Test certificate for Aboveground piping. NFPA 13: 25.1(3) edition 2016 |
2023/11/15 | Fire Safety | Final Fire Alarm | Conditional | Mary Creason | Fire Alarm final paperwork is required. Devices worked when tested |
2023/11/07 | Mechanical | Final Mechanical | Conditional | Dwayne Mahony | Provide test and balance report. Of specific interest will be control and operation of the toilet room (s) exhaust fan. This fan was not running at time of inspection. The plans call for toilet room doors to have 1 1/2" undercut, for "return air", which may have been intended to be for exhaust make-up air. The doors have some undercut; the architect is to determine if this is satisfactory. |
2023/11/07 | Building/Structural | Final Building | Conditional | Dwayne Mahony | Install the accessible parking sign as noted on the plans. Install signage for the toilet rooms. |
2023/11/07 | Electrical | Final Electrical | Conditional | Dwayne Mahony | This building has two separate electrical services. These have long ago been installed in violation of basic NEC requirements, and must be corrected: 1. The 200 amp service is not grounded. This is a fundamental life safety hazard, and must be corrected by installing a lug in the fuse box, and running a #4 minimum conductor the grounding electrode (water pipe) at panel MDP. 2. NEC 230.2(E) requires each service to be identified (in this case Service 1 of 2, Service 2 of 2, with system voltages listed (in this case service 1 is 120/208 volts, three phase, and service two is 120/240 volts, single phase). Identifying multiple services is important for emergency personnel trying to de-energize a building. Identifying voltages and phases is important to electrical service technicians. 3. Identify where the circuit breaker is that feeds new panel H1A. No 200 amp breaker located. |
2023/09/28 | Fire Safety | Final Fire Safety | NOT READY | Mary Creason | Need to call in sprinkler and fire alarm finals Also trade finals. |
2023/06/15 | Building/Structural | Framing | Passed | Dwayne Mahony | Approved the soffit framing over the main entry bar/counter. |
2023/02/23 | Building/Structural | Masonry | Passed | Tom Deckert | Rebar for 8' bond beam- RI steel in place per CD's. All cells clean for grout placement. |
2023/02/08 | Building/Structural | Masonry | Passed | Andy Howard | Andy Howard met with Travis Sullivan for this inspection. The first lift of vertical masonry passed inspection. |
2023/02/06 | Building/Structural | Slab | Passed | Andy Howard | FaceTime call with Andy. This inspection was performed using video telephone between Andy Howard and Travis Sullivan on 02/06/2023. |
2023/01/20 | Building/Structural | Footing | Passed | Andy Howard | Andy Howard met with Travis Sullivan and Mike Walker/Gulf Coast Masonry for this inspection. Footer width, depth, and steel sizes and placement were as per plans. Inspection passed. |
2023/01/11 | Electrical | Ceiling Rough-in | Passed | Andy Howard | Andy Howard/FSU BCA, Travis Sullivan/Southern, and Shannon Stephens/L&L Electric met for this inspection. The second floor junction boxes and conduits were inspected for above ceiling installation. This inspection was done at 11:15 A.M. est. |
2022/11/21 | Building/Structural | Sheetrock | Passed | Tom Deckert | Wall Patches secured OK to finish |
2022/11/15 | Electrical | Wall Rough-in | Passed | Andy Howard | Andy Hoard, Neely Lewis, Travis Sullivan, and Shannon Stephens were present for the stud wall framing and electrical wall rough inspections. Both inspections passed. |
2022/11/15 | Building/Structural | Framing | Passed | Andy Howard | Andy Hoard, Neely Lewis, Travis Sullivan, and Shannon Stephens were present for the stud wall framing and electrical wall rough inspections. Both inspections passed. |
Mechanical | Final Mechanical | Neely Lewis | Final |
BCA Project #: 20-03138- Keen Building Re-Roofing
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/02/07 | Electrical | Final Electrical | Conditional | Andy Howard | Final Electrical: Andy Howard, Neely Lewis, Sean Mitchell, Travis Marchant, Kent Malik, Matt Ganskop, Mark Poindexter, and Kurt Koetz were present for this joint inspection. The panel on the roof requires a permanent placard identifying the panel, the feed from panel, and the circuit breaker associated with the new exhaust fan. 2017 NEC 408.4 field identification of new equipment. |
2023/02/07 | Mechanical | Final Mechanical | Failed | Neely Lewis | 1. Roof drains appear to not be installed according to manufacturers instructions, including the interfacing of the roof membrane with the roof drain. The hole cut into the membrane is smaller than the bowl below it. See Zurn product literature rd-cvr-21. 2. Condensate lines from the package a/c units need to be secured to the roof. FBC2020-M Section 301.15. |
2023/02/07 | Building/Structural | Roof Final | Conditional | Andy Howard | Roof Final Building Inspection: Andy Howard, Neely Lewis, Sean Mitchell, Travis Marchant, Kent Malik, Matt Ganskop, Mark Poindexter, and Kurt Koetz were present for this joint inspection. The final building inspection is dependent on the final mechanical deficiencies and the final electrical deficiencies to be corrected. Once Final Mechanical and Final Electrical pass, the Final Building can be passed. See the final mechanical and final electrical results for dificiencies. |
2023/01/10 | Building/Structural | Roofing | Passed | Andy Howard | Andy Howard/FSU BCA met with Matt Ganskop and Nick Polovich of OWC at the walk way concrete roof covering the sidewalk between Keen and Collins. This inspection was for the MDC Product Approved Siplast Liquid Applied Roof Coating. This stage of the work included approximately 70% of the roof area with the first stage of the installation which includes a coating directly on the existing coating, a textile membrane, and a coating on top of the membrane. This is stage one of a multilayer installation - see the MDCPA for the exact steps. This is an inprogress inspection. A final inspection is required. |
2022/09/06 | Building/Structural | Roofing | Passed | Andy Howard | Andy Howard, Sean Mitchell, Kent Malik, and John Travis Marchant of FSU and Jacob Winters of OWC met for a cap sheet inprogress inspection. The cap inprogress passed, however, the FSU Design team and Project Manager discussed multiple quality control tems to be reworked. John Travis Marchant will be producing a report on the items that were discussed. |
2022/08/18 | Building/Structural | Roofing | Conditional | Tom Deckert | This work was concealed without BCA inspection. AOR and Manufacturers inspections will be reviewed for records and acceptance. Contractor needs to verify roof drains / capacities and wall flashing detail. Note- Contractor ceased torching activities until 2 charged extinguishers were on site. |
BCA Project #: 17-02732- Mission Road Main House - New Open Pole Barn
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2018/04/24 | Fire Safety | Final Fire Safety | Passed | Gail Ivey | Fire Extinguisher is mounted correctly |
2018/04/20 | Building/Structural | Final Building | Failed | Dwayne Mahony | Dwayne Thanks for going to the inspection this afternoon. I will stop by Monday morning to discuss with you and Tom. Have a nice weekend. Brian Cannady FSU Design and Construction |
2018/04/06 | Building/Structural | Footing | Passed | Dwayne Mahony | Approved for concrete placement into foundation holes at posts. |